[Federal Register Volume 85, Number 61 (Monday, March 30, 2020)]
[Notices]
[Pages 17601-17606]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-06486]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-400; NRC-2020-0080]


Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, 
Unit 1

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request 
a hearing, and petition for leave to intervene; order.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an amendment to Facility Operating License No. NFP-63, 
issued to Duke Energy Progress, LLC, for operation of the Shearon 
Harris Nuclear Power Plant, Unit 1. The proposed amendment would revise 
the Technical Specifications (TSs) to include the NRC-approved topical 
report, ANP-10341P-A, ``The ORFEO-GAIA and ORFEO-NMGRID Critical Heat 
Flux Correlations,'' and add Appendix J to DPC-NE-2005-P, ``Thermal-
Hydraulic Statistical Core Design Methodology.'' TSs would be revised 
to add the departure from nucleate boiling ratio safety limit for a 
fuel assembly design with characteristics similar to the GAIA fuel 
design using the ORFEO-GAIA correlation methodology. The TSs would also 
be revised with minor formatting editorial adjustments to the impacted 
pages. For this amendment request, the NRC proposes to determine that 
it involves no significant hazards consideration. Because this 
amendment request contains sensitive unclassified non-safeguards 
information (SUNSI), an order imposes procedures to obtain access to 
SUNSI for contention preparation.

DATES: Submit comments by April 29, 2020. Requests for a hearing or 
petition for leave to intervene must be filed by May 29, 2020. Any 
potential party as defined in Sec.  2.4 of title 10 of the Code of 
Federal Regulations (10 CFR), who believes access to SUNSI is necessary 
to respond to this notice must request document access by April 9, 
2020.

ADDRESSES: You may submit comments by any of the following methods
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0080. Address 
questions about NRC dockets IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Tanya E. Hood, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 
20555-0001; telephone: 301-415-1387, email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2020-0080 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0080.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The application dated April 10, 2019, 
as supplemented by letters dated June 6, 2019 and December 20, 2019 are 
available in ADAMS under Accession Nos. ML19100A442, ML19157A036, and 
ML19354B380 respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2020-0080 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC

[[Page 17602]]

