[Federal Register Volume 86, Number 54 (Tuesday, March 23, 2021)]
[Notices]
[Pages 15501-15511]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-05248]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0068]
Monthly Notice; Applications and Amendments to Facility Operating
Licenses and Combined Licenses Involving No Significant Hazards
Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Monthly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 189.a.(2) of the Atomic Energy Act of
1954, as amended (the Act), the U.S. Nuclear Regulatory Commission
(NRC) is publishing this regular monthly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued, and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration (NSHC),
notwithstanding the pendency before the Commission of a request for a
hearing from any person. This monthly notice includes all amendments
issued, or proposed to be issued, from February 5, 2021, to March 4,
2021. The last monthly notice was published on February 23, 2021.
DATES: Comments must be filed by April 22, 2021. A request for a
hearing or petitions for leave to intervene must be filed by May 24,
2021.
ADDRESSES: You may submit comments by any of the following method;
however, the NRC encourages electronic comment submission through the
Federal Rulemaking website:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0068. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed
[[Page 15502]]
in the FOR FURTHER INFORMATION CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, telephone: 301-415-1506, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2021-0068, facility name, unit
number(s), docket number(s), application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly available information related to this
action by any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0068.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through
Friday, except Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal Rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2021-0068, facility name, unit number(s), docket
number(s), application date, and subject, in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
For the facility-specific amendment requests shown below, the
Commission finds that the licensees' analyses provided, consistent with
title 10 of the Code of Federal Regulations (10 CFR) section 50.91, are
sufficient to support the proposed determinations that these amendment
requests involve NSHC. Under the Commission's regulations in 10 CFR
50.92, operation of the facilities in accordance with the proposed
amendments would not (1) involve a significant increase in the
probability or consequences of an accident previously evaluated; or (2)
create the possibility of a new or different kind of accident from any
accident previously evaluated; or (3) involve a significant reduction
in a margin of safety.
The Commission is seeking public comments on these proposed
determinations. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determinations.
Normally, the Commission will not issue the amendments until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue any of these license amendments before expiration
of the 60-day period provided that its final determination is that the
amendment involves NSHC. In addition, the Commission may issue any of
these amendments prior to the expiration of the 30-day comment period
if circumstances change during the 30-day comment period such that
failure to act in a timely way would result, for example in derating or
shutdown of the facility. If the Commission takes action on any of
these amendments prior to the expiration of either the comment period
or the notice period, it will publish in the Federal Register a notice
of issuance. If the Commission makes a final NSHC determination for any
of these amendments, any hearing will take place after issuance. The
Commission expects that the need to take action on any amendment before
60 days have elapsed will occur very infrequently.
A. Opportunity to Request a Hearing and Petition for Leave to Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by any of these
actions may file a request for a hearing and petition for leave to
intervene (petition) with respect to that action. Petitions shall be
filed in accordance with the Commission's ``Agency Rules of Practice
and Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed,
the Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right to be made a party
to the proceeding; (3) the nature and extent of the petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions that the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion that support the contention and
[[Page 15503]]
on which the petitioner intends to rely in proving the contention at
the hearing. The petitioner must also provide references to the
specific sources and documents on which the petitioner intends to rely
to support its position on the issue. The petition must include
sufficient information to show that a genuine dispute exists with the
applicant or licensee on a material issue of law or fact. Contentions
must be limited to matters within the scope of the proceeding. The
contention must be one that, if proven, would entitle the petitioner to
relief. A petitioner who fails to satisfy the requirements at 10 CFR
2.309(f) with respect to at least one contention will not be permitted
to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of NSHC, the Commission will make a final
determination on the issue of NSHC. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves NSHC, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing would take place after issuance of
the amendment. If the final determination is that the amendment request
involves a significant hazards consideration, then any hearing held
would take place before the issuance of the amendment unless the
Commission finds an imminent danger to the health or safety of the
public, in which case it will issue an appropriate order or rule under
10 CFR part 2.
A State, local governmental body, Federally recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or Federally recognized Indian Tribe, or agency thereof does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. Alternatively, a State, local
governmental body, Federally recognized Indian Tribe, or agency thereof
may participate as a non-party under 10 CFR 2.315(c).
