[Federal Register Volume 88, Number 72 (Friday, April 14, 2023)]
[Notices]
[Pages 23117-23140]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07761]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
FTA Fiscal Year 2023 Apportionments, Allocations and Program
Information
AGENCY: Federal Transit Administration (FTA), Department of
Transportation (DOT).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice provides priorities for programs in fiscal year
(FY) 2023, announces the Consolidated Appropriations Act, 2023, and
full-year apportionments and allocations for grant programs, provides
contract authority, and describes plans for several competitive
programs.
FOR FURTHER INFORMATION CONTACT: For general information about this
notice, contact John Bodnar, Director of Transit Programs, Office of
Program Management, at (202) 366-2053. Please contact the appropriate
FTA Regional Office for any specific requests for information or
technical assistance. FTA Regional Office contact information is
available on FTA's website: https://www.transit.dot.gov/about/regional-offices/regional-offices. An FTA headquarters contact for each major
program area is included in the discussion of that program in the text
of this notice. FTA recommends stakeholders subscribe via: https://public.govdelivery.com/accounts/USDOTFTA/subscriber/new to receive
email notifications when new information is available.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Overview
II. FY 2023 Funding for FTA Programs
A. Funding Available Under the Consolidated Appropriations Act,
2023
B. Oversight Takedown
C. FY 2023 Formula Apportionments Data and Methodology
III. FY 2023 Program Highlights and Updates
A. Focus Areas
1. Safety--PTASP and Safety Committees
2. Census Urbanized Areas Designations
3. Build America-Buy America Act
4. State, Local, Tribal, and Territorial Fiscal Recovery,
Infrastructure, and Disaster Relief Flexibility Act (Cornyn-Padilla)
5. FTA Strategic Plan
B. Program Updates
1. FY 2023 Competitive Programs Update
IV. Program Information
A. Metropolitan and Statewide Transportation Planning Program
(49 U.S.C. 5303 and 5305(d))
B. State Planning and Research Program (49 U.S.C. 5304 and
5305(e))
C. Urbanized Area Formula Program (49 U.S.C. 5307)
D. Fixed Guideway Capital Investment Grants Program (49 U.S.C.
5309)
E. Enhanced Mobility of Seniors and Individuals with
Disabilities Program (49 U.S.C. 5310)
F. Formula Grants for Rural Areas Program (49 U.S.C. 5311)
G. Rural Transportation Assistance Program (49 U.S.C.
5311(b)(3))
H. Appalachian Development Public Transportation Assistance
Program (49 U.S.C. 5311(c)(2))
I. Formula Grants for Public Transportation on Indian
Reservations Program (49 U.S.C. 5311(j))
J. Public Transportation Innovation (49 U.S.C. 5312)
K. Technical Assistance and Workforce Development (49 U.S.C.
5314)
L. Public Transportation Emergency Relief Program (49 U.S.C.
5324)
M. Public Transportation Safety Program (49 U.S.C. 5329)
N. State of Good Repair Program (49 U.S.C. 5337)
O. Grants for Buses and Bus Facilities Program (49 U.S.C. 5339)
P. Growing States and High-Density States Formula Factors (49
U.S.C. 5340)
Q. Washington Metropolitan Area Transit Authority Grants
R. Community Project Funding/Congressionally Directed Spending
V. FTA Policy and Procedures for FY 2023 Grants
A. Automatic Pre-Award Authority To Incur Project Costs
B. FY 2023 Annual List of Certifications and Assurances
C. Letter of No Prejudice (LONP) Policy
D. Civil Rights Requirements
E. Consolidated Planning Grants
F. Grant Application Procedures
I. Overview
This notice provides priorities for the Federal Transit
Administration's (FTA) programs in Fiscal Year (FY) 2023, announces the
Consolidated Appropriations Act, 2023, Public Law 117-328 and full-year
apportionments and allocations for grant programs, provides contract
authority, as well as describes plans for several competitive programs.
It also contains information on how FTA plans to administer its
transit programs in FY 2023 and how funds appropriated and allocated
prior to FY 2023 will be treated.
This notice highlights updates and changes to FTA programs,
describes definitional changes and cross-cutting requirements and
provides specific information about FTA's statutory programs.
For each FTA program, FTA provides information on the
Infrastructure Investment and Jobs Act (IIJA, also called the
Bipartisan Infrastructure Law (BIL), Public Law 117-58) authorized
funding levels for FY 2023, the basis for apportionment or allocation
of funds, requirements specific to the program, period of availability
of funds, and other program information. A separate section provides
information on pre-award authority and other requirements and guidance
applicable to FTA programs and grant administration. Finally, the
notice includes references to tables on FTA's website that show amounts
apportioned under the FY 2023 appropriations and approximately $6.6
billion in unobligated or carryover funding available in FY 2023 under
certain competitive programs carried out in accordance with prior
authorization acts.
Information in this document includes references to existing FTA
program guidance and circulars. Some information in guidance and
circulars may have been superseded by
[[Page 23118]]
provisions in IIJA, but these guidance documents and circulars remain a
resource for program management in most areas. FTA intends to revise
the guidance and circulars, as appropriate, with an opportunity for
public comment when necessary.
II. FY 2023 Funding for FTA Programs
A. Funding Available Under the Consolidated Appropriations Act, 2023
A total of $21,432,364,662 was appropriated for FY 2023 including
funding from the Consolidated Appropriations Act, 2023 and advance
appropriations.
Division L, title I, of the Consolidated Appropriations Act, 2023,
appropriated $16,968,459,324 for FY 2023, providing the authorized
$13.634 billion from the Mass Transit Account; $542 million in Transit
Infrastructure Grants, including: an additional $90 million for the
Buses and Bus Facilities Competitive grant program, an additional $50
million for the Low or No Emission Grants program, an additional $15
million for the Urbanized Area Passenger Ferry program, an additional
$2 million for the Bus Testing program, an additional $7 million for
several research programs, an additional $17.5 million to the ferry
service for rural communities program, and $360.5 million for Community
Project Funding/Congressionally Directed Spending. The Consolidated
Appropriations Act, 2023, also appropriated $7.5 million in additional
technical assistance and training funding; $2.2 billion for the Capital
Investment Grant (CIG) program and the Expedited Project Delivery Pilot
Program; $425 million in additional support for New Start and Core
Capacity CIG Projects with Existing Full Funding Grant Agreements that
met criteria listed in division L, section 165 of the Consolidated
Appropriations Act, 2023; and $150 million for the Washington
Metropolitan Area Transit Authority.
Division N, title X of the Consolidated Appropriations Act, 2023,
appropriated $213,905,338 for Public Transportation Emergency Relief
for transit systems affected by major declared disasters occurring in
calendar years 2017, 2020, 2021, and 2022.
In addition, IIJA provided $4.25 billion in advance appropriations
for FY 2023, including $1.6 billion for Capital Investment Grants;
$2.05 billion for Transit Infrastructure Grants; $350 million for the
All Stations Accessibility Program; $50 million for the Electric or
Low-Emitting Ferry Program; and $217.5 million for Ferry Service for
Rural Communities.
Current funding availability for each program is identified in
section IV of this notice and in table 1 located on FTA's FY 2023
Apportionments web page: https://www.transit.dot.gov/funding/apportionments/current-apportionments.
B. Oversight Takedown
The following oversight takedowns of FTA programs will be applied:
0.5 percent of Metropolitan and Statewide Planning funds, 0.75 percent
of Urbanized Area Formula funds, 1 percent of Fixed Guideway Capital
Investment Grants funds, 0.5 percent of Formula Grants for the Enhanced
Mobility of Seniors and Individuals with Disabilities, 0.5 percent of
Formula Grants for Rural Areas, 1 percent of State of Good Repair
Formula funds, 0.75 percent for Grants for Buses and Bus Facilities,
and 1 percent of Capital and Preventive Maintenance Projects for
Washington Metropolitan Area Transit Authority funds. The funds are
used to provide necessary oversight activities, such as oversight of
the construction of any major capital project receiving Federal transit
assistance; to conduct State Safety Oversight, drug and alcohol, civil
rights, procurement systems, management, planning certification, and
financial reviews and audits, as well as evaluations and analyses of
recipient-specific problems and issues; to generally provide technical
assistance and correct deficiencies identified in compliance reviews
and audits; and to support FTA's administrative expenses.
Additionally, there remains a 2 percent administrative/oversight
takedown from each of the advance appropriations provided under
Division J, Title VIII of IIJA, except for the Capital Investment Grant
takedown, which remains at 1 percent. One-half percent of the 2 percent
is to be transferred to the U.S. DOT Office of the Inspector General
(OIG).
C. Formula Apportionment Data and Methodology
1. Apportionment Tables
FTA published apportionment tables on its website for each program
that reflect the full-year appropriations less oversight takedowns, as
applicable. Tables displaying the funds available to eligible states,
tribes, and urbanized areas have been posted to Fiscal Year 2023
Apportionment Tables (Full Year). This website contains a page listing
the apportionment and allocation tables for FY 2023, as well as links
to prior year formula apportionment notices and tables and the National
Transit Database and Census data used to calculate the FY 2022
apportionments.
2. National Transit Database and Census Data Used in the FY 2023
Apportionments
Consistent with past practices, the calculations for sections 5307,
5311, including 5311(j) (Tribal Transit), 5329, 5337, and 5339 programs
rely on the most-recent transit service data reported to the National
Transit Database (NTD), which at the time of apportionment was the 2021
report year. However, due to the impacts of the COVID-19 pandemic,
through this final fiscal year, FTA allowed agencies to use either 2019
NTD data or 2021 NTD data, defaulting to the year with the higher
vehicle revenue miles unless instructed otherwise by the reporting
agency. In some cases where an apportionment is based on the age of the
system, the age is calculated as of September 30, 2022, which was the
last day before FY 2023 began. Any recipient or subrecipient of either
section 5307 or section 5311 program funds is required to report to the
NTD. All FTA grant recipients that own, operate, or manage transit
capital assets must report their asset data to the NTD. Additionally, a
number of transit operators report to the NTD on a voluntary basis. For
the 2021 report year, the NTD includes data from 963 urban reporters,
935 of which reported operating transit service; 313 of these urban
reporters also provide service in rural areas. The NTD also includes
data from 1,338 rural transit providers. Additionally, 137 Tribes
report service to the NTD, with 129 of them reporting exclusively rural
service, and 8 operating both rural and urban service.\1\ IIJA made a
number of changes to NTD reporting requirements. FTA finalized the
proposal in a Federal Register notice published on March 3, 2023 (88 FR
13497). Some of the changes will take effect beginning in NTD Report
Year (RY) 2023 or 2024, which corresponds to an agency's fiscal year,
while others will take effect in calendar year (CY) 2023.
---------------------------------------------------------------------------
\1\ Tribal reporters operate public transportation in a tribal
area and receive or benefit from section 5311 funding under FTA's
Tribal Transit Program. In some limited cases, tribal reporters may
also receive section 5307 funding, in which case, these tribes may
be counted as urban. The 137 tribes noted are those that receive
Tribal Transit Program funding and excludes those tribes (if any)
that receive section 5307 funding, for consistency with the other
counts provided herein.
---------------------------------------------------------------------------
The 2010 Census data was used to determine population and
population density for sections 5303, 5305, 5307 and 5339 as well as
rural population and rural land area for section 5311. The formulas for
sections 5307, 5311, and
[[Page 23119]]
5311(j) include tiers where funding is allocated on the basis of the
number of persons living in poverty, and the section 5310 formula
program allocates funding on the basis of the population of older
adults and people with disabilities. The Census Bureau no longer
publishes decennial census data on persons living in poverty and
persons with disabilities. As a result, since FY 2013, FTA has been
using the data for these populations available via the Census' American
Community Survey (ACS). The NTD and census data that FTA used to
calculate the apportionments associated with this notice can be found
on FTA's Formula Apportionments Data web page: (https://www.transit.dot.gov/funding/apportionments/formula-apportionments-data).
The FY 2023 apportionments use data on low-income persons, persons
with disabilities, and older adults from the 2016-2020 ACS five-year
data set, which was published in December 2021. This data represents
the most recent five-year ACS estimates that are available as of
October 1 for the year being apportioned. As was the case in prior
years, data on low-income persons comes from ACS Table B17024, ``Age by
Ratio of Income to Poverty in the Last Twelve Months,'' and data on
people with disabilities under 65 years old comes from ACS table S1810,
``Disability Characteristics.'' For the FY 2023 apportionments, FTA is
using data on older adults (over 65 years old) from ACS table B01001,
``Sex by Age'' after determining that the ACS table used in prior
fiscal years (ACS table S.0103, ``People over 65 in the United
States'') did not include data for all urbanized areas.
III. FY 2023 Program Highlights and Updates
A. Focus Areas
1. Safety--PTASP and Safety Committees
IIJA amended 49 U.S.C. 5329(d) to require a transit agency that
receives section 5307 funding and serves a large, urbanized area (an
urbanized area with a population of 200,000 or more) to establish a
Safety Committee consistent with 49 U.S.C. 5329(d)(5). The transit
agency must certify, through their Certifications and Assurances, that
the safety committee of the operator approved the Public Transportation
Agency Safety Plan (PTASP) or any updates to the Public Transportation
Agency Safety Plan prior to approval by the Board of Directors, or
Equivalent Authority.
The Safety Committee also is responsible for, at a minimum: (1)
identifying and recommending risk-based mitigations or strategies
necessary to reduce the likelihood and severity of consequences
identified through the agency's safety risk assessment; (2) identifying
mitigations or strategies that may be ineffective, inappropriate, or
were not implemented as intended; and (3) identifying safety
deficiencies for purposes of continuous improvement.
IIJA also amended 49 U.S.C. 5329(d)(1)(B) to require a transit
agency serving a small, urbanized area (an urbanized area with a
population of fewer than 200,000) to review and update its PTASP in
cooperation with frontline employee representatives. Transit agencies
serving a small urbanized area are required to certify, through their
Certifications and Assurances, that their Public Transportation Agency
Safety Plan was developed or updated in cooperation with frontline
worker representatives prior to approval by the Board of Directors, or
Equivalent Authority.
2. Census Urbanized Areas Designations
On December 29, 2022, the Census Bureau announced final urban area
designations based on the 2020 Census. FTA program eligibility and
funding distribution is determined in part by service provision and
demographics in both urban and non-urban areas. The 2020 Census
delineations will impact FTA formula apportionments beginning in FY
2024. Eligibility and requirements associated with a Notice of Funding
Opportunity (NOFO) published in FY 2023 will be determined using 2010
Census designations. FTA has additional resources and information
available on its Census landing page, https://transit.dot.gov/census.
3. Build America, Buy America Act
The Infrastructure Investment and Jobs Act (IIJA) includes the
Build America, Buy America Act (BABA), Public Law 117-58, division G,
title IX, subtitle A, part I, sections 70901 through 70927, which
greatly strengthens Made in America standards. Specifically, BABA
expands the coverage and application of Buy America preferences in
Federal financial assistance programs for infrastructure. BABA requires
that no later than May 14, 2022--180 days after the date of enactment--
the head of each covered Federal agency shall ensure that ``none of the
funds made available for a Federal financial assistance program for
infrastructure . . . may be obligated for a project unless all of the
iron, steel, manufactured products, and construction materials used in
the project are produced in the United States.'' IIJA section 70914(a).
BABA provides that the preferences under section 70914 apply only
to the extent that a domestic content procurement preference as
described in section 70914 does not already apply to iron, steel,
manufactured products, and construction materials. IIJA section
70917(a)-(b). This provision allows FTA to continue to implement its
existing Buy America regulations and policies for steel and iron,
manufactured products, and rolling stock, which meet or exceed the
standards required by BABA. One of the new Buy America preferences
included under section 70914 of BABA is for construction materials. By
May 14, 2022, each covered Federal agency had to ensure that all
manufacturing processes for construction materials used in federally
assisted infrastructure projects occur in the United States.
On April 18, 2022, OMB issued memorandum M-22-11, ``Initial
Implementation Guidance on Application of Buy America Preference in
Federal Financial Assistance Programs for Infrastructure''
(``Implementation Guidance''). Under section VIII of the Implementation
Guidance, ``Preliminary Guidance for Construction Materials,''
``construction materials'' includes: An article, material, or supply--
other than an item of primarily iron or steel; a manufactured product;
cement and cementitious materials; aggregates such as stone, sand, or
gravel; or aggregate binding agents or additives--that is or consists
primarily of: Non-ferrous metals; plastic and polymer-based products
(including polyvinylchloride, composite building materials, and
polymers used in fiber optic cables); glass (including optic glass);
lumber; or drywall. Implementation Guidance at p. 13-14. The
Implementation Guidance also states that ``an article, material, or
supply should only be classified into one of the following categories:
(1) Iron or steel; (2) a manufactured product; or (3) a construction
material. For ease of administration, an article, material, or supply
should not be considered to fall into multiple categories.'' Id. at p.
