[Federal Register Volume 86, Number 11 (Tuesday, January 19, 2021)]
[Notices]
[Pages 5269-5280]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-01091]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-334, 50-412, 50-456, 50-457, 50-259, 50-260, 50-296, 
50-325, 50-324, 50-454, 50-455, 50-317, 50-318, 50-413, 50-414, 50-461, 
50-397, 50-445, 50-446, 50-298, 50-346, 50-275, 50-323, 50-315, 50-316, 
50-237, 50-249, 50-321, 50-366, 50-341, 50-354, 50-272, 50-311, 50-003, 
50-247, 50-286, 50-333, 50-348, 50-364, 50-261, 50-373, 50-374, 50-352, 
50-353, 50-369, 50-370, 50-245, 50-336, 50-423, 50-263, 50-220, 50-410, 
50-338, 50-339, 50-269, 50-270, 50-287, 50-243, 50-255, 50-528, 50-529, 
50-530, 50-277, 50-278, 50-440, 50-266, 50-301, 50-282, 50-306, 50-254, 
50-265, 50-244, 50-458, 50-335, 50-389, 50-443, 50-400, 50-498, 50-499, 
50-280, 50-281, 50-387, 50-388, 50-395, 50-424, 50-425, 50-382, 50-390, 
50-391; NRC-2020-0110]


Issuance of Multiple Exemptions in Response to COVID-19 Public 
Health Emergency

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemptions; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued 68 
exemptions in response to requests from 26 licensees. The exemptions 
afford these licensees temporary or permanent relief from certain 
requirements under NRC regulations. The exemptions are in response to 
the licensees' requests for relief due to the coronavirus disease 2019 
(COVID-19) public health emergency (PHE). The NRC is issuing a single 
notice to announce the issuance of the exemptions.

DATES: During the period from December 1, 2020, to December 28, 2020, 
the NRC granted 68 exemptions in response to requests submitted by 
licensees from September 30, 2020, to December 23, 2020.

ADDRESSES: Please refer to Docket ID NRC-2020-0110 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0110. Address 
questions about NRC Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected].
     Attention: The PDR, where you may examine and order copies 
of public documents, is currently closed. You may submit your request 
to the PDR via email at [email protected] or call 1-800-397-4209 or 
301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through 
Friday, except Federal holidays.
    For the convenience of the reader, instructions about obtaining 
materials referenced in this document are provided in the 
``Availability of Documents'' section.

FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-
0001; telephone: 301-415-7422, email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    During the period from December 1, 2020, to December 28, 2020, the 
NRC granted 68 exemptions in response to requests submitted by 
licensees from September 30, 2020, to December 23, 2020. These 
exemptions allow the licensees to deviate from certain requirements (as 
cited in this notice) of various parts of chapter I of title 10 of the 
Code of Federal Regulations (10 CFR).
    The exemptions from certain requirements of 10 CFR part 26, 
``Fitness for Duty Programs,'' for Exelon Generation Company, LLC (for 
Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; 
Clinton Power Station, Unit No. 1; LaSalle County Station, Units 1 and 
2; and Quad Cities Nuclear Power Station, Units 1 and 2); for Vistra 
Operations Company LLC (for Comanche Peak Nuclear Power Plant, Unit 
Nos. 1 and 2); for Arizona Public Service Company (for Palo Verde 
Nuclear Generating Station, Units 1, 2, and 3); for PSEG Nuclear LLC 
(for Hope Creek Generating Station and Salem Nuclear Generating 
Station, Unit Nos. 1 and 2); and for Indiana Michigan Power Company 
(for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2), afford these 
licensees temporary relief from the work-hour controls under 10 CFR 
26.205(d)(1) through (d)(7). The exemptions from 10 CFR 26.205(d)(1) 
through (d)(7) ensure that the control of work hours and management of 
worker fatigue do not unduly limit licensee flexibility in using 
personnel resources to most effectively manage the impacts of the 
COVID-19 PHE on maintaining the safe operation of these facilities. 
Specifically, these licensees have stated that their staffing levels 
are affected or are expected to be affected by the COVID-19 PHE, and 
they can no longer meet or likely will not meet the work-hour controls 
of 10 CFR 26.205(d)(1) through (d)(7). These licensees have committed 
to effecting site-specific administrative controls for COVID-19 PHE 
fatigue management for personnel specified in 10 CFR 26.4(a).
    The exemptions from certain requirements of 10 CFR part 50, 
appendix E, ``Emergency Planning and Preparedness for Production and 
Utilization Facilities,'' section IV.F., ``Training,'' for Energy 
Northwest (for Columbia Generating Station); for DTE Electric Company 
(for Fermi-2); for PSEG Nuclear LLC (for Hope Creek Generating Station 
and Salem Nuclear Generating Station, Unit Nos. 1 and 2); for Entergy 
Nuclear Operations, Inc. (for Indian Point Nuclear Generating Station, 
Unit Nos. 1, 2, and 3; and Palisades Nuclear Plant); for Virginia 
Electric and Power Company (for North Anna Power Station, Unit Nos. 1 
and 2); for Exelon Generation Company, LLC (for LaSalle County Station, 
Units 1 and 2); for Oregon State University (for the Oregon State TRIGA 
Reactor); for Entergy Operations, Inc. (for River Bend Station, Unit 
1); for NextEra Energy Seabrook, LLC (for Seabrook Station, Unit No. 
1), grant temporary exemptions from the biennial emergency preparedness 
exercise requirement. The exemptions allow a temporary exemption from 
the requirements of 10 CFR part 50, appendix E, regarding the conduct 
of the biennial emergency preparedness exercise. These exemptions will 
not adversely affect the emergency response capability of the 
facilities because affected licensee

[[Page 5270]]