If a petition is submitted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can
[[Page 15504]]
obtain access to the documents via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call to 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC issued
digital ID certificate as described above, click ``cancel'' when the
link requests certificates and you will be automatically directed to
the NRC's electronic hearing dockets where you will be able to access
any publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
The table below provides the plant name, docket number, date of
application, ADAMS accession number, and location in the application of
the licensees' proposed NSHC determinations. For further details with
respect to these license amendment applications, see the applications
for amendment, which are available for public inspection in ADAMS. For
additional direction on accessing information related to this document,
see the ``Obtaining Information and Submitting Comments'' section of
this document.
License Amendment Request(s)
------------------------------------------------------------------------
------------------------------------------------------------------------
Arizona Public Service Company, et al; Palo Verde Nuclear Generating
Station, Units 1, 2, and 3; Maricopa County, AZ
------------------------------------------------------------------------
Docket No(s)................. 50-528, 50-529, 50-530.
Application date............. January 22, 2021.
ADAMS Accession No........... ML21022A408.
Location in Application of Pages 81-84 of the Enclosure.
NSHC.
Brief Description of The proposed amendments would revise
Amendment(s). Technical Specification (TS) 5.5.16,
``Containment Leakage Rate Testing
Program,'' to allow the following:
change the existing Type A integrated
leakage rate test program test interval
to 15 years in accordance with Nuclear
Energy Institute (NEI) Topical Report
NEI 94-01, Revision 3-A, ``Industry
Guideline for Implementing Performance-
Based Option of 10 CFR 50, Appendix J''
[``Primary Reactor Containment Leakage
Testing for Water-Cooled Power
Reactors``], and the limitations and
conditions specified in NEI 94-01,
Revision 2-A; adopt an extension of the
containment isolation valve leakage rate
testing (Type C) frequency from the 60
months currently permitted by 10 CFR 50,
Appendix J, Option B, to 75 months for
Type C leakage rate testing of selected
components, in accordance with NEI 94-
01, Revision 3-A; adopt the use of
American National Standards Institute/
American Nuclear Society (ANSI/ANS) 56.8-
2002, ``Containment System Leakage
Testing Requirements``; and adopt a more
conservative allowable test interval
extension of 9 months, for Type A, Type
B and Type C leakage rate tests in
accordance with NEI 94-01, Revision 3-A.
Proposed Determination....... NSHC.
Name of Attorney for Michael G. Green, Associate General
Licensee, Mailing Address. Counsel, Nuclear and Environmental,
Pinnacle West Capital Corporation, P.O.
Box 52034, MS 7602, Phoenix, AZ 85072-
2034
NRC Project Manager, Siva Lingam, 301-415-1564.
Telephone Number.
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1
and 2; Mecklenburg County, NC; Duke Energy Progress, LLC; Shearon Harris
Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC
------------------------------------------------------------------------
Docket No(s)................. 50-369, 50-370, 50-413, 50-414, 50-400.
Application date............. December 3, 2020.
ADAMS Accession No........... ML20338A264.
Location in Application of Pages 19-21 of the Enclosure.
NSHC.
[[Page 15505]]
Brief Description of For Catawba Nuclear Station (CNS) and
Amendment(s). McGuire Nuclear Station, the proposed
change would revise Technical
Specification (TS) Section 3.3.2,
``Engineered Safety Features Actuation
System (ESFAS) Instrumentation''
specifically Table 3.3.2-1 dealing with
the ESFAS interlock, reactor trip
function, and for Shearon Harris Nuclear
Power Plant the proposed change would
also revise the ESFAS interlock, reactor
trip function found in TS Table 3.3-3 of
Section \3/4\.3.2, ``Engineered Safety
Features Actuation System
Instrumentation.'' This change will
thereby identify the enabled functions
and the applicable MODES for each
enabled function which will remove the
turbine trip function of the P-4
interlock in MODE 3 from the existing
specifications. Additionally, for CNS
only, this change will remove the steam
dump function of the P-4 interlock in
MODES 1, 2, and 3.
Proposed Determination....... NSHC.
Name of Attorney for Kathryn B. Nolan, Deputy General Counsel,
Licensee, Mailing Address. Duke Energy Corporation, 550 South Tryon
Street (DEC45A), Charlotte, NC 28202;
Kathryn B. Nolan, Deputy General
Counsel, Duke Energy Corporation, 550
South Tryon Street (DEC45A), Charlotte,
NC 28202; Michelle Spak, General
Counsel, Duke Energy Corporation, 550
South Tryon St.--DEC45A, Charlotte, NC
28202.
NRC Project Manager, John Klos, 301-415-5136.
Telephone Number.
------------------------------------------------------------------------
Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
Charles Parish, LA
------------------------------------------------------------------------
Docket No(s)................. 50-382.
Application date............. December 18, 2020.
