[Federal Register Volume 85, Number 177 (Friday, September 11, 2020)]
[Proposed Rules]
[Pages 56200-56207]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-18311]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 271

[EPA-R04-RCRA-2020-0402; FRL-10013-63-Region 4]


South Carolina: Proposed Authorization of State Hazardous Waste 
Management Program Revisions

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: South Carolina has applied to the Environmental Protection 
Agency (EPA) for final authorization of changes to its hazardous waste 
program under the Resource Conservation and Recovery Act (RCRA), as 
amended. The EPA has reviewed South Carolina's application and has 
determined, subject to public comment, that these changes satisfy all 
requirements needed to qualify for final authorization. Therefore, we 
are proposing to authorize the State's changes. The EPA seeks public 
comment prior to taking final action.

DATES: Comments must be received on or before October 13, 2020.

ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R04-
RCRA-2020-0402, at https://www.regulations.gov. Follow the online 
instructions for submitting comments. Once submitted, comments cannot 
be edited or removed from www.regulations.gov. The EPA may publish any 
comment received to its public docket. Do not submit electronically any 
information you consider to be Confidential Business Information (CBI) 
or other information whose disclosure is restricted by statute. 
Multimedia submissions (audio, video, etc.) must be accompanied by a 
written comment. The written comment is considered the official comment 
and should include discussion of all points you wish to make. The EPA 
will generally not consider comments or comment contents located 
outside of the primary submission (i.e., on the web, cloud, or other 
file sharing system). For additional submission methods, the full EPA 
public comment policy, information about CBI or multimedia submissions, 
and general guidance on making effective comments, please visit http://www2.epa.gov/dockets/commenting-epa-dockets. The EPA encourages 
electronic submittals, but if you are unable to submit electronically 
or need other assistance, please contact Leah Davis, the contact listed 
in the FOR FURTHER INFORMATION CONTACT provision below. Please also 
contact Leah Davis if you need assistance in a language other than 
English or if you are a person with disabilities who needs a reasonable 
accommodation at no cost to you.

FOR FURTHER INFORMATION CONTACT: Leah Davis, RCRA Programs and Cleanup 
Branch, LCR Division, U.S. Environmental Protection Agency, Atlanta 
Federal Center, 61 Forsyth Street SW, Atlanta, Georgia 30303-8960; 
telephone number: (404) 562-8562; fax number: (404) 562-9964; email 
address: [email protected].

SUPPLEMENTARY INFORMATION: 

A. Why are revisions to state programs necessary?

    States that have received final authorization from the EPA under 
RCRA section 3006(b), 42 U.S.C. 6926(b), must maintain a hazardous 
waste program that is equivalent to, consistent with, and no less 
stringent than the Federal program. As the Federal program changes, 
states must change their programs and ask the EPA to authorize the 
changes. Changes to state programs may be necessary when Federal or 
state statutory or regulatory authority is modified or when certain 
other changes occur. Most commonly, states must change their programs 
because of changes to the EPA's regulations in 40 Code of Federal 
Regulations (CFR) parts 124, 260 through 268, 270, 273, and 279.
    New Federal requirements and prohibitions imposed by Federal 
regulations that the EPA promulgates pursuant to the Hazardous and 
Solid Waste Amendments of 1984 (HSWA) take effect in authorized states 
at the same time that they take effect in unauthorized states. Thus, 
the EPA will implement those requirements and prohibitions in South 
Carolina, including the issuance of new permits implementing those 
requirements, until the State is granted authorization to do so.

B. What decisions has the EPA made in this proposed rule?

    South Carolina submitted a final complete program revision 
application, dated April 8, 2020, seeking authorization of changes to 
its hazardous waste program that correspond to certain Federal rules 
promulgated between July 1, 2003 and June 30, 2018 (including RCRA

[[Page 56201]]

Clusters \1\ XIV through XXVI). The EPA concludes that South Carolina's 
application to revise its authorized program meets all of the statutory 
and regulatory requirements established under RCRA, as set forth in 
RCRA section 3006(b), 42 U.S.C. 6926(b), and 40 CFR part 271. 
Therefore, the EPA proposes to grant South Carolina final authorization 
to operate its hazardous waste program with the changes described in 
the authorization application, and as outlined below in Section F of 
this document.
---------------------------------------------------------------------------

    \1\ A ``cluster'' is a grouping of hazardous waste rules that 
the EPA promulgates from July 1st of one year to June 30th of the 
following year.
---------------------------------------------------------------------------

    South Carolina has responsibility for permitting treatment, 
storage, and disposal facilities within its borders (except in Indian 
country, as defined at 18 U.S.C. 1151) and for carrying out the aspects 
of the RCRA program described in its program revision application, 
subject to the limitations of HSWA, as discussed above.

C. What is the effect of this proposed authorization decision?

    If South Carolina is authorized for the changes described in South 
Carolina's authorization application, these changes will become part of 
the authorized State hazardous waste program, and will therefore be 
federally enforceable. South Carolina will continue to have primary 
enforcement authority and responsibility for its State hazardous waste 
program. The EPA would maintain its authorities under RCRA sections 
3007, 3008, 3013, and 7003, including its authority to:
     Conduct inspections, and require monitoring, tests, 
analyses, and reports;
     Enforce RCRA requirements, including authorized State 
program requirements, and suspend or revoke permits; and
     Take enforcement actions regardless of whether the State 
has taken its own actions.
    This action will not impose additional requirements on the 
regulated community because the regulations for which the EPA is 
proposing to authorize South Carolina are already effective under State 
law, and are not changed by today's proposed action.

D. What happens if the EPA receives comments that oppose this action?

    The EPA will evaluate any comments received on this proposed action 
and will make a final decision on approval or disapproval of South 
Carolina's proposed authorization. Our decision will be published in 
the Federal Register. You may not have another opportunity to comment. 
If you want to comment on this authorization, you must do so at this 
time.

E. What has South Carolina previously been authorized for?

    South Carolina initially received final authorization on November 
8, 1985, effective November 22, 1985 (50 FR 46437) to implement the 
RCRA hazardous waste management program. The EPA granted authorization 
for changes to South Carolina's program on the following dates: 
September 8, 1988, effective November 7, 1988 (53 FR 34758); February 
10, 1993, effective April 12, 1993 (58 FR 7865); November 29, 1994, 
effective January 30, 1995 (59 FR 60901); April 26, 1996, effective 
June 25, 1996 (61 FR 18502); October 4, 2000, effective December 4, 
2000 (65 FR 59135); August 21, 2001, effective October 22, 2001 (66 FR 
43798); September 2, 2003, effective November 3, 2003 (68 FR 52113); 
February 9, 2005, effective April 11, 2005 (70 FR 6765); and March 28, 
2005, effective May 27, 2005 (70 FR 15594).