personnel are currently qualified, and the licensees' proposed 
compensatory measures will enable their staff to maintain their 
knowledge, skills, and abilities without the conduct of the biennial 
emergency preparedness exercise during the exemption term.
    The exemptions from certain requirements of 10 CFR part 73, 
appendix B, ``General Criteria for Security Personnel,'' section VI, 
``Nuclear Power Reactor Training and Qualification Plan for Personnel 
Performing Security Program Duties,'' for Energy Harbor Nuclear Corp. 
(for Beaver Valley Power Station, Units 1 and 2; Davis-Besse Nuclear 
Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1); 
for Exelon Generation Company, LLC (for Braidwood Station, Units 1 and 
2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power 
Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden 
Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear 
Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating 
Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; 
Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear 
Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant); for 
Tennessee Valley Authority (for Browns Ferry Nuclear Plant, Units 1, 2, 
and 3; and Watts Bar Nuclear Plant, Units 1 and 2); for Duke Energy 
Progress, LLC (for Brunswick Steam Electric Plant, Units 1 and 2; 
Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam 
Electric Plant, Unit No. 2); for Nebraska Public Power District (for 
Cooper Nuclear Station); for Duke Energy Carolinas, LLC (for Catawba 
Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Unit Nos. 1 
and 2; and Oconee Nuclear Station, Units 1, 2, and 3); for Energy 
Northwest (for Columbia Generating Station); for Vistra Operations 
Company LLC (for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2); 
for Pacific Gas and Electric Company (for Diablo Canyon Nuclear Power 
Plant, Units 1 and 2); for Indiana Michigan Power Company (for Donald 
C. Cook Nuclear Plant, Unit Nos. 1 and 2); for Southern Nuclear 
Operating Co., Inc. (for Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 
2; Joseph M. Farley Nuclear Plant, Units 1 and 2; and Vogtle Electric 
Generating Plant, Units 1 and 2); for DTE Electric Company (for Fermi-
2); for Entergy Nuclear Operations, Inc. (for Indian Point Nuclear 
Generating Unit Nos. 2 and 3; and Palisades Nuclear Plant); for 
Dominion Energy Nuclear Connecticut, Inc. (for Millstone Power Station, 
Unit Nos. 1, 2, and 3); for Northern States Power Company (for 
Monticello Nuclear Generating Plant and Prairie Island Nuclear 
Generating Plant, Units 1 and 2); for Virginia Electric and Power 
Company (for North Anna Power Station, Unit Nos. 1 and 2; and Surry 
Power Station, Unit Nos. 1 and 2); for NextEra Energy Point Beach, LLC 
(for Point Beach Nuclear Plant, Units 1 and 2); for Florida Power & 
Light Company (for St. Lucie Plant, Unit Nos. 1 and 2); for NextEra 
Energy Seabrook, LLC (for Seabrook Station, Unit No. 1); STP Nuclear 
Operating Company (for South Texas Project, Units 1 and 2); for 
Susquehanna Nuclear LLC (for Susquehanna Steam Electric Station, Units 
1 and 2), for Dominion Energy South Carolina, Inc. (for Virgil C. 
Summer Nuclear Station, Unit No. 1); and Entergy Operations, Inc. (for 
Waterford Steam Electric Station, Unit 3), will help to ensure that 
these regulatory requirements do not unduly limit licensee flexibility 
in using personnel resources in a manner that most effectively manages 
the impacts of the COVID-19 PHE on maintaining the safe and secure 
operation of these facilities and the implementation of the licensees' 
NRC approved security plans, protective strategy, and implementing 
procedures. These licensees have committed to certain security measures 
to ensure response readiness and for their security personnel to 
maintain performance capability.
    The NRC is providing compiled tables of exemptions using a single 
Federal Register notice for COVID-19 related exemptions instead of 
issuing individual Federal Register notices for each exemption. The 
compiled tables in this notice provide transparency regarding the 
number and type of exemptions the NRC has issued. Additionally, the NRC 
publishes tables of approved regulatory actions related to the COVID-19 
PHE on its public website at https://www.nrc.gov/about-nrc/covid-19/reactors/licensing-actions.html.

II. Availability of Documents

    The tables in this notice provide the facility name, docket number, 
document description, and ADAMS accession number for each exemption 
issued. Additional details on each exemption issued, including the 
exemption request submitted by the respective licensee and the NRC's 
decision, are provided in each exemption approval listed in the tables 
in this notice. For additional directions on accessing information in 
ADAMS, see the ADDRESSES section of this document.

----------------------------------------------------------------------------------------------------------------
                    Document description                                     ADAMS accession No.
----------------------------------------------------------------------------------------------------------------
                                   Beaver Valley Power Station, Units 1 and 2
                                          Docket Nos. 50-334 and 50-412
----------------------------------------------------------------------------------------------------------------
Beaver Valley Power Station, Units 1 and 2 -Request for a    ML20303A213.
 One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(1)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated October
 28, 2020.
Beaver Valley Power Station, Units 1 and 2--Exemption from   ML20324A089.
 Annual Force-on-Force Exercise Requirement of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(l)(1) (EPID L-2020-LLE-
 0171 [COVID-19]), dated December 15, 2020.
----------------------------------------------------------------------------------------------------------------
                                        Braidwood Station, Units 1 and 2
                                          Docket Nos. 50-456 and 50-457
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    non-public, withheld pursuant to 10 CFR 2.390.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Braidwood Station, Units 1 and 2--Exemption from Annual      ML20322A338.
 Force-on-Force Exercise Requirements of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0198) [COVID-
 19], dated December 10, 2020.
----------------------------------------------------------------------------------------------------------------

[[Page 5271]]

 
                                        Braidwood Station, Units 1 and 2
                                          Docket Nos. 50-456 and 50-457
----------------------------------------------------------------------------------------------------------------
Braidwood Station, Units 1 and 2--COVID-19 Related Request   ML20323A008.
 for Exemption from 10 CFR part 26 Work Hours Requirements,
 dated November 17, 2020.
Braidwood Station, Units 1 and 2--Response to Request for    ML20328A215.
 Additional Information Related to Exemption from 10 CFR
 part 26 Requirements, dated November 23, 2020.
Braidwood Station, Units 1 and 2--Exemption from Select      ML20324A002.
 Requirements of 10 CFR part 26 (EPID L-2020-LLE-0207
 [COVID-19]), dated December 1, 2020.
----------------------------------------------------------------------------------------------------------------
                                  Browns Ferry Nuclear Plant, Units 1, 2, and 3
                                     Docket Nos. 50-259, 50-260, and 50-296
----------------------------------------------------------------------------------------------------------------
Browns Ferry Nuclear Power Plant, Units 1, 2, and 3--        ML20343A214.
 Request for a One-Time Exemption from 10 CFR part 73,
 appendix B, section VI, subsection C.3.(I)(1) Regarding
 Annual Force-on-Force Exercises due to COVID-19 Pandemic,
 dated December 8, 2020.
Browns Ferry Nuclear Plant, Units 1, 2, and 3--Exemption     ML20343A363.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0233 [COVID-19]), dated December 15, 2020.
----------------------------------------------------------------------------------------------------------------
                                  Brunswick Steam Electric Plant, Units 1 and 2
                                          Docket Nos. 50-325 and 50-324
----------------------------------------------------------------------------------------------------------------
Duke Energy--Request for One-Time Exemption from 10 CFR      non-public, withheld pursuant to 10 CFR 2.390.
 part 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 4, 2020.
Duke Energy--Response to Request for Additional Information  non-public, withheld pursuant to 10 CFR 2.390.
 for One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 19, 2020.
Brunswick Steam Electric Plant, Units 1 and 2 Exemption      ML20338A329.
 from Annual Force-On-Force Exercise Requirements of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0180 [COVID-19]), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                        Byron Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-454 and 50-455
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    non-public, withheld pursuant to 10 CFR 2.390.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Byron Station, Unit Nos. 1 and 2--Exemption from Annual      ML20323A393.
 Force-on-Force Exercise Requirements of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3(l)(1) (EPID L-2020-LLE-0199) [COVID-19],
 dated December 10, 2020.
----------------------------------------------------------------------------------------------------------------
                                        Byron Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-454 and 50-455
----------------------------------------------------------------------------------------------------------------
Byron Station, Unit Nos. 1 and 2--Subsequent Request for     ML20329A533.
 Exemption from 10 CFR part 26 Work Hours Requirements,
 dated November 24, 2020.
Byron Station, Unit Nos. 1 and 2--Response to Request for    ML20336A341.
 Additional Information Related to Subsequent Exemption
 from 10 CFR part 26 Requirements, dated December 1, 2020.
Byron Station, Unit Nos. 1 and 2--Exemption from Select      ML20332A017.
 Requirements of 10 CFR part 26 (EPID L-2020-LLE-0218
 [COVID-19]), dated December 2, 2020.
----------------------------------------------------------------------------------------------------------------
                                Calvert Cliffs Nuclear Power Plant, Units 1 and 2
                                          Docket Nos. 50-317 and 50-318
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    ML20318A288.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Calvert Cliffs Nuclear Power Plant, Units 1 and 2--          ML20321A243.
 Exemption from Annual Force-on-Force Exercise Requirement
 of 10 CFR part 73, appendix B, ``General Criteria for
 Security Personnel,'' subsection VI.C.3(l)(1) (EPID L-2020-
 LLE-0194 [COVID-19]), dated December 11, 2020.
----------------------------------------------------------------------------------------------------------------
                                     Catawba Nuclear Station, Units 1 and 2
                                          Docket Nos. 50-413 and 50-414
----------------------------------------------------------------------------------------------------------------
Duke Energy--Request for One-Time Exemption from 10 CFR      non-public, withheld pursuant to 10 CFR 2.390.
 part 73, appendix B, section VI, subsection C.3.(I)(1),
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 4, 2020.
Duke Energy--Response to Request for Additional Information  non-public, withheld pursuant to 10 CFR 2.390.
 for One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 19, 2020.
Catawba Nuclear Station, Units 1 and 2--Exemption from       ML20337A128.
 Annual Force-On-Force Exercise Requirements of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0180 [COVID-19]), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------

