NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-280 and 50-281; NRC-2020-0096]


Virginia Electric and Power Company; Surry Power Station, Unit 
Nos. 1 and 2

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request 
a hearing, and petition for leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of amendments to Renewed Facility Operating License Nos. DPR-
32 and DPR-37, issued to Virginia Electric and Power Company, for 
operation of the Surry Power Station (Surry), Unit Nos. 1 and 2. The 
proposed amendments would revise Technical Specification (TS) 6.4.Q.4.b 
to add a note to permit a one-time deferral of the Surry, Unit No. 2 
Steam Generator (SG) B inspection from the Surry, Unit No. 2 spring 
2020 refueling outage (RFO) (2R29) to the Surry, Unit No. 2 fall 2021 
RFO (2R30).

DATES: Submit comments by May 6, 2020. Requests for a hearing or 
petition for leave to intervene must be filed by June 22, 2020.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0096. Address 
questions about NRC docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: G. Edward Miller, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 
20555-0001; telephone: 301-415-2481, email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2020-0096 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0096.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The license amendment request, dated 
April 14, 2020, is available in ADAMS under Accession No. ML20105A223.

B. Submitting Comments

    Please include Docket ID NRC-2020-0096 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment

[[Page 22461]]

submissions available to the public or entering the comment into ADAMS.

II. Introduction

    The NRC is considering issuance of amendments to Renewed Facility 
Operating License Nos. DPR-32 and DPR-37, issued to Virginia Electric 
and Power Company, for operation of Surry, Unit Nos. 1 and 2, located 
in Surry County, Virginia.
    The proposed amendments would revise TS 6.4.Q.4.b to add a note to 
permit a one-time deferral of the Surry, Unit No. 2 SG B inspection 
from the Surry, Unit No. 2 spring 2020 RFO (2R29) to the Surry, Unit 
No. 2 fall 2021 RFO (2R30).
    Before any issuance of the proposed license amendments, the NRC 
will need to make the findings required by the Atomic Energy Act of 
1954, as amended (the Act), and NRC's regulations.
    Pursuant to 50.91(a)(6) of title 10 of the Code of Federal 
Regulations (10 CFR) for amendments to be granted under exigent 
circumstances, the NRC has made a proposed determination that the 
license amendment request involves no significant hazards 
consideration. Under the NRC's regulations in 10 CFR 50.92, this means 
that operation of the facility in accordance with the proposed 
amendments would not (1) involve a significant increase in the 
probability or consequences of an accident previously evaluated; or (2) 
create the possibility of a new or different kind of accident from any 
accident previously evaluated; or (3) involve a significant reduction 
in a margin of safety. As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed change adds a note to TS 6.4.Q.4.b to permit a one-
time deferral of the Surry Unit 2 SG B inspection from the Surry 
Unit 2 spring 2020 refueling outage (RFO) (S2R29) to the Surry Unit 
2 fall 2021 refueling outage (S2R30). An operational assessment has 
been performed that concludes Surry Unit 2 SG B will continue to 
meet its specific structural and leakage integrity performance 
criteria throughout the operating period preceding the next 
inspection in fall 2021. In addition, the proposed change does not 
implement plant physical changes to any plant structure, system or 
component; hence, no new failure modes are introduced. Therefore, 
the probability of an accident previously evaluated is not 
significantly increased. Also, there is no significant increase in 
the consequences of an accident because the TS primary-to-secondary 
leakage limit is not being changed, and the SG tubes continue to 
meet the SG Program performance criteria and remain bounded by the 
plant's accident analyses.
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed change adds a note to TS 6.4.Q.4.b to permit a one-
time deferral of the Surry Unit 2 SG B inspection from the Surry 
Unit 2 spring 2020 refueling outage (RFO) (S2R29) to the Surry Unit 
2 fall 2021 refueling outage (S2R30). The proposed change does not 
alter the design function or operation of the SGs or the ability of 
a SG to perform its design function. The SG tubes continue to meet 
the SG Program performance criteria. No plant physical changes are 
being implemented that would result in plant operation in a 
configuration outside the plant safety analyses or design basis. The 
proposed change does not introduce any changes or mechanisms that 
create the possibility of a new or different kind of accident. 
Furthermore, Surry Unit 2 SG B will continue to meet its specific 
structural and leakage integrity performance criteria throughout the 
operating period preceding the next inspection in fall 2021. 
Finally, no new effects on existing equipment are created nor are 
any new malfunctions introduced.
    Therefore, based on the above evaluation, the proposed change 
does not create the possibility of a new or different kind of 
accident from any accident previously evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    The proposed change adds a note to TS 6.4.Q.4.b to permit a one-
time deferral of the Surry Unit 2 SG B inspection from the Surry 
Unit 2 spring 2020 refueling outage (RFO) (S2R29) to the Surry Unit 
2 fall 2021 refueling outage (S2R30). Extending the Surry Unit 2 SG 
B inspection schedule does not involve changes to any limit on 
accident consequences specified in the Surry licensing bases or 
applicable regulations, does not modify how accidents are mitigated, 
and does not involve a change in a methodology.
    A forward-focused operational assessment (OA) of Surry Unit 2 SG 
B was performed that demonstrates there is reasonable assurance the 
structural integrity and accident induced leakage performance 
criteria will remain satisfied in SG B throughout the period 
preceding the fall 2021 RFO inspection for a total operating 
duration of three cycles between primary side inspections. The OA 
also identified projected margin to the structural integrity and 
accident induced leakage performance criteria prior to the fall 2021 
RFO for each evaluated degradation mechanism.
    Therefore, operation of the facility in accordance with the 
proposed change will not involve a significant reduction in a margin 
of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves a no significant hazards 
consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 14 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendments until the 
expiration of the 14-day notice period. However, if circumstances 
change during the notice period, such that failure to act in a timely 
way would result, for example, in derating or shutdown of the facility, 
the Commission may issue the license amendments before the expiration 
of the 14-day notice period, provided that its final determination is 
that the amendments involve no significant hazards consideration. The 
final determination will consider all public and State comments 
received. If the Commission takes this action, it will publish in the 
Federal Register a notice of issuance. The Commission expects that the 
need to take this action will occur very infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. The NRC's regulations are accessible 
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, 
the Commission or a presiding officer will rule on the petition and, if 
appropriate, a notice of a hearing will be issued.
    As required by 10 CFR 2.309(d) the petition should specifically 
explain the reasons why intervention should be permitted with 
particular reference to the following general requirements for 
standing: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right to be made a party 
to the proceeding; (3) the nature and extent of the petitioner's