F. What changes is the EPA proposing with today's action?

    South Carolina submitted a final complete program revision 
application, dated April 8, 2020, seeking authorization of changes to 
its hazardous waste management program in accordance with 40 CFR 
271.21. This application included changes associated with Checklists 
\2\ 205 through 207, 209, 211 through 215, 217 through 218, 220, 222 
through 223, 226 through 229, 231 through 234, and 236 through 239. The 
EPA proposes to determine, subject to receipt of written comments that 
oppose this action, that South Carolina's hazardous waste program 
revisions are equivalent to, consistent with, and no less stringent 
than the Federal program, and therefore satisfy all of the requirements 
necessary to qualify for final authorization. Therefore, the EPA is 
proposing to authorize South Carolina for the following program 
changes: \3\
---------------------------------------------------------------------------

    \2\ A ``checklist'' is developed by the EPA for each Federal 
rule amending the RCRA regulations. The checklists document the 
changes made by each Federal rule and are presented and numbered in 
chronological order by date of promulgation.
    \3\ Although submitted for authorization, the EPA is not 
including Checklists 212 or 217 in the authorization of South 
Carolina's program at this time.

----------------------------------------------------------------------------------------------------------------
                                           Federal Register date and
   Description of Federal requirement                 page                   Analogous state authority \1\
----------------------------------------------------------------------------------------------------------------
Checklist 205, NESHAP: Surface Coating    69 FR 22601, 4/26/04.......  R.61-79.264.1050(h) and R.61-
 of Automobiles and Light-Duty Trucks.                                  79.265.1050(g).
Checklist 206 and 206.1, Nonwastewaters   70 FR 9138, 2/24/05; 70 FR   R.61-79.261.4(b)(15) and (b)(15)(i)-(v);
 from Dyes and Pigments.                   35032, 6/16/05.              R.61-79.261.32(a)-(d) and (d)(1)-(5);
                                                                        R.61-79.261 Appendices VII & VIII; R.61-
                                                                        79.268.20(a)-(c); R.61-79.268.40
                                                                        Treatment Standards Table; R.61-
                                                                        79.268.48 Universal Treatment Standards
                                                                        Table.
Checklist 207 and 207.1, Uniform          70 FR 10776, 3/4/05; 70 FR   R.61-79.260.10; R.61-
 Hazardous Waste Manifest Rule \2\.        35034, 6/16/05.              79.261.7(b)(1)(iii)(A)-(B); R.61-
                                                                        79.262.20(a)(1)-(2); R.61-79.262.21(a)-
                                                                        (m) and (m)(1)-(2), except 262.21(f)(4);
                                                                        R.61-79.262.27(a)-(b); R.61-79.262.32(b)
                                                                        and (b)(1)-(5); R.61-79.262.33; R.61-
                                                                        79.263.20(a)(1)-(3) and (g)(1)-(4); R.61-
                                                                        79.263.21(b)(1)-(2) and (b)(2)(i)-(ii);
                                                                        R.61-79.264.70(a)-(b); R.61-
                                                                        79.264.71(a)(1)-(3), (b)(4), and (e);
                                                                        R.61-79.264.72(a)-(g); R.61-79.264.76(a)-
                                                                        (b) [(b) reserved]; R.61-79.265.70(a)-
                                                                        (b); R.61-79.265.71(a)(1)-(3), (b)(4),
                                                                        and (e); R.61-79.265.72(a)-(g); R.61-
                                                                        79.265.76(a)-(b) [(b) now reserved].
Checklist 209, Universal Waste Rule:      70 FR 45508, 8/5/05........  R.61-79.260.10; R.61-79.261.9(c); R.61-
 Specific Provisions for Mercury                                        79.264.1(g)(11)(iii); R.61-
 Containing Equipment.                                                  79.265.1(c)(14)(iii); R.61-
                                                                        79.268.1(f)(3); R.61-
                                                                        79.270.1(c)(2)(viii)(C); R.61-
                                                                        79.273.1(a)(3); R.61-79.273.4(a)-(c) and
                                                                        (c)(1)-(2); R.61-79.273.9; R.61-
                                                                        79.273.13(c)(1)-(4) and (c)(4)(i)-(iii);
                                                                        R.61-79.273.14(d)(1)-(2); R.61-
                                                                        79.273.32(b)(4)-(5); R.61-
                                                                        79.273.33(c)(1)-(4) and (c)(4)(i)-(iii);
                                                                        R.61-79.273.34(d)(1)-(2).
Checklist 211, Revision of Wastewater     70 FR 57769, 10/4/05.......  R.61-79.261.3(a)(2)(iv)(A)-(B), (D), and
 Treatment Exemptions for Hazardous                                     (F)-(G).
 Waste Mixtures (``Headworks
 exemptions'').

[[Page 56202]]

 
Checklist 213, Burden Reduction           71 FR 16862, 4/4/06........  R.61-79.260.31(b)(2)-(7); R.61-
 Initiative \3\.                                                        79.261.4(a)(9)(iii)(E) and (f)(9); R.61-
                                                                        79.264.15(b)(4); R.61-79.264.16(a)(4);
                                                                        R.61-79.264.52(b); R.61-79.264.56(i);
                                                                        R.61-79.264.73(b), (b)(1)-(2), (b)(6),
                                                                        (b)(8), (b)(10), and (b)(18)-(19); R.61-
                                                                        79.264.98(d) and (g)(2)-(3); R.61-
                                                                        79.264.99(f)-(g); R.61-79.264.100(g);
                                                                        R.61-79.264.113(e)(5); R.61-79.264.115;
                                                                        R.61-79.264.120; R.61-79.264.143(i);
                                                                        R.61-79.264.145(i); R.61-79.264.147(e);
                                                                        R.61-79.264.191(a) and (b)(5)(ii); R.61-
                                                                        79.264.192(a) and (b); R.61-
                                                                        79.264.193(a)(1)-(2) and (i)(2); R.61-
                                                                        79.264.195(b)-(d) and (f)-(h); R.61-
                                                                        79.264.196(f); R.61-79.264.251(c); R.61-
                                                                        79.264.280(b); R.61-79.264.314(a)-(e)
                                                                        and (e)(1)-(2); R.61-79.264.343(a)(2);
                                                                        R.61-79.264.347(d); R.61-
                                                                        79.264.554(c)(2); R.61-79.264.571(a)-
                                                                        (c); R.61-79.264.573(a)(4)(ii) and (g);
                                                                        R.61-79.264.574(a); R.61-
                                                                        79.264.1061(b)(1)-(2) and (d) [(d)
                                                                        removed]; R.61-79.264.1062(a); R.61-
                                                                        79.264.1100; R.61-79.264.1101(c)(2) and
                                                                        (c)(4); R.61-79.265.15(b)(4); R.61-
                                                                        79.265.16(a)(4); R.61-79.265.52(b); R.61-
                                                                        79.265.56(i); R.61-79.265.73(b), (b)(1)-
                                                                        (2), (b)(6)-(8), and (b)(15); R.61-
                                                                        79.265.90(d)(1) and (d)(3); R.61-
                                                                        79.265.93(d)(2) and (d)(5); R.61-
                                                                        79.265.113(e)(5); R.61-79.265.115; R.61-
                                                                        79.265.120; R.61-79.265.143(h); R.61-
                                                                        79.265.145(h); R.61-79.265.147(e); R.61-
                                                                        79.265.174; R.61-79.265.191(a) and
                                                                        (b)(5)(ii); R.61-79.265.192(a) and (b);
                                                                        R.61-R.79.265.193(a)(1)-(2) and (i)(2);
                                                                        R.61-79.265.195(a)-(c) and (e)-(g); R.61-
                                                                        79.265.196(f); R.61-79.265.221(a); R.61-
                                                                        79.265.224(a); R.61-79.265.259(a); R.61-
                                                                        79.265.280(e); R.61-79.265.301(a); R.61-
                                                                        79.265.303(a); R.61-79.265.314(a)-(f)
                                                                        and (f)(1)-(2); R.61-79.265.441(a)-(c);
                                                                        R.61-79.265.443(a)(4)(ii) and (g); R.61-
                                                                        79.265.444(a); R.61-79.265.1061(b)(1)-
                                                                        (2); R.61-79.265.1061(d); R.61-
                                                                        79.265.1062(a); R.61-79.265.1100; R.61-
                                                                        79.265.1101(c)(2) and (c)(4); R.61-
                                                                        79.266.102(e)(10); R.61-79.266.103(d)
                                                                        and (k); R.61-79.268.7(a)(1)(2) and
                                                                        (b)(6); R.61-79.268.9(a) and (d); R.61-
                                                                        79.270.14(a); R.61-79.270.16(a); R.61-
                                                                        79.270.26(c)(15); R.61-79.270.42,
                                                                        Appendix I, Item O.

