[Federal Register Volume 89, Number 145 (Monday, July 29, 2024)]
[Rules and Regulations]
[Pages 60795-60796]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-16404]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
========================================================================
Federal Register / Vol. 89, No. 145 / Monday, July 29, 2024 / Rules
and Regulations
[[Page 60795]]
NUCLEAR REGULATORY COMMISSION
10 CFR Part 50
[NRC-2018-0291]
RIN 3150-AK23
American Society of Mechanical Engineers Code Cases and Update
Frequency; Correction
AGENCY: Nuclear Regulatory Commission.
ACTION: Final rule; correction.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is correcting a
final rule that was published in the Federal Register on July 17, 2024,
regarding changes to its regulations to incorporate by reference
revisions of three regulatory guides, which would approve new, revised,
and reaffirmed code cases published by the American Society of
Mechanical Engineers. This action is necessary to correct a misspelled
word, a grammatical error, an amendatory instruction, and footnote
references.
DATES: The correction is effective August 16, 2024.
ADDRESSES: Please refer to Docket ID NRC-2018-0291 when contacting the
NRC about the availability of information for this action. You may
obtain publicly available information related to this action by any of
the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0291. Address
questions about NRC dockets to Helen Chang; telephone: 301-415-3228;
email: [email protected]. For technical questions, contact the
individuals listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. The ADAMS accession number for
each document referenced (if it is available in ADAMS) is provided the
first time that it is mentioned in the SUPPLEMENTARY INFORMATION
section.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time, Monday through Friday, except Federal
holidays.
Technical Library: The Technical Library, which is located
at Two White Flint North, 11545 Rockville Pike, Rockville, Maryland
20852, is open by appointment only. Interested parties may make
appointments to examine documents by contacting the NRC Technical
Library by email at [email protected] between 8 a.m. and 4 p.m.
(ET), Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Tyler Hammock, Office of Nuclear
Material Safety and Safeguards, telephone: 301-415-1381, email:
[email protected]; or Bruce Lin, Office of Nuclear Regulatory
Research, telephone: 301-415-2446, [email protected]. Both are staff of
the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION: The NRC may post materials related to this
document, including public comments, on the Federal rulemaking website
at https://www.regulations.gov under Docket ID NRC-2018-0291. In
addition, the Federal rulemaking website allows members of the public
to receive alerts when changes or additions occur in a docket folder.
To subscribe: (1) navigate to the docket folder (NRC-2018-0291); (2)
click the ``Subscribe'' link; and (3) enter an email address and click
on the ``Subscribe'' link.
Corrections
In FR Doc. 2024-15288, published at 89 FR 58039 on July 17, 2024,
the NRC makes the following corrections:
Preamble
1. On page 58041, in the third column, the sentence ``Licensees
seeking to use a later edition in the middle of an IST or ISI interval
must still submit an exemption request for NRC review and approval.''
is corrected to read ``The NRC will continue to review mid-ISI interval
requests in accordance with the existing process described in 10 CFR
50.55a(g)(4)(iv) and Regulatory Issue Summary 2004-12, ``Clarification
on Use of Later Editions and Addenda to the ASME OM Code and Section
XI,'' dated July 28, 2004.''
2. On page 58052, in the first column, under ``Appendix J to 10 CFR
part 50,'' remove the last sentence.
Regulatory Text
0
3. In amendatory instruction 2 for Sec. 50.55a:
0
a. On page 58056, starting in the first column, paragraph (f)(4)(ii) is
corrected;
0
b. On page 58056, in the second column, in paragraph (g)(4), ``BPVC''
is corrected to read ``BPV''; and
0
c. On page 58057, in the third column, in paragraph (g)(5)(ii),
``intervalduring'' is corrected to read ``interval during''.
The correction reads as follows:
Sec. 50.55a [Corrected]
(f) * * *
(4) * * *
(ii) Applicable IST Code: Successive code of record intervals.
Inservice tests to verify operational readiness of pumps and valves,
whose function is required for safety, conducted during successive code
of record intervals must comply with the requirements of the latest
edition and addenda of the ASME OM Code incorporated by reference in
paragraph (a)(1)(iv) of this section no more than18 months before the
start of the code of record interval (or the optional ASME Code Cases
listed in NRC Regulatory Guide 1.147 or NRC Regulatory Guide 1.192 as
incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this
section, respectively), subject to the conditions listed in paragraph
(b) of this section.
0
4. On page 58058, in the second column, amendatory instruction 3 and
the accompanying regulatory text for appendix J to part 50 is corrected
to read:
3. In appendix J to part 50, in section III of option A, revise
paragraph D.1.(a) to read as follows:
[[Page 60796]]
Appendix J to Part 50--Primary Reactor Containment Leakage Testing for
Water-Cooled Power Reactors
* * * * *
Option A--Prescriptive Requirements
* * * * *
III. * * *
D. * * * 1. * * *
(a) After the preoperational leakage rate tests, a set of three
Type A tests shall be performed, at approximately equal intervals
during each inservice inspection interval, as defined in Sec.
50.55a(y). The third test of each set shall be conducted when the plant
is shut down for the final plant inservice inspections of the inservice
inspection interval.\[2]\
* * * * *
[2] See footnote 1.
* * * * *
Dated: July 22, 2024.
For the Nuclear Regulatory Commission.
Helen Chang,
Acting Chief, Regulatory Analysis and Rulemaking Support Branch,
Division of Rulemaking, Environmental, and Financial Support, Office of
Nuclear Material Safety and Safeguards.
[FR Doc. 2024-16404 Filed 7-26-24; 8:45 am]
BILLING CODE 7590-01-P