NUCLEAR REGULATORY COMMISSION
[Docket No. 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc.; Vogtle Electric
Generating Plant, Unit 4; Operation Under a Combined License
AGENCY: Nuclear Regulatory Commission.
ACTION: Finding that the acceptance criteria in the combined license
are met.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) found pursuant to
its regulations that the acceptance criteria in the combined license
for Vogtle Electric Generating Plant (VEGP), Unit 4 are met. Because of
this action, operation of the facility is allowed in accordance with
the terms and conditions of the license.
DATES: The finding that the acceptance criteria in the combined license
are met became effective on July 28, 2023.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the ``For Further
Information Contact'' section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. For the convenience of the reader,
instructions about obtaining materials referenced in this document are
provided in the ``Availability of Documents'' section.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. ET, Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270; email: [email protected].
SUPPLEMENTARY INFORMATION: Under section 2.106 of title 10 of the Code
of Federal Regulations (10 CFR), ``Notice of issuance,'' the NRC is
providing notice that it has found that the acceptance criteria in the
combined license for VEGP, Unit 4 are met. Section 185b. (42 U.S.C.
2235(b)) of the Atomic Energy Act of 1954, as amended (AEA), and 10 CFR
52.97(b) require that the Commission identify within the combined
license the inspections, tests, and analyses, including those
applicable to emergency planning, that the licensee shall perform, and
the acceptance criteria that, if met, are necessary and sufficient to
provide reasonable assurance that the facility has been constructed and
will be operated in conformity with the license, the provisions of the
AEA, and the Commission's rules and regulations. In compliance with
these requirements,
[[Page 50920]]
the Commission included inspections, tests, analyses, and acceptance
criteria (ITAAC) in Appendix C to VEGP, Unit 4 combined license No.
NPF-92.
Section 185b. of the AEA also requires, in part, that following
issuance of the combined license, the Commission shall ensure that the
prescribed inspections, tests, and analyses are performed, and before
operation of the facility, find that the prescribed acceptance criteria
are met. The NRC codified the requirement to ensure completion of the
inspections, tests, and analyses in 10 CFR 52.99(e) and codified the
requirement regarding the finding that the acceptance criteria are met
in 10 CFR 52.103(g).
The NRC staff has determined that the inspections, tests, and
analyses have been successfully completed and found that all specified
acceptance criteria in the VEGP, Unit 4 combined license No. NPF-92 are
met. This finding was made on July 28, 2023, and was effective on July
28, 2023. The principal basis for the staff's 10 CFR 52.103(g) finding
was the staff's review of the licensee's ITAAC notifications under 10
CFR 52.99(c) and the staff's inspection of ITAAC-related activities
conducted by the licensee. The staff explained the basis for its
finding in the document titled ``10 CFR 52.103(g) Basis Document Vogtle
Electric Generating Plant, Unit 4.'' Because of the NRC's finding that
the acceptance criteria are met, operation of the facility is allowed
in accordance with the terms and conditions of the license.
I. Availability of Documents
The documents identified in the following table are available to
interested persons through the ADAMS Public Documents collection and
the NRC's PDR. The files are also available online at https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
------------------------------------------------------------------------
Document description ADAMS accession No.
------------------------------------------------------------------------
VEGP, Unit 4 Combined License No. NPF-92 ML14100A135
VEGP, Unit 4 Finding that the Acceptance ML22348A093
Criteria in the Combined License Are
Met.
10 CFR 52.103(g) Basis Document Vogtle ML22348A088
Electric Generating Plant, Unit 4.
------------------------------------------------------------------------
Dated: July 28, 2023.
For the Nuclear Regulatory Commission.
Andrea D. Veil,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2023-16408 Filed 8-1-23; 8:45 am]