NUCLEAR REGULATORY COMMISSION

[NRC-2020-0247]


Applications and Amendments to Facility Operating Licenses and 
Combined Licenses Involving Proposed No Significant Hazards 
Considerations and Containing Sensitive Unclassified Non-Safeguards 
Information and Order Imposing Procedures for Access to Sensitive 
Unclassified Non-Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment request; notice of opportunity to comment, 
request a hearing, and petition for leave to intervene; order imposing 
procedures.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is 
considering approval of three amendment requests. The amendment 
requests are for Waterford Steam Electric Station, Unit 3; Hope Creek 
Generating Station; and Sequoyah Nuclear Plant, Units 1 and 2. For each 
amendment request, the NRC proposes to determine that they involve no 
significant hazards consideration (NSHC). Because each amendment 
request contains sensitive unclassified non-safeguards information 
(SUNSI), an order imposes procedures to obtain access to SUNSI for 
contention preparation.

DATES: Comments must be filed by December 31, 2020. A request for a 
hearing or petition for leave to intervene must be filed by February 1, 
2021. Any potential party as defined in section 2.4 of title 10 of the 
Code of Federal Regulations (10 CFR) who believes access to SUNSI is 
necessary to respond to this notice must request document access by 
December 11, 2020.

ADDRESSES: You may submit comments by any of the following methods 
however, the NRC encourages electronic comment submission through the 
Federal Rulemaking website:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0247. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory

[[Page 77262]]

Commission, Washington, DC 20555-0001, ATTN: Program Management, 
Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Bernadette Abeywickrama, Office of 
Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-4081, email: 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2020-0247, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0247.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ADAMS accession number for each 
document referenced (if it is available in ADAMS) is provided the first 
time that it is mentioned in this document.
     Attention: The PDR, where you may examine and purchase 
copies of public documents, is currently closed. You may submit your 
request to the PDR via email at [email protected] or call 1-800-397-
4209 between 8:00 a.m. and 4:00 p.m., Eastern Standard Time (EST), 
Monday through Friday, except Federal holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal Rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2020-0247, facility name, unit number(s), docket 
number(s), application date, and subject in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Background

    Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the NRC is publishing this notice. The Act requires 
the Commission to publish notice of any amendments issued, or proposed 
to be issued and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves (NSHC, notwithstanding the pendency before the 
Commission of a request for a hearing from any person.
    This notice includes notices of amendments containing SUNSI.

III. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses, Proposed No Significant 
Hazards Consideration Determination, and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment requests involve NSHC. Under the Commission's regulations in 
10 CFR 50.92, this means that operation of the facilities in accordance 
with the proposed amendments would not (1) involve a significant 
increase in the probability or consequences of an accident previously 
evaluated, or (2) create the possibility of a new or different kind of 
accident from any accident previously evaluated, or (3) involve a 
significant reduction in a margin of safety. The basis for this 
proposed determination for each amendment request is shown below.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves no significant hazards consideration. In addition, 
the Commission may issue any of these amendments prior to the 
expiration of the 30-day comment period if circumstances change during 
the 30-day comment period such that failure to act in a timely way 
would result, for example, in derating or shutdown of the facility. If 
the Commission takes action on any of these amendments prior to the 
expiration of either the comment period or the notice period, it will 
publish a notice of issuance in the Federal Register. If the Commission 
makes a final no significant hazards consideration determination for 
any of these amendments, any hearing will take place after issuance. 
The Commission expects that the need to take this action will occur 
very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. The NRC's regulations are accessible 
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, 
the Commission or a presiding officer will rule on the petition and, if 
appropriate, a notice of a hearing will be issued.
    As required by 10 CFR 2.309(d) the petition should specifically 
explain the reasons why intervention should be permitted with 
particular reference to the following general requirements for 
standing: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right to be made a party 
to the proceeding; (3) the nature and extent of the petitioner's

[[Page 77263]]