6. The Implementation Guidance also explains that ``items that consist
of two or more of the listed materials that have been combined together
through a manufacturing process, and items that include at least one of
the listed materials combined with a material that is not listed
through a manufacturing process, should be treated as manufactured
products, rather than as construction materials.'' Id. at p. 14.
[[Page 23120]]
On May 19, 2022, the U.S. Department of Transportation (DOT) issued
a general waiver that delayed the effective date of BABA's domestic
preference requirements for construction materials, until November 10,
2022 (87 FR 31931). All FTA grants obligated on or after November 10
have required construction materials produced in the United States.
On January 30, 2023, DOT announced a new, limited waiver of the Buy
America requirement for construction materials for certain contracts
and solicitations. The waiver is intended to assist project sponsors
transitioning to using U.S. manufactured construction materials without
delaying delivery of projects in sufficiently advanced stages. The
waiver of BABA's domestic preference for construction materials applies
to: (1) Any contract entered into before November 10, 2022; and (2) Any
contract entered into on or after November 10, 2022, and before March
10, 2023, if the contract results from a solicitation published prior
to May 14, 2022. For contracts executed on or after May 14, 2022, and
before March 10, 2023, the waiver does not apply to any construction
materials that a contractor or subcontractor takes delivery of on or
after October 1, 2024.
This waiver applies only to: (i) DOT awards (including FTA awards)
obligated on or after January 30, 2023; and (ii) for awards that are
obligated on or after November 10, 2022, but prior to January 30, 2023,
to expenditures for construction materials incurred on or after January
30, 2023. FTA encourages recipients to contact their FTA Regional
Office with any questions regarding applicability of this waiver.
4. State, Local, Tribal, and Territorial Fiscal Recovery,
Infrastructure, and Disaster Relief Flexibility Act (Cornyn-Padilla)
Division LL of the Consolidated Appropriations Act, 2023, is the
``State, Local, Tribal, and Territorial Fiscal Recovery,
Infrastructure, and Disaster Relief Flexibility Act,'' also known as
Cornyn-Padilla. The law amends title VI of the Social Security Act (42
U.S.C. 801, et seq.), as amended by the Infrastructure Investment and
Jobs Act (IIJA), to allow coronavirus relief funds to be used for
certain infrastructure projects by State, Territorial, Tribal,
metropolitan, city, non-entitlement unit of local government, or county
recipients. Among other eligible uses, funds may be used for capital
projects eligible under FTA's Urbanized Area Formula Grants Program
(section 5307), Capital Investment Grants Progra (section 5309), Rural
Area Formula Grants Program (section 5311), State of Good Repair Grants
Program (section 5337), and Bus and Bus Facility Grants Program
(section 5339). Funds specifically may be used to meet the non-Federal
share requirement for capital investment grants and may be used to
repay TIFIA loans.
The law requires the Department of Treasury, in consultation with
U.S. DOT, to issue guidance or promulgate a rule to carry out the
transportation section of the bill. FTA encourages recipients to review
the Treasury guidance or rule when it becomes available and to contact
their FTA Regional Office with any questions.
5. FTA Strategic Plan
FTA recently completed an agency-specific strategic plan, in
alignment with the recently completed DOT Strategic Plan for 2021-2026.
FTA's plan sets five strategic goals for the agency:
Enhance Safety--reduce safety events on the Nation's
transit systems.
Build Resiliency--renew our transit systems and increase
resiliency into the future.
Increase Sustainability--reduce greenhouse gas emissions
and environmental impacts from transit construction and operations.
Improve Equity--address disparities in access to
opportunities and services; and
Connect Communities--expand high quality transit service
to build communities that connect people
B. Program Updates
1. FY 2023 Competitive Program Updates
FTA's competitive grant programs and the FY 2023 appropriated
funding levels are identified in the chart below. FTA selects projects
for funding after issuance of a Notice of Funding Opportunity.
--------------------------------------------------------------------------------------------------------------------------------------------------------
FY 2023 funding Application due date
Program/competitive grant title Statute 49 U.S.C. appropriated Proposed or actual NOFO publication and comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
Transit-Oriented Development Planning MAP-21 Section 20005(b), $13,432,051 Summer 2023............................ TBA.
Pilot Program. IIJA Section 30009.
Low or No Emission Grants and Grants Section 5339(b) and (c).. 1,621,126,602 January 27, 2023....................... April 13, 2023.
for Buses & Bus Facilities.
Tribal Transit Grants................. Section 5311(c)(1)(A).... 8,935,753 March 28, 2023......................... June 26, 2023.
Passenger Ferry Grants, Electric or Sections 5307/5311....... 307,500,000 Spring 2023 (Passenger Ferry and Rural Part of FY23 Rural Ferry
Low-Emitting Ferry Program, Ferry Only). and all FY23 Low-
Service for Rural Communities. Emitting Ferry
selections were
announced in January
2023. Approximately
$50M in Passenger Ferry
and $170M in Rural
Ferry funding will be
made available through
NOFO.
Innovative Coordinated Access & Section 5312............. 9,525,190 Fall 2023.............................. TBA.
Mobility.
All Station Accessibility Program..... Sections 5307/5311....... 343,000,000 N/A.................................... Project selections
announced in December
2022.
Competitive Grants for Rail Vehicle Section 5337............. 300,000,000 N/A.................................... FY22 and FY23 funding
Replacement. announced in the same
NOFO on October 12,
2022.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 23121]]
IV. Program Information
A. Metropolitan Planning Program (49 U.S.C. 5303, 5305(d), and 5305(f))
Section 5305(d) and (f) makes available Federal funding to support
a cooperative, continuous, and comprehensive planning program for
transportation investment decision-making at the metropolitan area
level. The specific requirements of metropolitan transportation
planning are set forth in 49 U.S.C. 5303 and in 23 CFR part 450, as
incorporated by reference in 49 CFR part 613, Metropolitan and
Statewide and Non-metropolitan Planning. State Departments of
Transportation (DOTs) are direct recipients of planning funds allocated
by FTA, and the funds are then sub-allocated to Metropolitan Planning
Organizations (MPOs) for planning activities that support the economic
vitality of the metropolitan area.
The metropolitan transportation planning process must establish a
performance-based approach in which the MPO will develop specific
performance targets that address transportation system performance
measures (issued by U.S. DOT), where applicable, to use in tracking
progress towards attaining critical outcomes. These performance targets
will be established by MPOs in coordination with States and transit
providers. MPOs will provide a system performance report that evaluates
the progress of the MPO in meeting the performance targets in
comparison with the system performance identified in prior reports.
This funding must support work elements and activities resulting in
comprehensive intermodal transportation planning for the movement of
people and goods in the metropolitan area. Comprehensive transportation
planning is not limited to transit planning or surface transportation
planning but also encompasses the relationships among land use and all
transportation modes, without regard to the programmatic source of
Federal assistance. A represenatataive list of eligible work elements
or activities is provided in FTA Circular 8100.1D, Program Guidance for
Metropolitan Planning and State Planning and Research Program Grants,
dated September 10, 2018.
The Infrastructure Investment and Jobs Act (IIJA), also known as
the Bipartisan Infrastructure Law (BIL), amended 49 U.S.C. 5305(f) to
require a Federal share of not less than 90 percent for grants under
the Metropolitan Planning Program (MPP) and the State Planning and
Research Program (SPRP). Eligible recipients seeking an increased
Federal share under 49 U.S.C. 5305(f)(2) must demonstrate that planning
activities support increased mobility through expanded access to public
transportation in areas with a lower population density or a lower
average income in relationship to surrounding areas. In addition, on
March 13, 2023, FTA approved a waiver of the non-Federal match for the
MPP and the SPRP funds authorized at 49 U.S.C. 5305(f)(1) for Complete
Streets planning activities conducted by States and MPOs in their
transportation planning processes. The non-Federal match waiver for MPP
and SPRP funds is limited to Complete Streets planning activities as
identified in BIL, section 11206(c)). The waiver of the non-Federal
share for Complete Streets planning activities will end once a State or
MPO receives approval from FHWA to opt out of meeting the requirements
described in BIL, section 11206(c). Once a State or MPO opts out, they
must notify FTA.
For more about the Metropolitan Planning Program, contact Ryan
Long, Office of Planning and Environment at (215) 656-7051 or
[email protected].
1. Authorized Amounts
IIJA authorized $799.4 million over five years to provide financial
assistance for metropolitan planning needs under section 5305.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $155,931,187 is
available to the Metropolitan Planning Program (section 5305(d) and
(f)) to support metropolitan transportation planning activities set
forth in section 5303. The total amount apportioned for the
Metropolitan Planning Program to States for use by MPOs is $155,151,531
as shown in the table below, after the deduction for oversight
(authorized by section 5338).
------------------------------------------------------------------------
------------------------------------------------------------------------
Metropolitan Planning Program--FY2023
------------------------------------------------------------------------
Total FY 2023 Appropriation Available............... $155,931,187
Oversight Deduction................................. (779,656)
-------------------
Total Apportioned................................. 155,151,531
------------------------------------------------------------------------
3. Basis for Formula Apportionment
Of the amounts authorized in section 5305, 82.72 percent is made
available to the Metropolitan Planning program. Eighty percent of those
funds are apportioned on a statutory basis to the States based on the
most recent decennial Census for each State's UZA population. The
remaining 20 percent is provided to the States based on an FTA
administrative formula to address planning needs in larger, more
complex UZAs. The amount published for each State includes the
supplemental allocation.
4. Requirements
The State allocates Metropolitan Planning funds to MPOs in UZAs or
portions thereof to provide funds for planning projects included in a
one- or two-year program of planning work activities (the Unified
Planning Work Program, or UPWP) that includes multimodal systems
planning activities spanning both highway and transit planning topics.
Each State has either reaffirmed or developed, in consultation with
their MPOs, an allocation formula among MPOs within the State, based on
the 2010 Census. The allocation formula among MPOs in each State may be
changed annually, but any change requires approval by the FTA Regional
Office before grant approval. Program guidance for the Metropolitan
Planning Program is found in FTA Circular 8100.1D.
5. Period of Availability
The Metropolitan Planning program funds apportioned in this notice
are available for obligation during FY 2023 plus three additional
fiscal years. Accordingly, funds apportioned in FY 2023 must be
obligated in grants by September 30, 2026. Any FY 2023 apportioned
funds that remain unobligated at the close of business on September 30,
2026, will revert to FTA for reapportionment under the Metropolitan
Planning program.
B. State Planning and Research Program (49 U.S.C. 5304, 5305(e), and
5305(f))
This program provides financial assistance to States for statewide
transportation planning and other technical assistance activities,
including supplementing the technical assistance program provided
through the Metropolitan Planning program. The specific requirements of
Statewide transportation planning are set forth in 49 U.S.C. 5304 and
in 23 CFR part 450, as incorporated by reference in 49 CFR part 613,
Metropolitan and Statewide and Nonmetropolitan Planning. State DOTs are
required to reference
[[Page 23122]]
performance measures and performance targets within the Statewide
Planning process. This funding must support work elements and
activities resulting in comprehensive intermodal transportation
planning for the movement of people and goods and has the same
eligibilities as metropolitan planning funds. Comprehensive
transportation planning is not limited to transit planning or surface
transportation planning but also encompasses the relationships among
land use and all transportation modes, without regard to the
programmatic source of Federal assistance.
The Infrastructure Investment and Jobs Act (IIJA), also known as
the Bipartisan Infrastructure Law (BIL), amended 49 U.S.C. 5305(f) to
require a Federal share of not less than 90 percent for grants under
the Metropolitan Planning Program (MPP) and the State Planning and
Research Program (SPRP). Eligible recipients seeking an increased
Federal share under 49 U.S.C. 5305(f)(2) must demonstrate that planning
activities support increased mobility through expanded access to public
transportation in areas with a lower population density or a lower
average income in relationship to surrounding areas. In addition, on
March 13, 2023, FTA approved a waiver of the non-Federal match for the
MPP and the SPRP funds authorized at 49 U.S.C. 5305(f)(1) for Complete
Streets planning activities conducted by States and MPOs in their
transportation planning processes. The non-Federal match waiver for MPP
and SPRP funds is limited to Complete Streets planning activities as
identified in BIL, section 11206(c)). The waiver of the non-Federal
share for Complete Streets planning activities will end once a State or
MPO receives approval from FHWA to opt out of meeting the requirements
described in BIL, section 11206(c). Once a State or MPO opts out, they
must notify FTA.
For more information, contact Ryan Long, Office of Planning and
Environment at (215) 656-7051 or [email protected].
1. Authorized Amounts
IIJA authorized $167 million over five years to provide financial
assistance for statewide planning and other technical assistance
activities under section 5305.
2. FY 2023 Funding Availability
In FY 2023, $32,573,633 is available to the State Planning and
Research Program (section 5305(e) and (f)). The total amount
apportioned for the State Planning and Research Program (SPRP) is
$32,412,789 as shown in the table below, after the deduction for
oversight and addition of reapportioned funds.
------------------------------------------------------------------------
------------------------------------------------------------------------
Statewide Planning Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $32,573,633
Oversight Deductions................................ (162,868)
Reapportioned Funds................................. 2,024
-------------------
Total Apportioned................................. 32,412,789
------------------------------------------------------------------------
States' apportionments for this program are displayed in table 2.
3. Basis for Formula Apportionment
Of the amount authorized in section 5305, 17.28 percent is
allocated to the State Planning and Research Program. FTA apportions
these funds to States by a statutory formula that is based on the most
recent decennial Census data available, and the State's UZA population
as compared to the UZA population of all States.
4. Requirements
Funds are provided to States for Statewide transportation planning
programs. These funds may be used for a variety of statewide and
nonmetropolitan transportation planning purposes such as developing
transportation plans and programs, planning and evaluating public
transportation projects, and conducting technical studies. In addition,
a State may authorize a portion of these funds to be used to supplement
Metropolitan Planning funds allocated by the State to its UZAs, as the
State deems appropriate. Program guidance for the State Planning and
Research program is found in FTA Circular 8100.1D.
5. Period of Availability
The State Planning and Research program funds apportioned in this
notice are available for obligation during FY 2023 plus three
additional fiscal years. Accordingly, funds apportioned in FY 2023 must
be obligated in grants by September 30, 2026. Any FY 2023 apportioned
funds that remain unobligated at the close of business on September 30,
2026, will revert to FTA for reapportionment under the State Planning
and Research Program.
C. Urbanized Area Formula Program (49 U.S.C. 5307)
The Urbanized Area Formula Program provides Federal assistance for
capital, planning, job access and reverse commute projects, and, in
some cases, operating assistance for public transportation in urbanized
areas. In accordance with 49 U.S.C. 5302, an urbanized area (UZA) is an
Urban Area, as defined and designated as such by the U.S. Census
Bureau, with a population of 50,000 or more. Program funds are
apportioned to urbanized areas through a statutory formula. In
addition, $30 million is allocated each year under this program to
passenger ferry projects through a discretionary funding competition.
For more information about the Urbanized Area Formula Program,
contact Bret Martin with the Office of Transit Programs, at (202) 366-
0870 or [email protected].
1. Authorized Amounts
IIJA authorized $33.5 billion over five years to provide financial
assistance for urbanized areas under section 5307. Of the amounts
authorized and appropriated for section 5307 in each year, $30 million
is set aside for the competitive discretionary Passenger Ferry Grant
Program, 0.75 percent is apportioned to eligible States for State
Safety Oversight (SSO), and 0.75 percent is set aside for oversight.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $6,542,164,133 is
available for the Urbanized Area Formula program. The total amount
apportioned is $7,060,120,714 after deductions for the State Safety
Oversight Program, Passenger Ferry Program, and oversight (authorized
by section 5338) and the addition of section 5340 and reapportioned
funds as shown in the table below.
------------------------------------------------------------------------
------------------------------------------------------------------------
Urbanized Area Formula Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $6,542,164,133
Oversight Deductions................................ (49,066,231)
State Safety Oversight Program...................... (49,066,231)
Passenger Ferry Program............................. (30,000,000)
Section 5340 High Density States.................... 355,566,259
Section 5340 Growing States......................... 286,316,112
Reapportioned Funds................................. 4,206,672
-------------------
Total Apportioned................................. 7,060,120,714
------------------------------------------------------------------------
3. Basis for Formula Apportionment
FTA apportions Urbanized Area Formula Program funds based on
statutory formulas. Congress established four separate formulas that
are used to apportion the available funding: the section 5307 Urbanized
Area Formula Program formula, the Small Transit Intensive Cities (STIC)
formula, the Growing States and High-Density States formulas, and a
formula based on low-income population.