[[Page 5272]]

 
                                        Clinton Power Station, Unit No. 1
                                                Docket No. 50-461
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    non-public, withheld pursuant to 10 CFR 2.390.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Clinton Power Station, Unit No. 1--Exemption from Annual     ML20323A434.
 Force-on-Force Exercise Requirements of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3(l)(1) (EPID L-2020-LLE-0200 [COVID-19]),
 dated December 11, 2020.
----------------------------------------------------------------------------------------------------------------
                                        Clinton Power Station, Unit No. 1
                                                Docket No. 50-461
----------------------------------------------------------------------------------------------------------------
Clinton Power Station, Unit No. 1--COVID-19 Related Request  ML20339A318.
 for Exemption from 10 CFR part 26 Work Hours Requirements,
 dated December 3, 2020.
Clinton Power Station, Unit No. 1--Exemption from Select     ML20339A538.
 Requirements of 10 CFR part 26 (EPID L-2020-LLE-0232
 [COVID-19]), dated December 16, 2020.
----------------------------------------------------------------------------------------------------------------
                                           Columbia Generating Station
                                                Docket No. 50-397
----------------------------------------------------------------------------------------------------------------
Columbia Generating Station--Exemption Request from 10 CFR   ML20303A348.
 part 50, appendix E due to COVID-19 Pandemic, dated
 October 29, 2020.
Columbia Generating Station--Temporary Exemption from        ML20336A183.
 Biennial Emergency Preparedness Exercise Frequency
 Requirements of 10 CFR part 50, appendix E, sections
 IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0173 [COVID-19]),
 dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                           Columbia Generating Station
                                                Docket No. 50-397
----------------------------------------------------------------------------------------------------------------
Columbia Generating Station--Request for a One-Time          ML20303A286.
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3.(I)(1) regarding Annual Force-On-Force
 Exercises due to COVID-19 Pandemic, dated October 29, 2020.
Columbia Generating Station--Response to Request for         ML20338A541.
 Additional Information Related to Request for a One-Time
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3.(I)(1) Regarding Annual Force-On-Force
 Exercises due to COVID-19, dated December 3, 2020.
Columbia Generating Station--Exemption from Annual Force-On- ML20342A211.
 Force Exercise Requirements of 10 CFR part 73, appendix B,
 ``General Criteria for Security Personnel,'' subsection
 VI.C.3.(I)(1) (EPID L-2020-LLE-0172 [COVID-19]), dated
 December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                              Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2
                                          Docket Nos. 50-445 and 50-446
----------------------------------------------------------------------------------------------------------------
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2--       ML20345A341.
 Request for a One-Time Exemption from 10 CFR part 73,
 appendix B, section VI, subsection C.3.(I)(l) Regarding
 Annual Force-on-Force Exercises due to COVID-19 Pandemic,
 dated December 10, 2020.
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2--       ML20350B666.
 Exemption from Annual Force-On-Force Exercise Requirement
 of 10 CFR part 73, appendix B, ``General Criteria for
 Security Personnel,'' subsection VI.C.3.(I)(1) (EPID L-
 2020-LLE-0235 [COVID-19]), dated December 22, 2020.
----------------------------------------------------------------------------------------------------------------
                              Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2
                                          Docket Nos. 50-445 and 50-446
----------------------------------------------------------------------------------------------------------------
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2--       ML20346A565.
 Request for Exemption from Specific Requirements of 10 CFR
 part 26, ``Fitness for Duty Programs,'' dated December 11,
 2020.
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2--       ML20350B830.
 Supplement to Request for Exemption from Specific
 Requirements of 10 CFR part 26, ``Fitness for Duty
 Programs,'' dated December 15, 2020.
Comanche Peak, Unit Nos. 1 and 2--Exemption from Selection   ML20349A038.
 from Requirements of 10 CFR part 26 (EPID L-2020-LLE-0236
 [COVID-19]), dated December 16, 2020.
----------------------------------------------------------------------------------------------------------------
                                             Cooper Nuclear Station
                                                Docket No. 50-298
----------------------------------------------------------------------------------------------------------------
Cooper Nuclear Station--Request for a One-Time Exemption     ML20309A663.
 from 10 CFR part 73, appendix B, section VI, subsection
 C.3.(1)(1) Regarding Annual Force-on-Force Exercises due
 to COVID-19 Pandemic, dated October 27, 2020.
Cooper Nuclear Station--Exemption from Annual Force-On-      ML20323A237.
 Force Exercise Requirements of 10 CFR part 73, appendix B,
 ``General Criteria for Security Personnel,'' subsection
 VI.C.3.(I)(1) (EPID L-2020-LLE-0178 [COVID-19]), dated
 December 11, 2020.
----------------------------------------------------------------------------------------------------------------

[[Page 5273]]