property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the petitioner's interest.
    In accordance with 10 CFR 2.309(f), the petition must also set 
forth the specific contentions that the petitioner seeks to have 
litigated in the proceeding. Each contention must consist of a specific 
statement of the issue of law or fact to be raised or controverted. In 
addition, the petitioner must provide a brief explanation of the bases 
for the contention and a concise statement of the alleged facts or 
expert opinion that support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to the specific sources and 
documents on which the petitioner intends to rely to support its 
position on the issue. The petition must include sufficient information 
to show that a genuine dispute exists with the applicant or licensee on 
a material issue of law or fact. Contentions must be limited to matters 
within the scope of the proceeding. The contention must be one that, if 
proven, would entitle the petitioner to relief. A petitioner who fails 
to satisfy the requirements at 10 CFR 2.309(f) with respect to at least 
one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene. 
Parties have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that party's admitted 
contentions, including the opportunity to present evidence, consistent 
with the NRC's regulations, policies, and procedures.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice. Petitions and motions for leave to file new 
or amended contentions that are filed after the deadline will not be 
entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in 
accordance with the filing instructions in the ``Electronic Submissions 
(E-Filing)'' section of this document.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to establish when the hearing is held. If the final determination is 
that the amendment request involves no significant hazards 
consideration, the Commission may issue the amendment and make it 
immediately effective, notwithstanding the request for a hearing. Any 
hearing would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of the amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission no later 
than 60 days from the date of publication of this notice. The petition 
must be filed in accordance with the filing instructions in the 
``Electronic Submissions (E-Filing)'' section of this document, and 
should meet the requirements for petitions set forth in this section, 
except that under 10 CFR 2.309(h)(2) a State, local governmental body, 
or Federally recognized Indian Tribe, or agency thereof does not need 
to address the standing requirements in 10 CFR 2.309(d) if the facility 
is located within its boundaries. Alternatively, a State, local 
governmental body, Federally recognized Indian Tribe, or agency thereof 
may participate as a non-party under 10 CFR 2.315(c).
    If a petition is submitted, any person who is not a party to the 
proceeding and is not affiliated with or represented by a party may, at 
the discretion of the presiding officer, be permitted to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
his or her position on the issues but may not otherwise participate in 
the proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to the limits and 
conditions as may be imposed by the presiding officer. Details 
regarding the opportunity to make a limited appearance will be provided 
by the presiding officer if such sessions are scheduled.

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing and petition for leave to intervene (petition), any 
motion or other document filed in the proceeding prior to the 
submission of a request for hearing or petition to intervene, and 
documents filed by interested governmental entities that request to 
participate under 10 CFR 2.315(c), must be filed in accordance with the 
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 
46562; August 3, 2012). The E-Filing process requires participants to 
submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Detailed 
guidance on making electronic submissions may be found in the Guidance 
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit 
paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC 
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a 
digital ID certificate and a docket has been created, the participant 
can then submit adjudicatory documents. Submissions must be in Portable 
Document Format (PDF). Additional guidance on PDF submissions is 
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59

[[Page 77264]]

p.m. (EST) on the due date. Upon receipt of a transmission, the E-
Filing system time stamps the document and sends the submitter an email 
notice confirming receipt of the document. The E-Filing system also 
distributes an email notice that provides access to the document to the 
NRC's Office of the General Counsel and any others who have advised the 
Office of the Secretary that they wish to participate in the 
proceeding, so that the filer need not serve the document on those 
participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before adjudicatory documents are filed so that 
they can obtain access to the documents via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., (EST), Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing adjudicatory documents in this 
manner are responsible for serving the document on all other 
participants. Filing is considered complete by first-class mail as of 
the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service. A presiding officer, having granted an 
exemption request from using E-Filing, may require a participant or 
party to use E-Filing if the presiding officer subsequently determines 
that the reason for granting the exemption from use of E-Filing no 
longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
Commission or the presiding officer. If you do not have an NRC issued 
digital ID certificate as described above, click ``cancel'' when the 
link requests certificates and you will be automatically directed to 
the NRC's electronic hearing dockets where you will be able to access 
any publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information, 
such as social security numbers, home addresses, or personal phone 
numbers in their filings, unless an NRC regulation or other law 
requires submission of such information. For example, in some 
instances, individuals provide home addresses in order to demonstrate 
proximity to a facility or site. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants are 
requested not to include copyrighted materials in their submission.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
 Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St.
                           Charles Parish, LA
------------------------------------------------------------------------
Docket No(s)...........................  50-382.
Application Date.......................  July 23, 2020.
ADAMS Accession No.....................  ML20205L588.
Location in Application of NSHC........  Pages 23-25 of the Enclosure.
Brief Description of Amendment(s)......  The proposed amendment would
                                          revise multiple Waterford
                                          Steam Electric Station, Unit 3
                                          Technical Specifications in
                                          order to implement a
                                          modification to the existing
                                          digital minicomputers of the
                                          core protection calculator
                                          system.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Anna Vinson Jones, Senior
 Address.                                 Counsel, Entergy Services,
                                          Inc., 101 Constitution Avenue
                                          NW, Suite 200 East,
                                          Washington, DC 20001.
NRC Project Manager, Telephone Number..  Audrey Klett, 301-415-0489.
------------------------------------------------------------------------
    PSEG Nuclear LLC; Hope Creek Generating Station; Salem County, NJ
------------------------------------------------------------------------
Docket No(s)...........................  50-354.
Application Date.......................  September 24, 2020.
ADAMS Accession No.....................  ML20272A063.
Location in Application of NSHC........  Pages 7-9 of Enclosure 1.
Brief Description of Amendment(s)......  The amendment would revise Hope
                                          Creek Generating Station (Hope
                                          Creek) Technical Specification
                                          2.1, ``SAFETY LIMITS,''
                                          specifically, 2.1.1, ``THERMAL
                                          POWER, Low Pressure or Low
                                          Flow,'' and 2.1.2, ``THERMAL
                                          POWER, High Pressure and High
                                          Flow,'' to reduce the reactor
                                          vessel steam dome pressure
                                          value to address General
                                          Electric Nuclear Energy 10 CFR
                                          part 21 Safety Communication
                                          SC05-03, ``10 CFR part 21
                                          Reportable Condition
                                          Notification: Potential to
                                          Exceed Low Pressure Technical
                                          Specification Safety Limit,''
                                          issued on March 29, 2005,
                                          regarding the potential to
                                          violate the low pressure
                                          safety limit following a
                                          pressure regulator failure--
                                          open transient for Hope Creek.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Steven Fleischer, PSEG Services
 Address.                                 Corporation, 80 Park Plaza, T-
                                          5, Newark, NJ 07102.