[[Page 23123]]
a. Section 5307--Urbanized Area Formula
For UZAs between 50,000 and 199,999 in population, the section 5307
formula is based on population and population density. For UZAs with
populations of 200,000 and more, the formula is based on a combination
of bus vehicle revenue miles, bus passenger miles, bus operating costs,
fixed guideway vehicle revenue miles, and fixed guideway directional
route miles, as well as population and population density. The
Urbanized Area Formula is defined in 49 U.S.C. 5336.
To calculate a UZA's FY 2023 apportionment, FTA used population and
population density statistics from the 2010 Census and validated
mileage and transit service data from transit providers' 2019 or 2021
National Transit Database (NTD) Report Year, defaulting to the year
with the higher vehicle revenue miles unless instructed otherwise by
the reporting agency. Consistent with section 5336(b), FTA has included
27 percent of the fixed guideway directional route miles and vehicle
revenue miles from eligible urbanized area transit systems, but which
were attributable to rural areas outside of the urbanized areas from
which the system receives funds. FTA has calculated dollar unit values
for the formula factors used in the Urbanized Area Formula Program
apportionment calculations. These values represent the amount of money
each unit of a factor is worth in this year's apportionment. The unit
values change each year based on all of the data used to calculate the
apportionments, as well as the amount appropriated by Congress for the
apportionment. The dollar unit values for FY 2023 are displayed in
table 5. To replicate the basic formula component of a UZA's
apportionment, multiply the dollar unit value by the appropriate
formula factor (i.e., the population, population x population density),
and when applicable, data from the NTD (i.e., directional route miles,
vehicle revenue miles, passenger miles, and operating cost).
b. Small Transit Intensive Cities Formula (STIC)
Under the STIC formula, FTA apportions 3 percent of the funds made
available for section 5307 to UZAs that are under 200,000 in population
and have public transportation service that operates at a level equal
to or above the industry average for UZAs with a population of at least
200,000, but not more than 999,999. STIC funds are apportioned on the
basis of one or more of six performance categories: passenger miles
traveled per vehicle revenue mile, passenger miles traveled per vehicle
revenue hour, vehicle revenue miles per capita, vehicle revenue hours
per capita, passenger miles traveled per capita, and passengers per
capita.
The data used to determine a UZA's eligibility under the STIC
formula and to calculate the STIC apportionments was obtained from the
NTD. Because performance data change with each year's NTD reports, the
UZAs eligible for STIC funds and the amount each receives may vary each
year. UZAs that received funding through the STIC formula for FY 2023
are listed in table 6.
c. Section 5340--Growing States and High-Density States Formula
FTA also apportions funds to qualifying UZAs and States according
to the section 5340 Growing States and High-Density States formula, as
shown in table 3. More information on this program and its formula is
found in section IV.P. of this notice.
d. Low-Income Population
Of the amount authorized and appropriated for the Urbanized Area
Formula Program in each year, 3.07 percent is apportioned on the basis
of low-income population.
As specified in statute, FTA apportions 75 percent of the available
funds to UZAs with a population of 200,000 or more. Funds are
apportioned based on the ratio of the number of low-income individuals
in each UZA to the total number of low-income individuals in all
urbanized areas of that size. FTA apportions the remainder of the funds
(25 percent) to UZAs with populations of less than 200,000, according
to an equivalent formula. The low-income populations used for this
calculation were based on the American Community Survey (ACS) data set
for 2016--2020. This information is updated by the Census Bureau
annually.
4. Eligible Expenses
Eligible activities include planning, engineering, design and
evaluation of transit projects and other technical transportation-
related studies; capital investments in bus and bus-related activities
such as replacement, overhaul and rebuilding of buses; crime prevention
and security equipment; construction of maintenance and passenger
facilities; and capital investments in new and existing fixed guideway
systems, including rolling stock, overhaul and rebuilding of vehicles,
track, signals, communications, and computer hardware and software. All
preventive maintenance and some Americans with Disabilities Act
complementary paratransit service costs are considered capital costs.
For urbanized areas with populations less than 200,000, operating
assistance is an eligible expense. In areas with a population of
200,000 or more, operating assistance is an eligible expense for an
applicant that operates a maximum of 100 buses during peak service
hours, per 49 U.S.C. 5307(a)(2) (the ``100-bus rule''). Job access and
reverse commute activities remain eligible under the program.
In addition, recipients may use up to one-half of one percent of
their section 5307 funds to support workforce development activities,
including supportive services, at an 80 percent Federal share; the
eligible workforce development activities are defined in section 5314;
see section IV.K. of this notice for more information. This provision
is in addition to the one-half of one percent that a recipient may use
for training activities with the National Transit Institute.
5. Requirements
Program guidance for the Urbanized Area Formula Program is found in
FTA Circular 9030.1E, Urbanized Area Formula Program: Program Guidance
and Application Instructions, dated January 16, 2014, and is
supplemented by additional information and changes provided in this
notice and that may be posted to the FTA's section 5307 web page.
6. Period of Availability
Funds made available under section 5307 are available for
obligation during the year of apportionment plus five additional years.
Accordingly, funds apportioned in FY 2023 must be obligated in grants
by September 30, 2028. Any FY 2023 apportioned funds that remain
unobligated at the close of business on September 30, 2028, will revert
to FTA for reapportionment under the Urbanized Area Formula Program.
D. Fixed Guideway Capital Investment Grants Program (49 U.S.C. 5309)
The Capital Investment Grants (CIG) Program includes three types of
eligible projects--New Starts projects, Small Starts projects, and Core
Capacity Improvement projects. Funding is provided for construction of:
(1) new fixed guideway systems or extensions to existing fixed guideway
systems such as rapid rail (heavy rail), commuter rail, light rail,
trolleybus (using overhead catenary), cable car, passenger ferries, and
bus rapid transit operating on an exclusive transit lane for the
majority of
[[Page 23124]]
the corridor length that also includes features that emulate the
services provided by rail fixed guideway including defined stations,
traffic signal priority for public transit vehicles, and short headway
bi-directional service for a substantial part of weekdays and weekends;
(2) corridor-based bus rapid transit service that does not operate on
an exclusive transit lane but includes features that emulate the
services provided by rail fixed guideway including defined stations,
traffic signal priority for public transit vehicles, and short headway
bi-directional services for a substantial part of weekdays; and (3)
projects that expand the capacity by at least 10 percent of an existing
fixed guideway corridor that is at capacity today or will be in ten
years.
Projects become candidates for funding under the Capital Investment
Grants program by successfully completing steps in the multi-year
process defined in section 5309 and obtaining a satisfactory rating
under the statutorily defined criteria. For New Starts and Core
Capacity Improvement projects, the steps in the process include project
development, engineering, and construction. For Small Starts projects
the steps in the process include project development and construction.
New Starts and Core Capacity Improvement projects receive construction
funds from the program through a full funding grant agreement (FFGA)
that defines the scope of the project and specifies the total multi-
year Federal commitment to the project. Small Starts projects receive
construction funds through a single year grant or an expedited grant
agreement that defines the scope of the project and specifies the
Federal commitment to the project.
Bundles of CIG projects, comprised of multiple New Starts, Core
Capacity, or Small Starts projects being pursued by the same project
sponsor, are also allowed. Bundles must enhance or increase the
capacity of the transportation system and streamline procurements or
enable time or cost savings for the projects.
For more information about the Capital Investment Grants program
contact Elizabeth Day, Office of Capital Project Development, at (202)
366-5159 or [email protected].
For information about published allocations contact Kevin Osborn,
Office of Transit Programs, at (202) 366-7519 or [email protected].
1. Authorized Amounts
IIJA authorized $15 billion to be appropriated over five years for
the CIG program and the Expedited Project Delivery Pilot Program (EPD),
with an additional $8 billion in advance appropriations.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $3,810,000,000 is
available for the Capital Investment Grants (CIG) Program and the FAST
Act section 3005(b) Expedited Project Delivery Pilot Program. The total
amount available for projects is $3,771,900,000 as shown in the table
below, after the deduction for oversight (authorized by section 5338).
------------------------------------------------------------------------
------------------------------------------------------------------------
Capital Investment Grant Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $3,810,000,000
Oversight........................................... (38,100,000)
Deduction........................................... ..................
-------------------
Total Apportioned................................. 3,771,900,000
------------------------------------------------------------------------
In addition, $425,000,000 is available as additional funding to
support New Start and Core Capacity Improvement CIG Projects with
existing Full Funding Grant Agreements (FFGA) that met criteria listed
in division L, section 165 of the Consolidated Appropriations Act,
2023. Such amounts are in addition to the CIG amounts identified in the
FFGA.
------------------------------------------------------------------------
------------------------------------------------------------------------
Additional Funding to Projects with Existing FFGAs--FY 2023
------------------------------------------------------------------------
Additional Funding for Existing FFGAs............... $425,000,000
-------------------
Total Apportioned................................. 425,000,000
------------------------------------------------------------------------
3. Basis for Allocation
CIG Funds are allocated on a discretionary basis and subject to
program evaluation. However, the $425 million in additional funding to
projects with existing FFGAs was allocated based on factors identified
in the Consolidated Appropriations Act, 2023.
4. Eligible Expenses
See beginning of section D above.
5. Requirements
Project sponsors should reference the FTA website at https://www.transit.dot.gov/CIG for the most current Capital Investment Grants
program policy guidance to learn what is required to enter and advance
through the program. Grant-related guidance is found in FTA Circular
9300.1B, Capital Investment Grant Program Guidance and Application
Instructions, November 1, 2008; and C5200.1A, Full Funding Grant
Agreement Guidance, December 5, 2002.
6. Period of Availability
Funding is available for four years, which is the fiscal year in
which the amount is allocated to a project plus three additional years.
Therefore, funds for a project allocated funding in FY 2023 must be
obligated for the project by September 30, 2026. Section 5309 funds
that remain unobligated after four fiscal years to the projects for
which they were originally designated may be made available for other
section 5309 projects.
E. Enhanced Mobility of Seniors and Individuals With Disabilities
Program (49 U.S.C. 5310)
The Enhanced Mobility of Seniors and Individuals with Disabilities
Program provides formula funding apportioned to direct recipients:
States for rural (population under 50,000) and small urbanized areas
(population from 50,000 to 199,999); and designated recipients chosen
by the Governor of the State for large urbanized areas (populations of
200,000 or more); or a State or local governmental entity that operates
a public transportation service. The section 5310 program provides
capital and operating assistance to improve the mobility for older
adults and people with disabilities by removing barriers to
transportation service and expanding transportation mobility options.
This program supports transportation services planned, designed, and
carried out to meet the transportation needs of older adults and people
with disabilities.
This program provides funds for capital and operating assistance
for: (1) public transportation to meet the needs of older adults and
people with disabilities when public transportation is insufficient,
inappropriate, or unavailable; (2) public transportation projects that
exceed the requirements of the Americans with Disabilities Act (ADA);
(3) public transportation projects that improve access to fixed-route
service and decrease reliance on complementary paratransit; and (4)
alternatives to public transportation that meet the transportation
needs of older adults and people with disabilities.
Section 5310 funds are available for capital and operating expenses
to support the provision of transportation services to meet the
specific needs of older adults and people with disabilities. Additional
information on eligible expenses can be found in FTA Circular 9070.1G,
Enhanced Mobility of Seniors and Individuals with Disabilities Program
Guidance and Application Instructions, dated July 7, 2014.
[[Page 23125]]
For more information about the section 5310 program, contact
Destiny Buchanan, Office of Transit Programs, at (202) 493-8018 or
[email protected].
1. Authorized Amounts
IIJA authorized $1,943,105,343 over five years for the Enhanced
Mobility of Seniors and Individuals with Disabilities formula program,
with an additional $250 million provided in advance appropriations.
2. FY 2023 Funding Availability
In FY 2023, $429,002,836 is appropriated for the program. A total
of $428,004,567 is available for allocation after the oversight and
administrative deduction, transfer to the U.S. DOT Office of Inspector
General, and addition of reapportioned funds as shown in the table
below.
------------------------------------------------------------------------
------------------------------------------------------------------------
Section 5310 Formula Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $429,002,836
Oversight and Administrative........................ (2,890,014)
Transfer to OIG..................................... (5,000)
Reapportioned Funds................................. 1,896,745
-------------------
Total Apportioned................................. 428,004,567
------------------------------------------------------------------------
3. Basis for Formula Apportionment
Sixty percent of the funds are apportioned among designated
recipients for urbanized areas with a population of 200,000 or more
individuals. Twenty percent of the funds are apportioned among the
States for their urbanized areas with a population of at least 50,000
but less than 200,000. Twenty percent of the funds are apportioned
among the States for rural areas with a population of less than 50,000.
Census Data on Older Adults and People with Disabilities is used for
the section 5310 Enhanced Mobility of Older Adults and People with
Disabilities Apportionments. To view the table 8, which displays the
amounts apportioned under the Enhanced Mobility of Seniors and
Individuals with Disabilities Program, see FTA's FY 2023 Apportionments
web page.
Under the section 5310 formula, funds are allocated using Census
data on seniors (i.e., persons 65 and older) and people with
disabilities. However, beginning in 2010, the Census Bureau stopped
collecting this demographic information as part of its decennial
census. Data on seniors and people with disabilities is now only
available from the American Community Survey (ACS), which is conducted
and published on a rolling basis. FTA's FY 2023 section 5310
apportionments incorporate ACS data published in December 2021, which
was the most-recent data available at the start of Federal FY 2023.
Data on seniors comes from the ACS 2016--2020 five-year data set, Table
B01001, ``Sex by Age.'' Data on persons with disabilities comes from
the ACS 2016--2020 five-year data set, Table S.1810, ``Disability
Characteristics.''
4. Requirements
Eligible direct recipients include States for rural and small urban
areas and designated recipients chosen by the Governor of the State for
large urban areas. Federally recognized Indian tribes and State or
local governmental entities that operate a public transportation
service are also eligible direct recipients.
Eligible subrecipients include private nonprofit organizations, and
state or local governmental authorities approved by a state to
coordinate services for older adults and people with disabilities, or
state or local governmental authorities which certify to the Governor
that no nonprofit organizations or associations are readily available
in an area to provide the service.
Of the amounts apportioned to states and designated recipients, not
less than 55 percent of funds must be used for ``traditional'' section
5310 projects--those public transportation capital projects planned,
designed, and carried out to meet the specific needs of seniors and
individuals with disabilities when public transportation is
insufficient, unavailable, or inappropriate. Up to 45 percent of an
area's apportionment may be used for additional public transportation
projects that: exceed the Americans with Disabilities Act minimum
requirements; improve access to fixed-route service and decrease
reliance by individuals with disabilities on ADA complementary
paratransit service; or provide alternatives to public transportation
that assist seniors and individuals with disabilities with
transportation.
All projects funded under this program must be included in a
locally developed, coordinated public transit-human service
transportation plan.
5. Period of Availability
For Enhanced Mobility of Seniors and Individuals with Disabilities
Program funds apportioned under this notice, the period of availability
is the year of apportionment plus two additional years. Accordingly,
funds apportioned in FY 2023 must be obligated in grants by September
30, 2025. Any FY 2023 apportioned funds that remain unobligated at the
close of business on September 30, 2025, will revert to FTA for
reapportionment among the States and urbanized areas.
6. Other Program Highlights
Recipients may use a competitive selection process to select
projects, but it is not required. A State may transfer funds
apportioned to small, urbanized areas and rural areas to other parts of
the state if it can certify that the needs are being met in the area to
which the funds were originally apportioned. Funds apportioned to
large, urbanized areas may not be used outside the urbanized area to
which they were apportioned.
Transit service providers receiving section 5310 funds may
coordinate and assist in providing meal delivery services on a regular
basis as long as this does not conflict with the provision of transit
services.
Additional information about the requirements for the section 5310
program can be found in FTA Circular 9070.1G, Enhanced Mobility of
Seniors and Individuals with Disabilities Program Guidance and
Application Instructions, dated July 7, 2014.
F. Formula Grants for Rural Areas Program (49 U.S.C. 5311)
The Rural Areas program provides formula funding to States and
Indian tribes for the purpose of supporting public transportation in
areas with a population of less than 50,000. Funding may be used for
capital, operating, planning, job access and reverse commute projects,
and State administration expenses. Eligible subrecipients include State
and local governmental authorities, Indian Tribes, private non-profit
organizations, and private operators of public transportation services,
including intercity bus companies. Indian Tribes are also eligible
direct recipients under section 5311, both for funds apportioned to the
States and for projects apportioned or selected to be funded with funds
set aside for a separate Tribal Transit Program.
For more information about the Formula Grants for Rural Areas
program, contact Matt Lange, Office of Transit Programs, at (312) 353-
4118 or [email protected].