 
                                  Davis-Besse Nuclear Power Station, Unit No. 1
                                                Docket No. 50-346
----------------------------------------------------------------------------------------------------------------
Davis-Besse Nuclear Power Station, Unit No. 1--Request for   ML20304A046.
 a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated October
 29, 2020.
Davis-Besse Nuclear Power Station, Unit No. 1--Response to   ML20342A199.
 Request for Additional Information Regarding Request for
 Exemption--10 CFR part 73 Force-on-Force Exercises (EPID L-
 2020-LLE-0175), dated December 7, 2020.
Davis-Besse Nuclear Power Station, Unit No. 1--Exemption     ML20345A205.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0175 [COVID-19]), dated December 15, 2020.
----------------------------------------------------------------------------------------------------------------
                                Diablo Canyon Nuclear Power Plant, Units 1 and 2
                                          Docket Nos. 50-275 and 50-323
----------------------------------------------------------------------------------------------------------------
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Request    non-public, withheld pursuant to 10 CFR 2.390.
 for a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated October
 14, 2020.
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Response   non-public, withheld pursuant to 10 CFR 2.390.
 to Request for Additional Information Regarding Request
 for a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 December 3, 2020.
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Exemption  ML20346A024.
 from Annual Force-On-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0166 [COVID-19]), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                Diablo Canyon Nuclear Power Plant, Units 1 and 2
                                          Docket Nos. 50-275 and 50-323
----------------------------------------------------------------------------------------------------------------
Diablo Canyon Power Plant, Units 1 and 2--Request for a One- non-public, withheld pursuant to 10 CFR 2.390.
 Time Exemption from 10 CFR part 73, appendix B, section
 VI, subsection F.5.(a) Regarding Firearms Requalification
 due to COVID-19 Pandemic, dated October 14, 2020.
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Response   non-public, withheld pursuant to 10 CFR 2.390.
 to Request for Additional Information Regarding Request
 for a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection F.5.(a) Regarding Firearms
 Requalification due to COVID-19 Pandemic, dated December
 3, 2020.
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Exemption  ML20346A120.
 from Annual Firearms Tactical Qualification Course
 Requirement of 10 CFR part 73, appendix B, ``General
 Criteria for Security Personnel,'' subsection VI.F.5.(a)
 (EPID L-2020-LLE-0167 [COVID-19]), dated December 18, 2020.
----------------------------------------------------------------------------------------------------------------
                                Donald C. Cook Nuclear Plant, Units Nos. 1 and 2
                                          Docket Nos. 50-315 and 50-316
----------------------------------------------------------------------------------------------------------------
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2--Request     ML20318A034.
 for a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 4, 2020.
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2--Exemption   ML20324A003.
 from Certain Requirements of 10 CFR part 73, appendix B,
 ``General Criteria for Security Personnel,'' section VI
 (EPID L-2020-LLE-0182 [COVID-19]), dated December 8, 2020.
----------------------------------------------------------------------------------------------------------------
                                Donald C. Cook Nuclear Plant, Units Nos. 1 and 2
                                          Docket Nos. 50-315 and 50-316
----------------------------------------------------------------------------------------------------------------
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2--Request     ML20338A324.
 for a One-Time Exemption from 10 CFR 26.205(d) due to
 COVID-19 Pandemic, dated November 30, 2020.
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2--Exemption   ML20336A111.
 from Select Requirements of 10 CFR part 26 (EPID L-2020-
 LLE-0221 [COVID-19]), dated December 3, 2020.
----------------------------------------------------------------------------------------------------------------
                                  Dresden Nuclear Power Station, Units 2 and 3
                                          Docket Nos. 50-237 and 50-249
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    non-public, withheld pursuant to 10 CFR 2.390.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Dresden Nuclear Power Station, Units 2 and 3--Exemption      ML20322A303.
 from Annual Force-On-Force Exercise Requirements of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0203 [COVID-19]), dated December 14, 2020.
----------------------------------------------------------------------------------------------------------------
                                 Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2
                                          Docket Nos. 50-321 and 50-366
----------------------------------------------------------------------------------------------------------------
Request for One-Time Exemptions from 10 CFR part 73,         ML20311A662.
 appendix B, section VI, subsection C.3.(I)(1) Regarding
 Annual Force-on-Force Exercises due to COVID-19 Pandemic,
 dated November 6, 2020.

[[Page 5274]]

 
Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2--Exemption   ML20329A488.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(l)(1) (EPID L-2020-LLE-
 0215 [COVID-19]), dated December 4, 2020.
----------------------------------------------------------------------------------------------------------------
                                                     Fermi-2
                                                Docket No. 50-341
----------------------------------------------------------------------------------------------------------------
Fermi-2--Request for One-Time Exemption from 10 CFR part     ML20317A203.
 50, appendix E, ``Biennial Emergency Preparedness Exercise
 Requirements,'' due to COVID-19 Pandemic, dated November
 12, 2020.
Fermi-2--Temporary Exemption from Biennial Emergency         ML20332A179.
 Preparedness Exercise Frequency Requirements of 10 CFR
 part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID
 L-2020-LLE-0188 [COVID-19]), dated December 8, 2020.
----------------------------------------------------------------------------------------------------------------
                                                     Fermi-2
                                                Docket No. 50-341
----------------------------------------------------------------------------------------------------------------
Fermi-2--Request for Exemption from the Annual Force-on-     ML20318A383.
 Force Training Requirements of 10 CFR part 73, appendix B,
 section VI due to the COVID-19 Public Health Emergency,
 dated November 13, 2020.
Fermi-2--Response to Request for Additional Information      ML20338A333.
 Regarding Exemption from the Annual Force-on-Force
 Training Requirements of 10 CFR part 73, appendix B,
 section VI due to the COVID-19 Public Health Emergency,
 dated December 3, 2020.
Fermi-2--Exemption from Annual Force-on-Force Exercise       ML20343A350.
 Requirement of 10 CFR part 73, appendix B, ``General
 Criteria for Security Personnel,'' subsection
 VI.C.3.(l)(1) (EPID L-2020-LLE-0204 [COVID-19]), dated
 December 18, 2020.
----------------------------------------------------------------------------------------------------------------
                                          Hope Creek Generating Station
                                                Docket No. 50-354
                               Salem Nuclear Generating Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-272 and 50-311
----------------------------------------------------------------------------------------------------------------
Hope Creek Generating Station and Salem Generating Station,  ML20287A628.
 Units Nos. 1 and 2--Exemption Request from 10 CFR part 50,
 appendix E, ``Biennial Emergency Preparedness Exercise
 Requirements,'' due to COVID-19 Pandemic, dated October
 13, 2020.
Hope Creek Generating Station and Salem Nuclear Generating   ML20315A434.
 Station, Unit Nos. 1 and 2--Temporary Exemption from the
 Exercise Requirements of 10 CFR part 50, appendix E,
 sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0164
 [COVID-19]), dated December 7, 2020.
----------------------------------------------------------------------------------------------------------------
                                          Hope Creek Generating Station
                                                Docket No. 50-354
                               Salem Nuclear Generating Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-272 and 50-311
----------------------------------------------------------------------------------------------------------------
Hope Creek Generating Station and Salem Generating Station,  ML20358A186.
 Unit Nos. 1 and 2--Request for Exemption from Specific
 Requirements of 10 CFR part 26, ``Fitness for Duty
 Programs,'' dated December 23, 2020.
Hope Creek Generating Station and Salem Nuclear Generating   ML20358A281.
 Station, Unit Nos. 1 and 2--Exemption from Select
 Requirements of 10 CFR part 26 (EPID L-2020-LLE-0239
 [COVID-19]), dated December 28, 2020.
----------------------------------------------------------------------------------------------------------------
                         Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3
                                     Docket Nos. 50-003, 50-247, and 50-286
----------------------------------------------------------------------------------------------------------------
Indian Point Nuclear Generating Station, Unit Nos. 1, 2,     ML20282A612.
 and 3--One-time Scheduler Exemption Request from 10 CFR
 part 50, appendix E, ``Biennial Emergency Preparedness
 Exercise Requirements,'' due to COVID-19 Public Health
 Emergency, dated October 8, 2020.
Indian Point Nuclear Generating Station, Unit Nos. 1, 2,     ML20317A344.
 and 3--Supplement to One-Time Exemption Request from 10
 CFR part 50, appendix E, ``Biennial Emergency Preparedness
 Exercise Requirements'' (EPID L-2020-LLE-0160 [COVID-19]),
 dated November 12, 2020.
Indian Point Nuclear Generating Station, Unit Nos. 1, 2,     ML20320A000.
 and 3--Temporary Exemption from Exercise Frequency
 Requirements of 10 CFR part 50, appendix E, section
 IV.F.2.B (EPID L-2020-LLE-0160 [COVID-19]), dated December
 8, 2020.
----------------------------------------------------------------------------------------------------------------
                                Indian Point Nuclear Generating Unit Nos. 2 and 3
                                          Docket Nos. 50-247 and 50-286
----------------------------------------------------------------------------------------------------------------
Indian Point Nuclear Generating Unit Nos. and 3--Request     ML20317A299.
 for a One-Time Exemption from 10 CFR 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force (FOF) Exercises, Due to COVID 19 Pandemic, dated
 November 12, 2020.
Indian Point Nuclear Generating Unit Nos. 2 and 3--          ML20321A121.
 Exemption from Annual Force-on-Force Exercise Requirement
 of 10 CFR part 73, appendix B, ``General Criteria for
 Security Personnel,'' subsection VI.C.3.(I)(1) (EPID L-
 2020-LLE-0189 [COVID-19]), dated December 14, 2020.
----------------------------------------------------------------------------------------------------------------