[[Page 22462]]

property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the petitioner's interest.
    In accordance with 10 CFR 2.309(f), the petition must also set 
forth the specific contentions which the petitioner seeks to have 
litigated in the proceeding. Each contention must consist of a specific 
statement of the issue of law or fact to be raised or controverted. In 
addition, the petitioner must provide a brief explanation of the bases 
for the contention and a concise statement of the alleged facts or 
expert opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to the specific sources and 
documents on which the petitioner intends to rely to support its 
position on the issue. The petition must include sufficient information 
to show that a genuine dispute exists with the applicant or licensee on 
a material issue of law or fact. Contentions must be limited to matters 
within the scope of the proceeding. The contention must be one which, 
if proven, would entitle the petitioner to relief. A petitioner who 
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene. 
Parties have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that party's admitted 
contentions, including the opportunity to present evidence, consistent 
with the NRC's regulations, policies, and procedures.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice. Petitions and motions for leave to file new 
or amended contentions that are filed after the deadline will not be 
entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in 
accordance with the filing instructions in the ``Electronic Submissions 
(E-Filing)'' section of this document.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to establish when the hearing is held. If the final determination is 
that the amendment request involves no significant hazards 
consideration, the Commission may issue the amendment and make it 
immediately effective, notwithstanding the request for a hearing. Any 
hearing would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of the amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission no later 
than 60 days from the date of publication of this notice. The petition 
must be filed in accordance with the filing instructions in the 
``Electronic Submissions (E-Filing)'' section of this document, and 
should meet the requirements for petitions set forth in this section, 
except that under 10 CFR 2.309(h)(2) a State, local governmental body, 
or Federally-recognized Indian Tribe, or agency thereof does not need 
to address the standing requirements in 10 CFR 2.309(d) if the facility 
is located within its boundaries. Alternatively, a State, local 
governmental body, Federally-recognized Indian Tribe, or agency thereof 
may participate as a non-party under 10 CFR 2.315(c).
    If a hearing is granted, any person who is not a party to the 
proceeding and is not affiliated with or represented by a party may, at 
the discretion of the presiding officer, be permitted to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
his or her position on the issues but may not otherwise participate in 
the proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to the limits and 
conditions as may be imposed by the presiding officer. Details 
regarding the opportunity to make a limited appearance will be provided 
by the presiding officer if such sessions are scheduled.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing and petition for leave to intervene (petition), any 
motion or other document filed in the proceeding prior to the 
submission of a request for hearing or petition to intervene, and 
documents filed by interested governmental entities that request to 
participate under 10 CFR 2.315(c), must be filed in accordance with the 
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 
46562; August 3, 2012). The E-Filing process requires participants to 
submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Detailed 
guidance on making electronic submissions may be found in the Guidance 
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit 
paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a 
digital ID certificate and a docket has been created, the participant 
can then submit adjudicatory documents. Submissions must be in Portable 
Document Format (PDF). Additional guidance on PDF submissions is 
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59

[[Page 22463]]

p.m. Eastern Time on the due date. Upon receipt of a transmission, the 
E-Filing system time-stamps the document and sends the submitter an 
email notice confirming receipt of the document. The E-Filing system 
also distributes an email notice that provides access to the document 
to the NRC's Office of the General Counsel and any others who have 
advised the Office of the Secretary that they wish to participate in 
the proceeding, so that the filer need not serve the document on those 
participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before adjudicatory documents are filed so that 
they can obtain access to the documents via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing adjudicatory documents in this 
manner are responsible for serving the document on all other 
participants. Filing is considered complete by first-class mail as of 
the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service. A presiding officer, having granted an 
exemption request from using E-Filing, may require a participant or 
party to use E-Filing if the presiding officer subsequently determines 
that the reason for granting the exemption from use of E-Filing no 
longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
Commission or the presiding officer. If you do not have an NRC-issued 
digital ID certificate as described above, click ``cancel'' when the 
link requests certificates and you will be automatically directed to 
the NRC's electronic hearing dockets where you will be able to access 
any publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information, 
such as social security numbers, home addresses, or personal phone 
numbers in their filings, unless an NRC regulation or other law 
requires submission of such information. For example, in some 
instances, individuals provide home addresses in order to demonstrate 
proximity to a facility or site. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants are 
requested not to include copyrighted materials in their submission.
    For further details with respect to this action, see the 
application for license amendments dated April 14, 2020.
    Attorney for licensee: W.S. Blair, Senior Counsel, Dominion Energy 
Services Inc., 120 Tredegar St., RS-2, Richmond, VA 23219.
    NRC Branch Chief: Michael T. Markley.

    Dated: April 17, 2020.

    For the Nuclear Regulatory Commission.
Glenn E. Miller,
Project Manager, Plant Licensing Branch II-1, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2020-08503 Filed 4-21-20; 8:45 am]
 BILLING CODE 7590-01-P