1. Authorized Amounts
IIJA authorized $4.1 billion over five years to provide financial
assistance for rural areas under section 5311(c)(3). The section 5311
program includes three other programs: the Rural Transit Assistance
Program (RTAP); the
[[Page 23126]]
Appalachian Development Public Transportation Assistance Program; and
the Tribal Transit Program. These separate programs are described in
the sections that follow.
In addition to the funds made available to States under section
5311, $114.6 million of the funds authorized for the section 5340
Growing States formula factors are apportioned to States for use in
rural areas.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $804,217,747 is
available for the Rural Area Formula Program. The total amount
apportioned to the program is $914,581,455 as shown in the table below,
after the addition of section 5340 Growing States, reapportioned funds
and the oversight deduction authorized by section 5338.
------------------------------------------------------------------------
------------------------------------------------------------------------
Grants for Rural Areas Formula Program--FY 2023
------------------------------------------------------------------------
Total FY 2023 Appropriation......................... $804,217,747
Oversight Deduction................................. (4,467,876)
Section 5340 Growing States......................... 114,641,584
Reapportioned Funds................................. 190,000
-------------------
Total Apportioned................................. 914,581,455
------------------------------------------------------------------------
3. Basis for Formula Apportionment
FTA apportions section 5311 funds to the states by a statutory
formula. The majority of rural formula funds (83.15 percent) are
apportioned based on land area and population factors. In this first
tier, no state may receive more than 5 percent of the amount
apportioned on the basis of land area. The remaining rural formula
funds (16.85 percent) are apportioned based on land area, vehicle
revenue miles, and low-income individual factors. In this second tier,
no state may receive more than 5 percent of the amount apportioned on
the basis of land area, or more than 5 percent of the amounts
apportioned for vehicle revenue miles. In addition to funds made
available under section 5311, FTA adds amounts apportioned based on
rural population according to the Growing States formula factors of 49
U.S.C. 5340 to the amounts apportioned to the states under the section
5311 formula. Before FTA apportions section 5311 funds to the states,
FTA subtracts funding from the total available amounts for the
Appalachian Development Transportation Assistance Program, the Tribal
Transit Program, the Rural Transportation Assistance Program (RTAP),
and FTA oversight activities.
Data from the Rural Module of the National Transit Database (NTD)
was used for this apportionment, including data from directly reporting
Indian tribes. Data from public transportation systems that reported to
the Annual (Urbanized Area) Module, and not attributable to an
urbanized area, was also included.
4. Requirements
The section 5311 program provides funding for capital, operating,
planning, job access and reverse commute projects, and administration
expenses for public transit service in rural areas under 50,000 in
population. The planning activities undertaken with section 5311 funds
are in addition to those awarded to the State under section 5305 and
must be used specifically for rural areas' needs. Additional
information on eligible expenses can be found in Circular 9040.1G,
Formula Grants for Rural Areas: Program Guidance and Application
Instructions, dated October 24, 2014.
a. Intercity Bus Transportation
Each State must spend no less than 15 percent of its annual Rural
Areas Formula apportionment for the development and support of
intercity bus transportation, unless it can certify, after consultation
with affected intercity bus service providers, that the intercity bus
service needs of the State are adequately being met.
b. State Administration
States may elect to use up to 10 percent of their apportionment at
100 percent Federal share to administer the section 5311 program and
provide technical assistance to subrecipients.
c. Eligibility for Safety Certification Training
Recipients of section 5311 funds are permitted to use not more than
0.5 percent of their formula funds under the Rural Areas program to pay
not more than 80 percent of the cost of participation for an employee
who is directly responsible for safety oversight to participate in
public transportation safety certification training. Safety
certification training program requirements are established in
accordance with section 5329.
The Federal share for capital assistance is 80 percent and for
operating assistance is 50 percent, except that States eligible for the
sliding scale match under FHWA programs may use that match ratio for
section 5311 capital projects and 62.5 percent of the sliding scale
capital match ratio for operating projects.
Each State prepares an annual program of projects, which must
provide for fair and equitable distribution of funds within the States,
including Indian reservations, and must provide for maximum feasible
coordination with transportation services assisted by other Federal
sources.
Additional program guidance for the Rural Areas Program is found in
FTA Circular 9040.1G, Formula Grants for Rural Areas: Program Guidance
and Application Instructions, dated October 24, 2014, and is
supplemented by additional information and changes provided in this
notice and that may be posted to FTA's section 5311 web page.
5. Period of Availability
Section 5311 funds remain available to states for obligation for
three Federal fiscal years, beginning with the year of apportionment
plus two additional years. The Rural Areas program funds apportioned in
this notice are available for obligation during FY 2023 plus two
additional years. Any FY 2023 apportioned funds that remain unobligated
at the close of business on September 30, 2025, will revert to FTA for
reapportionment under the Rural Areas program.
G. Rural Transportation Assistance Program (49 U.S.C. 5311(b)(3))
The Rural Transportation Assistance Program (RTAP) provides funding
to states to assist in the design and implementation of training and
technical assistance projects, research, and other support services
tailored to meet the needs of transit operators in rural areas.
The National Rural Transit Assistance Program (NRTAP) is
administered through a cooperative agreement and re-competed at five-
year intervals. In 2019, FTA awarded a cooperative agreement to
Neponset Valley Transportation Management Association to administer
NRTAP. NRTAP addresses the training and technical assistance needs of
rural and tribal transit operators across the nation and supports state
RTAP programs. NRTAP's comprehensive set of free technical assistance
programs and resources includes training materials, webinars,
newsletters and technical briefs, peer resources, research, and
innovative technology initiatives.
For more information about Rural Transportation Assistance Program
(RTAP) contact Matt Lange, Office of Transit Programs, at (312) 353-
4118 or [email protected].
[[Page 23127]]
1. Authorized Amounts
IIJA authorizes $105 million over five years to carry out this
program. Of this amount, 15 percent is reserved for the National RTAP
program.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $17,871,506 is
available for the RTAP. The total amount apportioned for RTAP is
$15,190,780 as shown in the table below, after the deduction for NRTAP.
------------------------------------------------------------------------
------------------------------------------------------------------------
Rural Transportation Assistance Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $17,871,506
National RTAP....................................... (2,680,726)
-------------------
Total Apportioned................................. 15,190,780
------------------------------------------------------------------------
State allocations are shown in table 9 posted on FTA's FY 2023
Apportionments web page.
3. Basis for Formula Apportionment
FTA allocates funds to the States by an administrative formula.
First, FTA allocates $65,000 to each State ($10,000 to territories),
and then allocates the balance based on rural population.
4. Requirements
Eligible expenses include the design and implementation of training
and technical assistance projects, research, and other support services
tailored to meet the needs of transit operators in rural areas.
States may use the funds to undertake research, training, technical
assistance, and other support services to meet the needs of transit
operators in rural areas. These funds should be used in conjunction
with a State's administration of the Rural Areas Formula Program and
may also support the rural components of the section 5310 program.
5. Period of Availability
The section 5311 RTAP funds apportioned in this notice are
available for obligation in FY 2023 plus two additional years,
consistent with that established for the section 5311 program. Any FY
2023 apportioned funds that remain unobligated at the close of business
on September 30, 2025, will revert to FTA for reapportionment under the
Rural Areas program.
H. Appalachian Development Public Transportation Assistance Program (49
U.S.C. 5311(c)(2))
This program provides additional funding to support public
transportation in the Appalachian region. There are thirteen eligible
States that receive an allocation under this provision. The States and
their allocation are shown in the table 9 posted on FTA's FY 2023
Apportionments web page.
For more information about the Appalachian Development Public
Transportation Assistance Program, contact Matt Lange, Office of
Transit Programs, at (312) 353-4118 or [email protected].
1. Authorized Amounts
A total of $137.4 million is authorized over five years to support
public transportation in the Appalachian region.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $26,807,258
million is available. The total amount apportioned to the program is
$26,849,056 as shown in the table below, after the addition of
reapportioned funds.
------------------------------------------------------------------------
------------------------------------------------------------------------
Appalachian Development Public
Transportation Assistance Program--FY 2023
------------------------------------------------------------------------
Total FY 2023 Available............................. $26,807,258
Reapportioned Funds................................. 41,798
-------------------
Total Apportioned................................. 26,849,056
------------------------------------------------------------------------
3. Basis for Formula Apportionment
FTA apportions the funds using percentages established under
section 9.5(b) of the Appalachian Regional Commission Code (subtitle IV
of title 40 U.S.C.). Allocations are based in general on each State's
remaining estimated need to complete eligible sections of the
Appalachian Development Highway System as determined from the latest
percentages of available cost estimates for completion of the System.
Allocations contain upper and lower limits in amounts determined by the
Commission and are made in accordance with legislative instructions.
4. Requirements
Funds apportioned under this program can be used for purposes
consistent with section 5311 to support public transportation in the
Appalachian region. Funds can be applied for in the State's annual
section 5311 grant. Appalachian program funds that cannot be used for
operating may be used for a highway project under certain
circumstances. States should contact their Regional Office if they
intend to request a transfer. Additional information about the
requirements for this section can be found in chapter VII of FTA
Circular 9040.1G, Formula Grants for Rural Areas: Program Guidance and
Application Instructions, dated October 24, 2014.
5. Period of Availability
Section 5311 Appalachian program funds are available for three
years, which includes the year of apportionment plus two additional
years, consistent with that established for the section 5311 program.
Any FY 2023 apportioned funds that remain unobligated at the close of
business on September 30, 2025, will revert to FTA for reapportionment
under the Rural Areas program.
I. Formula Grants for Public Transportation on Indian Reservations
Program (49 U.S.C. 5311(j))
The Public Transportation on Indian Reservations Program or Tribal
Transit Program (TTP) is funded as a takedown from the section 5311
program. Eligible direct recipients are federally recognized American
Indian Tribes and Alaskan Native Villages, groups and communities
providing public transportation in rural areas. The TTP funds are
allocated for grants to eligible recipients for any purpose eligible
under section 5311, which includes capital, operating, planning, and
job access and reverse commute projects. No local match is required for
TTP formula funds.
For more information about the Tribal Transit Program contact Elan
Flippin-Jones, Office of Transit Programs at (202) 366-3800 or
[email protected].
1. Authorized Funding
A total of $229 million is authorized over five years, of which
$183.2 million is for a formula program and $45.8 million is for a
discretionary grant program.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $35,743,011 is
available for the Tribal Transit formula program. The total apportioned
for the formula program is $36,413,211 after the addition of
reapportioned funds.
------------------------------------------------------------------------
------------------------------------------------------------------------
Public Transportation on Indian
Reservations Program Formula Grants--FY 2023
------------------------------------------------------------------------
Total FY 2023 Appropriation Available............... $35,743,011
Reapportioned Funds................................. 670,200
-------------------
Total Apportioned................................. 36,413,211
------------------------------------------------------------------------
[[Page 23128]]
3. Basis for Formula Apportionment
Funding is allocated by formula to eligible Indian Tribes providing
public transportation on tribal lands in rural areas. The formula
apportionment shown in Table 10 is based on a statutory formula which
includes three tiers. Tiers 1 and 2 are based on data reported to NTD
by Indian tribes; Tier 3 is based on 2016-2020 American Community
Survey data. The three tiers for the formula are: Tier 1--50 percent
based on vehicle revenue miles reported to the NTD; Tier 2--25 percent
provided in equal shares to Indian Tribes reporting at least 200,000
vehicle revenue miles to the NTD; Tier 3--25 percent based on Indian
Tribes providing public transportation on Tribal Lands (American Indian
Areas, Alaska Native Areas, and Hawaiian Home Lands) on which more than
1,000 low income individuals reside. If more than one Tribe provides
public transportation services on Tribal Lands in a single Tribal
Statistical area, and the tribes cannot determine how to allocate Tier
3 funds, FTA will allocate the funds based on the relative portion of
transit (as defined by unlinked passenger trips) operated by each
Tribe, as reported to the National Transit Database.
4. Requirements
Formula funds apportioned under this program can be used for
purposes consistent with section 5311 to support public transportation
on Indian Reservations in rural areas.
Section 5335 requires NTD reporting for all direct recipients and
subrecipients of section 5311 funds. This reporting requirement has and
continues to apply to the Tribal Transit Program. Tribes that provide
public transportation in rural areas are reminded to report annually so
they are included in the TTP formula apportionments. Tribes needing
assistance with reporting to the NTD should contact the NTD Helpdesk:
[email protected] or the Appian NTD Reporting Application Support line:
(877) 561-7466.
Additional program guidance for the TTP is found in FTA Circular
9040.1G, Formula Grants for Rural Areas: Program Guidance and
Application Instructions, dated October 24, 2014, and is supplemented
by additional information and changes provided in this notice and that
may be posted to FTA's Tribal Transit web page.
5. Period of Availability
Funding under the TTP is available for three years, which includes
the year of apportionment or allocation plus two additional years,
consistent with that established for the section 5311 program. Any FY
2023 formula funds that remain unobligated at the close of business on
September 30, 2025, will revert to FTA for reapportionment under the
TTP.
6. Other Program Highlights
The funds set aside for the TTP are not meant to replace or reduce
funds that Indian Tribes receive from States through the section 5311
program but are to be used to enhance public transportation on Indian
reservations and transit serving Tribal communities. Funds allocated to
Indian Tribes by a State may be included in the State's section 5311
application or awarded by FTA in a grant directly to the Indian Tribe.
FTA encourages Indian Tribes intending to apply to FTA as direct
recipients to contact the appropriate FTA Regional Office at the
earliest opportunity.
TTP recipients must comply with all applicable Federal statutes,
regulations, executive orders, FTA circulars, and other Federal
requirements in carrying out the project supported by the FTA grant.
FTA assists Tribes with understanding these requirements through Tribal
Transit Technical Assistance Workshops, and the Tribal Transit
Technical Assistance Assessments initiative. Through these assessments,
FTA collaborates with Tribal Transit grantees to review processes and
identify areas in need of improvement and then assist with solutions to
address these needs--all in a supportive and mutually beneficial
manner. Information about upcoming workshops and other technical
assistance opportunities will be posted on the FTA website. FTA's
Regional Tribal Transit Liaisons are available to assist Tribes with
applying for and managing FTA grants. A list of Regional Tribal Transit
Liaisons can be found on FTA's website at: https://www.transit.dot.gov/funding/grants/federal-transit-administrations-regional-tribal-liaisons.
The Tribal Transportation Self-Governance Program (TTSGP) was
authorized by the FAST Act and is codified at 23 U.S.C. 207. Grant
funding made available through the FTA formula or competitive TTP may
be included in a Tribal Transportation Self-Governance funding
agreement if there is an existing Self-Governance compact in place
between the Tribe and the Department of Transportation. If funds are
transferred to a Tribal Self-Governance funding agreement, the funds
will be subject to the requirements and provisions of the Tribal
Transportation Self-Governance Program regulation at 49 CFR part 29 and
may be used only for the purpose for which they were awarded.
For more information about the Tribal Transit Program, please
contact Elan Flippin-Jones at [email protected] or (202)366-3800.
J. Public Transportation Innovation (49 U.S.C. 5312)
FTA's innovative research program includes three distinct programs:
(a) a Research, Development, Demonstration, Deployment, and Evaluation
program (49 U.S.C. 5312(b)-(e)); (b) a Low or No Emission Vehicle
Component Assessment Program (Lo-No CAP) (49 U.S.C. 5312(h)); and (c) a
Transit Cooperative Research Program (TCRP) (49 U.S.C. 5312(i)).
For more information about the Public Transportation Innovation
program, contact Mary Leary, Office of Research, Demonstration and
Innovation at (202) 366-4052 or [email protected].
1. Authorized Funding
IIJA authorizes $192.8 million over five years.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $32,789,262 is
available for the Public Transportation Innovation program. The total
amounts apportioned to each subcomponent of the program is shown below
in the table.
------------------------------------------------------------------------
------------------------------------------------------------------------
Public Transportation Innovation--FY 2023
------------------------------------------------------------------------
Research, Development, Demonstration, Deployment, $32,789,262
and Evaluation.....................................
Low or No Emission Vehicle Component Testing........ 5,104,455
Transit Cooperative Research Program (TCRP)......... 6,716,026
-------------------
Total Apportioned................................. 44,609,743
------------------------------------------------------------------------
3. Basis for Allocation of Funds
Section 5312 funds are allocated according to the authorized
purposes and amounts described above, and then remaining amounts are
subject to discretionary allocations where not specifically authorized.
For FY 2023, FTA intends to fund projects and activities in support of
the FTA FY 2023 action plan in five major areas: safety, climate and
resiliency, equity, economic strength, and transformation. The
Consolidated Appropriations Act, 2023, included $7 million in Transit
[[Page 23129]]
Infrastructure Grants, including: $1 million for demonstration and
deployment for innovation mobility solutions; $1 million for the
accelerating innovative mobility initiative; and $5 million for
technical assistance, research, demonstration, or deployment activities
or projects to accelerate the adoption of zero emissions buses.