[[Page 56203]]

 
Checklist 214, Corrections to Errors in   71 FR 40254, 7/14/06.......  R.61-79.260.10; R.61-79.260.22(a)(1) and
 the Code of Federal Regulations 4 5.                                   (d)(1)(ii); R.61-79.260.40(a); R.61-
                                                                        79.260.41; R.61-79.261.2(c)(1)(i); R.61-
                                                                        79.261.3(a)(2)(i); R.61-
                                                                        79.261.4(a)(20)(v), (b)(6)(i)(B),
                                                                        (b)(6)(ii), (b)(6)(ii)(D),
                                                                        (b)(6)(ii)(F), (b)(9), (e)(2)(vi), and
                                                                        (e)(3)(i); R.61-79.261.6(a)(2)(i)-(iv)
                                                                        and (c)(2); R.61-79.261.21(a)(3)-(4),
                                                                        (a)(4)(i), (a)(4)(i)(A)-(D), and Notes 1-
                                                                        4; R.61-79.261.24(b); R.61-79.261.31(a)
                                                                        Table; R.61-79.261.32 Table (Entries
                                                                        K107 and K069); R.61-79.261.33(e), (e)
                                                                        Comment, (e) Table, (f), (f) Comment,
                                                                        and (f) Table; R.61-79.261 Appendices
                                                                        VII & VIII; R.61-79.262.70; R.61-
                                                                        79.262.82(a)(1)(ii); R.61-
                                                                        79.262.83(b)(1)(i) and (b)(2)(ii); R.61-
                                                                        79.262.84(e);R.61-79.264.1(g)(2); R.61-
                                                                        79.264.4; R.61-79.264.13(b)(7)(iii)(B);
                                                                        R.61-79.264.17(b); R.61-
                                                                        79.264.18(a)(2)(iii) and (b)(2)(iii);
                                                                        R.61-79.264.97(a)(1), (a)(1)(i), and
                                                                        (i)(5); R.61-79.264.98(a)(2) and
                                                                        (g)(4)(i); R.61-79.264.99(h)(2); R.61-
                                                                        79.264.101(d); R.61-79.264.111(c); R.61-
                                                                        79.264.112(b)(8); R.61-79.264.115; R.61-
                                                                        79.264.116; R.61-79.264.118(c); R.61-
                                                                        79.264.119(b)(1)(ii); R.61-
                                                                        79.264.140(d)(1); R.61-79.264.142(b)(2);
                                                                        R.61-79.264.143(b)(7), (b)(8), and
                                                                        (e)(5); R.61-79.264.145(d)(6) and
                                                                        (f)(11); R.61-79.264.147(h)(1); R.61-
                                                                        79.264.151(b), (f), (g), (h)(2), (i),
                                                                        (j), (k), (l), (m)(1), and (n)(1); R.61-
                                                                        79.264.175(b)(1); R.61-79.264.193(c)(4)
                                                                        Note, (d)(4), (e)(2)(ii)-(iii),
                                                                        (e)(2)(v)(A)-(B), (e)(3)(i)-(ii),
                                                                        (g)(1)(iii)-(iv), and (g)(2)(i)(A); R.61-
                                                                        79.264.221(c)(1)(i)(B), (c)(2)(ii),
                                                                        (e)(1), and (e)(2)(i)(B)-(C); R.61-
                                                                        79.264.223(b)(1); R.61-79.264.226(a)(2);
                                                                        R.61-79.264.251(a)(2)(i)(A); R.61-
                                                                        79.264.252(a)-(b); R.61-79.264.259(b);
                                                                        R.61-79.264.280(c)(7) and (d); R.61-
                                                                        79.264.283(a); R.61-79.264.301(c)(2) and
                                                                        (e)(2)(i)(B); R.61-79.264.302(a)-(b);
                                                                        R.61-79.264.304(b)(1); R.61-
                                                                        79.264.314(e)(2); R.61-79.264.317(a);
                                                                        R.61-79.264.344(b); R.61-
                                                                        79.264.552(e)(4)(iii), (e)(4)(iv)(F),
                                                                        and (e)(6)(iii)(E); R.61-79.264.553(e);
                                                                        R.61-79.264.554(a); R.61-
                                                                        79.264.555(e)(6); R.61-79.264.573(a)(1),
                                                                        (a)(4)(i), (a)(5), (b), and (m)(2)-(3);
                                                                        R.61-79.264.600; R.61-79.264.601(a),
                                                                        (b)(11), and (c)(4); R.61-
                                                                        79.264.1030(c); R.61-
                                                                        79.264.1033(f)(2)(vii)(B); R.61-
                                                                        79.264.1034(b)(2); R.61-
                                                                        79.264.1035(c)(4)(i)-(ii); R.61-
                                                                        79.264.1050(f); R.61-79.264.1058(c)(1);
                                                                        R.61-79.264.1064(c)(3); R.61-
                                                                        79.264.1080(a) and (c); R.61-
                                                                        79.264.1090(c); R.61-
                                                                        79.264.1101(b)(3)(iii), (c)(3),
                                                                        (c)(3)(i), and (d); R.61-79.264.1102(a);
                                                                        R.61-79.264 Appendix I, Tables 1 and 2;
                                                                        R.61-79.265.1(c)(6); R.61-
                                                                        79.265.12(a)(1); R.61-79.265.14(b)(1);
                                                                        R.61-79.265.16(b); R.61-79.265.19(c)(2);
                                                                        R.61-79.265.56(b); R.61-79.265.90(d);
                                                                        R.61-79.265.110(b)(4); R.61-
                                                                        79.265.111(c); R.61-79.265.112(b)(5) and
                                                                        (d)(4); R.61-79.265.113(b) and (e)(4);
                                                                        R.61-79.265.117(b); R.61-
                                                                        79.265.119(b)(1)(ii); R.61-79.265.140(b)