[[Page 5275]]

 
                                    James A. FitzPatrick Nuclear Power Plant
                                                Docket No. 50-333
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    ML20318A288.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
James A. Fitzpatrick Nuclear Power Plant--Exemption from     ML20337A004.
 Annual Force-On-Force Exercise Requirements of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0197 [COVID 19]), dated December 8, 2020.
----------------------------------------------------------------------------------------------------------------
                                  Joseph M. Farley Nuclear Plant, Units 1 and 2
                                          Docket Nos. 50-348 and 50-364
----------------------------------------------------------------------------------------------------------------
Request for One-Time Exemptions from 10 CFR part 73,         ML20311A662.
 appendix B, section VI, subsection C.3.(I)(1) Regarding
 Annual Force-on-Force Exercises due to COVID-19 Pandemic,
 dated November 6, 2020.
Joseph M. Farley Nuclear Plant, Units 1 and 2--Exemption     ML20315A374.
 from Certain Requirements of 10 CFR part 73, appendix B,
 ``General Criteria for Security Personnel,'' subsection VI
 C.3.(I)(1) (EPID L-2020-LLE-0183 [COVID-19]), dated
 December 4, 2020.
----------------------------------------------------------------------------------------------------------------
                                 H. B. Robinson Steam Electric Plant, Unit No. 2
                                                Docket No. 50-261
----------------------------------------------------------------------------------------------------------------
Duke Energy--Request for One-Time Exemption from 10 CFR      non-public, withheld pursuant to 10 CFR 2.390.
 part 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 4, 2020.
Duke Energy--Response to Request for Additional Information  non-public, withheld pursuant to 10 CFR 2.390.
 for One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 19, 2020.
H. B. Robinson Steam Electric Plant, Unit No. 2--Exemption   ML20339A521.
 from Annual Force-On-Force Exercise Requirements of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1), dated December 17,
 2020.
----------------------------------------------------------------------------------------------------------------
                                      LaSalle County Station, Units 1 and 2
                                          Docket Nos. 50-373 and 50-374
----------------------------------------------------------------------------------------------------------------
LaSalle County Station, Units 1 and 2--Request for           ML20328A292.
 Exemption from the Biennial Emergency Preparedness
 Exercise Requirements in 10 CFR part 50, appendix E,
 section IV.F.2.b, dated November 23, 2020.
LaSalle County Station, Units 1 and 2--Supplemental          ML20342A259.
 Information Regarding Request for Exemption from the
 Biennial Emergency Preparedness Exercise Requirements of
 10 CFR part 50, appendix E, section IV.F.2.b, dated
 December 7, 2020.
LaSalle County Station, Units 1 and 2--Temporary Exemption   ML20346A014.
 from Biennial Emergency Preparedness Exercise Frequency
 Requirements of 10 CFR part 50, appendix E, section
 IV.F.2.b (EPID-L-2020-LLE-0223 [COVID-19]), dated December
 18, 2020.
----------------------------------------------------------------------------------------------------------------
                                      LaSalle County Station, Units 1 and 2
                                          Docket Nos. 50-373 and 50-374
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    non-public, withheld pursuant to 10 CFR 2.390.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
LaSalle County Station, Units 1 and 2--Exemption from        ML20324A104.
 Annual Force-on-Force Exercise Requirements of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3(l)(1) (EPID L-2020-LLE-0191
 [COVID-19]), dated December 9, 2020.
----------------------------------------------------------------------------------------------------------------
                                      LaSalle County Station, Units 1 and 2
                                          Docket Nos. 50-373 and 50-374
----------------------------------------------------------------------------------------------------------------
LaSalle County Station, Units 1 and 2- COVID-19 Related      ML20329A301.
 Request for Exemption from 10 CFR part 26 Work Hours
 Requirements, dated November 24, 2020.
LaSalle County Station, Units 1 and 2--Exemption from        ML20330A326.
 Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-
 0217 [COVID-19]), dated December 1, 2020.
----------------------------------------------------------------------------------------------------------------
                                   Limerick Generating Station, Units 1 and 2
                                          Docket Nos. 50-352 and 50-353
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Limerick Generating Station, Units 1 and  ML20318A288.
 2--Request for Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding 2020 Annual
 Force-on-Force Exercises due to COVID-19 Public Health
 Emergency, dated November 13, 2020.
Limerick Generating Station, Units 1 and 2--Exemption from   ML20330A295.
 Annual Force-on-Force Exercise Requirement of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(l)(1) (EPID L-2020-LLE-
 0201 [COVID-19]), dated December 10, 2020.
----------------------------------------------------------------------------------------------------------------

[[Page 5276]]