does not routinely edit comment submissions to remove such information 
before making the comment submissions available to the public or 
entering the comment into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to Facility 
Operating License No. NFP-63, issued to Duke Energy Progress, LLC, for 
operation of the Shearon Harris Nuclear Power Plant (Harris), Unit 1, 
located in Wake and Chatham Counties, North Carolina. The proposed 
amendment would revise the Harris TSs to include the NRC-approved 
topical report, ANP-10341P-A, for the correlation associated with the 
fuel design transition from the high thermal performance fuel to a fuel 
assembly design with characteristics similar to the GAIA fuel design.
    The amendment would also add Appendix J to DPC-NE-2005-P to address 
the applicability of the ORFEO-GAIA critical heat flux correlation 
methodology to a fuel assembly design with characteristics similar to 
the GAIA fuel design at Harris. In addition, the TSs would be revised 
to add the departure from nucleate boiling ratio safety limit for a 
fuel assembly design with characteristics similar to the GAIA fuel 
design using the ORFEO-GAIA correlation methodology. The TSs would also 
be revised with minor formatting editorial adjustments to the impacted 
pages.
    Before any issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in 10 CFR 50.92, this means that operation of the 
facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated; or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated; 
or (3) involve a significant reduction in a margin of safety. As 
required by 10 CFR 50.91(a), the licensee has provided its analysis of 
the issue of no significant hazards consideration, which is presented 
below, along with NRC edits in square brackets:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    [Response: No.]
    The proposed change incorporates into [Harris'] TS a limit on 
the departure from nucleate boiling ratio (DNBR) safety limit for [a 
fuel assembly design with characteristics similar to the GAIA fuel 
design] that is based on a NRC reviewed and approved correlation, 
and does not require a physical change to plant systems, structures 
or components. Plant operations and analysis will continue to be in 
accordance with the [Harris] licensing basis. This change does not 
impact any of the accident initiators. The departure from nucleate 
boiling ratio is the basis for protecting the fuel and is consistent 
with the safety analysis. The DNBR setpoint continues to ensure 
automatic protective action is initiated to prevent exceeding the 
proposed DNBR safety limit.
    The proposed safety limit ensures that fuel integrity will be 
maintained during normal operations and anticipated operational 
transients. The core operating limits report will be developed in 
accordance with the approved methodology. The proposed safety limit 
value and proposed Appendix J to the DPC-NE-2005-P methodology 
report do not affect the performance of any equipment used to 
mitigate the consequences of an analyzed accident. There is no 
impact on the source term or pathways assumed in accidents 
previously assumed. No analysis assumptions are violated and there 
are no adverse effects on the factors that contribute to offsite or 
onsite dose as the result of an accident.
    The proposed change also adds a topical report for a NRC 
reviewed and approved critical heat flux (CHF) correlation to the 
list of topical reports in the [Harris] TS, which is administrative 
in nature and has no impact on a plant configuration or system 
performance relied upon to mitigate the consequences of an accident. 
The list of topical reports in the TS used to develop the core 
operating limits does not impact either the initiation of an 
accident or the mitigation of its consequences. Additionally, the 
editorial change to remove the excess spacing between subitems in TS 
6.9.1.6.2 is strictly administrative and has no impact on the 
technical content.
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different kind of accident from any previously evaluated?
    [Response: No.]
    The proposed change does not require a physical change to plant 
systems, structures or components. The proposed change extends the 
use of DPC-NE-2005-P-A by [Harris] for [a fuel assembly design with 
characteristics similar to the GAIA fuel design] and adds a limit on 
DNBR for [a fuel assembly design with characteristics similar to the 
GAIA fuel design] to the [Harris] TS that is based on the NRC 
reviewed and approved ORFEO-GAIA CHF correlation, ensuring that the 
fuel design limits are met. Operations and analyses will continue to 
be in compliance with NRC regulations. The addition of a new DNBR 
limit does not affect any accident initiators that would create a 
new accident.
    The proposed safety limit value does not change the methods 
governing normal plant operation, nor are the methods utilized to 
respond to plant transients altered. The CHF correlation is not an 
accident/event initiator. No new initiating events or transients 
result from the use of the ORFEO/GAIA CHF correlation or the related 
safety limit change.
    The proposed change also adds a topical report for a NRC 
reviewed and approved CHF correlation to the list of topical reports 
in the [Harris] TS, which is administrative in nature and has no 
impact on a plant configuration or system performance. The proposed 
change updates the list of NRC-approved topical reports used to 
develop the core operating limits. There is no change in the 
parameters within which the plant is normally operated. 
Additionally, the editorial change to remove the excess spacing 
between sub-items in TS 6.9.1.6.2 is strictly administrative and has 
no impact on the technical content. The possibility of a new or 
different kind of accident is not created.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any accident previously 
evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    [Response: No.]
    The proposed safety limit value has been established in 
accordance with the methodology for the ORFEO-GAIA CHF correlation 
to ensure that the applicable margin of safety is maintained (i.e., 
there is at least 95% probability at a 95% confidence level that the 
hot fuel rod does not experience DNB [departure from nucleate 
boiling]). The other reactor core safety limits will continue to be 
met by analyzing the reload using NRC-approved methods and 
incorporation of resultant operating limits into the Core Operating 
Limits Report. Consistent with the existing methodology, the use of 
the proposed Appendix J to the methodology will continue to ensure 
that all applicable design and safety limits are satisfied such that 
the fission product barriers will continue to perform their design 
functions.
    Therefore, the proposed change does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves no significant hazards 
consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The

[[Page 17603]]

Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no 
significant hazards consideration. In addition, the Commission may 
issue the amendment prior to the expiration of the 30-day comment 
period if circumstances change during the 30-day comment period such 
that failure to act in a timely way would result, for example, in 
derating or shutdown of the facility. If the Commission takes action 
prior to the expiration of either the comment period or the notice 
period, it will publish in the Federal Register a notice of issuance. 
If the Commission makes a final no significant hazards consideration 
determination, any hearing will take place after issuance. The 
Commission expects that the need to take this action will occur very 
infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. The NRC's regulations are accessible 
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of 
the regulations is available at the NRC's PDR, located at One White 
Flint North, Room O1-F21, 11555 Rockville Pike (first floor), 
Rockville, Maryland 20852. If a petition is filed, the Commission or a 
presiding officer will rule on the petition and, if appropriate, a 
notice of a hearing will be issued.
    As required by 10 CFR 2.309(d) the petition should specifically 
explain the reasons why intervention should be permitted with 
particular reference to the following general requirements for 
standing: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right to be made a party 
to the proceeding; (3) the nature and extent of the petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the petitioner's interest.
    In accordance with 10 CFR 2.309(f), the petition must also set 
forth the specific contentions which the petitioner seeks to have 
litigated in the proceeding. Each contention must consist of a specific 
statement of the issue of law or fact to be raised or controverted. In 
addition, the petitioner must provide a brief explanation of the bases 
for the contention and a concise statement of the alleged facts or 
expert opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to the specific sources and 
documents on which the petitioner intends to rely to support its 
position on the issue. The petition must include sufficient information 
to show that a genuine dispute exists with the applicant or licensee on 
a material issue of law or fact. Contentions must be limited to matters 
within the scope of the proceeding. The contention must be one which, 
if proven, would entitle the petitioner to relief. A petitioner who 
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene. 
Parties have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that party's admitted 
contentions, including the opportunity to present evidence, consistent 
with the NRC's regulations, policies, and procedures.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice. Petitions and motions for leave to file new 
or amended contentions that are filed after the deadline will not be 
entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in 
accordance with the filing instructions in the ``Electronic Submissions 
(E-Filing)'' section of this document.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to establish when the hearing is held. If the final determination is 
that the amendment request involves no significant hazards 
consideration, the Commission may issue the amendment and make it 
immediately effective, notwithstanding the request for a hearing. Any 
hearing would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of the amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission no later 
than 60 days from the date of publication of this notice. The petition 
must be filed in accordance with the filing instructions in the 
``Electronic Submissions (E-Filing)'' section of this document, and 
should meet the requirements for petitions set forth in this section, 
except that under 10 CFR 2.309(h)(2) a State, local governmental body, 
or Federally-recognized Indian Tribe, or agency thereof does not need 
to address the standing requirements in 10 CFR 2.309(d) if the facility 
is located within its boundaries. Alternatively, a State, local 
governmental body, Federally-recognized Indian Tribe, or agency thereof 
may participate as a non-party under 10 CFR 2.315(c).
    If a hearing is granted, any person who is not a party to the 
proceeding and is not affiliated with or represented by a party may, at 
the discretion of the presiding officer, be permitted to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
his or her position on the issues but may not otherwise participate in 
the proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to the limits and 
conditions as may be imposed by the presiding officer. Details 
regarding the opportunity to make a limited appearance will be provided 
by the presiding officer if such sessions are scheduled.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing and petition for leave to intervene (petition), any 
motion or other document filed in the proceeding prior to the 
submission of a request for hearing or petition to intervene, and 
documents filed by interested governmental entities that request to 
participate under 10 CFR 2.315(c), must be filed in accordance

[[Page 17604]]

with the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended 
at 77 FR 46562; August 3, 2012). The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases to mail copies on electronic storage media. 
Detailed guidance on making electronic submissions may be found in the 
Guidance for Electronic Submissions to the NRC and on the NRC website 
at https://www.nrc.gov/site-help/e-submittals.html. Participants may 
not submit paper copies of their filings unless they seek an exemption 
in accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a 
digital ID certificate and a docket has been created, the participant 
can then submit adjudicatory documents. Submissions must be in Portable 
Document Format (PDF). Additional guidance on PDF submissions is 
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed so that they can obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing adjudicatory documents in this 
manner are responsible for serving the document on all other 
participants. Filing is considered complete by first-class mail as of 
the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service. A presiding officer, having granted an 
exemption request from using E-Filing, may require a participant or 
party to use E-Filing if the presiding officer subsequently determines 
that the reason for granting the exemption from use of E-Filing no 
longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
Commission or the presiding officer. If you do not have an NRC-issued 
digital ID certificate as described above, click ``cancel'' when the 
link requests certificates and you will be automatically directed to 
the NRC's electronic hearing dockets where you will be able to access 
any publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information, 
such as social security numbers, home addresses, or personal phone 
numbers in their filings, unless an NRC regulation or other law 
requires submission of such information. For example, in some 
instances, individuals provide home addresses in order to demonstrate 
proximity to a facility or site. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants are 
requested not to include copyrighted materials in their submission.
    For further details with respect to this action, see the 
application for license amendment dated April 10, 2019, as supplemented 
by letters dated June 6, 2019 and December 20, 2019.
    Attorney for licensee: David Cummings, Associate General Counsel, 
Duke Energy Corporation, Mail Code DEC45, 550 South Tryon St., 
Charlotte, NC 28202.
    NRC Branch Chief: Undine Shoop.

V. Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing SUNSI.
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request access to SUNSI. A ``potential party'' is any person who 
intends to participate as a party by demonstrating standing and filing 
an admissible contention under 10 CFR 2.309. Requests for access to 
SUNSI submitted later than 10 days after publication of this notice 
will not be considered absent a showing of good cause for the late 
filing, addressing why the request could not have been filed earlier.
    C. The requester shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Deputy

[[Page 17605]]

General Counsel for Hearings and Administration, Office of the General 
Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. 
The expedited delivery or courier mail address for both offices is: 
U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, 
Maryland 20852. The email address for the Office of the Secretary and 
the Office of the General Counsel are [email protected] and 
[email protected], respectively.\1\ The request must 
include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requester's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
receipt of (or access to) that information. However, if more than 25 
days remain between the petitioner's receipt of (or access to) the 
information and the deadline for filing all other contentions (as 
established in the notice of hearing or opportunity for hearing), the 
petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and requisite need, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requester may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an Administrative Law Judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    (3) Further appeals of decisions under this paragraph must be made 
pursuant to 10 CFR 2.311.
    H. Review of Grants of Access. A party other than the requester may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed within 5 days of the notification by the 
NRC staff of its grant of access and must be filed with: (a) The 
presiding officer designated in this proceeding; (b) if no presiding 
officer has been appointed, the Chief Administrative Judge, or if he or 
she is unavailable, another administrative judge, or an Administrative 
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if 
another officer has been designated to rule on information access 
issues, with that officer.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requesters should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562; August 3, 2012) apply to appeals of NRC staff 
determinations (because they must be served on a presiding officer 
or the Commission, as applicable), but not to the initial SUNSI 
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. The 
attachment to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 24th of March, 2020.
    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

[[Page 17606]]



   Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in This Proceeding
------------------------------------------------------------------------
           Day                             Event/Activity
------------------------------------------------------------------------
0........................  Publication of Federal Register notice of
                            hearing and opportunity to petition for
                            leave to intervene, including order with
                            instructions for access requests.
10.......................  Deadline for submitting requests for access
                            to SUNSI with information: Supporting the
                            standing of a potential party identified by
                            name and address; describing the need for
                            the information in order for the potential
                            party to participate meaningfully in an
                            adjudicatory proceeding.
60.......................  Deadline for submitting petition for
                            intervention containing: (i) Demonstration
                            of standing; and (ii) all contentions whose
                            formulation does not require access to SUNSI
                            (+25 Answers to petition for intervention;
                            +7 petitioner/requestor reply).
20.......................  NRC staff informs the requester of the
                            staff's determination whether the request
                            for access provides a reasonable basis to
                            believe standing can be established and
                            shows need for SUNSI. (NRC staff also
                            informs any party to the proceeding whose
                            interest independent of the proceeding would
                            be harmed by the release of the
                            information.) If NRC staff makes the finding
                            of need for SUNSI and likelihood of
                            standing, NRC staff begins document
                            processing (preparation of redactions or
                            review of redacted documents).
25.......................  If NRC staff finds no ``need'' or no
                            likelihood of standing, the deadline for
                            petitioner/requester to file a motion
                            seeking a ruling to reverse the NRC staff's
                            denial of access; NRC staff files copy of
                            access determination with the presiding
                            officer (or Chief Administrative Judge or
                            other designated officer, as appropriate).
                            If NRC staff finds ``need'' for SUNSI, the
                            deadline for any party to the proceeding
                            whose interest independent of the proceeding
                            would be harmed by the release of the
                            information to file a motion seeking a
                            ruling to reverse the NRC staff's grant of
                            access.
30.......................  Deadline for NRC staff reply to motions to
                            reverse NRC staff determination(s).
40.......................  (Receipt +30) If NRC staff finds standing and
                            need for SUNSI, deadline for NRC staff to
                            complete information processing and file
                            motion for Protective Order and draft Non-
                            Disclosure Affidavit. Deadline for applicant/
                            licensee to file Non-Disclosure Agreement
                            for SUNSI.
A........................  If access granted: issuance of presiding
                            officer or other designated officer decision
                            on motion for protective order for access to
                            sensitive information (including schedule
                            for providing access and submission of
                            contentions) or decision reversing a final
                            adverse determination by the NRC staff.
A + 3....................  Deadline for filing executed Non-Disclosure
                            Affidavits. Access provided to SUNSI
                            consistent with decision issuing the
                            protective order.
A + 28...................  Deadline for submission of contentions whose
                            development depends upon access to SUNSI.
                            However, if more than 25 days remain between
                            the petitioner's receipt of (or access to)
                            the information and the deadline for filing
                            all other contentions (as established in the
                            notice of opportunity to request a hearing
                            and petition for leave to intervene), the
                            petitioner may file its SUNSI contentions by
                            that later deadline.
A + 53...................  (Contention receipt +25) Answers to
                            contentions whose development depends upon
                            access to SUNSI.
A + 60...................  (Answer receipt +7) Petitioner/Intervenor
                            reply to answers.
>A + 60..................  Decision on contention admission.
------------------------------------------------------------------------

[FR Doc. 2020-06486 Filed 3-27-20; 8:45 am]
 BILLING CODE 7590-01-P