ADAMS Accession No........... ML20353A433.
Location in Application of Pages 20-22 of the Enclosure.
NSHC.
Brief Description of The proposed amendment would modify the
Amendment(s). Waterford Steam Electric Station, Unit 3
licensing basis, by the addition of a
license condition, to allow for the
implementation of the provisions of 10
CFR 50.69, ``Risk-informed
categorization and treatment of
structures, systems and components for
nuclear power reactors.''
Proposed Determination....... NSHC.
Name of Attorney for Anna Vinson Jones, Senior Counsel,
Licensee, Mailing Address. Entergy Services, Inc.,101 Constitution
Avenue, NW, Suite 200 East, Washington,
DC 20001.
NRC Project Manager, Audrey Klett, 301-415-0489.
Telephone Number.
------------------------------------------------------------------------
Exelon FitzPatrick, LLC and Exelon Generation Company, LLC; James A
FitzPatrick Nuclear Power Plant; Oswego County, NY
------------------------------------------------------------------------
Docket No(s)................. 50-333.
Application date............. December 11, 2020, as supplemented by
letter dated February 18, 2021.
ADAMS Accession No........... ML20346A023, ML21049A213.
Location in Application of Pages 5-7 of Attachment 1.
NSHC.
Brief Description of The proposed amendment would revise the
Amendment(s). Technical Specification Limiting
Condition for Operation 3.5.1, ``ECCS
[Emergency Core Cooling System]--
Operating,'' Surveillance Requirement
3.5.1.6 frequency from ``Once each
startup prior to exceeding 25% RTP
[rated thermal power],'' as modified by
a note stating, ``Not required to be
performed if performed within the
previous 31 days'' to 24 months.
Proposed Determination....... NSHC.
Name of Attorney for Donald P. Ferraro, Assistant General
Licensee, Mailing Address. Counsel, Exelon Generation Company, LLC,
200 Exelon Way, Suite 305, Kennett
Square, PA 19348.
NRC Project Manager, Justin Poole, 301-415-2048.
Telephone Number.
------------------------------------------------------------------------
Exelon Generation Company, LLC; Clinton Power Station, Unit No. 1;
DeWitt County, IL
------------------------------------------------------------------------
Docket No(s)................. 50-461.
Application date............. January 20, 2021.
ADAMS Accession No........... ML21020A053.
Location in Application of Pages 6-8 of Attachment 1.
NSHC.
Brief Description of The proposed amendment would revise the
Amendment(s). degraded voltage reset and drop-out
allowable values that are listed in
Technical Specification (TS) 3.3.8.1,
``Loss of Power (LOP) Instrumentation,''
Table 3.3.8.1-1, ``Loss of Power
Instrumentation.''
Proposed Determination....... NSHC.
Name of Attorney for Tamra Domeyer, Associate General Counsel,
Licensee, Mailing Address. Exelon Generation Company, LLC, 4300
Winfield Road, Warrenville, IL 60555.
NRC Project Manager, Joel Wiebe, 301-415-6606.
Telephone Number.
------------------------------------------------------------------------
Holtec Decommissioning International, LLC; Oyster Creek Nuclear
Generating Station; Forked River, NJ
------------------------------------------------------------------------
Docket No(s)................. 50-219.
Application date............. February 23, 2021.
ADAMS Accession No........... ML21054A321.
Location in Application of Enclosure 1 Section 6.3.
NSHC.
[[Page 15506]]
Brief Description of By letter dated February 23, 2021, Holtec
Amendment(s). Decommissioning International, LLC (HDI)
submitted a license amendment request
for review and approval of the Oyster
Creek Nuclear Generating Station (OCNGS)
Independent Spent Fuel Storage
Installation Facility (ISFSI) Only
Emergency Plan and its associated
Emergency Action Level scheme. The
proposed changes are being submitted to
the U.S. Nuclear Regulatory Commission
(NRC) for approval prior to
implementation, as required under
Paragraph 50.54(q)(4) of title 10 of the
Code of Federal Regulations (10 CFR).
Revisions to the OCNGS Emergency Plan
and associated Emergency Action level
Scheme are proposed to comport with the
requirements for a facility
configuration with all spent nuclear
fuel in dry storage within the ISFSI.
Proposed Determination....... NSHC.
Name of Attorney for Erin Connolly, Corporate Counsel--Legal,
Licensee, Mailing Address. Holtec International, Krishna P. Singh
Technology Campus, 1 Holtec Blvd.,
Camden, NJ 08104.