 
                                   McGuire Nuclear Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-369 and 50-370
----------------------------------------------------------------------------------------------------------------
Duke Energy--Request for One-Time Exemption from 10 CFR      non-public, withheld pursuant to 10 CFR 2.390.
 part 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 4, 2020.
Duke Energy--Response to Request for Additional Information  non-public, withheld pursuant to 10 CFR 2.390.
 for One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 19, 2020.
McGuire Nuclear Station, Unit Nos. 1 and 2--Exemption from   ML20330A321.
 Annual Force-on-Force Exercise Requirements of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0180) [COVID-19], dated December 9, 2020.
----------------------------------------------------------------------------------------------------------------
                                 Millstone Power Station, Unit Nos. 1, 2, and 3
                                     Docket Nos. 50-245, 50-336, and 50-423
----------------------------------------------------------------------------------------------------------------
Millstone Power Station, Unit Nos. 1, 2, and 3--Request for  non-public, withheld pursuant to 10 CFR 2.390.
 a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(1)(1) Regarding Annual Force-
 On-Force Exercises due to COVID-19 Pandemic, dated
 December 3, 2020.
Millstone Power Station, Unit Nos. 1, 2, and 3--Exemption    ML20338A552.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0227 [COVID-19]), dated December 16, 2020.
----------------------------------------------------------------------------------------------------------------
                                       Monticello Nuclear Generating Plant
                                                Docket No. 50-263
----------------------------------------------------------------------------------------------------------------
Monticello and Prairie Island--Request for a One-Time        non-public, withheld pursuant to 10 CFR 2.390.
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3(l)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated October 30, 2020.
Response to Request for Additional Information Regarding     non-public, withheld pursuant to 10 CFR 2.390.
 Request for a One-Time Exemption from 10 CFR part 73,
 appendix B, section VI, subsection C.3(l)(1) Regarding
 Annual Force-on-Force Exercises due to COVID-19 Pandemic,
 dated December 14, 2020.
Monticello Nuclear Generating Plant--Exemption from Certain  ML20317A136.
 Requirements of 10 CFR part 73, appendix B, ``General
 Criteria for Security Personnel,'' subsection
 VI.C.3.(I)(1) (EPID L-2020-LLE-0174 [COVID-19]), dated
 December 22, 2020.
----------------------------------------------------------------------------------------------------------------
                                 Nine Mile Point Nuclear Station, Units 1 and 2
                                          Docket Nos. 50-220 and 50-410
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    ML20318A288.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Nine Mile Point Nuclear Station, Units 1 and 2--Exemption    ML20321A290.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0195 [COVID-19]), dated December 14, 2020.
----------------------------------------------------------------------------------------------------------------
                                   North Anna Power Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-338 and 50-339
----------------------------------------------------------------------------------------------------------------
North Anna Power Station, Unit Nos. 1 and 2--Request for     ML20317A162.
 One-Time Schedular Exemption from Offsite Biennial
 Emergency Preparedness Exercise Requirement in 10 CFR part
 50, appendix E, section IV.F.2.c, dated November 10, 2020.
North Anna Power Station, Unit Nos. 1 and 2--Temporary       ML20324A222.
 Exemption from Biennial Emergency Preparedness Exercise
 Frequency Requirements of 10 CFR part 50, appendix E,
 section IV.F.2.C (EPID L-2020-LLE-0184 [COVID-19]), dated
 December 8, 2020.
----------------------------------------------------------------------------------------------------------------
                                   North Anna Power Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-338 and 50-339
----------------------------------------------------------------------------------------------------------------
North Anna Power Station, Unit Nos. 1 and 2--Request for a   non-public, withheld pursuant to 10 CFR 2.390.
 One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 On-Force Exercises due to COVID-19 Pandemic, dated
 December 3, 2020.
North Anna Power Station, Units Nos. 1 and 2--Exemption      ML20342A293.
 from Annual Force-On Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0231 [COVID-19]), dated December 15, 2020.
----------------------------------------------------------------------------------------------------------------
                                    Oconee Nuclear Station, Units 1, 2, and 3
                                     Docket Nos. 50-269, 50-270, and 50-287
----------------------------------------------------------------------------------------------------------------
Duke Energy--Request for One-Time Exemption from 10 CFR      non-public, withheld pursuant to 10 CFR 2.390.
 part 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 4, 2020.
Duke Energy--Response to Request for Additional Information  non-public, withheld pursuant to 10 CFR 2.390.
 for One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 19, 2020.

[[Page 5277]]

 
Oconee Nuclear Station, Units 1, 2, and 3--Exemption from    ML20344A004.
 Annual Force-On-Force Exercise Requirements of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0180 [COVID-19]), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                             Oregon State University
                                                Docket No. 50-243
----------------------------------------------------------------------------------------------------------------
Oregon State University--Extension of Timeframe Required to  ML20318A035.
 Complete Biennial Emergency Exercise per Oregon State
 TRIGA Reactor Emergency Response Plan, dated November 3,
 2020.
Oregon State University--Extension of Timeframe required to  ML20350B726.
 Complete Biennial Emergency Exercise per Oregon State
 TRIGA Reactor Emergency Response Plan, dated December 10,
 2020.
Oregon State University--Temporary Exemption from the        ML20318A380.
 Requirements of 10 CFR part 50, appendix E, section
 IV.F.2.b Related to Biennial Emergency Exercise [COVID-
 19], dated December 18, 2020.
----------------------------------------------------------------------------------------------------------------
                                             Palisades Nuclear Plant
                                                Docket No. 50-255
----------------------------------------------------------------------------------------------------------------
Palisades Nuclear Plant--Request for One-Time Exemption      ML20275A110.
 from 10 CFR part 50, appendix E, ``Biennial Emergency
 Preparedness Exercise Requirements,'' due to COVID-19
 Pandemic, dated September 30, 2020.
Palisades Nuclear Plant--Temporary Exemption from Biennial   ML20308A607.
 Emergency Preparedness Exercise Frequency Requirements of
 10 CFR part 50, appendix E, section IV.F (EPID L-2020-LLE-
 0155 [COVID-19]), dated December 9, 2020.
----------------------------------------------------------------------------------------------------------------
                                             Palisades Nuclear Plant
                                                Docket No. 50-255
----------------------------------------------------------------------------------------------------------------
Palisades Nuclear Plant--Request for a One-Time Exemption    ML20317A300.
 from 10 CFR part 73, appendix B, section VI, subsection
 C.3.(I)(1) Regarding Annual Force-on-Force Exercises due
 to COVID-19 Pandemic, dated November 12, 2020.
Palisades Nuclear Plant--Exemption from Annual Force-on-     ML20330A000.
 Force Exercise Requirements of 10 CFR part 73, appendix B,
 ``General Criteria for Security Personnel,'' subsection
 VI.C.3.(I)(1) (EPID L-2020-LLE-0190 [COVID-19]), dated
 December 3, 2020.
----------------------------------------------------------------------------------------------------------------
                            Palo Verde Nuclear Generating Station, Units 1, 2, and 3
                                       Docket Nos. 50-528, 50-529, 50-530
----------------------------------------------------------------------------------------------------------------
Palo Verde Nuclear Generating Station, Units 1, 2, and 3,    ML20356A292.
 and Independent Spent Fuel Storage Installation--
 Subsequent Request for Exemption from Specific
 Requirements of 10 CFR part 26, ``Fitness for Duty
 Programs,'' dated December 21, 2020.
Palo Verde Nuclear Generating Station, Units 1, 2, and 3--   ML20357A055.
 Subsequent Request for Exemption from Select Requirements
 of 10 CFR part 26 (EPID L-2020-LLE-0238 [COVID-19]), dated
 December 23, 2020.
----------------------------------------------------------------------------------------------------------------
                                Peach Bottom Atomic Power Station, Units 2 and 3
                                          Docket Nos. 50-277 and 50-278
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    ML20318A288.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Peach Bottom Atomic Power Station, Units 2 and 3--Exemption  ML20325A017.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(l)(1) (EPID L-2020-LLE-
 0192 [COVID-19]), dated December 10, 2020.
----------------------------------------------------------------------------------------------------------------
                                      Perry Nuclear Power Plant, Unit No. 1
                                                Docket No. 50-440
----------------------------------------------------------------------------------------------------------------
Perry Nuclear Power Plant, Unit No. 1--Request for a One-    ML20304A191.
 Time Exemption from 10 CFR part 73, appendix B, section
 VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated October 29, 2020.
Perry Nuclear Power Plant, Unit No. 1--Response to Request   ML20335A531.
 for Additional Information Regarding Request for
 Exemption--10 CFR part 73 Force-on-Force Exercises (EPID L-
 2020-LLE-0176), dated November 25, 2020.
Perry Nuclear Power Plant, Unit No. 1--Exemption from        ML20309A135.
 Certain Requirements of 10 CFR part 73, appendix B,
 section VI.C.3.(I)(1) Re: Annual Force-on-Force Exercise
 for CY 2020 (EPID L-2020-LLE-0176 [COVID-19]), dated
 December 14, 2020.
----------------------------------------------------------------------------------------------------------------
                                    Point Beach Nuclear Plant, Units 1 and 2
                                          Docket Nos. 50-266 and 50-301
----------------------------------------------------------------------------------------------------------------
Point Beach Nuclear Plant, Units 1 and 2--Request for a One- non-public, withheld pursuant to 10 CFR 2.390.
 Time Exemption from 10 CFR part 73, appendix B, section
 VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated November 19,
 2020.
Point Beach Nuclear Plant, Units 1 and 2--Response to        non-public, withheld pursuant to 10 CFR 2.390.
 Request for Additional Information, Request for Exemption
 from 10 CFR part 73, appendix B, section VI Regarding
 Annual Force-On-Force Exercise, dated December 8, 2020.