Projects may be selected through competitive Notices of Funding
Opportunity (NOFO), noncompetitive awards, and partnerships with other
Federal entities through interagency agreements. Potential recipients
can register to receive information on NOFOs that are released under
this program on https://www.Grants.gov.
4. Eligible Expenses
Eligible expenses include activities involving research; innovation
and development; demonstration, deployment, and evaluation; accelerated
implementation and deployment of advanced digital construction
management systems; evaluation; low or no emission vehicle component
testing and research; and the Transit Cooperative Research Program.
5. Requirements
Generally, the Government share of the cost of a project carried
out under section 5312 shall not exceed 80 percent, except if there is
substantial public interest or benefit, FTA may approve a greater
Federal share. The non-Government share of the cost of a project
carried out under section 5312 may be derived from in-kind
contributions. If FTA determines that there would be a clear and direct
financial benefit to an entity under a grant, contract, cooperative
agreement, or other agreement under this section, FTA shall establish a
Government share of the costs of the project to be carried out under
the grant, contract, cooperative agreement, or other agreement that is
consistent with the benefit. However, for the Lo-No Component Testing
Program, the Government share is 50 percent; the remaining 50 percent
of the costs will be paid by amounts recovered through the fees
established by the testing facilities. There is no match requirement
for the TCRP.
Application instructions and program management guidelines are set
forth in FTA Circular 6100.1E, Technology Development and Deployment,
``Research, Technical Assistance and Training Program: Application
Instructions and Program Management Guidelines'' dated April 10, 2015.
All research recipients are required to work with FTA to develop
approved Statements of Work.
Pursuant to the Small Business Innovation Development Act, a
portion of the section 5312 funds must be set aside for the
Department's Small Business Innovation Research program to address high
priority research that will demonstrate innovative, economic, accurate,
and durable technologies, devices, applications, or solutions to
significantly improve current transit-related service including transit
vehicle operation, safety, infrastructure and environmental
sustainability, mobility, rider experience, or broadband communication.
6. Period of Availability
FTA establishes the period in which the funds must be obligated to
the project. If the funds are not obligated within that period of time,
they revert to FTA for reallocation under the program.
K. Technical Assistance and Workforce Development (49 U.S.C. 5314)
The Technical Assistance and Workforce Development program, 49
U.S.C. 5314, provides assistance to: (1) carry out technical assistance
activities that enable more effective and efficient delivery of
transportation services, foster compliance with Federal laws, and
improve public transportation service; (2) develop standards and best
practices for the transit industry; and (3) address public
transportation workforce needs through research, outreach, training and
the implementation of a frontline workforce grant program, and conduct
training and educational programs in support of the public
transportation industry.
For more information about the Technical Assistance and Workforce
Development program, contact Mary Leary, Office of Research,
Demonstration, and Innovation at 202-366-4052 or [email protected].
1. Authorized Amounts
IIJA authorizes $61.98 million over five years for technical
assistance. Of this amount, $34.4 million is authorized for the
National Transit Institute under section 5314(c).
2. FY 2023 Funding Availability
In FY 2023, under the Consolidated Appropriations Act, 2023,
$19,588,846 is available for the Technical Assistance and Workforce
Development program, as shown in the table below. The total apportioned
for the formula program is $12,872,820 after the deduction of $6.7
million for National Transit Institute.
------------------------------------------------------------------------
------------------------------------------------------------------------
Technical Assistance and Workforce Development--FY 2022
------------------------------------------------------------------------
Technical Assistance, Standards Development & Human $19,588,846
Resource Training..................................
National Transit Institute.......................... (6,716,026)
-------------------
Total Appropriated................................ 12,872,820
------------------------------------------------------------------------
3. Basis for Allocation of Funds
Under the appropriated amounts for section 5314, $6.7 million is
available for the National Transit Institute (NTI) in FY 2023. The
remaining $12.87 million of appropriated funds will be allocated in
support of both FTA and USDOT strategic goals for technical assistance,
standards development, and workforce development. Projects may be
selected through Notices of Funding Opportunity (NOFO) or sole source
cooperative agreements. Potential recipients can register to receive
notification of NOFOs under this program on https://www.Grants.gov.
Once selected, FTA enters into cooperative agreements, contracts,
or other agreements to award funds and manage the projects carried out
under this section.
4. Eligible Expenses
Eligible expenses include activities involving (a) technical
assistance; (b) standards development; and (c) human resources and
training, which includes workforce development programs and activities
as well as supportive services. Supportive services are wraparound
services that help individuals, and especially those from
underrepresented and underserved groups, enroll in and successfully
complete training. For mor information on Supportive Services please go
to: https://www.transit.dot.gov/funding/grants/federal-transit-administration-faqs-supportive-services.
Eligible technical assistance activities may include activities to
support: (a) compliance with the Americans with Disabilities Act (ADA);
(b) compliance with coordinating planning and human services
transportation; (c) meeting the transportation needs of elderly
individuals; (d) increasing transit ridership in coordination with MPOs
and other entities, particularly around transit-oriented development;
(e) addressing transportation equity with regard to the effect that
transportation planning, investment, and operations have for low-income
and minority individuals; (f) facilitating best practices to promote
bus driver safety; (g) compliance with Buy America and pre- and post-
award audits; (h) assisting with the development and deployment of low
[[Page 23130]]
and no emission vehicles or components for vehicles; (i) and other
technical assistance activities that are necessary to advance the
interests of public transportation.
Eligible standards activities include the development of voluntary
and consensus-based standards and best practices by the industry to
include those needed for safety, fare collection, intelligent
transportation systems, accessibility, procurement, security, asset
management, operations, maintenance, vehicle propulsion,
communications, and vehicle electronics.
Eligible human resources and training activities include (a)
employment training programs; (b) outreach programs to increase
employment for veterans, females, individuals with disabilities, and
minorities in public transportation activities; (c) research on public
transportation personnel and training needs; (d) training and
assistance for veteran and minority business opportunities; and (e)
consensus-based national training standards and certifications in
partnership with industry stakeholders. FTA funding directly allocated
for these eligible purposes must be done through a competitive
frontline workforce development program as required in the
authorization. Should FTA allocate funds for these purposes, it will
advertise the available funding in a Notice of Funding Opportunity
(NOFO) on https://www.Grants.gov and on its website. FTA will be
issuing additional guidance in the coming months on how recipients can
utilize their formula funds in support of these eligible activities.
5. Requirements
Generally, the Government's share of the cost of a project carried
out using a grant under section 5314 shall not exceed 80 percent.
However, for the human resources and training, including the Innovative
Public Transportation Frontline Workforce Development Program, the
Government's share cannot exceed 50 percent. The Federal share for
other types of awards will be stated in the agreement. In some cases,
FTA may require a higher non-Federal share if FTA determines a
recipient would obtain a clear and direct financial benefit from the
project, or if the non-Federal share is an evaluation factor under a
competitive selection process. There is no match requirement for the
National Transit Institute.
Application instructions and program management guidelines are set
forth in FTA Circular 6100.1E, Research, Technical Assistance and
Training Program: Application Instructions and Program Management
Guidelines dated April 10, 2015.
Under 49 U.S.C. 5314(b)(4), recipients may use no more than 0.5
percent of their section 5307, 5337 and 5339 funds to support workforce
development activities. In addition, 49 U.S.C. 5314(c)(4) allows
recipients to use no more than 0.5 percent of their 5307, 5337, and
5339 funds to attend NTI training. Both provisions allow recipients to
use these funds to pay up to 80 percent of the cost of training.
6. Period of Availability
FTA establishes the period in which the funds must be obligated to
the project. If the funds are not obligated within that period of time,
they revert to FTA for reallocation under the program.
7. Other Program Highlights
For more information about the NTI, contact Lisa Colbert, at the
FTA Office of Research, Demonstration, and Innovation (TRI):
[email protected] or call 202-366-9261.
L. Public Transportation Emergency Relief Program (49 U.S.C. 5324)
FTA's Emergency Relief (ER) Program is authorized to provide
funding for public transportation expenses incurred as a result of an
emergency or major disaster. The Consolidated Appropriations Act, 2023
(Pub. L. 117-328), appropriated $213,905,338 for FTA's Emergency Relief
Program for transit systems affected by major declared disasters
occurring in calendar years 2017, 2020, 2021, and 2022. Costs related
to the COVID-19 pandemic are not eligible for this funding. After the
administrative takedown of 0.75 percent, FTA announced a Notice of
Availability of Emergency Relief Funding (NAERF), the availability of
$212,301,048 in FY 2023.
In the event of a publicly declared emergency or disaster, eligible
expenses will include emergency operating expenses, such as
evacuations, rescue operations, and expenses incurred to protect assets
in advance of a disaster, as well as capital projects to protect,
repair, reconstruct, or replace equipment and facilities of a public
transportation system in the United States or on an Indian reservation
that the Secretary determines is in danger of suffering serious damage
or has suffered serious damage as a result of an emergency. Additional
information on eligible expenses and the process for applying for ER
Program funding can be found in FTA's Emergency Relief Manual: A
Reference Manual for States & Transit Agencies on Response and Recovery
from Declared Disasters and FTA's Emergency Relief Program (49 U.S.C.
5324), which was published on October 5, 2015.
Recipients of FTA funding affected by a declared emergency or
disaster are authorized to use funds apportioned under sections 5307
and 5311 for emergency purposes. Recipients are advised that formula
funds used for emergency purposes will not be replaced or restored with
funding available through FTA under the ER Program or by the Federal
Emergency Management Agency (FEMA).
In the event of a disaster affecting a public transportation
system, the affected recipient should contact their FTA Regional Office
as soon as practicable to determine whether Emergency Relief funds are
available, and to notify FTA that it plans to seek reimbursement for
emergency operations or repairs that have already taken place or are in
process. If Emergency Relief funds are unavailable the recipient may
seek reimbursement from FEMA. Properly documented costs for which the
recipient has not received reimbursement from FEMA may later be
reimbursed by grants made either from section 5324 funding (if
appropriated) or sections 5307 and 5311 program funding, once the
eligible recipient formally applies to FTA for reimbursement and FTA
determines that the expenses are eligible for emergency relief.
In addition, before receiving a grant under this section following
an emergency, the recipient shall: (1) submit documentation
demonstrating proof of insurance required under Federal law for all
structures related to the grant application; and (2) certify that the
recipient has insurance required under State law for all structures
related to the grant application.
Additional information about the Emergency Relief program is
available on the FTA website at https://www.transit.dot.gov/funding/grant-programs/emergency-relief-program.
For more information, contact Tom Wilson, Office of Program
Management, at 202-366-5279 or [email protected].
M. Public Transportation Safety Program (49 U.S.C. 5329)
Section 5329(e)(6) provides funding to support States with rail
fixed guideway public transportation systems (rail transit systems) to
develop and carry out State Safety Oversight (SSO) Programs consistent
with the requirements of 49 U.S.C. 5329. For more information,
[[Page 23131]]
contact Maria Wright, Office of Safety Review at (202) 366-5922 or
[email protected].
1. Authorized Amounts
A total of $251.6 million is authorized over five years for the
State Safety Oversight Program.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $49,066,231 is
available for the State Safety Oversight (SSO) Formula program. The
total apportioned for the formula program is $50,416,539 after the
addition of reapportioned funds, as shown in the table below.
------------------------------------------------------------------------
------------------------------------------------------------------------
Public Transportation Safety Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $49,066,231
Reapportioned Funds................................. 1,350,308
-------------------
Total Apportioned................................. 50,416,539
------------------------------------------------------------------------
3. Basis for Formula Apportionment
FTA will continue to allocate funds to the States by an
administrative formula, which is detailed in the Federal Register
notice which apportioned the initial SSO Formula Grant Program funds
(79 FR 13380). Grant funds for the SSO program are apportioned to
eligible States using a three-tier formula based on statutory
requirements, which apportion 60 percent of available funds based on
rail transit system vehicle passenger miles (PMT), vehicle revenue
miles (VRM), and directional route miles (DRM), 20 percent of available
funds equally to each eligible State, and 20 percent based on the
number of rail transit systems.
4. Requirements
FTA requires each applicant to demonstrate in its grant application
that its proposed grant activities will develop, lead to, or carry out
a State Safety Oversight program that meets the requirements under 49
U.S.C. 5329(e). Grant funds may be used for program operational and
administrative expenses, including employee training activities. Please
see the Federal Register notice (79 FR 13380) for more information.
IIJA enhances State safety oversight programs by strengthening rail
inspection practices by providing state safety oversight agencies
authority to collect and analyze data and conduct risk-based
inspections of rail fixed guideway transportation systems. Recipients
may also use funds in support of the development and implementation of
transmission-based train control systems that enforce train speed
regulation and ensure train separation and collision avoidance. FTA
continues to be authorized to issue restrictions and prohibitions to
address unsafe conditions or practices, and to withhold funds for non-
compliance with safety requirements.
5. Period of Availability
SSO Formula Grant Program funds are available for the year of
apportionment plus two additional years. Any FY 2023 funds that remain
unobligated as of September 30, 2025, will revert to FTA for
reapportionment under the SSO Formula Grant Program.
N. State of Good Repair Program (49 U.S.C. 5337)
The State of Good Repair (SGR) program provides capital assistance
for maintenance, replacement, and rehabilitation projects of existing
high intensity fixed guideway and high intensity motorbus systems to
maintain a state of good repair. Additionally, SGR grants are eligible
for developing and implementing Transit Asset Management plans. This
program provides funding for the following fixed guideway transit
modes: rapid rail (heavy rail), commuter rail, light rail, hybrid rail,
monorail, automated guideway, trolleybus (using overhead catenary),
aerial tramway, cable car, inclined plane (funicular), passenger ferry,
and bus rapid transit. Fixed-route bus capital projects for services
operating on high-occupancy-vehicle (HOV) facilities are also funded
through the High Intensity Motorbus tier of this program. Of the amount
authorized for section 5337 each year, $300 million is set aside for
the competitive Rail Vehicle Replacement Program.
FTA published the State of Good Repair program guidance, FTA
Circular 5300.1, State of Good Repair Grants Program: Guidance and
Application Instructions, on January 28, 2015.
For more information about the SGR program, contact Donna Iken,
Office of Transit Programs, at (202) 366-0876 or [email protected].
1. Authorized Amounts
IIJA authorized $18.39 billion over five years for the State of
Good Repair program, including $1.5 billion for the Rail Vehicle
Replacement Program, and provided an additional $4.75 billion in
advance appropriations.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $4,537,778,037 is
available for the State of Good Repair Program. The total amount
apportioned is $4,183,665,069 after the deductions for oversight and
transfers to OIG, the set-aside for the rail vehicle replacement
program, and the addition of reapportioned funds as shown in the table
below. Of the total amount apportioned, $4,063,735,620 is apportioned
to the High Intensity Fixed Guideway Formula and $119,929,449 is
apportioned to the High Intensity Motorbus Formula.
------------------------------------------------------------------------
------------------------------------------------------------------------
State of Good Repair Formula Program--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $4,537,778,037
Oversight Deductions................................ (54,782,780)
Transfer to OIG..................................... (95,000)
Reapportioned Funds................................. 764,812
FY 2023 Rail Replacement Competitive Grant.......... (300,000,000)
-------------------
Total Available to Apportion.................... 4,183,665,069
Total Apportioned to High Intensity Fixed 4,063,735,620
Guideway Formula...............................
Total Apportioned to High Intensity Motorbus 119,929,449
Formula..........................................
------------------------------------------------------------------------
3. Basis for Formula Apportionment
FTA allocates State of Good Repair program funds according to a
statutory formula. Funds are apportioned to urbanized areas with high
intensity fixed guideway and high intensity motorbus systems that have
been in operation for at least seven years. This means that only
segments of high intensity fixed guideway and motorbus systems that
entered into revenue service on or before September 30, 2015, are
included in the formula, as identified in the NTD.
The law requires that 97.15 percent of the total amount authorized
for the State of Good Repair program be apportioned to urbanized areas
with ``High Intensity Fixed Guideway'' systems. The apportionments to
urbanized areas with ``High Intensity Fixed Guideway'' systems are
determined by two equal elements: (1) the proportion of the amount an
urbanized area would have received in FY 2011 to the total amount
apportioned to all urbanized areas in FY 2011 using new fixed guideway
definition; and (2) the proportion of vehicle revenue miles of an
urbanized area to the total vehicle revenue miles of all urbanized
areas and the proportion of directional route miles of an urbanized
area to the total directional route miles of all urbanized areas. High
Intensity Motorbus systems will receive the remaining 2.85 percent of
the total amount authorized for the State of Good
[[Page 23132]]
Repair program, and the apportionments to urbanized areas are based on
vehicle revenue miles and directional route miles.