NRC Project Manager, Zahira Cruz Perez, 301-415-3808.
Telephone Number.
------------------------------------------------------------------------
NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Linn
County, IA
------------------------------------------------------------------------
Docket No(s)................. 50-331.
Application date............. October 29, 2020, as supplemented by
letter dated January 7, 2021.
ADAMS Accession No........... ML20311A127, ML21014A380.
Location in Application of Pages 1-2 of Attachment 2.
NSHC.
Brief Description of By letter dated October 29, 2020, as
Amendment(s). supplemented by letter dated January 7,
2021, NextEra Energy Duane Arnold, LLC,
submitted a license amendment request
for Duane Arnold Energy Center (DAEC).
The proposed amendment would revise the
DAEC Physical Security Plan to align the
defensive strategy with the post-
shutdown and permanently defueled
condition. Portions of the letters dated
October 29, 2020, and January 7, 2021,
contain safeguards information and have
been withheld from public disclosure.
Proposed Determination....... NSHC.
Name of Attorney for Steven Hamrick, Managing Attorney--
Licensee, Mailing Address. Nuclear, Florida Power & Light Company,
P.O. Box 14000, Juno Beach, FL 33408-
0420.
NRC Project Manager, Marlayna Doell, 301-415-3178.
Telephone Number.
------------------------------------------------------------------------
PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2;
Salem County, NJ
------------------------------------------------------------------------
Docket No(s)................. 50-272, 50-311.
Application date............. February 16, 2021.
ADAMS Accession No........... ML21047A238.
Location in Application of Pages 2-3 of the Enclosure.
NSHC.
Brief Description of The proposed amendment would adopt
Amendment(s). Technical Specifications Task Force
(TSTF) Traveler TSTF-569, ``Revise
Response Time Testing Definition,'' to
revise the technical specification
definitions for the engineered safety
feature response time and reactor trip
system response time.
Proposed Determination....... NSHC.
Name of Attorney for Steven Fleischer, PSEG Services
Licensee, Mailing Address. Corporation, 80 Park Plaza, T-5, Newark,
NJ 07102.
NRC Project Manager, James Kim, 301-415-4125.
Telephone Number.
------------------------------------------------------------------------
TMI-2 Solutions, LLC; Three Mile Island Unit 2; Londonderry Township,
Dauphin County, PA
------------------------------------------------------------------------
Docket No(s)................. 50-320.
Application date............. February 19, 2021.
ADAMS Accession No........... ML21057A046.
Location in Application of Pages 65-75 of Attachment 1.
NSHC.
Brief Description of This proposed license amendment would
Amendment(s). revise the possession-only license and
technical specifications to support the
transition of TMI [Three Mile Island]-
from a Post-Defueling Monitored Storage
condition to that of a facility
undergoing radiological decommissioning.
Proposed Determination....... NSHC.
Name of Attorney for Russ Workman, General Counsel,
Licensee, Mailing Address. EnergySolutions, 299 South Main Street,
Suite 1700, Salt Lake City, UT 84111.
NRC Project Manager, Ted Smith, 301-415-6721.
Telephone Number.
------------------------------------------------------------------------
Virginia Electric and Power Company, Dominion Nuclear Company; North
Anna Power Station, Units 1 and 2; Louisa County, VA
------------------------------------------------------------------------
Docket No(s)................. 50-338, 50-339.
Application date............. January 7, 2021.
ADAMS Accession No........... ML21007A264.
Location in Application of Pages 6-10 of Attachment 1.
NSHC.
Brief Description of The request would amend the requirements
Amendment(s). of TS 2.1.1.2 to reflect the peak fuel
centerline melt temperature specified in
Topical Report WCAP-17642-P-A, Revision
1, ``Westinghouse Performance Analysis
and Design Model (PAD5).''
Proposed Determination....... NSHC.
Name of Attorney for Lillian M. Cuoco, Esq., Senior Counsel,
Licensee, Mailing Address. Dominion Energy, Inc., 120 Tredegar
Street, RS-2, Richmond, VA 23219.
NRC Project Manager, G. Ed Miller, 301-415-2481.
Telephone Number.
------------------------------------------------------------------------
[[Page 15507]]
III. Notice of Issuance of Amendments to Facility Operating Licenses
and Combined Licenses
During the period since publication of the last monthly notice, the
Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed NSHC
determination, and opportunity for a hearing in connection with these
actions, was published in the Federal Register as indicated in the
safety evaluation for each amendment.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated in the safety evaluation for the amendment.