                                                                        and (b)(2); R.61-79.265.142(a); R.61-
                                                                        79.265.145(e)(11); R.61-
                                                                        79.265.147(a)(1)(i) and (b)(1)(i)-(ii);
                                                                        R.61-79.265.174; R.61-
                                                                        79.265.193(e)(2)(v)(A)-(B) and (i)(2);
                                                                        R.61-79.265.194(b)(1)-(2); R.61-
                                                                        79.265.197(b); R.61-79.265.221(a) and
                                                                        (d)(2)(i)(A)-(B); R.61-79.265.224(b)(1);
                                                                        R.61-79.265.228(a)(2)(iii)(D) and
                                                                        (b)(2); R.61-79.265.229(b)(2) and
                                                                        (b)(3); R.61-79.265.255(b); R.61-
                                                                        79.265.259(b)(1); R.61-79.265.280(a)(4);
                                                                        R.61-79.265.281(a)(1); R.61-
                                                                        79.265.301(a), (d)(1), and (d)(2)(i)(B);
                                                                        R.61-79.265.302(b); R.61-
                                                                        79.265.303(b)(1); R.61-79.265.312(a)(1);
                                                                        R.61-79.265.314(e)(1)(ii) and (f)(2);
                                                                        R.61-79.265.316(c)-(d); R.61-
                                                                        79.265.405(a)(1); R.61-79.265.441(c);
                                                                        R.61-79.265.443(a)(4)(i) and (b); R.61-
                                                                        79.265.445(b); R.61-
                                                                        79.265.1033(f)(2)(ii); R.61-
                                                                        79.265.1035(b)(2), (b)(2)(i), and
                                                                        (c)(4)(i); R.61-79.265.1063(b)(4)(ii);
                                                                        R.61-79.265.1080(a); R.61-
                                                                        79.265.1085(h)(3); R.61-79.1087(b); R.61-
                                                                        79.265.1090(f)(1); R.61-
                                                                        R.79.265.1100(d); R.61-
                                                                        79.265.1101(b)(3)(i)(B), (b)(3)(iii),
                                                                        (c)(3), and (d); R.61-79.265 Appendices
                                                                        I (Tables 1 and 2), V (Table), and VI;
                                                                        R.61-79.266.70(a); R.61-79.266.80(a)
                                                                        Table; R.61-79.266.100(b)(2)(iv),
                                                                        (d)(3)(i)(A), and (g); R.61-
                                                                        79.266.102(a)(2)(iv), (e)(3)(i)(E),
                                                                        (e)(5)(i)(C), (e)(6)(ii)(B)(2), and
                                                                        (e)(8)(iii); R.61-79.266.103(a)(4)(vii),
                                                                        (b)(2)(v)(B)(2), (b)(5)(ii)(A),
                                                                        (b)(6)(viii)(A), (c)(1)(i),
                                                                        (c)(1)(ii)(A)(2), (c)(1)(ix),
                                                                        (c)(1)(ix)(A), (c)(4)(iv)(C)(1), and
                                                                        (g)(1)(i); R.61-79.266.106(d)(1); R.61-
                                                                        79.266.109(a)(2)(ii) and (b); R.61-
                                                                        79.266 Subpart N (heading); R.61-79.266
                                                                        Appendices III-VI, VIII, IX and XIII;
                                                                        R.61-79.268.2(g); R.61-79.268.4(a)(3);
                                                                        R.61-79.268.6(c)(5); R.61-
                                                                        79.268.7(a)(1), (a)(3)(ii), (a)(4)
                                                                        Table, (b)(3)(ii) Table, (b)(4)(ii),
                                                                        (c)(2), (d), (d)(1)-(3); R.61-
                                                                        79.268.14(b) and (c); R.61-79.268.40(g)
                                                                        and Treatment Standards Table; R.61-
                                                                        79.268.42 Table 1; R.61-79.268.44(c);
                                                                        R.61-79.268.45 Table 1; R.61-79.268.48
                                                                        Universal Treatment Standards Table;
                                                                        R.61-79.268.49(d); R.61-79.268.50(c) and
                                                                        (g); R.61-79.268 Appendix VIII; R.61-
                                                                        79.270.1(a)(2) Table, (b), (c)(1)(iii),
                                                                        and (c)(3)(i); R.61-79.270.2; R.61-
                                                                        79.270.10(j); R.61-79.270.11(d)(1)-(2);
                                                                        R.61-79.270.13(k)(7); R.61-79.270.14(a),
                                                                        (b)(11)(ii)(B), (b)(19)(iii), and
                                                                        (b)(21); R.61-79.270.17(f); R.61-
                                                                        79.270.18(b) and (g); R.61-
                                                                        79.270.20(i)(2); R.61-79.270.26(c)(15);
                                                                        R.61-79.270.33(b); R.61-79.270.41(c);
                                                                        R.61-79.270.42(d)(2)(i); R.61-
                                                                        79.270.70(a); R.61-79.270.72(b)(2); R.61-
                                                                        79.273.9; R.61-79.273.13(b); R.61-
                                                                        79.273.14(a); R.61-79.273.34(a).
Checklist 215, Cathode Ray Tubes Rule...  71 FR 42928, 7/28/06.......  R.61-79.260.10; R.61-79.261.4(a)(22)(i)-
                                                                        (iv); R.61-79.261.39 through 261.41(a)-
                                                                        (b).
Checklist 218, F019 Exemption for         73 FR 31756, 6/4/08........  R.61-79.261.31(a) Table (entry for F019);
 Wastewater Treatment Sludges from Auto                                 R.61-79.261.31(b)(4) and (b)(4)(i)-(ii).
 Manufacturing Zinc Phosphating
 Processes.
Checklist 220, Academic Laboratories      73 FR 72912, 12/1/08.......  R.61-79.262.10(l) and (l)(1)-(2);
 Generator Standards \3\.                                               Addition of 262 Subpart K (R.61-
                                                                        79.262.200 through R.61-79.262.216).