Vehicle revenue miles and directional route miles attributable to
an urbanized area must be placed in revenue service at least 7 years
before the first day of the fiscal year. A threshold level of more than
one mile of high intensity fixed guideway is required in order to
receive State of Good Repair funds. Therefore, urbanized areas
reporting one mile or less of fixed guideway mileage under the NTD are
not included. FTA will apportion funds to designated recipients in the
UZAs (see section IV.C. of this notice for more information about
designated recipients; FTA will apportion section 5337 funds to the
section 5307 designated recipient for the UZA) with high intensity
fixed guideway and/or high intensity motorbus systems operating at
least 7 years. The designated recipients will then allocate funds as
appropriate to recipients that are public entities in the urbanized
areas and provide split letters to FTA. FTA can make grants to direct
recipients after sub-allocation of funds.
4. Eligible Expenses
Eligible activities include projects that maintain, rehabilitate,
and replace transit assets, as well as projects that implement Transit
Asset Management plans. Additionally, training and workforce
activities, including supportive services, authorized under 49 U.S.C.
5314(b) and (c) are eligible for the State of Good Repair funds; funds
for such activities are limited to 1 percent of the total amount
apportioned to the recipient (0.5 percent for each of the authorized
activities). See section IV.K. of this notice for more information on
workforce development activities.
5. Requirements
In addition to the program guidance found in the Circular, all
recipients will need to certify that they will comply with the rule
issued under section 5326 for the Transit Asset Management plan, 49 CFR
part 625, and SGR projects will need to be included in recipients'
Transit Asset Management plans.
6. Period of Availability
The State of Good Repair Program funds apportioned in this notice
are available for obligation during FY 2023 plus three additional
years. Accordingly, funds apportioned in FY 2023 must be obligated in
grants by September 30, 2026. Any FY 2023 apportioned funds that remain
unobligated at the close of business on September 30, 2026, will revert
to FTA for reapportionment under the State of Good Repair Program.
O. Grants for Buses and Bus Facilities Program (49 U.S.C. 5339)
The section 5339 program provides funding to replace, rehabilitate,
and purchase buses and related equipment as well as construct bus-
related facilities.
Additional guidance on the section 5339(a) formula program can be
found in FTA Circular 5100.1, Bus and Bus Facilities Program: Guidance
and Application Instructions, which was published on May 18, 2015.
Information on the section 5339(b) Buses and Bus Facilities Competitive
Grant Program and the section 5339(c) Low or No Emission Vehicle
Program was published in a Notice of Funding Opportunity on January 27,
2023.
For more information about the Low or No Emission Vehicle Program
and the Buses and Bus Facilities program, contact Margaretta Veltri,
Office of Transit Programs at (202) 366-5094 or
[email protected].
1. Authorized Amounts
IIJA authorized a total of $5.5 billion to be appropriated over
five years for the Section 5339 Program. IIJA provided an additional
$5.25 billion over five years in advance appropriations for the Section
5339(c) Low or No Emission Program.
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $2,213,211,810 is
available for Grants for Buses and Bus Facilities. Of this amount:
$613,179,354 is available for the Formula Grants for Buses and Bus
Facilities Program after the deduction for oversight and the addition
of reapportioned funds; $469,445,424 is available for the Competitive
Grants for Buses and Bus Facilities Program after the takedowns for
oversight and the Low or No Emission grants; and $1,151,681,178
(including advance appropriations) is available for the Low or No
Emission Competitive Grants Program after the takedowns for oversight
and transfer to the OIG. These amounts are detailed in the table below.
------------------------------------------------------------------------
------------------------------------------------------------------------
5339(a) Formula Grants for Buses and Bus Facilities
------------------------------------------------------------------------
Total FY 2023 Appropriation Available............... $616,610,699
Oversight Deduction................................. (4,624,580)
Reapportioned Funds................................. 1,193,235
-------------------
Total Apportioned............................... 613,179,354
------------------------------------------------------------------------
Section 5339(b) Competitive Grants for Buses and Bus Facilities
------------------------------------------------------------------------
Total FY 2023 Appropriation Available............... 546,601,111
Oversight Deduction................................. (4,099,509)
Less Section 5339(c) Low or No Emission Grants (73,056,178)
(Competitive)......................................
-------------------
Total Apportioned............................... 469,445,424
------------------------------------------------------------------------
Section 5339(c) Low or No Emission Grants (Competitive)
------------------------------------------------------------------------
Total FY 2023 Available............................. 1,173,056,178
Less FY 2023 Oversight and Admin.................... (21,270,000)
Less FY 2023 Transfer to OIG........................ (105,000)
-------------------
Total Available for Allocation.................... 1,151,681,178
------------------------------------------------------------------------
3. Basis for Allocation
Section 5339(a) Buses and Bus Facilities formula program funds are
apportioned to States, territories, and designated recipients based on
a statutory formula. Under the national distribution, each State is
allocated $4 million, and each territory is allocated $1 million, for
use anywhere in the State or territory. The remainder of the available
funding is then apportioned for UZAs based on population, vehicle
revenue miles and passenger miles using the same apportionment formula
and allocation process as section 5307. Funds for UZAs under 200,000 in
population are apportioned to the State through a section 5339(a)
Governor's apportionment for allocation to eligible recipients within
such areas of the State at the Governor's discretion. Funds for UZAs
with populations of 200,000 or more are apportioned directly to one or
more designated recipients within each UZA for allocation to eligible
projects and recipients within the UZA.
4. Eligible Expenses
Eligible capital projects under the Buses and Bus Facilities
formula program (section 5339(a)) continue to include projects to
replace, rehabilitate, and purchase buses and related equipment, and
projects to construct bus-related facilities. Recipients may use up to
one-half of one percent of their section 5339 funds to support
workforce development activities, including supportive services, at an
80 percent Federal share; the eligible workforce development activities
are defined in section 5314; see section IV.K. of this notice for more
information. This provision is in addition to the one-half of one
percent that recipients may use for training
[[Page 23133]]
activities with the National Transit Institute.
5. Requirements
Eligible recipients of the Buses and Bus Facilities formula program
(section 5339(a)) include designated recipients that operate fixed
route bus service or that allocate funding to fixed route bus
operators; and State or local governmental entities that operate fixed
route bus service that are eligible to receive direct grants under the
Urbanized Area Formula (section 5307) and Rural Formula (section 5311)
programs. Eligible subrecipients continue to include public agencies or
private nonprofit organizations engaged in public transportation,
including those providing services open to a segment of the general
public, as defined by age, disability, or low income.
The requirements of section 5307 apply to recipients of section
5339 funds within an urbanized area. The requirements of section 5311
apply to recipients of section 5339 funds within rural areas. For
additional program requirements, refer to FTA Circular 5100.1, Bus and
Bus Facilities Program: Guidance and Application Instructions.
6. Period of Availability
The Buses and Bus Facilities Formula Program funds apportioned in
this notice are available for obligation during FY 2023 plus three
additional years. Accordingly, funds apportioned in FY 2023 must be
obligated in grants by September 30, 2026. Any FY 2023 apportioned
funds that remain unobligated at the close of business on September 30,
2026, will revert to FTA for reapportionment under the Buses and Bus
Facilities Formula Program.
Discretionary program funds authorized under section 5339(b) and
(c) (Bus and Low No, respectively) follow the same period of
availability: year of allocation to a project plus three additional
years.
P. Growing States and High-Density States Formula Factors (49 U.S.C.
5340)
IIJA continues the use of formula factors to distribute additional
funds to the section 5307 and section 5311 programs for Growing States
and High-Density States. FTA will continue to publish single urbanized
and rural apportionments that show the total amount for section 5307
and 5311 programs that includes section 5340 apportionments for these
programs.
a. Authorized Amounts
IIJA authorized $3.879 billion over five years for the Growing
States and High-Density States Formula factors.
FY 2023 Funding Availability
In FY 2023, $756,523,955 is authorized and appropriated for
apportionment in accordance with the formula factors prescribed for
Growing States and High-Density States set forth in section 5340 for FY
2023.
------------------------------------------------------------------------
------------------------------------------------------------------------
Growing States and High-Density States Formula Factors--FY 2023
------------------------------------------------------------------------
5340 High Density States............................ $355,566,259
5340 Growing States................................. 400,957,696
-------------------
Total Apportioned................................. 756,523,955
------------------------------------------------------------------------
b. Basis for Formula Apportionment
Under the Growing States portion of the section 5340 formula, FTA
projects each State's 2025 population by comparing each State's
apportionment year population (as determined by the Census Bureau) to
the State's 2010 Census population and extrapolating to 2025 based on
each State's rate of population growth between 2010 and the
apportionment year. Each State receives a share of Growing States funds
on the basis of its projected 2025 population relative to the
nationwide projected 2025 population.
Once each State's share is calculated, funds attributable to that
State are divided into an urbanized area allocation and a non-urbanized
area allocation on the basis of the percentage of each State's 2010
Census population that resides in urbanized and non-urbanized areas.
Urbanized areas receive portions of their State's urbanized area
allocation on the basis of the 2010 Census population in that urbanized
area relative to the total 2010 Census population in all urbanized
areas in the State. These amounts are added to the Urbanized Area's
section 5307 apportionment. The States' rural area allocation is added
to the allocation that each State receives under the section 5311
Formula Grants for Rural Areas program.
The High-Density States portion of the section 5340 formula are
allocated to urbanized areas in States with a population density equal
to or greater than 370 persons per square mile. Based on this threshold
and 2010 Census data, the States that qualify in FY 2023 are Maryland,
Delaware, Massachusetts, Connecticut, Rhode Island, New York and New
Jersey. The amount of funds provided to each of these seven States is
allocated on the basis of the population density of the individual
State relative to the population density of all seven States. Once
funds are allocated to each State, funds are then allocated to
urbanized areas within the States on the basis of an individual
urbanized area's population relative to the population of all urbanized
areas in that State.
Q. Washington Metropolitan Area Transit Authority Grants
1. Authorized Amounts
Section 601(f) of the Passenger Rail Investment and Improvement Act
of 2008, as amended by IIJA, authorized $150 million per year for each
of fiscal years of 2022 through 2030 for capital and preventive
maintenance grants to the Washington Metropolitan Area Transit
Authority (WMATA).
2. FY 2023 Funding Availability
Under the Consolidated Appropriations Act, 2023, $150,000,000 is
available. The total amount available is $148,500,000 after the
deduction for oversight as shown in the table below.
------------------------------------------------------------------------
------------------------------------------------------------------------
Washington Metropolitan Area Transit Authority Grants--FY 2023
------------------------------------------------------------------------
Total Appropriation................................. $150,000,000
Oversight Deduction................................. (1,500,000)
-------------------
Total Apportioned................................. 148,500,000
------------------------------------------------------------------------
3. Period of Availability
Funds appropriated for WMATA under the Consolidated Appropriations
Act, 2023, shall remain available until expended.
For more information about WMATA grants, contact Kevin Osborn,
Office of Transit Programs, at (202) 366-7519 or [email protected].
R. Transit Infrastructure Grants--Community Project Funding/
Congressionally Directed Spending
For more information about Community Project Funding grants,
contact Amy Volz, Office of Transit Programs, at (202) 366-7484 or
[email protected].
1. Appropriated Amounts
The Consolidated Appropriations Act, 2023, appropriated
$360,459,324 for Community Project Funding/Congressionally Directed
Spending for 125 projects in 31 States, identified in the accompanying
Joint Explanatory Statement. Table 20 identifies the recipient,
project, amount and a project ID that will be used to identify the
project in TrAMS.
------------------------------------------------------------------------
------------------------------------------------------------------------
Community Project Funding/Congressionally Directed Spending--FY 2023
------------------------------------------------------------------------
Total Appropriated................................ $360,459,324
------------------------------------------------------------------------
[[Page 23134]]
2. Period of Availability
Funds remain available until expended. Recipients are, however,
encouraged to apply for these funds by the end of FY 2026. First time
grant recipients should contact the relevant Regional Office for
assistance to initiate steps to become a FTA recipient.
3. Requirements
As the Consolidated Appropriations Act, 2023 specifies that funds
are available for projects and activities eligible under chapter 53,
generally applicable chapter 53 requirements apply to these funds,
including the planning requirements of sections 5303 and 5304; bus
testing requirements of section 5318; general provision requirements of
section 5323 (such as Buy America compliance); contract requirements of
section 5325; project management requirements of section 5327;
nondiscrimination requirements of section 5332; disposition
requirements of section 5334; and applicability of FTA oversight of
section 5338, as well as the National Environmental Policy Act (NEPA)
and related requirements.
Unlike in FY 2022, Community Project Funding/Congressionally
Directed Spending projects funded by the Consolidated Appropriations
Act, 2023 will receive a maximum Federal share of 80 percent of the net
costs of the project. Non-Federal match of 20 percent is required for
these funds.
Upon written request by the recipient named in table 20 and a
proposed pass-through recipient, FTA may approve another entity to act
as the direct recipient of the funding and the named recipient may
serve as a subrecipient. Pre-award authority is provided consistent
with the requirements for FTA's formula funds as of the date all
necessary requirements were met (see section V, below.) However, before
incurring costs, recipients are strongly encouraged to consult with the
appropriate FTA Regional Office regarding the eligibility of the
project for future FTA funds and for questions on environmental
requirements, or any other Federal requirements that must be met before
incurring pre-award costs.
V. FTA Policy and Procedures for FY 2023 Grants
A. Automatic Pre-Award Authority To Incur Project Costs
1. Caution to New Recipients
While FTA provides pre-award authority to incur expenses before
grant award for formula programs, it recommends that first-time grant
recipients not utilize this automatic pre-award authority without
verifying with the appropriate FTA Regional Office that all pre-
requisite requirements have been met. Commonly, a new recipient may
misunderstand pre-award authority conditions and be unaware of all the
applicable FTA requirements that must be met in order to be reimbursed
for project expenditures incurred in advance of grant award. FTA
programs have specific statutory requirements that are often different
from those for other Federal grant programs with which new recipient
may be familiar. If costs are incurred for an ineligible project or
activity, or for an eligible activity but at an inappropriate time
(e.g., prior to NEPA completion), FTA will be unable to reimburse the
project sponsor, and, in certain cases, the entire project may be
rendered ineligible for FTA assistance.
2. Policy
FTA provides pre-award authority to incur expenses before grant
award for certain program areas described below. This pre-award
authority allows recipients to incur certain project costs before grant
approval and retain the eligibility of those costs for subsequent
reimbursement after grant approval. The recipient assumes all risk and
is responsible for ensuring that all conditions are met to retain
eligibility. This pre-award spending authority permits an eligible
recipient to incur costs on an eligible transit capital, operating,
planning, or administrative project without prejudice to possible
future Federal participation in the cost of the project. In this
notice, FTA continues to provide pre-award authority through the
authorization period of IIJA (October 1, 2022, through September 30,
2026) for capital assistance under all formula programs, so long as the
conditions described below are met. Pre-award authority is indicated in
the application. The actual items of cost associated with the use of
pre-award authority are documented in the initial Federal Financial
Report (FFR) that is required to be completed prior to the recipient
executing the award. FTA provides pre-award authority for planning and
operating assistance under the formula programs without regard to the
period of the authorization. For projects funded by competitive
programs, pre-award authority may be granted at the time of project
selection unless otherwise noted. All pre-award authority is subject to
conditions and triggers stated below:
a. Operating, Planning, or Administrative Assistance
FTA does not impose additional conditions on pre-award authority
for operating, planning, or administrative assistance under the formula
grant programs. Recipients may be reimbursed for expenses incurred
before grant award so long as funds have been expended in accordance
with all Federal requirements, costs would have been allowable if
incurred after the date of award, and the recipient is otherwise
eligible to receive the funding. In addition to cross-cutting Federal
grant requirements, program specific requirements must be met.
Designated recipients of section 5310 funds have pre-award authority
for the ten percent of the apportionment for program administration.
b. Transit Capital Projects
For transit capital projects, the date that costs may be incurred
varies depending on the type of activity and its potential to have a
significant impact on the human and natural environment as described in
section 3., Conditions, below.
c. Public Transportation Innovation, Technical Assistance and Workforce
Development
Unless provided for in an announcement of project selections, pre-
award authority does not apply to section 5312 Public Transportation
Innovation projects or section 5314 Technical Assistance and Workforce
Development projects. Before an applicant may incur costs for
activities under these programs, it must first obtain a written Letter
of No Prejudice (LONP) from FTA.
For more information, contact Lisa Colbert, at the FTA Office of
Research, Demonstration, and Innovation (TRI): [email protected] or
call 202-366-9261.
