DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6470-008]
Winooski Hydroelectric Company; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
and Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 6470-008.
c. Date Filed: July 30, 2021.
d. Applicant: Winooski Hydroelectric Company (WHC).
e. Name of Project: Winooski 8 Hydroelectric Project (project).
f. Location: On the Winooski River in Washington County, Vermont.
No federal lands are occupied by the project works or located within
the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r)
h. Applicant Contact: Mathew Rubin, General Partner, Winooski
Hydroelectric Company, 26 State Street, Montpelier, Vermont 05602;
(802) 793-5939; or email at [email protected].
i. FERC Contact: Kristen Sinclair at (202) 502-6587, or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: September 28, 2021.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Winooski 8 Hydroelectric Project (P-
6470-008).
m. The application is not ready for environmental analysis at this
time.
n. Project Description: The existing Winooski 8 Hydroelectric
Project consists of: (1) A 222.5-foot-long, 26-foot-high concrete
gravity dam impounding a reservoir with a storage capacity of
approximately 20 acre-feet at an elevation of 615 feet mean sea level;
(2) a 148-foot-long spillway with 4-foot-high flashboards built into
the crest of the dam; (3) a 24-foot-long, hydraulically operated crest
gate built into the crest of the dam; (4) a 1,100-square-foot forebay
located adjacent to the project impoundment; (5) three hydraulically
operated trashracks; (6) a 1,550-square-foot powerhouse that contains
two semi-Kaplan turbines and one fixed propeller turbine for a total
installed capacity of 856 kilowatts; (7) a 100-foot-long tailrace; (8)
a 1,000 kilovolt-amp station transformer; (9) a 30-foot long, 13-
kilovolt transmission line and (10) appurtenant facilities. The project
generates an annual average of 3,507 megawatt-hours. WHC proposes to
continue to operate the project in an automated run-of-river mode. WHC
also proposes to add 3.6 acres to the existing project boundary to
enclose a 4,100-foot-long dirt road currently used by WHC to access the
dam and powerhouse and to enclose an existing unimproved site that
provides access to the river for boating and fishing activities
downstream of the dam.
o. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (http://www.ferc.gov)
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-
6470). At this time, the Commission has suspended access to the
Commission's Public Reference Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19)
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (866) 208-3676 or
(202) 502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural Schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
Issue Deficiency Letter (if necessary)--August 2021
Request Additional Information (if needed)--September 2021
Issue Notice of Acceptance--December 2021
Issue Scoping Document 1 for comments--January 2022
[[Page 44010]]
Issue Scoping Document 2--March 2022
Issue Notice of Ready for Environmental Analysis--March 2022
q. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: August 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-17137 Filed 8-10-21; 8:45 am]
BILLING CODE 6717-01-P