NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc; Vogtle Electric
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4. The NRC
staff is also rescinding a prior determination of the successful
completion of particular inspections, tests, analyses, and acceptance
criteria (ITAAC) for VEGP Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 are effective on the dates
indicated in the NRC staff's verification evaluation forms for the
ITAAC. The NRC staff's rescission of its prior determination of the
successful completion of particular ITAAC for VEGP Units 3 and 4 was
effective on August 12, 2021.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through
Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC) (hereafter called
the licensee) has submitted ITAAC closure notifications (ICNs) under
section 52.99(c)(1) of title 10 of the Code of Federal Regulations (10
CFR), informing the NRC that the licensee has successfully performed
the required inspections, tests, and analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.09c (44), 2.1.02.12a.iii (55), 2.1.02.13a (63), 2.1.02.13b
(64), 2.1.02.14 (66), 2.2.01.01 (90), 2.2.04.09a.ii (241), 2.2.05.02a
(253), 2.3.02.08a.i (301), 2.3.02.14 (317), 2.3.04.05 (332), 2.3.06.11a
(382), 2.3.07.05.i (396), 2.3.13.08 (470), 2.3.29.02 (489), 2.4.01.02
(493), 2.5.01.03a (511), 2.5.01.04 (519), C.2.5.04.04a (561), 2.5.06.02
(574), 2.6.03.05d.i (613), C.2.6.09.05a (664), C.2.6.09.06 (666),
2.7.03.03 (710), 2.7.07.02 (732), 3.2.00.04 (751), 3.3.00.02a.i.a
(760), and 2.3.10.12 (879).
VEGP Unit 4 ITAAC
2.2.03.08c.iv.01 (183), 2.2.03.08c.iv.02 (184), 2.2.03.08c.iv.03
(185),
[[Page 50382]]
2.3.07.07b.ii (403), and 3.3.00.02a.ii.f (769).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications (IPCNs)
Since the last Federal Register notice of the NRC staff's
determinations of successful completion of inspections, tests, and
analyses for VEGP Units 3 and 4 (86 FR 23756; May 4, 2021), the NRC
staff has not made additional determinations of the successful
completion of inspections, tests, and analyses based on licensee IPCNs
submitted under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) Each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria of the ITAAC
are met; and (3) any NRC inspections for the ITAAC have been completed
and any ITAAC findings associated with that ITAAC have been closed. The
NRC's review process for IPCNs is similar to that for ICNs but focuses
on how the licensee addressed the new, material information giving rise
to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC can be found by selecting the link
``ITAAC Status Report'' on the NRC's websites: https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html and https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Note: As of August 12, 2021, NRC staff rescinds its previous
determination of the successful completion of ITAAC 2.5.05.03b (570)
for both VEGP Units 3 and 4 due to the subsequent determination by
NRC staff that this ITAAC is not met for both units. The NRC's prior
determination of the successful completion of ITAAC 2.5.05.03b (570)
was originally published in the Federal Register (85 FR 67017) on
October 21, 2020. The licensee will resubmit the ICNs related to
ITAAC 2.5.05.03b (570) for both Units.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS accession number for each ICN
received, the ADAMS accession number for each VEF, and the ADAMS
accession numbers for the inspection reports associated with these
specific ITAAC can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC, can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
Dated: September 1, 2021.
For the Nuclear Regulatory Commission.
Philip J. McKenna,
Acting Chief, Vogtle Project Office, Office of Nuclear Reactor
Regulation.
[FR Doc. 2021-19306 Filed 9-7-21; 8:45 am]
BILLING CODE 7590-01-P