[Federal Register Volume 89, Number 164 (Friday, August 23, 2024)]
[Notices]
[Pages 68236-68238]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-19034]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Submission Deadline for Schedule Information for 
Chicago O'Hare International Airport, John F. Kennedy International 
Airport, Los Angeles International Airport, Newark Liberty 
International Airport, and San Francisco International Airport for the 
Summer 2025 Scheduling Season

AGENCY: Department of Transportation, Federal Aviation Administration 
(FAA).

ACTION: Notice of submission deadline.

-----------------------------------------------------------------------

SUMMARY: Under this notice, the FAA announces the submission deadline 
of October 10, 2024, for Summer 2025 flight schedules at Chicago O'Hare 
International Airport (ORD), John F. Kennedy International Airport 
(JFK),

[[Page 68237]]

Los Angeles International Airport (LAX), Newark Liberty International 
Airport (EWR), and San Francisco International Airport (SFO).

DATES: Schedules should be submitted by October 10, 2024.

ADDRESSES: Schedules may be submitted to the Slot Administration Office 
by email to: [email protected].

FOR FURTHER INFORMATION CONTACT: Al Meilus, Manager, Slot 
Administration and Capacity Analysis, AJR-G, Federal Aviation 
Administration, 800 Independence Avenue SW, Washington, DC 20591; 
telephone (202) 267-2822; email [email protected].

SUPPLEMENTARY INFORMATION: This document provides routine notice to 
carriers serving capacity-constrained airports in the United States, 
including ORD, JFK, LAX, EWR, and SFO. In particular, this notice 
announces the deadline for carriers to submit schedules for the Summer 
2025 scheduling season.

General Information for All Airports

    The FAA has designated JFK as an IATA Level 3 airport consistent 
with the Worldwide Slot Guidelines (WSG).\1\ The FAA currently limits 
scheduled operations at JFK by order that expires on October 24, 
2026.\2\
---------------------------------------------------------------------------

    \1\ The FAA generally applies the WSG to the extent there is no 
conflict with U.S. law or regulation. The FAA recognizes the WSG has 
been replaced by the Worldwide Airports Slot Guidelines (WASG) 
edition 1, effective June 1, 2020, WASG edition 2, effective July 1, 
2022, and most recently, WASG edition 3, effective April 1, 2024. 
The WASG is published jointly by Airports Council International-
World, IATA, and the Worldwide Airport Coordinators Group (WWACG). 
While the FAA is considering whether to implement certain changes to 
the Guidelines in the United States, it will continue to apply WSG 
edition 9.
    \2\ Operating Limitations at John F. Kennedy International 
Airport, 73 FR 3510 (Jan. 18, 2008), as most recently extended 89 FR 
41486 (May 13, 2024). The slot coordination parameters for JFK are 
set forth in this Order.
---------------------------------------------------------------------------

    The FAA has designated EWR, LAX, ORD, and SFO as IATA Level 2 
airports \3\ subject to a schedule review process premised upon 
voluntary cooperation. The Summer 2025 scheduling season is from March 
30, 2025, through October 25, 2025, in recognition of the IATA Summer 
scheduling period.
---------------------------------------------------------------------------

    \3\ These designations remain effective until the FAA announces 
a change in the Federal Register.
---------------------------------------------------------------------------

    The FAA is primarily concerned about scheduled and other regularly 
conducted commercial operations during designated hours, but carriers 
may submit schedule plans for the entire day. The designated hours for 
the Summer 2025 scheduling season are: at EWR and JFK from 0600 to 2300 
Eastern Time (1000 to 0300 UTC), at LAX and SFO from 0600 to 2300 
Pacific Time (1300 to 0600 UTC), and at ORD from 0600 to 2100 Central 
Time (1100 to 0200 UTC). These hours are unchanged from previous 
scheduling seasons.
    Carriers should submit schedule information in sufficient detail 
including, at minimum, the marketing or operating carrier, flight 
number, scheduled time of operation, frequency, aircraft equipment, and 
effective dates. IATA standard schedule information format and data 
elements for communications at Level 2 and Level 3 airports in the IATA 
Standard Schedules Information Manual (SSIM) Chapter 6 may be used. The 
WSG provides additional information on schedule submissions at Level 2 
and Level 3 airports. Some carriers at JFK manage and track slots 
through FAA-assigned Slot ID numbers corresponding to an arrival or 
departure slot in a particular half-hour on a particular day of week 
and date. The FAA has a similar voluntary process for tracking 
schedules at EWR with Reference IDs, and certain carriers are managing 
their schedules accordingly. The primary users of IDs are United States 
and Canadian carriers that have the highest frequencies and 
considerable schedule changes throughout the season and can benefit 
from a simplified exchange of information not dependent on full flight 
details. Carriers are encouraged to submit schedule requests at those 
airports using Slot or Reference IDs.
    As stated in the WSG, schedule facilitation at a Level 2 airport is 
based on the following: (1) Schedule adjustments are mutually agreed 
upon between the carriers and the facilitator; (2) the intent is to 
avoid exceeding the airport's coordination parameters; (3) the concepts 
of historic precedence and series of slots do not apply at Level 2 
airports, although WSG recommends giving priority to approved services 
that plan to operate unchanged from the previous equivalent season at 
Level 2 airports; and (4) the facilitator should adjust the smallest 
number of flights by the least amount of time necessary to avoid 
exceeding the airport's coordination parameters. Consistent with the 
WSG, the success of Level 2 in the United States depends on the 
voluntary cooperation of carriers.
    The FAA considers several factors and priorities that are 
consistent with the WSG as it reviews schedule and slot requests at 
Level 2 and Level 3 airports, including (1) historic slots or services 
from the previous equivalent season over new demand for the same 
timings; (2) services that are unchanged over services that plan to 
change time or other capacity relevant parameters; (3) introduction of 
year-round services; (4) effective period of operation; (5) regularly 
planned operations over ad hoc operations; and (6) other operational 
factors that may limit a carrier's timing flexibility.
    The FAA seeks to maintain close communications with carriers and 
terminal schedule facilitators on potential runway schedule issues or 
terminal and gate issues that may affect the runway times. In addition 
to applying these priorities from the WSG, the U.S. Government has 
adopted a number of measures and procedures to promote competition and 
new entry at U.S. slot-controlled and schedule-facilitated airports.
    Slot management in the United States differs in some respect from 
procedures in other countries. In the United States, the FAA is 
responsible for facilitation and coordination of runway access for 
takeoffs and landings at Level 2 and Level 3 airports; however, the 
airport authority or its designee is responsible for facilitation and 
coordination of terminal/gate/airport facility access. The process with 
the individual airports for terminal access and other airport services 
is separate from, and in addition to, the FAA schedule review based on 
runway capacity.
    Generally, the FAA uses average hourly runway capacity throughput 
for airports and performance metrics in conducting its schedule review 
at Level 2 airports and determining the scheduling limits at Level 3 
airports included in FAA rules or orders.\4\ The FAA also considers 
other factors that can affect operations, such as capacity changes due 
to runway, taxiway, or other airport construction, air traffic control 
procedural changes, airport surface operations, and historical or 
projected flight delays and congestion.
---------------------------------------------------------------------------