[[Page 5278]]

 
Point Beach Nuclear Plant, Units 1 and 2--Exemption from     ML20345A000.
 Annual Force-on-Force Exercise Requirement of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0210 [COVID-19]), dated December 15, 2020.
----------------------------------------------------------------------------------------------------------------
                             Prairie Island Nuclear Generating Plant, Units 1 and 2
                                          Docket Nos. 50-282 and 50-306
----------------------------------------------------------------------------------------------------------------
Monticello and Prairie Island--Request for a One-Time        non-public, withheld pursuant to 10 CFR 2.390.
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3(l)(1) Re: Annual Force-on-Force Exercises
 due to COVID-19 Pandemic, dated October 30, 2020.
Response to Request for Additional Information, Request for  non-public, withheld pursuant to 10 CFR 2.390.
 a One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3(l)(1) Regarding Annual Force-on-
 Force Exercises due to COVID-19 Pandemic, dated December
 14, 2020.
Prairie Island Nuclear Generating Plant, Units 1 and 2--     ML20317A259.
 Exemption from Certain Requirements of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0177 [COVID-
 19]), dated December 21, 2020.
----------------------------------------------------------------------------------------------------------------
                                Quad Cities Nuclear Power Station, Units 1 and 2
                                          Docket Nos. 50-254 and 50-265
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for Exemption from 10 CFR part    non-public, withheld pursuant to 10 CFR 2.390.
 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding 2020 Annual Force-on-Force Exercises due to
 COVID-19 Public Health Emergency, dated November 13, 2020.
Quad Cities Nuclear Power Station, Units 1 and 2--Exemption  ML20332A175.
 from Annual Force-on-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0193 [COVID-19]), dated December 4, 2020.
----------------------------------------------------------------------------------------------------------------
                                Quad Cities Nuclear Power Station, Units 1 and 2
                                          Docket Nos. 50-254 and 50-265
----------------------------------------------------------------------------------------------------------------
Quad Cities Nuclear Power Station, Units 1 and 2--COVID-19   ML20339A474.
 Related Request for Exemption from 10 CFR part 26 Work
 Hours Requirements, dated December 4, 2020.
Quad Cities Nuclear Power Station, Units 1 and 2--Exemption  ML20343A027.
 from Select Requirements of 10 CFR part 26 (EPID L-2020-
 LLE-0228 [COVID-19]), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                         R. E. Ginna Nuclear Power Plant
                                                Docket No. 50-244
----------------------------------------------------------------------------------------------------------------
Exelon Generation--Request for One-Time Exemptions from 10   ML20318A288.
 CFR part 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 13, 2020.
R. E. Ginna Nuclear Power Plant--Exemption from Annual       ML20330A291.
 Force-on-Force Exercise Requirement of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0202 [COVID-
 19]), dated December 10, 2020.
----------------------------------------------------------------------------------------------------------------
                                           River Bend Station, Unit 1
                                                Docket No. 50-458
----------------------------------------------------------------------------------------------------------------
River Bend Station, Unit 1--One-Time Schedular Exemption     ML20338A539.
 Request from 10 CFR part 50, appendix E, ``Biennial
 Emergency Preparedness Exercise Requirements,'' due to
 COVID-19 Public Health Emergency, dated December 3, 2020.
River Bend Station, Unit 1--Temporary Exemption from         ML20344A135.
 Biennial Emergency Preparedness Exercise Frequency
 Requirements of 10 CFR part 50, appendix E, section
 IV.F.2.b (EPID-L-2020-LLE-0212 [COVID-19]), dated December
 22, 2020.
----------------------------------------------------------------------------------------------------------------
                                       St. Lucie Plant, Unit Nos. 1 and 2
                                          Docket Nos. 50-335 and 50-389
----------------------------------------------------------------------------------------------------------------
St. Lucie Plant, Unit Nos. 1 and 2--Request for a One-Time   non-public, withheld pursuant to 10 CFR 2.390.
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3.(I)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated December 9, 2020.
St. Lucie Plant, Unit Nos. 1 and 2--Exemption from Annual    ML20352A118.
 Force-on-Force Exercise Requirement of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0234) [COVID-
 19], dated December 18, 2020.
----------------------------------------------------------------------------------------------------------------
                                          Seabrook Station, Unit No. 1
                                                Docket No. 50-443
----------------------------------------------------------------------------------------------------------------
Seabrook Station, Unit No. 1--Request for a One-Time         ML20329A205.
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3.(1)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated November 23,
 2020.
Seabrook Station, Unit No. 1--Response to Request for        ML20343A112.
 Additional Information in Response to One-Time Exemption
 from 10 CFR part 73, appendix B, section VI, subsection
 C.3.(I)(1) Regarding Annual Force-on-Force Exercises due
 to COVID-19 Pandemic, dated December 8, 2020.