[[Page 56204]]

 
Checklist 222, OECD Requirements; Export  75 FR 1236, 1/8/10.........  R.61-79.262.10(d); R.61-79.262.80(a)-(b);
 Shipments of Spent Lead-Acid Batteries.                                R.61-79.262.81; R.61-79.262.82(a)-(e);
                                                                        R.61-79.262.83(a)-(e); R.61-79.262.84(a)-
                                                                        (e); R.61-79.263.10(d); R.61-
                                                                        79.264.12(a)(2); R.61-79.264.71(a)(3)
                                                                        and (d); R.61-79.265.12(a)(2); R.61-
                                                                        79.265.71(a)(3) and (d); R.61-
                                                                        79.266.80(a) Table Sections 6 and 7.
Checklist 223, Hazardous Waste Technical  75 FR 12989, 3/18/10; 75 FR  R.61-79.260.10; R.61-79.260 (Removal of
 Corrections and Clarifications.           31716, 6/4/10.               Appendix); R.61-79.261.1(c)(10); R.61-
                                                                        79.261.2(c) Table 1; R.61-
                                                                        79.261.4(a)(17)(vi); R.61-
                                                                        79.261.6(a)(2), (a)(2)(ii), and (a)(3);
                                                                        R.61-79.261.7(b)(1) and (b)(3); R.61-
                                                                        79.261.23(a)(8); R.61-79.261.30(d); R.61-
                                                                        79.261.31(a) (listings for F037 and
                                                                        K107); R.61-79.261.32(a) Table; R.61-
                                                                        79.261.33(f); R.61-79.261 Appendix VII;
                                                                        R.61-79.262.23(f) and (f)(1)-(4); R.61-
                                                                        79.262.42(a)(1)-(2), (c), and (c)(1)-
                                                                        (2); R.61-79.264.52; R.61-
                                                                        79.264.56(d)(2); R.61-79.264.72(e)(6),
                                                                        (f)(1), and (f)(7)-(8); R.61-
                                                                        79.264.314(d); R.61-79.264.316(b); R.61-
                                                                        79.264.552(a)(3)(ii)-(iv) and
                                                                        (e)(4)(iv)(F); R.61-79.265.52; R.61-
                                                                        79.265.72(e)(6), (f)(1), and (f)(7)-(8);
                                                                        R.61-79.265.314(e), R.61-79.265.316(b);
                                                                        R.61-79.266.20(b); R.61-79.268.40
                                                                        Treatment Standards Table; R.61-
                                                                        79.268.48 Universal Treatment Standards
                                                                        Table; R.61-79.270.4(a).
Checklist 226, Academic Laboratories      75 FR 79304, 12/20/10......  R.61-79.262.200; R.61-
 Generator Standards Technical                                          79.262.206(b)(3)(i); R.61-
 Corrections.                                                           79.262.212(e)(1); R.61-79.262.214(a)(1)
                                                                        and (b)(1).
Checklist 227, Revision of the Land       76 FR 34147, 6/13/11.......  R.61-79.268.40 Treatment Standards Table;
 Disposal Treatment Standards for                                       R.61-79.268.48 Universal Treatment
 Carbamate Wastes.                                                      Standards Table.
Checklist 228, Hazardous Waste Technical  77 FR 22229, 4/13/12.......  R.61-79.261.32(a) (entry for K107); R.61-
 Corrections and Clarifications Rule.                                   79.266.20(b).
Checklist 229, Conditional Exclusions     78 FR 46448, 7/31/13.......  R.61-79.260.10; R.61-79.261.4(a)(26) and
 for Solvent Contaminated Wipes.                                        (a)(26)(i)-(vi); R.61-79.261.4(b)(18),
                                                                        (b)(18)(i)-(vi), and (b)(18)(vi)(A)-(B).
Checklist 231, Hazardous Waste            79 FR 7518, 2/7/2014.......  R.61-79.260.2(a)-(c) and(c)(1)-(2); R.61-
 Electronic Manifest Rule.                                              79.260.10; R.61-79.260.20(a)(3) and
                                                                        (a)(3)(i)-(ii); R.61-79.262.24(a)-(f);
                                                                        R.61-79.262.25(a)-(b); R.61-
                                                                        79.263.20(a)(1)-(7); R.61-79.263.25(a);
                                                                        R.61-79.264.71(a)(2), (a)(2)(i)-(vi),
                                                                        and (f)-(k); R.61-79.265.71(a)(2),
                                                                        (a)(2)(i)-(vi), and (f)-(k).
Checklist 232, Revisions to the Export    79 FR 36220, 6/26/14.......  R.61-79.260.10; R.61-
 Provisions of the Cathode Ray Tube                                     79.261.39(a)(5)(i)(F), (a)(5)(x)-(xi);
 (CRT) Rule \6\.                                                        R.61-79.261.41(a)-(b).
Checklist 233, Revisions to the           80 FR 1694, 1/13/15; 83 FR   R.61-79.260.31(c) and (c)(1)-(5); R.61-
 Definition of Solid Waste, Response to    24664, 5/30/18.              79.260.33(c)-(e); R.61-79.260.42(a)-(b).
 Vacatur of Certain Provisions of the
 Definition of Solid Waste.
Checklist 233A, Checklist A--Changes
 affecting all non-waste determinations
 and variances.
Checklists 233B, Legitimacy-related       ...........................  R.61-79.260.10; R.61-79.260.43(a)(1)-(3)
 provisions, including prohibition of                                   and (b)-(c) [(c) reserved]; R.61-
 sham recycling, definition of                                          79.261.2 (b)(3)-(4) and (g).
 legitimacy, definition of contained \2\.
Checklist 233C, Speculative Accumulation  ...........................  R.61-79.261.1(c)(8).
Checklist 233D2, 2008 DSW exclusions and  ...........................  R.61-79.260.10; R.61-79.260.30(b), (d)-
 non-waste determinations, including                                    (f) [(f) removed]; R.61-79.260.31(d)
 revisions from 2015 DSW final rule and                                 [removed]; R.61-79.260.33(a); R.61-
 2018 DSW final rule \2\.                                               79.260.34(a)-(c) and (c)(1)-(5),
                                                                        excluding (a)(1)-(3); R.61-
                                                                        79.261.1(c)(4); R.61-79.261.2(c)(3);