[[Page 77265]]

 
NRC Project Manager, Telephone Number..  James Kim, 301-415-4125.
------------------------------------------------------------------------
   Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2;
                           Hamilton County, TN
------------------------------------------------------------------------
Docket No(s)...........................  50-327, 50-328.
Application Date.......................  September 23, 2020.
ADAMS Accession No.....................  ML20267A617.
Location in Application of NSHC........  Pages E1 55-E1 60 of Enclosure
                                          1.
Brief Description of Amendment(s)......  The proposed amendments would
                                          revise Technical
                                          Specifications (TS) to allow
                                          the use of Westinghouse RFA-2
                                          fuel with Optimized ZIRLOTM
                                          cladding. Further, the
                                          proposed amendments would
                                          revise TS 5.6.3, ``Core
                                          Operating Limits Report,'' to
                                          replace the loss-of-coolant
                                          accident analysis evaluation
                                          model references with the FULL
                                          SPECTRUMTM Loss-of-Coolant
                                          Accident Evaluation Model.
                                          Finally, the proposed
                                          amendments would revise the
                                          TSs to permit the use of 52
                                          full-length control rods with
                                          no full-length control rod
                                          assembly in core location H-
                                          08. The license amendment
                                          request included a related
                                          request for exemption from the
                                          requirements of 10 CFR 50.46
                                          and appendix K to 10 CFR part
                                          50. That exemption request
                                          will be processed separately
                                          from this license amendment
                                          request.
Proposed Determination.................  NSHC.
Name of Attorney for Licensee, Mailing   Sherry Quirk, Executive VP and
 Address.                                 General Counsel, Tennessee
                                          Valley Authority, 400 West
                                          Summit Hill Drive, WT 6A,
                                          Knoxville, TN 37902.
NRC Project Manager, Telephone Number..  Michael Wentzel, 301-415-6459.
------------------------------------------------------------------------

IV. Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

Entergy Operations, Inc.; Docket No. 50-382; Waterford Steam Electric 
Station, Unit 3; St. Charles Parish, LA

PSEG Nuclear LLC; Docket No. 50-354; Hope Creek Generating Station; 
Salem County, NJ

Tennessee Valley Authority; Docket Nos. 50-327 and 50-328; Sequoyah 
Nuclear Plant, Units 1 and 2; Hamilton County, TN

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing SUNSI.
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request access to SUNSI. A ``potential party'' is any person who 
intends to participate as a party by demonstrating standing and filing 
an admissible contention under 10 CFR 2.309. Requests for access to 
SUNSI submitted later than 10 days after publication of this notice 
will not be considered absent a showing of good cause for the late 
filing, addressing why the request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Deputy General Counsel 
for Hearings and Administration, Office of the General Counsel, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001. The expedited 
delivery or courier mail address for both offices is: U.S. Nuclear 
Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. 
The email address for the Office of the Secretary and the Office of the 
General Counsel are [email protected] and 
[email protected], respectively.\1\ The request must 
include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
receipt of (or access to) that information. However, if more than 25 
days remain between the petitioner's receipt of (or access to) the 
information and the deadline for filing all other contentions (as 
established in the notice of hearing or opportunity for hearing), the 
petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.