For further details with respect to each action, see the amendment
and associated documents such as the Commission's letter and safety
evaluation, which may be obtained using the ADAMS accession numbers
indicated in the table below.
The safety evaluation will provide the ADAMS accession numbers for
the application for amendment and the Federal Register citation for any
environmental assessment. All of these items can be accessed as
described in the ``Obtaining Information and Submitting Comments''
section of this document.
License Amendment Issuance(s)
------------------------------------------------------------------------
------------------------------------------------------------------------
Arizona Public Service Company, et al; Palo Verde Nuclear Generating
Station, Units 1, 2, and 3; Maricopa County, AZ
------------------------------------------------------------------------
Docket No(s)................. 50-528, 50-529, 50-530.
Amendment Date............... February 8, 2021.
ADAMS Accession No........... ML20350B803.
Amendment No(s).............. 214 (Unit 1), 214 (Unit 2), and 214 (Unit
3).
Brief Description of The amendments revised the Palo Verde
Amendment(s). Nuclear Generating Station, Units 1, 2,
and 3 Technical Specifications (TSs) to
make necessary administrative changes.
Specifically, the amendments made the
following five administrative changes to
the TSs that removed no longer
applicable information, extraneous
information, and adopted standard
industry terminology: (1) TS 3.1.5,
``Control Element Assembly (CEA)
Alignment,'' Surveillance Requirement
3.1.5.3, removed a one-time use Note for
Unit 2 CEA No. 88; (2) TS 3.7.17,
``Spent Fuel Assembly Storage,'' TS 4.3,
``Fuel Storage,'' and TS 5.5.21, ``Spent
Fuel Storage Rack Neutron Absorber
Monitoring Program,'' removed no longer
applicable pages related to the
implementation of Amendment No. 203,
which addressed a revised spent fuel
pool criticality analysis; (3) TS 4.1,
``Site Location,'' removed extraneous
information from the site location
description; (4) TS 5.5.2, ``Primary
Coolant Sources Outside Containment,''
removed a remaining post-accident
sampling subsystem reference; (5) TS
5.7, ``High Radiation Area,'' modified
radiation protection terminology to
match industry standards.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
No. 2; New London County, CT
------------------------------------------------------------------------
Docket No(s)................. 50-336.
Amendment Date............... February 23, 2021.
ADAMS Accession No........... ML21026A142.
Amendment No(s).............. 342 (Unit 2).
Brief Description of The amendment revised the Millstone Power
Amendment(s). Station, Unit No. 2 Technical
Specification (TS) Table 3.3 11,
``Accident Monitoring Instrumentation,''
ACTION 3, to add an alternate method for
determining if there is loss of coolant
through a power-operated relief valve or
pressurizer safety valve flow path when
any of the three valve position
indications (i.e., Instruments 4, 5, and
6) become inoperable. The amendment also
included two grammatical corrections in
TS Table 3.3 11 ACTIONS 4.a and 4.b for
Instrument 7, Containment Pressure (Wide
Range) and Instrument 9, Containment
Water Level (Wide Range).
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
DTE Electric Company; Fermi, Unit 2; Monroe County, MI
------------------------------------------------------------------------
Docket No(s)................. 50-341.
Amendment Date............... February 24, 2021.
ADAMS Accession No........... ML20358A155.
Amendment No(s).............. 218.
[[Page 15508]]
Brief Description of The amendment revised the Fermi 2
Amendment(s). technical specifications (TS) to support
a 24-month fuel cycle in accordance with
the guidance of Generic Letter 91-04. TS
5.5.15, ``Surveillance Frequency Control
Program,'' item b, was revised to add
the following insert: ``The one-time 24
Month Fuel Cycle related Surveillance
Requirement Frequency changes approved
by the NRC in License Amendment 208 are
not subject to this provision.
Subsequent changes are subject to the
Surveillance Frequency Control
Program.'' Additionally, TS 5.5.7,
``Ventilation Filter Testing Program,''
and TS 5.5.14, ``Control Room Envelope
Habitability Program,'' were revised to
increase the test frequency from 18
months to 24 months.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC;
Beaver Valley Power Station, Units 1 and 2; Beaver County, PA
------------------------------------------------------------------------
Docket No(s)................. 50-334, 50-412
Amendment Date............... February 18, 2021.
ADAMS Accession No........... ML20335A052.
Amendment No(s).............. 308 (Unit 1) and 198 (Unit 2).
Brief Description of The amendments revised Technical
Amendment(s). Specification (TS) 1.1, ``Definitions,''
and TS 5.0, ``Administrative Controls.''