                                                                        R.61-79.261.4(a)(23), including
                                                                        (a)(23)(i)-(ii)(F); R.61-
                                                                        79.261.4(a)(24), including (a)(24)(i)-
                                                                        (vii); R.61-79.261.4(a)(25), including
                                                                        (25)(i)-(xii); Addition of 261 Subpart H
                                                                        (R.61-79.261.140 through R.61-79.261.151
                                                                        including Appendices [R.61-79.261.144
                                                                        through R.61-79.261.146 reserved])
                                                                        Addition and Reservation of Subparts K-
                                                                        L; Addition of Subpart M (R.61-
                                                                        79.261.400; R.61-79.261.410; R.61-
                                                                        79.261.411; R.61-79.261.420).
Checklist 233E, Remanufacturing           ...........................  R.61-79.260.10; R.61-79.261.2(c)(3); R.61-
 exclusion \2\.                                                         79.261.4(a)(27), including (a)(27)(i)-
                                                                        (vi)(F); Addition of 261 Subpart I (R.61-
                                                                        79.261.170; R.61-79.261.171; R.61-
                                                                        79.261.172; R.61-79.261.173; R.61-
                                                                        79.261.175; R.61-79.261.176; R.61-
                                                                        79.261.177; R.61-79.261.179); Addition
                                                                        of 261 Subpart J (R.61-79.261.190
                                                                        through R61-79.261.200 [261.192,
                                                                        261.193(e), 261.195 reserved]; Addition
                                                                        of 261 Subpart AA (R.61-79.261.1030
                                                                        through R.61-79.261.1049 [261.1036
                                                                        through 261.1049 reserved]); Addition of
                                                                        261 Subpart BB (R.61-79.261.1050 through
                                                                        R.61-79.261.1079 [261.1065 through
                                                                        261.1079 reserved]); Addition of 261
                                                                        Subpart CC (R.61-79.261.1080 through
                                                                        R.61-79.261.1090 including Appendices
                                                                        [261.1080(b), 261.1083(b),
                                                                        261.1086(b)(2), 261.1089(c),
                                                                        261.1089(f)(2), 261.1085, and 261.1090
                                                                        reserved]).
Checklist 234, Response to Vacaturs of    80 FR 18777, 4/8/15........  R.61-79.260.10; R.61-79.261.4(a)(12)(i)
 the Comparable Fuels Rule and the                                      and (a)(16) [(a)(16) reserved]; R.61-
 Gasification Rule.                                                     79.261.38 [reserved].
Checklist 236, Imports and Exports of     81 FR 85696, 11/28/16; 82    R.61-79.260.10; R.61-79.261.4(d)(1),
 Hazardous Waste \2\.                      FR 41015, 8/29/17; 83 FR     (d)(4), (e)(1), and (e)(4); R.61-
                                           38262, 8/6/2018.             79.261.6(a)(3)(i) and (a)(5); R.61-
                                                                        79.261.39(a)(5)(ii), (a)(5)(v)-(vi),
                                                                        (a)(5)(ix), and (a)(5)(xi); R.61-
                                                                        79.262.10(d); R.61-79.262.18(g); R.61-
                                                                        79.262.41(c); Removal of 262 Subpart E
                                                                        (R.61-79.262.50 through R.61-79.262.58);
                                                                        Removal of 262 Subpart F (R.61-
                                                                        79.262.60); R.61-79.262.80(a)-(b); R.61-
                                                                        79.262.81; R.61-79.262.82(a)-(e) and
                                                                        (e)(1)-(2); R.61-79.262.83(a)-(i) and
                                                                        (i)(1)-(3); R.61-79.262.84(a)-(h) and
                                                                        (h)(1)-(4); R.61-79.262.85 [reserved];
                                                                        R.61-79.262.86 [reserved]; R.61-
                                                                        79.262.87 [reserved]; R.61-79.262.88
                                                                        [reserved]; R.61-79.262.89 [reserved];
                                                                        R.61-79.263.10(d); R.61-79.263.20(a)(2),
                                                                        (c), (e)(2), (f)(2), (g)(1)-(4), and
                                                                        (g)(4)(i)-(ii); R.61-79.264.12(a),
                                                                        (a)(1)-(4), and (a)(4)(i)-(ii); R.61-
                                                                        79.264.71(a)(3), (a)(3)(i)-(ii), and
                                                                        (d); R.61-79.265.12(a), (a)(1)-(4), and
                                                                        (a)(4)(i)-(ii); R.61-79.265.71(a)(3),
                                                                        (a)(3)(i)-(ii), and (d); R.61-
                                                                        79.266.70(b) and (b)(1)-(3); R.61-
                                                                        79.266.80(a) Table Sections 6 through
                                                                        10; R.61-79.273.20; R.61-79.273.39(a)-
                                                                        (b); R.61-79.273.40; R.61-79.273.56;
                                                                        R.61-79.273.62(a); R.61-79.273.70; R.61-
                                                                        79.273.70(a)-(c).