[[Page 77266]]

    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and requisite need, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an Administrative Law Judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    (3) Further appeals of decisions under this paragraph must be made 
pursuant to 10 CFR 2.311.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed within 5 days of the notification by the 
NRC staff of its grant of access and must be filed with: (a) The 
presiding officer designated in this proceeding; (b) if no presiding 
officer has been appointed, the Chief Administrative Judge, or if he or 
she is unavailable, another administrative judge, or an Administrative 
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if 
another officer has been designated to rule on information access 
issues, with that officer.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562; August 3, 2012) apply to appeals of NRC staff 
determinations (because they must be served on a presiding officer 
or the Commission, as applicable), but not to the initial SUNSI 
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. The 
attachment to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is So Ordered.

    Dated: November 10, 2020.

    For the Nuclear Regulatory Commission.

Annette L. Vietti-Cook,
Secretary of the Commission.

   ATTACHMENT 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in This Proceeding
------------------------------------------------------------------------
           Day                             Event/activity
------------------------------------------------------------------------
0........................  Publication of Federal Register notice of
                            hearing and opportunity to petition for
                            leave to intervene, including order with
                            instructions for access requests.
10.......................  Deadline for submitting requests for access
                            to Sensitive Unclassified Non-Safeguards
                            Information (SUNSI) with information:
                            Supporting the standing of a potential party
                            identified by name and address; describing
                            the need for the information in order for
                            the potential party to participate
                            meaningfully in an adjudicatory proceeding.
60.......................  Deadline for submitting petition for
                            intervention containing: (i) Demonstration
                            of standing; and (ii) all contentions whose
                            formulation does not require access to SUNSI
                            (+25 Answers to petition for intervention;
                            +7 petitioner/requestor reply).
20.......................  U.S. Nuclear Regulatory Commission (NRC)
                            staff informs the requestor of the staff's
                            determination whether the request for access
                            provides a reasonable basis to believe
                            standing can be established and shows need
                            for SUNSI. (NRC staff also informs any party
                            to the proceeding whose interest independent
                            of the proceeding would be harmed by the
                            release of the information.) If NRC staff
                            makes the finding of need for SUNSI and
                            likelihood of standing, NRC staff begins
                            document processing (preparation of
                            redactions or review of redacted documents).
25.......................  If NRC staff finds no ``need'' or no
                            likelihood of standing, the deadline for
                            petitioner/requestor to file a motion
                            seeking a ruling to reverse the NRC staff's
                            denial of access; NRC staff files copy of
                            access determination with the presiding
                            officer (or Chief Administrative Judge or
                            other designated officer, as appropriate).
                            If NRC staff finds ``need'' for SUNSI, the
                            deadline for any party to the proceeding
                            whose interest independent of the proceeding
                            would be harmed by the release of the
                            information to file a motion seeking a
                            ruling to reverse the NRC staff's grant of
                            access.
30.......................  Deadline for NRC staff reply to motions to
                            reverse NRC staff determination(s).
40.......................  (Receipt +30) If NRC staff finds standing and
                            need for SUNSI, deadline for NRC staff to
                            complete information processing and file
                            motion for Protective Order and draft Non-
                            Disclosure Affidavit. Deadline for applicant/
                            licensee to file Non-Disclosure Agreement
                            for SUNSI.
A........................  If access granted: Issuance of presiding
                            officer or other designated officer decision
                            on motion for protective order for access to
                            sensitive information (including schedule
                            for providing access and submission of
                            contentions) or decision reversing a final
                            adverse determination by the NRC staff.
A + 3....................  Deadline for filing executed Non-Disclosure
                            Affidavits. Access provided to SUNSI
                            consistent with decision issuing the
                            protective order.
A + 28...................  Deadline for submission of contentions whose
                            development depends upon access to SUNSI.
                            However, if more than 25 days remain between
                            the petitioner's receipt of (or access to)
                            the information and the deadline for filing
                            all other contentions (as established in the
                            notice of opportunity to request a hearing
                            and petition for leave to intervene), the
                            petitioner may file its SUNSI contentions by
                            that later deadline.
A + 53...................  (Contention receipt +25) Answers to
                            contentions whose development depends upon
                            access to SUNSI.
A + 60...................  (Answer receipt +7) Petitioner/Intervenor
                            reply to answers.
>A + 60..................  Decision on contention admission.
------------------------------------------------------------------------


[FR Doc. 2020-25225 Filed 11-30-20; 8:45 am]
BILLING CODE 7590-01-P