The changes modify the definitions and
administrative controls TSs to a set of
permanently defueled TSs when they
become applicable.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC;
Perry Nuclear Power Plant, Unit 1; Lake County, OH
------------------------------------------------------------------------
Docket No(s)................. 50-440.
Amendment Date............... March 1, 2021.
ADAMS Accession No........... ML21035A170.
Amendment No(s).............. 192.
Brief Description of The amendment adopted Technical
Amendment(s). Specifications Task Force (TSTF)
Traveler TSTF-582, ``RPV [Reactor
Pressure Vessel] WIC [Water Inventory
Control] Enhancements.'' The technical
specifications related to RPV WIC are
revised to incorporate operating
experience and to correct errors and
omissions in TSTF-542, Revision 2,
``Reactor Pressure Vessel Water
Inventory Control.''
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No(s)................. 50-397.
Amendment Date............... March 3, 2021.
ADAMS Accession No........... ML21053A316.
Amendment No(s).............. 264.
Brief Description of The amendment modified the Columbia
Amendment(s). Technical Specifications (TSs) related
to reactor pressure vessel (RPV) water
inventory control (WIC) based on
Technical Specifications Task Force
(TSTF) Traveler TSTF 582, Revision 0,
``RPV WIC Enhancements,'' which was
approved by the NRC on August 13, 2020,
for adoption into the Columbia TSs.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Entergy Operations, Inc., System Energy Resources, Inc., Cooperative
Energy, A Mississippi Electric Cooperative, and Entergy Mississippi,
LLC; Grand Gulf Nuclear Station, Unit 1; Claiborne County, MS
------------------------------------------------------------------------
Docket No(s)................. 50-416.
Amendment Date............... February 24, 2021.
ADAMS Accession No........... ML21019A219.
Amendment No(s).............. 227.
Brief Description of The amendment revised Technical
Amendment(s). Specification (TS) 5.5.12, ``10 CFR 50,
Appendix J, Testing Program,'' to allow
for the permanent extension of the Type
A integrated leak rate testing. The
amendment made administrative changes to
TS 5.5.12 to delete the already
performed Type A test. In addition, the
amendment revised SRs 3.6.1.1.1 and
3.6.1.2.1, and TS 5.5.12 to align with
NUREG-1434, Volume 1, Revision 4,
``Standard Technical Specifications
General Electric BWR/6 Plants.''
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Entergy Operations, Inc.; Arkansas Nuclear One, Unit 2; Pope County, AR
------------------------------------------------------------------------
Docket No(s)................. 50-368.
Amendment Date............... February 8, 2021.
ADAMS Accession No........... ML20351A153.
Amendment No(s).............. 323 (Unit 2).
[[Page 15509]]
Brief Description of The amendment revised several Arkansas
Amendment(s). Nuclear One, Unit 2 (ANO-2) technical
specification (TS) requirements by the
addition, deletion, or relocation of
certain TS limiting conditions for
operation, actions, and surveillance
requirements. Relocated TSs were placed
in the ANO-2 Technical Requirements
Manual or the associated TS Bases.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Exelon Generation Company, LLC; Limerick Generating Station, Units 1 and
2; Montgomery County, PA
------------------------------------------------------------------------
Docket No(s)................. 50-352, 50-353.
Amendment Date............... February 22, 2021.
ADAMS Accession No........... ML21032A270.
Amendment No(s).............. 252 (Unit 1) and 214 (Unit 2).
Brief Description of The amendments revised the technical
Amendment(s). specifications related to reactor
pressure vessel (RPV) water inventory
control (WIC) based on Technical
Specifications Task Force (TSTF)
Traveler TSTF-582, Revision 0, ``RPV WIC
Enhancements,'' and the associated NRC
staff safety evaluation of TSTF-582.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Florida Power & Light Company, et al.; St. Lucie Plant, Unit No. 2; St.
Lucie County, FL
------------------------------------------------------------------------
Docket No(s)................. 50-389.
Amendment Date............... February 26, 2021.
ADAMS Accession No........... ML21022A219.
Amendment No(s).............. 206 (Unit 2).
Brief Description of The amendment modified the St. Lucie
Amendment(s). Plant, Unit No. 2, technical
specifications to update the reactor
coolant system pressure and temperature
limits and revise the low-temperature
overpressure protection system settings.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos.
3. and 4; Miami-Dade County, FL
------------------------------------------------------------------------
Docket No(s)................. 50-250, 50-251.