[[Page 56205]]

 
Checklist 237, Hazardous Waste Generator  81 FR 85732, 11/28/16......  R.61-79.260.3; R.61-79.260.10; R.61-
 Improvements Rule 2 3 7.                                               79.260.11(a)(10); R.61-79.261.1(a)(1)
                                                                        and (c)(6); R.61-79.261.4(a)(7); R.61-
                                                                        79.261.5 [reserved]; R.61-
                                                                        79.261.6(c)(2)(iv); R.61-79.261.33(e)
                                                                        and (f); R.61-79.262.1; R.61-
                                                                        79.262.10(a), (a)(1)-(3), (b), (d),
                                                                        (g)(1)-(2), (j) [reserved], (l), and
                                                                        (l)(1)-(2); R.61-79.262.11(a)-(g); R.61-
                                                                        79.262.13 through R.61-79.262.18(a)-(e);
                                                                        R.61-79.262.32(b)-(d); R.61-79.262.34
                                                                        [reserved]; R.61-79.262.35; R.61-
                                                                        79.262.40(c); R.61-79.262.41(a)-(c),
                                                                        except 262.41(b); R.61-79.262.43; R.61-
                                                                        79.262.44; R.61-79.262.200; 61-
                                                                        79.262.201(a)-(b); R.61-79.262.202(a)-
                                                                        (b); R.61-79.262.203(a) and (b)(2); R.61-
                                                                        79.262.204(a); R.61-
                                                                        79.262.206(b)(3)(ii); R.61-
                                                                        79.262.207(d)(2); R.61-79.262.208(a)(1)-
                                                                        (2), (d)(2), and (d)(2)(i)-(ii); R.61-
                                                                        79.262.209(b); R.61-79.262.210(a),
                                                                        (b)(3), and (d)(2); R.61-79.262.211(c),
                                                                        (d), and (e)(3); R.61-79.262.212(d);
                                                                        R.61-79.262.213(a)(1)-(3) and (b)(2);
                                                                        R.61-79.262.214(b)(5); R.61-
                                                                        79.262.216(a)-(b); Addition of Subpart L
                                                                        (R.61-79.262.230 through R.61-
                                                                        79.262.233); Addition of Subpart M (R.61-
                                                                        79.262.250 through R.61-79.262.256 and
                                                                        R.61-79.262.260 through R.61-
                                                                        79.262.265); R.61-79.263.12(a)-(b) and
                                                                        (b)(1)-(2); R.61-79.264.1(g)(1) and
                                                                        (g)(3); R.61-79.264.15(b)(4) and removal
                                                                        of comment; R.61-79.264.71(c) and
                                                                        removal of comment; R.61-79.264.75; R.61-
                                                                        79.264.170; R.61-79.264.174 and removal
                                                                        of comment; R.61-79.264.191(a); R.61-
                                                                        79.264.195(e) [reserved]; R.61-
                                                                        79.264.1030(b)(2); R.61-
                                                                        79.264.1050(b)(3); R.61-
                                                                        79.264.1101(c)(4); R.61-79.265.1(c)(5)
                                                                        and (c)(7); R.61-79.265.15(b)(4) and
                                                                        (b)(5) (removed); R.61-79.265.71(c) and
                                                                        removal of comment); R.61-79.265.75;
                                                                        R.61-79.265.174 and removal of comment;
                                                                        R.61-79.265.195(d) [reserved]; R.61-
                                                                        79.265.201 [reserved]; R.61-
                                                                        79.265.1030(b)(2)-(3); R.61-79.265.1050;
                                                                        R.61-79.265.1101(c)(4); R.61-
                                                                        79.266.80(a) Table Sections 6 through
                                                                        10; R.61-79.266.255(a); R.61-
                                                                        79.268.1(e)(1); R.61-79.268.7(a)(5);
                                                                        R.61-79.268.50(a)(1), (a)(2)(i), and
                                                                        (a)(2)(i)(A)-(D); R.61-79.270.1(a)(3),
                                                                        (c)(2), (c)(2)(i), and (c)(2)(iii); R.61-
                                                                        79.270.42(l) and Entries under O.1. in
                                                                        Appendix [reserved]; R.61-
                                                                        79.273.8(a)(2); R.61-79.273.81(b).
Checklist 238, Confidentiality            82 FR 60894, 12/26/17......  R.61-79.260.2(b) and (d)(1)-(2); R.61-
 Determinations for Hazardous Waste                                     79.261.39(a)(5)(iv); R.61-
 Export and Import Documents \8\.                                       79.262.83(b)(5) and (f)(9); R.61-
                                                                        79.262.84(b)(4) and (f)(8).
Checklist 239, Hazardous Waste            83 FR 420, 1/3/18..........  R. 61-79.260.4(a) and (a)(1)-(4); R.61-
 Electronic Manifest User Fee Rule.                                     79.260.5(a)-(b) and (b)(1)-(2); R.61-
                                                                        79.262.20(a)(1)-(2); R.61-
                                                                        79.262.21(f)(5)-(8); R.61-79.262.24(c),
                                                                        (c)(1), (c)(2) [reserved], (e), (g)
                                                                        [reserved], and (h); R.61-79.262
                                                                        (removal of Appendix); R.61-
                                                                        79.263.20(a)(8) [reserved] and (9); R.61-
                                                                        79.263.21(a)-(c) and (c)(1)-(2); R.61-
                                                                        79.264.71(a)(2), (a)(2)(i)-(vi), (j),
                                                                        (j)(1)-(2), (l), and (l)(1)-(5); R.61-
                                                                        79.264.1086(c)(4)(i); R.61-
                                                                        79.264.1086(d)(4)(i); Addition of 264
                                                                        Subpart FF (R.61-79.264.1300 and 1310-
                                                                        1316); R.61-79.265.71(a)(2), (a)(2)(i)-
                                                                        (vi), (j), (j)(1)-(2), (l), and (l)(1)-
                                                                        (5); R.61-79.265.1087(c)(4)(i) and
                                                                        (d)(4)(i); Addition of 265 Subpart FF
                                                                        (R.61-79.265.1300 and 1310-1316).
----------------------------------------------------------------------------------------------------------------
Notes
\1\ The South Carolina regulatory citations are from the South Carolina Hazardous Waste Management Regulations,
  S.C. Code Ann. Regs. 61-79.260-273, effective November 22, 2019, as amended June 26, 2020.
\2\ The following provisions have been excluded from this authorization because South Carolina does not have an
  equivalent corresponding provision or an error in the provision was deemed substantive: R.61-79.262.21(f)(4)
  (Checklist 207); R.61-79.261.2(a)(2)(ii) (Checklist 233B); R. 261.2(c)(4), Table 1 (Checklists 233D2 and
  233E); R.61-79.270.42, Entries 9 and 10 in Section A (Appendix I) (Checklist 233D2); R.61-79.261.420(g)
  (Checklist 237); R.61-79.262.14(a)(5)(iii) (Checklist 237); R.61-79.262.41(b) (Checklist 237) (although South
  Carolina has a 262.41(b), it does not address the substantive provisions of the Federal 262.41(b).
\3\ South Carolina does not seek authorization for any provisions pertaining to the Performance Track Program
  (Checklists 213, 220, 237).
\4\ Corrections to R.61-107.279 are excluded from this authorization because South Carolina has not been
  previously authorized for R.61-107.279.
\5\ There are several errors contained in South Carolina's table at 266.80(a), specifically in Sections 2, 3,
  and 4. South Carolina will be correcting these errors in a subsequent rulemaking.
\6\ The address for notification to EPA in Section 261.42(a)(2) has since been updated by the August 6, 2018
  final rule at 83 FR 38262.
\7\ R.61-79.260.11(a)(10) is equivalent to 40 CFR 260.11(d)(1).
\8\ SC incorrectly cites R.61-79.260.2(d)(1) as R.61-79.260.2(d)1(1).

G. Where are the revised state rules different from the Federal rules?

    When revised state rules differ from the Federal rules in the RCRA 
state authorization process, the EPA determines whether the state rules 
are equivalent to, more stringent than, or broader in scope than the 
Federal program. Pursuant to RCRA section 3009, 42 U.S.C. 6929, state 
programs may contain requirements that are more stringent than the 
Federal regulations. Such more stringent requirements can be federally 
authorized and, once authorized, become federally enforceable.
    The following South Carolina provisions are more stringent than the 
Federal program:
     South Carolina is more stringent than the Federal program 
at R.61-79.261.6(c)(2)(iv), R.61-79.262.41(a)-(b), R.61-79.264.75, and 
R.61-79.265.75 by requiring quarterly reporting rather than biennial 
reporting.
     South Carolina is more stringent than the Federal program 
at R.61-79.262.13(a)(1)(i)(B), R.61-79.262.13(a)(1)(ii)(B), R.61-
79.262.13(a)(1)(iii)(B), and R.61-79.262.12 by requiring generators 
(large quantity, small quantity, and very small quantity) to notify the 
State when any new hazardous waste is produced.
     South Carolina is more stringent than the Federal program 
at R.61-79.262.16(b)(2)(iii)(C) by prohibiting generators from stacking 
hazardous waste containers more than two high without written approval 
from the Department.
    Although the statute does not prevent states from adopting 
regulations that are broader in scope than the Federal program, states 
cannot receive authorization for such regulations, and they are not 
federally enforceable. South Carolina is broader in scope than the 
Federal program at R.61-79.262.33 by requiring that a generator comply 
with placarding requirements in accordance with the applicable South 
Carolina Public Service Commission regulations, in addition to the 
placarding requirements required by the U.S. Department of 
Transportation regulations in 49 CFR part 172. South Carolina is also 
broader in scope than the Federal program by not adopting the 
conditional exclusion for carbon