[[Page 5279]]

 
Seabrook Station, Unit No. 1--Exemption from Annual Force-   ML20336A006.
 On-Force Exercise Requirements of 10 CFR part 73, appendix
 B, ``General Criteria for Security Personnel,'' subsection
 VI.C.3.(I)(1) (EPID L-2020-LLE-0219 [COVID-19]), dated
 December 16, 2020.
----------------------------------------------------------------------------------------------------------------
                                          Seabrook Station, Unit No. 1
                                                Docket No. 50-443
----------------------------------------------------------------------------------------------------------------
Seabrook Station, Unit No. 1--One-Time Exemption Request     ML20338A493.
 for the Biennial Emergency Preparedness Exercise
 Requirements of 10 CFR part 50, appendix E, sections
 IV.F.2.b and IV.F.2.c, dated December 3, 2020.
Seabrook Station, Unit No. 1--Exemption from Requirements    ML20345A119.
 of 10 CFR part 50, appendix E, sections IV.F.2.B and
 IV.F.2.C (EPID L-2020-LLE-0229 and EPID L-2020-LLE-0230
 [COVID-19]), dated December 21, 2020.
----------------------------------------------------------------------------------------------------------------
                                   Shearon Harris Nuclear Power Plant, Unit 1
                                                Docket No. 50-400
----------------------------------------------------------------------------------------------------------------
Duke Energy--Request for One-Time Exemption from 10 CFR      non-public, withheld pursuant to 10 CFR 2.390.
 part 73, appendix B, section VI, subsection C.3.(I)(1)
 Regarding Annual Force-on-Force Exercises due to COVID-19
 Pandemic, dated November 4, 2020.
Duke Energy--Response to Request for Additional Information  non-public, withheld pursuant to 10 CFR 2.390.
 for One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 on-Force Exercises due to COVID-19 Pandemic, dated
 November 19, 2020.
Shearon Harris Nuclear Power Plant, Unit No. 1--Exemption    ML20330A301.
 from Annual Force-on-Force Exercise Requirements of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3(l)(1) (EPID L-2020-LLE-0180
 [COVID-19]), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                       South Texas Project, Units 1 and 2
                                          Docket Nos. 50-498 and 50-499
----------------------------------------------------------------------------------------------------------------
South Texas Project, Units 1 and 2--Request for a One-Time   ML20321A331.
 Exemption from 10 CFR part 73, appendix B, section VI,
 subsection C.3.(1)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated November 16,
 2020.
South Texas Project, Units 1 and 2--Exemption from Annual    ML20330A312.
 Force-on-Force Exercise Requirement of 10 CFR part 73,
 appendix B, ``General Criteria for Security Personnel,''
 subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0205 [COVID-
 19]), dated December 10, 2020.
----------------------------------------------------------------------------------------------------------------
                                     Surry Power Station, Unit Nos. 1 and 2
                                          Docket Nos. 50-280 and 50-281
----------------------------------------------------------------------------------------------------------------
Surry Power Station, Unit Nos. 1 and 2--Request for a One-   non-public, withheld pursuant to 10 CFR 2.390.
 Time Exemption from 10 CFR part 73, appendix B, section
 VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force
 Exercises due to COVID-19 Pandemic, dated December 3, 2020.
Surry Power Station, Unit Nos. 1 and 2--Exemption from       ML20339A645.
 Annual Force-on-Force Exercise Requirement of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0226 [COVID-19]), dated December 14, 2020.
----------------------------------------------------------------------------------------------------------------
                                Susquehanna Steam Electric Station, Units 1 and 2
                                          Docket Nos. 50-387 and 50-388
----------------------------------------------------------------------------------------------------------------
Susquehanna Steam Electric Station--Request for One-Time     ML20329A335.
 Exemption From 10 CFR part 73, appendix B, section VI,
 subsection C.3.(1)(1) Regarding Annual Force-On-Force
 Exercises due to COVID-19 Pandemic, dated November 24,
 2020.
Susquehanna Steam Electric Station, Units 1 and 2--          ML20344A458.
 Exemption from Annual Force-on-Force Exercise Requirement
 of 10 CFR part 73, appendix B, ``General Criteria for
 Security Personnel,'' subsection VI.C.3.(I)(1) (EPID L-
 2020-LLE-0222), dated December 17, 2020.
----------------------------------------------------------------------------------------------------------------
                                  Virgil C. Summer Nuclear Station, Unit No. 1
                                                Docket No. 50-395
----------------------------------------------------------------------------------------------------------------
Virgil C. Summer Nuclear Station, Unit No. 1--Request for a  non-public, withheld pursuant to 10 CFR 2.390.
 One-Time Exemption from 10 CFR part 73, appendix B,
 section VI, subsection C.3.(I)(1) Regarding Annual Force-
 On-Force Exercises due to COVID-19 Pandemic, dated
 December 3, 2020.
Virgil C. Summer Nuclear Station, Unit No. 1--Exemption      ML20342A003.
 from Annual Force On-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1)I (EPID L-2020-LLE-
 0225 [COVID-19]), dated December 18, 2020.
----------------------------------------------------------------------------------------------------------------
                                 Vogtle Electric Generating Plant, Units 1 and 2
                                          Docket Nos. 50-424 and 50-425
----------------------------------------------------------------------------------------------------------------
Request for One-Time Exemptions from 10 CFR part 73,         ML20311A662.
 appendix B, section VI, subsection C.3.(I)(1) Regarding
 Annual Force-on-Force Exercises due to COVID-19 Pandemic,
 dated November 6, 2020.
Vogtle Electric Generating Plant, Units 1 and 2--Exemption   ML20329A392.
 from Annual Force-On-Force Exercise Requirement of 10 CFR
 part 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI C.3.(I)(1) (EPID L-2020-LLE-
 0216 [COVID-19]), dated December 4, 2020.
----------------------------------------------------------------------------------------------------------------

[[Page 5280]]

 
                                    Waterford Steam Electric Station, Unit 3
                                                Docket No. 50-382
----------------------------------------------------------------------------------------------------------------
Waterford Steam Electric Station, Unit 3--Request for a One- ML20317A301.
 Time Exemption from 10 CFR part 73, appendix B, section
 VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force
 Exercises due to COVID-19 Pandemic, dated November 12,
 2020.
Waterford Steam Electric Station, Unit 3--Exemption from     ML20338A274.
 Annual Force-On-Force Exercise Requirement of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI.C.3.(I)(1) (EPID L-2020-LLE-
 0186 [COVID-19]), dated December 16, 2020.
----------------------------------------------------------------------------------------------------------------
                                     Watts Bar Nuclear Plant, Units 1 and 2
                                          Docket Nos. 50-390 and 50-391
----------------------------------------------------------------------------------------------------------------
Watts Bar Nuclear Plant, Units 1 and 2--Request for          ML20309A695.
 Exemption Regarding Calendar Year 2020 Force-on-Force
 Exercise, dated November 4, 2020.
Watts Bar Nuclear Plant, Units 1 and 2--Exemption from       ML20318A036.
 Annual Force-on-Force Exercise Requirement of 10 CFR part
 73, appendix B, ``General Criteria for Security
 Personnel,'' subsection VI C.3(l)(1) (EPID L-2020-LLE-0179
 [COVID-19]), dated December 8, 2020.
----------------------------------------------------------------------------------------------------------------


    Dated: January 13, 2021.

    For the Nuclear Regulatory Commission.
James G. Danna,
Chief, Plant Licensing Branch I, Division of Operating Reactor 
Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2021-01091 Filed 1-15-21; 8:45 am]
BILLING CODE 7590-01-P