    \4\ The FAA typically determines an airport's average adjusted 
runway capacity or typical throughput for Level 2 airports by 
reviewing hourly data on the arrival and departure rates that air 
traffic control indicates could be accepted for that hour, commonly 
known as ``called'' rates. The FAA also reviews the actual number of 
arrivals and departures that operated in the same hour. Generally, 
the FAA uses the higher of the two numbers, called or actual, for 
identifying trends and schedule review purposes. Some dates are 
excluded from analysis, such as during periods when extended airport 
closures or construction could affect capacity.
---------------------------------------------------------------------------

    Finally, the FAA notes that the schedule information submitted by 
carriers to the FAA may be subject to disclosure under the Freedom of 
Information Act (FOIA). The WSG also provides for release of 
information at certain stages of slot coordination and

[[Page 68238]]

schedule facilitation. In general, once it acts on a schedule 
submission or slot request, the FAA may release information on slot 
allocation or similar slot transactions, or schedule information 
reviewed as part of the schedule facilitation process. The FAA does not 
expect that practice to change, and most slot and schedule information 
would not be exempt from release under FOIA. The FAA recognizes that 
some carriers may submit information on schedule plans that is both 
customarily and actually treated as private. Carriers that submit such 
confidential schedule information should clearly mark the information, 
or any relevant portions thereof, as proprietary information 
(``PROPIN''). The FAA will take the necessary steps to protect properly 
designated information to the extent allowable by law.

EWR General Information

    Consistent with the WSG, carriers are asked for their voluntary 
cooperation to adjust schedules to meet the targeted scheduling limits 
in order to minimize potential congestion and delay. For the Summer 
2025 scheduling season, the voluntary, targeted hourly scheduling 
limits remain at 77 operations and 41 operations per half-hour.\5\ To 
help with a balance between arrivals and departures, the targeted 
maximum number of scheduled arrivals or departures, respectively, is 41 
in an hour and 22 in a half-hour. These targets are expected to allow 
some higher levels of operations in certain periods (not to exceed the 
hourly limits) and some recovery from lower demand in adjacent periods. 
Consistent with general established practice at EWR, the FAA will 
accept flights above the limits if the flights were operated as 
approved, or treated as operated, by the same carrier on a regular 
basis in the previous corresponding season (i.e., Summer 2024) and 
consistent with DOT's 2022 reassignment of 16 peak-hour runway 
timings.\6\ However, the FAA does not intend to approve requests for 
new flights unless they can be accommodated within the targeted limits. 
The FAA is seeking carriers' voluntary cooperation to get scheduled 
operations down to the targeted scheduling limits.
---------------------------------------------------------------------------

    \5\ See 88 FR 64964 (September 20, 2023).
    \6\ See Department of Transportation Order 2022-7-1, Docket DOT-
OST-2021-0103, served July 5, 2022, ``Reassignment of Schedules at 
Newark-Liberty International Airport.''
---------------------------------------------------------------------------

    Carriers are reminded that FAA approval for runway times is 
separate from the approval process for gates or other airport 
infrastructure and both are essential for the success of Level 2 at 
EWR. Schedule facilitation at Level 2 airports is designed to engender 
collaboration and gain mutual agreement between the carriers and the 
FAA regarding schedules and potential adjustments to stay within the 
performance goals and capacity limits of the airport and to mitigate 
delays and congestion that would result in the need for Level 3 slot 
controls. The FAA expects that all carriers operating at EWR will 
respect the targeted scheduling limits and work cooperatively with the 
FAA in order to avoid unacceptable delays and other adverse operational 
impacts at the airport.
    The FAA is aware of runway construction planned at EWR for 2025. At 
this time, the FAA is evaluating the impact on EWR's runway capacity 
throughout the projected construction period in 2025. If the FAA 
concludes that scheduling relief is needed, a separate policy will be 
issued.

    Issued in Washington, DC, on August 20, 2024.
Daniel J. Murphy,
Vice President, System Operations Services.
[FR Doc. 2024-19034 Filed 8-21-24; 4:15 pm]
BILLING CODE 4910-13-P