[[Page 56206]]

dioxide streams in geologic sequestration activities (Checklist 230) at 
40 CFR 261.4(h). South Carolina's continued regulation of these waste 
streams is broader in scope than the Federal program.
    There are certain regulatory provisions for which the states cannot 
be authorized to administer or implement. These provisions include the 
requirements associated with the Federal manifest registry system 
(Section 262.21) contained within the Uniform Hazardous Waste Manifest 
Rule (Checklist 207), as well as the operation of the national E-
Manifest system and the user fee provisions associated with the 
operation of such system contained in the Hazardous Waste Electronic 
Manifest Rule (Checklist 231) and the Hazardous Waste Electronic 
Manifest User Fee Rule (Checklist 239). Although South Carolina has 
adopted these regulations to maintain its equivalency with the Federal 
program, it has appropriately maintained the Federal references in 
order to preserve the EPA's authority to implement these non-delegable 
provisions.
    Because of the Federal government's special role in matters of 
foreign policy, the EPA does not authorize states to administer the 
Federal import/export functions associated with the Cathode Ray Tubes 
Rule (Checklist 215), the OECD Requirements for Export Shipments of 
Spent Lead-Acid Batteries (Checklist 222), the Revisions to the Export 
Provisions of the Cathode Ray Tube Rule (Checklist 232), the Imports 
and Exports of Hazardous Waste Rule (Checklist 236), and the 
Confidentiality Determinations for Hazardous Waste Export and Import 
Documents Rule (Checklist 238). Although South Carolina has adopted 
these regulations to maintain its equivalency with the Federal program, 
it has appropriately maintained the Federal references in order to 
preserve the EPA's authority to implement these provisions.

H. Who handles permits after the final authorization takes effect?

    When final authorization takes effect, South Carolina will issue 
permits for all the provisions for which it is authorized and will 
administer the permits it issues. The EPA will continue to administer 
any RCRA hazardous waste permits or portions of permits that the EPA 
issued prior to the effective date of authorization until they expire 
or are terminated. The EPA will not issue any new permits or new 
portions of permits for the provisions listed in the table above after 
the effective date of the final authorization. The EPA will continue 
implementing and issue permits for HSWA requirements for which South 
Carolina is not yet authorized. The EPA has the authority to enforce 
State-issued permits after the State is authorized.

I. How does today's proposed action affect Indian country in South 
Carolina?

    South Carolina is not authorized to carry out its hazardous waste 
program in Indian country within the State, which includes the Indian 
lands associated with the Catawba Indian Nation. Therefore, this 
proposed action has no effect on Indian country. The EPA retains 
jurisdiction over Indian country and will continue to implement and 
administer the RCRA program on these lands.

J. What is codification and will the EPA codify South Carolina's 
hazardous waste program as proposed in this rule?

    Codification is the process of placing citations and references to 
the State's statutes and regulations that comprise the State's 
authorized hazardous waste program into the Code of Federal 
Regulations. The EPA does this by adding those citations and references 
to the authorized State rules in 40 CFR part 272. The EPA is not 
proposing to codify the authorization of South Carolina's changes at 
this time. However, the EPA reserves the ability to amend 40 CFR part 
272, subpart PP, for the authorization of South Carolina's program 
changes at a later date.

K. Statutory and Executive Order Reviews

    The Office of Management and Budget (OMB) has exempted this action 
from the requirements of Executive Order 12866 (58 FR 51735, October 4, 
1993) and 13563 (76 FR 3821, January 21, 2011). This action proposes to 
authorize State requirements for the purpose of RCRA section 3006 and 
imposes no additional requirements beyond those imposed by State law. 
Therefore, this action is not subject to review by OMB. This action is 
not an Executive Order 13771 (82 FR 9339, February 3, 2017) regulatory 
action because actions such as today's proposed authorization of South 
Carolina's revised hazardous waste program under RCRA are exempted 
under Executive Order 12866. Accordingly, I certify that this action 
will not have a significant economic impact on a substantial number of 
small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et 
seq.). Because this action proposes to authorize pre-existing 
requirements under State law and does not impose any additional 
enforceable duty beyond that required by State law, it does not contain 
any unfunded mandate or significantly or uniquely affect small 
governments, as described in the Unfunded Mandates Reform Act of 1995 
(2 U.S.C. 1531-1538). For the same reason, this action also does not 
significantly or uniquely affect the communities of tribal governments, 
as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). 
This action will not have substantial direct effects on the states, on 
the relationship between the national government and the states, or on 
the distribution of power and responsibilities among the various levels 
of government, as specified in Executive Order 13132 (64 FR 43255, 
August 10, 1999), because it merely proposes to authorize State 
requirements as part of the State RCRA hazardous waste program without 
altering the relationship or the distribution of power and 
responsibilities established by RCRA. This action also is not subject 
to Executive Order 13045 (62 FR 19885, April 23, 1997) because it is 
not economically significant and it does not make decisions based on 
environmental health or safety risks. This action is not subject to 
Executive Order 13211, ``Actions Concerning Regulations That 
Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 
28355, May 22, 2001), because it is not a significant regulatory action 
under Executive Order 12866.
    Under RCRA section 3006(b), the EPA grants a state's application 
for authorization as long as the state meets the criteria required by 
RCRA. It would thus be inconsistent with applicable law for the EPA, 
when it reviews a state authorization application, to require the use 
of any particular voluntary consensus standard in place of another 
standard that otherwise satisfies the requirements of RCRA. Thus, the 
requirements of section 12(d) of the National Technology Transfer and 
Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. As required 
by section 3 of Executive Order 12988 (61 FR 4729, February 7, 1996), 
in proposing this rule, the EPA has taken the necessary steps to 
eliminate drafting errors and ambiguity, minimize potential litigation, 
and provide a clear legal standard for affected conduct. The EPA has 
complied with Executive Order 12630 (53 FR 8859, March 15, 1988) by 
examining the takings implications of this action in accordance with 
the ``Attorney General's Supplemental Guidelines for the Evaluation of 
Risk and Avoidance of Unanticipated Takings'' issued under the 
executive

[[Page 56207]]

order. This action does not impose an information collection burden 
under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 
3501 et seq.). ``Burden'' is defined at 5 CFR 1320.3(b). Executive 
Order 12898 (59 FR 7629, February 16, 1994) establishes Federal 
executive policy on environmental justice. Its main provision directs 
Federal agencies, to the greatest extent practicable and permitted by 
law, to make environmental justice part of their mission by identifying 
and addressing, as appropriate, disproportionately high and adverse 
human health or environmental effects of their programs, policies, and 
activities on minority populations and low-income populations in the 
United States. Because this action proposes authorization of pre-
existing State rules which are at least equivalent to, and no less 
stringent than existing Federal requirements, and imposes no additional 
requirements beyond those imposed by State law, and there are no 
anticipated significant adverse human health or environmental effects, 
this proposed rule is not subject to Executive Order 12898.

List of Subjects in 40 CFR Part 271

    Environmental protection, Administrative practice and procedure, 
Confidential business information, Hazardous waste, Hazardous waste 
transportation, Indian lands, Intergovernmental relations, Penalties, 
Reporting and recordkeeping requirements.

    Authority: This action is issued under the authority of sections 
2002(a), 3006, and 7004(b) of the Solid Waste Disposal Act as 
amended, 42 U.S.C. 6912(a), 6926, and 6974(b).

    Dated: August 14, 2020.
Mary Walker,
Regional Administrator, Region 4.
[FR Doc. 2020-18311 Filed 9-10-20; 8:45 am]
BILLING CODE 6560-50-P