Premium Energy Holdings, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 31, 2022, Premium Energy Holdings, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Nacimiento Pumped Storage Hydro Project to be located approximately 27
miles northwest of Highway 101 in Paso Robles, California in San Luis
Obispo County. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed closed-loop project would consist of the following:
(1) a new upper reservoir at a normal maximum operating elevation of
either 1,952 feet average mean sea level, with a surface area of 85
acres and a total storage capacity of 7,500 acre-feet (alternative A),
or 1,788 feet average mean sea level, with a surface area of 72 acres
and a total storage capacity of 8,000 acre-feet (alternative B); (2) an
existing lower reservoir (Lake Nacimiento, completed in 1956 for flood
control, irrigation water, groundwater recharge for the Salinas Valley,
and recreational activities); (3) either a 0.74 mile-long headrace
tunnel, 0.17-mile-long vertical shaft, 5.13-mile-long horizontal
tunnel, 0.07-mile-long penstock, and 1.06-mile-long tailrace tunnel
with a maximum head of 987 feet (alternative A), or a 0.42-mile-long
headrace tunnel, 0.10-mile-long vertical shaft, 2.93-mile-long
horizontal tunnel, 0.04-mile-long penstock, and-0.61 mile long tailrace
tunnel with a maximum head of 1,151 feet (alternative B) connecting the
reservoirs to the powerhouse; (4) a new powerhouse located on land
owned by the County of Monterey that would house 4 new pump-turbines
rated at 150 megawatts each; (5) a new substation constructed in the
southern shore of Lake Nacimiento near the powerhouse connected to the
regional electrical utility with either; (6) a new 21-mile-long 230-
kilovolt (kV) transmission line
[[Page 4998]]
interconnecting at the existing 60-kV Perry Substation (existing lines
would be upgraded to 230-kV, as required) (alternative 1) or a new 26-
mile-long 230-kV transmission line interconnecting PG&E's network at
the existing 60-kV Paso Robles Substation (existing lines would be
upgraded to 230-kV as required) (alternative 2), or a new 28-mile-long
230-kV transmission line interconnecting PG&E's network at the existing
230-kV Templeton Substation (no upgrades necessary) (alternative 3);
and (7) appurtenant facilities. The estimated annual power generation
at the Nacimiento Pumped Storage Project would be 1,200,000 megawatt-
hours.
Applicant Contact: Victor M. Rojas, Managing Director, Premium
Energy Holdings, LLC. 355 South Lemon Ave., Suite A, Walnut, California
91789; phone: (909) 595-5314; [email protected].
FERC Contact: Benjamin Mann; email: [email protected]; phone:
(202) 502-8127.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support. In lieu of
electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The first page of any filing should include docket number P-15269.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15269) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 19, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-01490 Filed 1-25-23; 8:45 am]