3. Conditions
The conditions under which pre-award authority may be utilized are
specified below:
i. Pre-award authority is not a legal or implied commitment that
the subject project will be approved for FTA assistance or that FTA
will obligate Federal funds. Furthermore, it is not a legal or implied
commitment that all items undertaken by the applicant will be eligible
for inclusion in the project.
ii. All FTA statutory, procedural, and contractual requirements
must be met.
iii. No action will be taken by the recipient that prejudices the
legal and administrative findings that FTA must make in order to
approve a project.
[[Page 23135]]
iv. Local funds expended by the recipient after the date of the
pre-award authority will be eligible for credit toward local match or
reimbursement if FTA later makes a grant or grant amendment for the
project. Local funds expended by the recipient before the date of the
pre-award authority will not be eligible for credit toward local match
or reimbursement. Furthermore, the expenditure of local funds or the
undertaking of certain activities that would compromise FTA's ability
to comply with Federal environmental laws (e.g., project implementation
activities such as land acquisition, demolition, or construction before
the date of pre-award authority) may render the project ineligible for
FTA funding.
v. The Federal amount of any future FTA assistance awarded to the
recipient for the project will be determined on the basis of the
overall scope of activities and the prevailing statutory provisions
with respect to the Federal/local match ratio at the time the funds are
obligated.
vi. For funds to which the pre-award authority applies, the
authority expires with the lapsing of the fiscal year funds.
vii. When a grant for the project is subsequently awarded, the
grant and the Federal Financial Report in TrAMS must indicate the use
of pre-award authority and an initial Federal Financial Report must be
submitted in TrAMS to associate those costs with the award.
viii. Environmental Requirements--All Federal grant requirements
must be met at the appropriate time for the project to remain eligible
for Federal funding. Designated recipients may incur costs for design
and environmental review activities for all formula funded projects
from the date of the authorization of the formula funds or for
discretionary funded projects other than those funded by the Capital
Investment Grants (CIG) program from the date of the announcement of
the competitive allocation of funds for the project.
For projects that qualify for a categorical exclusion (CE) pursuant
to 23 CFR 771.118(c), designated recipients may start activities and
incur costs under pre-award authority for property acquisition,
demolition, construction, and acquisition of vehicles, equipment, or
construction materials from the date of the authorization of formula
funds or the date of the announcement of competitive allocations for
the project.
FTA recommends that a grant applicant considering a CE pursuant to
23 CFR 771.118(c) contact the appropriate FTA Regional Office for
assistance in determining the proper environmental review process,
including other applicable environmental laws, and level of
documentation necessary before incurring the above-mentioned costs.
This applies especially when the grant applicant believes a c-list CE
with construction activities, such as 23 CFR 771.118(c)(8), (9), (10),
(12), or (13), applies to its project or if a grant applicant intends
to acquire property through the use of pre-award authority. If FTA
subsequently finds that a project does not qualify for a CE under 23
CFR 771.118(c) and the sponsor has already undertaken activities under
pre-award authority that are only allowable for projects that qualify
for a CE under 23 CFR 771.118(c), the project will be ineligible for
FTA assistance.
For all other non-CIG projects that do not qualify for a CE under
23 CFR 771.118(c), grant applicants may take action and incur costs for
property acquisition, demolition, construction, and acquisition of
vehicles, equipment, or construction materials from the date that FTA
completes the environmental review process required by NEPA and its
implementing regulations, 23 U.S.C. 139, and other environmental laws,
by its issuance of a 23 CFR 771.118(d) CE determination, a finding of
no significant impact (FONSI), a combined final environmental impact
statement (FEIS)/record of decision (ROD), or a ROD.
ix. Planning and other requirements--Formula funds must be
authorized, or appropriated, and competitive project allocations
published or announced before pre-award authority can be considered.
The requirements that a capital project be included in a locally
adopted Metropolitan Transportation Plan, the Metropolitan
Transportation Improvement Program, and the federally approved
Statewide Transportation Improvement Program (23 CFR part 450) must be
satisfied before the recipient may advance the project beyond planning
and preliminary design with non-Federal funds under pre-award
authority. If the project is located within an EPA-designated non-
attainment or maintenance area for air quality, the conformity
requirements of the Clean Air Act, 40 CFR part 93, must also be met
before the project may be advanced into implementation-related
activities under pre-award authority triggered by the completion of the
NEPA process. For a planning project to have pre-award authority, the
planning project must be included in an MPO-approved UPWP that has been
coordinated with the State.
x. Federal procurement procedures, as well as the whole range of
applicable Federal requirements (e.g., Buy America, Davis-Bacon Act,
and Disadvantaged Business Enterprise), must be followed for projects
in which Federal funding will be sought in the future. Failure to
follow any such requirements could make the project ineligible for
Federal funding. In short, the administrative flexibility requires a
recipient to make certain that no Federal requirements are
circumvented.
xi. All program specific requirements must be met. For example,
projects under section 5310 must comply with specific program
requirements, including coordinated planning.
Before incurring costs, recipients are strongly encouraged to
consult with the appropriate FTA Regional Office regarding the
eligibility of the project for future FTA funds and for questions on
environmental requirements, or any other Federal requirements that must
be met.
4. Pre-Award Authority for the Fixed Guideway Capital Investment Grants
Program
Projects proposed for section 5309 Capital Investment Grant (CIG)
program funds are required to follow a multi-step, multi-year process
defined in law. For New Starts and Core Capacity projects, this process
includes three phases: project development (PD), engineering, and
construction. For Small Starts projects, this process includes two
phases: PD and construction. After receiving a letter from the project
sponsor requesting entry into the PD phase, FTA must respond in writing
within 45 days whether the information was sufficient for entry. If
FTA's correspondence indicates the information was sufficient and the
New Starts, Small Starts or Core Capacity project enters PD, FTA
extends pre-award authority at that time to the project sponsor to
incur costs for PD activities. PD activities include the work necessary
to complete the environmental review process and as much engineering
and design activities as the project sponsor believes are necessary to
support the environmental review process. Upon completion of the
environmental review process with a Record of Decision (ROD), Finding
of No Significant Impact (FONSI), or Categorical Exclusion (CE)
determination by FTA for a New Starts, Small Starts, or Core Capacity
Improvement project, FTA extends pre-award authority to project
sponsors to incur costs for as much engineering and design as needed to
develop a reasonable cost estimate and financial
[[Page 23136]]
plan for the project, utility relocation, and real property acquisition
and associated relocations for any property acquisitions not already
accomplished as a separate project for hardship or protective purposes
or right-of-way under 49 U.S.C. 5323(q).
For Small Starts projects, upon completion of the environmental
review process and confirmation from FTA that the overall project
rating is at least a Medium, FTA extends pre-award authority for
vehicle purchases. Upon receipt of a letter notifying a New Starts or
Core Capacity project sponsor of the project's approval into the
engineering phase, FTA extends pre-award authority for vehicle
purchases as well as any remaining engineering and design, demolition,
and procurement of long lead items for which market conditions play a
significant role in the acquisition price. The long lead items include,
but are not limited to, procurement of rails, ties, and other
specialized equipment, and commodities.
Please contact the appropriate FTA Regional Office for a
determination of activities not listed here, but which meet the intent
described above. FTA provides this pre-award authority in recognition
of the long-lead time and complexity involved with purchasing vehicles
as well as their relationship to the ``critical path'' project
schedule. FTA cautions recipients that do not currently operate the
type of vehicle proposed in the project about exercising this pre-award
authority. FTA encourages these sponsors to wait until later in the
process when project plans are more fully developed. FTA reminds
project sponsors that the procurement of vehicles must comply with all
Federal requirements including, but not limited to, competitive
procurement practices, the Americans with Disabilities Act, and Buy
America. FTA encourages project sponsors to discuss the procurement of
vehicles with FTA in regard to Federal requirements before exercising
pre-award authority. Because there is not a formal engineering phase
for Small Starts projects, FTA does not extend pre-award authority for
demolition and procurement of long lead items. Instead, this work must
await receipt of a construction grant award or an expedited grant
agreement.
a. Real Property Acquisition
FTA extends pre-award authority for the acquisition of real
property and real property rights for CIG projects (New or Small Starts
or Core Capacity) upon completion of the environmental review process
for that project. The environmental review process is completed when
FTA signs a combined FEIS/ROD, ROD, FONSI or makes a CE determination.
With the limitations and caveats described below, real estate
acquisition may commence, at the project sponsor's risk. To maintain
eligibility for a possible future FTA grant award, any acquisition of
real property or real property rights must be conducted in accordance
with the requirements of the Uniform Relocation Assistance and Real
Property Acquisition Policies Act (URA) and its implementing
regulations, 49 CFR part 24. This pre-award authority is strictly
limited to costs incurred: (i) to acquire real property and real
property rights in accordance with the URA regulation, and (ii) to
provide relocation assistance in accordance with the URA regulation.
This pre-award authority is limited to the acquisition of real property
and real property rights that are explicitly documented in the draft
environmental impact statement (DEIS), FEIS, environmental assessment
(EA), or CE document, as needed for the selected alternative that is
the subject of the FTA-signed ROD or FONSI, or CE determination. This
pre-award authority regarding property acquisition that is granted at
the completion of the environmental review process does not cover site
preparation, demolition, or any other activity that is not strictly
necessary to comply with the URA, with one exception--namely when a
building that has been acquired, has been vacated and awaits demolition
poses a potential fire safety hazard or other hazard to the community
in which it is located or is susceptible to reoccupation by
unauthorized occupants. Demolition of the building is also covered by
this pre-award authority upon FTA's written agreement that the adverse
condition exists. Pre-award authority for property acquisition is also
provided when FTA makes a CE determination for a protective buy or
hardship acquisition in accordance with 23 CFR 771.118(d)(3). Pre-award
authority for property acquisition is also provided when FTA completes
the environmental review process for the acquisition of right-of-way as
a separate project in accordance with 49 U.S.C. 5323(q). When a tiered
environmental review in accordance with 23 CFR 771.111(g) is used, pre-
award authority is not provided upon completion of the first-tier
environmental document except when the Tier-1 ROD or FONSI signed by
FTA explicitly provides such pre-award authority for a particular
identified acquisition. Project sponsors should use pre-award authority
for real property acquisition relocation assistance with a clear
understanding that it does not constitute a funding commitment by FTA.
FTA provides pre-award authority upon completion of the environmental
review process for real property acquisition and relocation assistance
for displaced persons and businesses in accordance with the
requirements of the URA.
b. Reimbursement of Costs Incurred Under Pre-Award Authority
Although FTA provides pre-award authority for property acquisition,
long lead items, and vehicle purchases upon completion of the
environmental review process, FTA does not generally award Federal
funding for these activities conducted under pre-award authority until
the project receives a CIG program construction grant. This is to
ensure that Federal funds are not risked on a project whose advancement
into construction is not yet assured.
c. National Environmental Policy Act (NEPA) Activities
NEPA requires that major projects proposed for FTA funding
assistance be subjected to a public and interagency review of the need
for the project, its environmental and community impacts, and
alternatives to avoid and reduce adverse impacts. Projects of more
limited scope also need a level of environmental review, to determine
whether there are significant environmental impacts or confirmation
that a CE applies. FTA's regulation titled ``Environmental Impact and
Related Procedures,'' at 23 CFR part 771 states that the costs incurred
by a grant applicant for the preparation of environmental documents
requested by FTA are eligible for FTA financial assistance (23 CFR
771.105(f)). Accordingly, FTA extends pre-award authority for costs
incurred to comply with NEPA regulations and to conduct NEPA-related
activities, effective as of the earlier of the following two dates: (1)
the date of the Federal approval of the relevant STIP or STIP amendment
that includes the project or any phase of the project, or that includes
a project grouping under 23 CFR 450.216(j) that includes the project;
or (2) the date that FTA approves the project into the project
development phase of the CIG program. The grant applicant must notify
the appropriate FTA Regional Office upon initiation of the Federal
environmental review process consistent with 23 CFR 771.111. NEPA-
related activities include, but are not limited to, public involvement
activities, historic preservation reviews, section 4(f) evaluations,
wetlands evaluations, and endangered species consultations. This pre-
award authority
[[Page 23137]]
is strictly limited to costs incurred to conduct the NEPA process and
associated engineering, and to prepare environmental, historic
preservation and related documents. When a New Starts, Small Starts, or
Core Capacity project is granted pre-award authority for the
environmental review process, the reimbursement for NEPA activities
conducted under pre-award authority may be sought at any time through
section 5307 (Urbanized Area Formula Program) or the flexible highway
programs (e.g., Surface Transportation Program or Congestion Mitigation
and Air Quality Improvement Program). Reimbursement from the section
5309 CIG program for NEPA activities conducted under pre-award
authority is provided only for expenses incurred after entry into the
project development phase and only once a construction grant agreement
is signed. FTA reimbursement for costs incurred is not guaranteed and
recipients may not start activities and incur costs under pre-award
authority for property acquisition, demolition, construction, and
acquisition of vehicles, equipment, or construction materials until the
environmental review process is complete.
For more information about FTA's National Environmental Policy Act
(NEPA) activities, contact Megan Blum, Office of Environmental
Programs, at (202) 366-0463 or [email protected].
d. Other CIG Project Activities Requiring Letter of No Prejudice (LONP)
Except as discussed in paragraphs i through iii above, a CIG
project sponsor must obtain a written LONP from FTA before incurring
costs for any activity not covered by pre-award authority. To obtain an
LONP, an applicant must submit a written request accompanied by
adequate information and justification to the appropriate FTA Regional
Office, as described in C. Letter of No Prejudice (LONP) Policy, below.
For more information about the Fixed Guideway Capital Investment
Grants program, including LONP policy, real property acquisition, and
reimbursement of costs incurred under Pre-Award Authority, contact
Elizabeth Day, Office of Capital Project Development, at (202) 366-5159
or [email protected].
e. Pre-Award Authority for the Expedited Project Delivery (EPD) Pilot
Program
The EPD Pilot Program, as authorized by section 3005(b) of the
Fixing America's Surface Transportation Act (FAST Act), is aimed at
expediting delivery of new fixed guideway capital projects, small
starts projects, or core capacity improvement projects. Section 3005(b)
requires FTA to notify Congress and the applicant, in writing, within
120 days after the receipt of a complete application, on the decision
of project selection. FTA will extend pre-award authority for all
eligible project costs at the time it is announced that a project has
been selected. There is no pre-award authority provided until a project
selection announcement is made, and costs incurred prior to project
selection are not eligible. Letters of No Prejudice will not be
provided for the EPD Pilot Program, as all eligible costs are covered
by pre-award authority at the time of project selection.
Although FTA provides pre-award authority for eligible project
costs, FTA does not award Federal funding for activities conducted
under pre-award authority until the project receives an EPD Pilot
Program construction grant. This is to ensure that Federal funds are
not risked on a project whose advancement into construction is not yet
assured. To maintain eligibility for a possible future FTA grant award,
any acquisition of real property or real property rights must be
conducted in accordance with the requirements of the Uniform Relocation
Assistance and Real Property Acquisition Policies Act (URA) and its
implementing regulations, 49 CFR part 24.
For more information about the Expedited Project Delivery Pilot
Program, contact Elizabeth Day, Office of Capital Project Development,
at (202) 366-5159 or [email protected].
B. FY 2023 Annual List of Certifications and Assurances
Section 5323(n) requires FTA to publish annually a list of all
certifications required under Chapter 53 concurrently with the
publication of this annual apportionment notice. The FY 2023 version of
FTA's Certifications and Assurances is available on FTA's website at
https://www.transit.dot.gov/funding/grantee-resources/certifications-and-assurances/certifications-assurances.
FTA cannot make an award or an amendment to an award unless the
recipient has executed the latest version of FTA's Certifications and
Assurances. FTA encourages recipients of formula funding to execute the
FY 2023 Certifications and Assurances electronically in TrAMS within 90
days of this notice, to prevent delays.
C. Letter of No Prejudice (LONP) Policy
1. Policy
LONP authority allows an applicant to incur costs on a project
utilizing non-Federal resources, with the understanding that the costs
incurred subsequent to the issuance of the LONP may be reimbursable as
eligible expenses or eligible for credit toward the local match should
FTA approve the project at a later date. LONPs are applicable to
projects and project activities not covered by automatic pre-award
authority. The majority of LONPs will be for section 5309 CIG program
projects undertaking activities not covered under automatic pre-award
authority. LONPs may be issued for formula funds beyond the life of the
current authorization or FTA's extension of automatic pre-award
authority; however, the LONP is limited to a five-year period, unless
otherwise authorized in the LONP, or otherwise extended. Receipt of
Federal funding under any program is not implied or guaranteed by an
LONP.