Amendment Date............... February 26, 2021.
ADAMS Accession No........... ML21032A020.
Amendment No(s).............. 295 (Unit 3) and 268 (Unit 4).
Brief Description of The amendments modified Section 6.8.4.h,
Amendment(s). ``Containment Leakage Rate Testing
Program,'' of the Turkey Point, Units 3
and 4 technical specifications to
support the extension of the frequency
of the Type A Integrated Leak Rate Test
from 10 to 15 years and allow the
extension of the containment isolation
valves leakage test intervals (i.e.,
Type C tests) from their current 60-
month frequency to 75 months.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 2;
Berrien County, MI
------------------------------------------------------------------------
Docket No(s)................. 50-316.
Amendment Date............... March 3, 2021.
ADAMS Accession No........... ML21041A086.
Amendment No(s).............. 338 (Unit 2).
Brief Description of The amendment revised Technical
Amendment(s). Specification 5.5.7, ``Steam Generator
(SG) Program,'' to allow a one-time
deferral of the SG tube inspections from
the spring of 2021 to the fall of 2022
refueling outage.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Units 1
and 2; Berrien County, MI
------------------------------------------------------------------------
Docket No(s)................. 50-315, 50-316.
Amendment Date............... February 2, 2021.
ADAMS Accession No........... ML21006A458.
Amendment No(s).............. 358 (Unit 1) and 337 (Unit 2).
Brief Description of The amendments revised certain technical
Amendment(s). specification surveillance requirements
(SRs) to add exceptions that consider
the SR to be met when automatic valves
or dampers are locked, sealed, or
otherwise secured in the actuated
position. The revisions are consistent
with Technical Specifications Task Force
(TSTF) Traveler TSTF-541, Revision 2,
``Add Exceptions to Surveillance
Requirements for Valves and Dampers
Locked in the Actuated Position.''
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
[[Page 15510]]
NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1; Rockingham
County, NH
------------------------------------------------------------------------
Docket No(s)................. 50-443.
Amendment Date............... February 25, 2021.
ADAMS Accession No........... ML21008A014.
Amendment No(s).............. 168.
Brief Description of The amendment revised Technical
Amendment(s). Specification Table 3.3-4 to decrease
the trip setpoint and allowable value
for the 4.16 kilovolt Bus E5 and Bus E6
degraded voltage time delay relays.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Northern States Power Company--Minnesota; Prairie Island Nuclear
Generating Plant, Unit Nos. 1 and 2; Goodhue County, MN
------------------------------------------------------------------------
Docket No(s)................. 50-282, 50-306.
Amendment Date............... February 5, 2021.
ADAMS Accession No........... ML20356A002.
Amendment No(s).............. 234 (Unit 1) and 222 (Unit 2).
Brief Description of The amendments modified technical
Amendment(s). specification requirements to address
issues identified in Westinghouse
Nuclear Safety Advisory Letter (NSAL)
NSAL-09-05, Revision 1, ``Relaxed Axial
Offset Control FQ Technical
Specification Actions,'' and NSAL-15-1,
``Heat Flux Hot Channel Factor Technical
Specification Surveillance.''
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2;
Salem County, NJ
------------------------------------------------------------------------
Docket No(s)................. 50-272, 50-311.
Amendment Date............... February 23, 2021.
ADAMS Accession No........... ML20338A038.
Amendment No(s).............. 336 (Unit 1) and 317 (Unit 2).
Brief Description of The amendments made changes to the Salem
Amendment(s). Updated Final Safety Analysis Report to
use the leak-before-break methodology to
eliminate the dynamic effects of
postulated pipe ruptures in specific
portions of systems attached to the
reactor coolant system.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
Susquehanna Steam Electric Station, Units 1 and 2; Luzerne County, PA
------------------------------------------------------------------------
Docket No(s)................. 50-387, 50-388.
Amendment Date............... February 18, 2021.
ADAMS Accession No........... ML20342A237.
Amendment No(s).............. 279 (Unit 1) and 261 (Unit 2).
Brief Description of The amendments revised the technical
Amendment(s). specifications related to reactor
pressure vessel (RPV) water inventory
control (WIC) based on Technical
Specifications Task Force (TSTF)
Traveler TSTF-582, Revision 0, ``RPV WIC
Enhancements.''
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2;
Hamilton County, TN
------------------------------------------------------------------------
Docket No(s)................. 50-327, 50-328.
Amendment Date............... March 3, 2021.
ADAMS Accession No........... ML21021A349.
