SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on February 2, 2023. The Commission will hold this hearing in-
person and telephonically. At this public hearing, the Commission will 
hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION 
section of this notice. Such projects are intended to be scheduled for 
Commission action at its next business meeting, tentatively scheduled 
for March 16, 2023, which will be noticed separately. The public should 
take note that this public hearing will be the only opportunity to 
offer oral comment to the Commission for the listed projects. The 
deadline for the submission of written comments is February 13, 2023.

DATES: The public hearing will convene on February 2, 2023, at 6:30 
p.m. The public hearing will end at 9:00 p.m. or at the conclusion of 
public testimony, whichever is earlier. The deadline for the submission 
of written comments is Monday, February 13, 2023.

ADDRESSES: This public hearing will be conducted in-person and 
virtually. You may attend in person at Susquehanna River Basin 
Commission, 4423 N Front St., Harrisburg, Pennsylvania or join by 
telephone using Toll Free Number 1-877-304-9269 and then entering guest 
passcode 2619070 followed by #.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423 or 
[email protected]. Information concerning the applications for the 
projects is available at the Commission's Water Application and 
Approval Viewer at https://www.srbc.net/waav. Additional supporting 
documents are available to inspect and copy in accordance with the 
Commission's Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor: Biglerville Borough Authority. Project 
Facility: Biglerville Borough Water Company, Biglerville Borough and 
Butler Township, Adams County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.112 mgd (30-day average) from Well 7 
(Docket No. 19930503).
    2. Project Sponsor and Facility: BKV Operating, LLC (North Branch 
Wyalusing Creek), Middletown Township, Susquehanna County, Pa. 
Application for surface water withdrawal of up to 2.731 mgd (peak day).
    3. Project Sponsor and Facility: Dillsburg Area Authority, Carroll 
Township, York County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.460 mgd (30-day

[[Page 1626]]

average) from Well 7 (Docket No. 20070907).
    4. Project Sponsor and Facility: Dover Township, York County, Pa. 
Application for renewal of groundwater withdrawal of up to 0.360 mgd 
(30-day average) from Well 8 (Docket No. 19911104).
    5. Project Sponsor and Facility: First Quality Tissue, LLC (Bald 
Eagle Creek), Allison, Bald Eagle, and Castanea Townships, Clinton 
County, Pa. Applications for renewal of surface water withdrawal of up 
to 10.500 mgd (peak day) and consumptive use of up to 2.500 mgd (peak 
day) (Docket No. 20080303).
    6. 2022-094; 2020-017 Project Sponsor and Facility: Hardinge Inc., 
Town of Horseheads, Chemung County, N.Y. Applications for groundwater 
withdrawals (30-day averages) of up to 0.550 mgd from Well 4 and 
renewal of 0.580 mgd from Well 5 (Docket No. 19900302).
    7. Project Sponsor: Helix Ironwood, LLC. Project Facility: Ironwood 
Generating Station (Pennsy Quarry), South Lebanon Township, Lebanon 
County, Pa. Applications for renewal of surface water withdrawal of up 
to 4.500 mgd (peak day) and consumptive use of up to 4.500 mgd (peak 
day) (Docket No. 19980502).
    8. Project Sponsor and Facility: Mount Union Municipal Authority, 
Wayne Township, Mifflin County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.432 mgd (30-day average) from Well 
#3--Lemkelde (Docket No. 20070303).
    9. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Fall 
Brook), Ward Township, Tioga County, Pa. Application for renewal of 
surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 
20180303).
    10. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC 
(Fellows Creek), Ward Township, Tioga County, Pa. Application for 
renewal of surface water withdrawal of up to 0.999 mgd (peak day) 
(Docket No. 20180304).
    11. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Arnot No. 5 Mine Discharge), Bloss Township, Tioga County, Pa. 
Application for renewal of surface water withdrawal of up to 0.499 mgd 
(peak day) (Docket No. 20180305).
    12. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Cowanesque River), Deerfield Township, Tioga County, Pa. Application 
for renewal with modification to increase the surface water withdrawal 
by an additional 0.661 mgd, for a total of up to 1.600 mgd (peak day) 
(Docket No. 20220920).
    13. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Susquehanna River), Sheshequin Township, Bradford County, Pa. 
Application for renewal of surface water withdrawal of up to 0.850 mgd 
(peak day) (Docket No. 20180306).
    14. Project Sponsor: Springwood, LLC. Project Facility: Bridgewater 
Golf Club, York Township, York County, Pa. Application for renewal of 
consumptive use of up to 0.099 mgd (30-day average) (Docket No. 
20080307).
    15. Project Sponsor and Facility: SWN Production Company, LLC 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Application for renewal of surface water withdrawal of up to 1.500 mgd 
(peak day) (Docket No. 20180307).
    16. Project Sponsor and Facility: Wise Foods, Inc., Berwick 
Borough, Columbia County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.860 mgd (30-day average) from Well PW-1 (Docket 
No. 19920502).
    17. Project Sponsor: Wynding Brook Inc. Project Facility: Wynding 
Brook Golf Club, Turbot Township, Northumberland County, Pa. 
Application for renewal of consumptive use of up to 0.099 mgd (30-day 
average) (Docket No. 20080304).

Project Scheduled for Action Involving a Diversion

    18. Project Sponsor: Helix Ironwood, LLC. Project Facility: 
Ironwood Generating Station, South Lebanon Township, Lebanon County, 
Pa. Application for renewal of approval of an out-of-basin diversion of 
up to 4.500 mgd (peak day) (Docket No. 19980502).

Commission-Initiated Project Approval Modification

    19. Project Sponsor: Knouse Foods Cooperative, Inc. Project 
Facility: Peach Glen Plant, Tyrone and Huntington Townships, Adams 
County, and Dickinson Township, Cumberland County, Pa. Conforming the 
grandfathered amount with the forthcoming determination for groundwater 
withdrawals (30-day averages) of up to 0.327 mgd combined from Wells 2, 
4, 5, 7, 8, 9, 10, and 13, and up to 0.046 mgd from Well 13 (Docket No. 
20040912).

Opportunity To Appear and Comment

    Interested parties may call into the hearing to offer comments to 
the Commission on any business listed above required to be the subject 
of a public hearing. Given the nature of the meeting, the Commission 
strongly encourages those members of the public wishing to provide oral 
comments to pre-register with the Commission by emailing Jason Oyler at 
[email protected] prior to the hearing date. The presiding officer 
reserves the right to limit oral statements in the interest of time and 
to otherwise control the course of the hearing. Access to the hearing 
via telephone will begin at 6:15 p.m. Guidelines for the public hearing 
are posted on the Commission's website, www.srbc.net, prior to the 
hearing for review. The presiding officer reserves the right to modify 
or supplement such guidelines at the hearing. Written comments on any 
business listed above required to be the subject of a public hearing 
may also be mailed to Mr. Jason Oyler, Secretary to the Commission, 
Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, Pa. 17110-1788, or submitted electronically through https://www.srbc.net/regulatory/public-comment/. Comments mailed or 
electronically submitted must be received by the Commission on or 
before February 13, 2023, to be considered.
    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806, 
807, and 808.

    Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-00377 Filed 1-10-23; 8:45 am]