2. Conditions and Federal Requirements
The conditions and requirements for pre-award authority specified
in section V.4.ii and V.4.iii above apply to all LONPs for the CIG
program. Because project implementation activities may not be initiated
before completion of the environmental review process, FTA will not
issue an LONP for such activities until the environmental review
process has been completed with a combined FEIS/ROD, ROD, FONSI, or CE
determination.
3. Request for LONP
Before incurring costs for project activities not covered by
automatic pre-award authority, the project sponsor must first submit a
written request for an LONP, accompanied by adequate information and
justification, to the appropriate Regional Office and obtain written
approval from FTA. FTA approval of an LONP is determined on a case-by-
case basis. Federal funding under the CIG program is not implied or
guaranteed by an LONP. Specifically, when requesting an LONP, the
applicant shall provide the following items:
a. Description of the activities to be covered by the LONP.
b. Justification for advancing the identified activities. The
justification should include an accurate assessment of the consequences
to the project scope, schedule, and budget should the LONP not be
approved.
c. Allocated level of risk and contingency for the activity
requested.
[[Page 23138]]
D. Civil Rights Requirements
Recipients must ensure their programs and services operate in a
nondiscriminatory manner and fulfill reporting requirements to document
their civil rights compliance as a condition to receiving Federal
funds.
Americans With Disabilities Act (ADA) of 1990: Recipients must
carry out provisions of the ADA, related provisions in section 504 of
the Rehabilitation Act of 1973, as amended, and the Department of
Transportation's implementing regulations at 49 CFR parts 27, 37, 38,
and 39. FTA's ADA Circular 4710.1, Americans With Disabilities Act
Guidance, provides guidance for implementing the regulatory
requirements of the ADA. As public entities, recipients may also be
subject to Department of Justice regulations implementing Title II of
the ADA (28 CFR part 35); in addition, as employers, recipients may be
subject to Equal Employment Opportunity Commission regulations
implementing the employment titles of the ADA (29 CFR part 1630).
In addition, recipients must regularly prepare and submit in TrAMS
civil rights program plans and reports to establish and demonstrate
compliance and document policies and practices in the following areas:
Title VI of the Civil Rights Act of 1964: The Department of
Transportation's title VI implementing regulations are found in 49 CFR
part 21. FTA's Title VI Circular 4702.1B, Title VI Requirements and
Guidelines for Federal Transit Administration Recipients, provides
guidance for carrying out the regulatory requirements and outlines the
Title VI program requirements and timeline for submitting updates.
Disadvantaged Business Enterprise (DBE) program: The Department of
Transportation's DBE implementing regulations are found in 49 CFR part
26 and set forth requirements for implementing the DBE program in good
faith and developing and reporting on the triennial DBE goal.
Title VII of the Civil Rights Act of 1964, Equal Employment
Opportunity (EEO): The Department of Transportation's EEO implementing
regulations are found in 49 CFR part 21. FTA's EEO Circular 4704.1A
Equal Employment Opportunity (EEO) Act Guidance, provides guidance for
carrying out the regulatory requirements and outlines the EEO program
submission process.
Recipients are expected to maintain current civil rights program
plans and submit required reports in TrAMS. Recipients with past due or
expired programs are ineligible for new funding awards and may be
subject to other remedies or sanctions at FTA's discretion.
While not new requirements, recipients are specifically reminded of
the following:
Recipients awarding more than $250,000 in FTA-funded
contracts must comply with the Disadvantaged Business Enterprise (DBE)
regulations, including by implementing a DBE program that creates a
level playing field for DBEs to compete on FTA-funded projects. The
recipient must conduct outreach to and consultation with small
businesses, women-owned businesses, and minority-owned businesses;
apply DBE goals as needed when exercising pre-award authority; and
verify the DBE compliance of transit vehicle manufacturers before
purchasing transit vehicles.
Recipients in urbanized areas of 200,000 or more in
population and with 50 or more fixed-route vehicles in peak service
must conduct a service equity analysis for all service changes that
meet the recipient's definition of ``major service change'' prior to
implementing the service change. Those recipients also must conduct a
fare equity analysis for all fare increases or decreases prior to
implementing a fare change. Furthermore, an environmental justice
analysis is not a substitute for a Title VI service equity analysis
triggered by a major service change or fare change. When a full equity
analysis is not required due to the size of the recipient or duration
of a change, FTA expects agencies to take steps to ensure changes are
equitable and nondiscriminatory.
Recipients are encouraged to reach out to FTA's Office of Civil
Rights when contemplating new projects, new services, or new service
models for technical assistance and guidance, to support recipients in
achieving their equity and accessibility goals and complying with
Federal civil rights requirements.
For more information, contact the Office of Civil Rights at
[email protected].
E. Consolidated Planning Grants
The Consolidated Planning Grants (CPG) Program allows States and
Metropolitan Planning Organizations (MPOs) to merge funds from the FTA
Metropolitan Planning Program and State Planning and Research Program
(SPRP) with FHWA Planning and SPRP funds into a single consolidated
planning grant. Transferred planning funds can be awarded and
administered by either FTA or FHWA. The CPG eliminates the need to
monitor individual fund sources, if several have been used, and ensures
that the oldest funds will always be used first.
Under the CPG, States can report metropolitan planning program
expenditures to comply with the Uniform Administrative Requirements, 2
CFR part 200, subpart E, for both FTA and FHWA under the Catalogue of
Federal Domestic Assistance number for FTA's Metropolitan Planning
Program (20.505). Additionally, for States with an FHWA Metropolitan
Planning fund-matching ratio greater than 80 percent, the State can
waive the 20 percent local share requirement, with FTA's concurrence,
to allow FTA funds used for metropolitan planning in a CPG to be
granted at the higher FHWA sliding scale rate. For some States, this
Federal match rate can exceed 90 percent.
States interested in transferring planning funds between FTA and
FHWA should contact the FTA Regional Office or FHWA Division Office for
more detailed procedures. FHWA Order 4551.1 dated August 12, 2013, on
``Fund Transfers to Other Agencies and Among Title 23 Programs''
(https://www.fhwa.dot.gov/legsregs/directives/orders/45511.cfm)
provides guidance and more detailed information.
For further information on CPGs, contact Ann Souvandara, Office of
Budget and Policy, FTA, at (202) 366-0649 or [email protected]; or
Ryan Long, Office of Planning and Environment at (215) 656-7051 or
[email protected].
F. Grant Application Procedures
All applications are filed electronically. FTA continues to award
and manage grants and cooperative agreements using the Transit Award
Management System (TrAMS). To access TrAMS, contact your FTA Regional
Office. Resources on using TrAMS can be found on FTA's website at
https://www.transit.dot.gov/TrAMS.
FTA regional staff are responsible for working with potential
recipients to review and process grant applications. In order for an
application to be considered complete and for FTA to assign a Federal
Award Identification Number (FAIN), enabling submission in TrAMS, and
submission to the Department of Labor (when applicable), the following
requirements must be met:
i. Applicants must be registered and have an ``active status'' in
the System for Award Management (SAM) and its registration is current.
To register an entity or check the status and renew registration, visit
the SAM website at https://www.sam.gov/SAM.
[[Page 23139]]
ii. Applicant's contact information is correct and up to date.
iii. Applicant has properly submitted its annual certifications and
assurances.
iv. Applicant's Civil Rights submissions are current and approved.
v. Recipient has a Transit Asset Management plan in place that
meets the requirements of 49 CFR part 625 or is covered by a compliant
Group Plan.
vi. Documentation is on file to support status as either a
designated recipient (for the program and area) or a direct recipient.
vii. Funding is available, including any flexible funds included in
the budget, and split letters or suballocation letters on file, where
applicable, to support amount being applied for in grant application.
viii. The activity is listed in a currently approved Transportation
Improvement Program (TIP); Statewide Transportation Improvement Program
(STIP), or Unified Planning Work Program (UPWP) unless such
requirements have been waived for the specific funding and activity
type to facilitate response and recovery from the COVID-19 public
health emergency.
ix. All eligibility issues are resolved.
x. Required environmental findings are made.
xi. The application contains a well-defined scope of work including
at least one project with accompanying project narratives, budget that
includes scope codes and activity line-item information, Federal and
non-Federal funding amounts, and milestones.
xii. Major Capital Projects as defined by 49 CFR part 633 Project
Management Oversight must document that FTA has reviewed the project
management plan and provided approval.
xiii. Milestone information is complete. FTA will also review
status of other open grant reports to confirm financial and milestone
information is current on other open awards.
xiv. Applicant has ensured that it has registered to report to the
National Transit Database, and that any subrecipients that provide
public transportation service have also registered to report to the
National Transit Database.
xv. FTA must provide Congressional notification before awarding
competitive grants.
Other important issues that impact FTA grant processing activities
are discussed below.
a. Award Budgets--Scope Codes and Activity Line Items (ALI) Codes;
Financial Purpose Codes
FTA uses the Scope and Activity Line Item (ALI) Codes in the award
budgets to track program trends, to report to Congress, and to respond
to requests from the Inspector General and the Government
Accountability Office (GAO), as well as to manage grants. The accuracy
of the data is dependent on the careful and correct use of codes. ALI
codes should contain information on quantities (e.g., the number of
vehicles) related only to the funding identified for that ALI code.
b. Designated and Direct Recipients Documentation
For its formula programs, FTA primarily apportions funds to the
Designated Recipient in the large UZAs (areas over 200,000), or for
areas under 200,000 (small UZAs and rural areas), it apportions the
funds to the Governor, or the Governor's designee (e.g., State DOT).
Depending on the program and as described in the individual program
sections found in section IV of this notice, further suballocation of
funds may be permitted to eligible recipients who may then apply
directly to FTA for the funding as direct recipients.
For the programs in which FTA can make grants to eligible direct
recipients, other than the designated recipients, recipients are
reminded that documentation must be on file to support the (1) status
of the recipient either as a designated recipient or direct recipient;
and (2) the allocation of funds to the direct recipient.
Documentation to support existing designated recipients for the UZA
must also be on file at the time of the first application in FY 2023.
Suballocation letters (also called split letters or governor's
apportionment letters) must also be on file to support grant
applications from direct recipients. Once suballocation letters for FY
2023 funding are finalized they should also be uploaded as part of the
application into TrAMS.
The Direct Recipient is required to upload to TrAMS a copy of the
suballocation letter indicating the allocation of funding for the
appropriate fund program when the applicant transmits its application
for initial review. The suballocation letter must be signed by the
Designated Recipient, or as applicable in accordance with local
planning requirements. If there are two Designated Recipients, both
entities must sign the suballocation letter. The suballocation letter
must: (1) specify the allocations to the respective Direct Recipients
listed in the letter; (2) incorporate language above the signatories to
reflect this agreement; and (3) make clear that the Direct Recipient
will assume all responsibility associated with the award for the funds.
When drafting the suballocation letter, Designated Recipients may use
the template language below:
``As identified in this Letter, the Designated Recipient(s)
authorize(s) the reassignment/reallocation of [enter fund source, e.g.,
section 5307 funds] to the Direct Recipient(s) named herein. The
undersigned agree to the amounts allocated/reassigned to each Direct
Recipient. Each Direct Recipient is responsible for its application to
the Federal Transit Administration to receive such funds and assumes
the responsibilities associated with any award for these funds.''
1. Payments
Once a grant has been awarded and executed, requests for payment
can be processed. To process payments FTA uses ECHO-Web, an internet
accessible system that provides recipients the capability to submit
payment requests on-line, as well as receive user-IDs and passwords via
email. New applicants should contact the appropriate FTA Regional
Office to obtain and submit the registration package necessary for set-
up under ECHO-Web.
2. Oversight
FTA is responsible for conducting oversight activities to help
ensure that grant recipients use FTA Federal financial assistance in a
manner consistent with their intended purpose and in compliance with
regulatory and statutory requirements. Each Urbanized Area Formula
Program recipient is reviewed every three years, (FTA's Triennial
Review); and States and statewide public transportation agencies are
reviewed periodically to assess the management practices and program
implementation of FTA statewide programs (e.g., Planning, Rural Areas,
Enhanced Mobility of Seniors and Individuals with Disabilities
Programs). Other more detailed reviews are scheduled based on an annual
recipient oversight assessment. Important objectives of FTA's oversight
program include but are not limited to: determining recipient
compliance with Federal requirements; identifying technical assistance
needs and delivering technical assistance to meet those needs; spotting
emerging issues with recipients in a forward-looking fashion;
recognizing when there is a need for more in-depth reviews in the areas
of procurement, financial management, and civil rights; and identifying
recipients with recurring or systemic issues.
[[Page 23140]]
3. Technical Assistance
As noted throughout the notice, FTA continues to rely on several of
the existing program circulars for general program guidance. FTA is
continuing to update the program circulars, with an opportunity for
notice and comment where warranted, to reflect amendments to chapter 53
of title 49, U.S.C. made by IIJA. In the meantime, if you have any
questions, please do not hesitate to contact FTA. FTA headquarters and
regional staff will be pleased to answer your questions and provide any
technical assistance you may need to apply for FTA program funds and
manage the grants you receive. At its discretion, FTA may also use
program oversight consultants to provide technical assistance to
recipients on a case-by-case basis. This notice and the program
guidance circulars previously identified in this document may be
accessed via the FTA website at https://www.transit.dot.gov/.
G. Grant Management
1. Grant Reporting
Recipients of FTA funds are reminded that all FTA recipients are
required to report on their grants and that it is critical to ensure
reports demonstrate that reasonable progress is being made on the
project. At a minimum, all awards require a Federal Financial Report
(FFR) and a Milestone Progress Report (MPR) on an annual basis, with
some reports required quarterly or monthly depending on the recipient
and the type of projects funded under the grant. The requirements for
these reports and other reporting requirements can be found in FTA
Circular 5010.1E, Grant Management Requirements, dated July 16, 2018.
FTA staff, auditors, and contractors rely on the information provided
in the FFR and MPR to review and report on the status of both financial
and project-level activities contained in the grant. It is critical
that recipients provide accurate and complete information in these
reports and submit them by the required due date. Failure to report or
demonstrate reasonable progress on projects can result in suspension or
premature close-out of a grant.
2. Inactive Grants and Grant Closeout
In FY 2023, FTA will continue to focus on inactive grants and
grants that do not comply with reporting requirements. If appropriate,
FTA will take action to close out and deobligate funds from these
grants if reasonable progress is not being made. The efficient use of
funds will further FTA's fulfillment of its mission to provide
efficient and effective public transportation systems for the nation.
At the end of Federal Fiscal Year 2023, FTA will identify the list
of grants that were awarded on or prior to September 30, 2020, have had
no funds disbursed or have not had a disbursement since September 30,
2022. FTA Regional Offices will contact grant recipients with grants
that meet these criteria to notify them that FTA intends to close the
grant and deobligate any remaining funds unless the recipient can
provide information that demonstrates that the projects funded by the
grant remain active and the recipient has a realistic schedule to
expedite completion of the projects funded in the grant.
3. Transportation Investments Generating Economic Recovery (TIGER),
Better Utilizing Investments To Leverage Development (BUILD) and
Rebuilding American Infrastructure With Sustainability and Equity
(RAISE) Discretionary Grants
Recipients of open TIGER, BUILD and RAISE grants should be aware
that, as a matter of law, all remaining TIGER funds must be disbursed
from grants by the end of the fifth fiscal year after the Expiration of
Obligation Authority. (See, 31 U.S.C. 1552.) For FTA TIGER VII
projects, that deadline was extended to the end of FY 2023. For FTA
TIGER VIII projects, that deadline is the end of FY 2024. Accordingly,
once ECHO closes for disbursements in late September 2023 (September
2024 for TIGER VIII), all undisbursed funds within FTA TIGER VII-funded
grants will no longer be available to the recipient. These undisbursed
funds will be deobligated from the grant. Even if a recipient has
incurred costs or disbursed funds prior to the close of ECHO, if the
recipient has not actually drawn down the funds by the time ECHO
closes, FTA will be unable to reimburse the recipient. Therefore,
recipients with open TIGER VIII grants must ensure project activities
are completed and all funds are drawn down before ECHO closes by late
September 2024 (September 2023 for TIGER VII).
For more information about the Transportation Investments
Generating Economic Recovery (TIGER), Better Utilizing Investments to
Leverage Development (BUILD) and Rebuilding American Infrastructure
with Sustainability and Equity (RAISE) Discretionary Grants program,
contact Victor Waldron, Office of Transit Programs at (202) 366-5183 or
[email protected].
The contents of this document do not have the force and effect of
law and are not meant to bind the public in any way. This document is
intended only to provide clarity to the public regarding existing
requirements under the law or agency policies. Recipients should refer
to applicable regulations and statutes referenced in this document.
Nuria I. Fernandez,
Administrator.
[FR Doc. 2023-07761 Filed 4-13-23; 8:45 am]
BILLING CODE 4910-57-P