Amendment No(s).............. 354 (Unit 1) and 347 (Unit 2).
Brief Description of The amendments revised each unit's
Amendment(s). Technical Specification 4.2.2, ``Control
Rod Assemblies,'' to permit the Sequoyah
Nuclear Plant, Unit 1 Cycle 25 (U1C25)
and Sequoyah Nuclear Plant, Unit 2 Cycle
25 (U2C25) cores to contain 52 full
length control rods with no full length
control rod assembly in core location H-
08.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rhea
County, TN
------------------------------------------------------------------------
Docket No(s)................. 50-391.
Amendment Date............... February 9, 2021.
ADAMS Accession No........... ML21027A167.
Amendment No(s).............. 48 (Unit 2).
Brief Description of The amendment revised the Watts Bar
Amendment(s). Nuclear Plant Updated Final Safety
Analysis Report to apply alternate eddy
current probability of detection values
to indications of axial outer diameter
stress corrosion cracking at tube
support plates in the Watts Bar, Unit 2,
steam generators for the beginning of
cycle voltage distribution in support of
the Watts Bar, Unit 2, operational
assessment.
[[Page 15511]]
Public Comments Received as No
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea
County, TN
------------------------------------------------------------------------
Docket No(s)................. 50-390, 50-391.
Amendment Date............... February 11, 2021.
ADAMS Accession No........... ML20232C622.
Amendment No(s).............. 142 (Unit 1), 49 (Unit 2).
Brief Description of The amendments revised the Watts Bar
Amendment(s). Nuclear Plant technical specifications,
as necessary, to implement new
surveillance methods for the heat flux
hot channel factor and deleted the Watts
Bar Nuclear Plant, Unit 2, Facility
Operating License Condition 2.C.10
because it was no longer necessary.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Unit
Nos. 1 and 2; Somervell County, TX
------------------------------------------------------------------------
Docket No(s)................. 50-445, 50-446.
Amendment Date............... February 12, 2021.
ADAMS Accession No........... ML21015A212.
Amendment No(s).............. 178 (Unit 1) and 178 (Unit 2).
Brief Description of The amendments revised Technical
Amendment(s). Specification (TS) 3.7.8, ``Station
Service Water System (SSWS),'' and TS
3.8.1, ``AC [Alternating Current]
Sources--Operating,'' to extend the
completion times for one SSWS train
inoperable and for one diesel generator
inoperable from 72 hours to 8 days on a
one-time basis to allow for the
replacement of Comanche Peak Nuclear
Power Plant, Unit No. 2 SSWS Pump 2-02
(Train B) during Unit No. 2 Cycle 19.
The revised TSs incorporate by reference
a regulatory commitment that identifies
compensatory measures to be implemented
during the extended completion times.
Public Comments Received as No.
to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
IV. Previously Published Notice of Consideration of Issuance of
Amendments to Facility Operating Licenses and Combined Licenses,
Proposed No Significant Hazards Consideration Determination, and
Opportunity for a Hearing
The following notice was previously published as separate
individual notice. It was published as an individual notice either
because time did not allow the Commission to wait for this monthly
notice or because the action involved exigent circumstances. It is
repeated here because the monthly notice lists all amendments issued or
proposed to be issued involving NSHC.
For details, including the applicable notice period, see the
individual notice in the Federal Register on the day and page cited.
License Amendment Request(s)--Repeat of Individual Federal Register
Notice
------------------------------------------------------------------------
------------------------------------------------------------------------
Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC;
Beaver Valley Power Station, Unit 1; Beaver County, PA
------------------------------------------------------------------------
Docket No(s)................. 50-334.
Application Date............. January 27, 2021.
ADAMS Accession No........... ML21027A228.
Brief Description of The proposed amendment would revise
Amendment(s). Technical Specification (TS) 5.5.5.1,
``Unit 1 SG [Steam Generator] Program,''
paragraph d.2 to defer the spring of
2021 refueling outage (1R27) steam
generator inspections to the fall of
2022 refueling outage (1R28).
Date & Cite of Federal February 11, 2021 (86 FR 9087).
Register Individual Notice.
Expiration Dates for Public March 15, 2021 (Public Comments); April
Comments & Hearing Requests. 12, 2021 (Hearing Requests).
------------------------------------------------------------------------
Dated: March 9, 2021.
For the Nuclear Regulatory Commission.
Caroline L. Carusone,
Deputy Director, Division of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. 2021-05248 Filed 3-22-21; 8:45 am]
BILLING CODE 7590-01-P