NUCLEAR REGULATORY COMMISSION
[NRC-2020-0042]
Biweekly Notice; Applications and Amendments to Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Biweekly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 189.a.(2) of the Atomic Energy Act of
1954, as amended (the Act), the U.S. Nuclear Regulatory Commission
(NRC) is publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued, and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person. This biweekly notice includes all amendments
issued, or proposed to be issued, from January 14, 2020, to January 27,
2020. The last biweekly notice was published on January 28, 2020.
DATES: Comments must be filed by March 12, 2020. A request for a
hearing or petitions for leave to intervene must be filed by April 13,
2020.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0042. Address
[[Page 7788]]
questions about NRC Docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Bernadette Abeywickrama, Office of
Nuclear Reactor Regulations, 301-415-4081, email:
[email protected], U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2020-0042, facility name, unit
number(s), docket number(s), application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly-available information related to this
action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0042.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2020-0042, facility name, unit
number(s), docket number(s), application date, and subject in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
For the facility-specific amendment requests shown below, the
Commission finds that the licensee's analyses provided, consistent with
title 10 of the Code of Federal Regulations (10 CFR) Section 50.91 is
sufficient to support the proposed determination that these amendment
requests involve NSHC. Under the Commission's regulations in 10 CFR
50.92, operation of the facility in accordance with the proposed
amendment would not (1) involve a significant increase in the
probability or consequences of an accident previously evaluated, or (2)
create the possibility of a new or different kind of accident from any
accident previously evaluated; or (3) involve a significant reduction
in a margin of safety.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves NSHC. In addition, the Commission may issue the amendment
prior to the expiration of the 30-day comment period if circumstances
change during the 30-day comment period such that failure to act in a
timely way would result, for example in derating or shutdown of the
facility. If the Commission takes action prior to the expiration of
either the comment period or the notice period, it will publish in the
Federal Register a notice of issuance. If the Commission makes a final
NSHC determination, any hearing will take place after issuance. The
Commission expects that the need to take action on an amendment before
60 days have elapsed will occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise
[[Page 7789]]
statement of the alleged facts or expert opinion which support the
contention and on which the petitioner intends to rely in proving the
contention at the hearing. The petitioner must also provide references
to the specific sources and documents on which the petitioner intends
to rely to support its position on the issue. The petition must include
sufficient information to show that a genuine dispute exists with the
applicant or licensee on a material issue of law or fact. Contentions
must be limited to matters within the scope of the proceeding. The
contention must be one which, if proven, would entitle the petitioner
to relief. A petitioner who fails to satisfy the requirements at 10 CFR
2.309(f) with respect to at least one contention will not be permitted
to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or Federally-recognized Indian Tribe, or agency thereof does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. Alternatively, a State, local
governmental body, Federally-recognized Indian Tribe, or agency thereof
may participate as a non-party under 10 CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or
[[Page 7790]]
their counsel or representative) must apply for and receive a digital
ID certificate before adjudicatory documents are filed so that they can
obtain access to the documents via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click ``cancel'' when the
link requests certificates and you will be automatically directed to
the NRC's electronic hearing dockets where you will be able to access
any publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
The table below provides the plant name, docket number, date of
application, ADAMS accession number, and location in the application of
the licensee's proposed NSHC determination. For further details with
respect to these license amendment applications, see the application
for amendment which is available for public inspection in ADAMS and at
the NRC's PDR. For additional direction on accessing information
related to this document, see the ``Obtaining Information and
Submitting Comments'' section of this document.
------------------------------------------------------------------------
------------------------------------------------------------------------
Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit No. 2;
Waterford, CT
------------------------------------------------------------------------
Application Date.................. December 17, 2019.
ADAMS Accession No................ ML19353A022.
Location in Application of NSHC... Attachment 1, Pages 5 and 6.
Brief Description of Amendments... The proposed amendment would revise
Technical Specification (TS) 6.25,
``Pre-Stressed Concrete Containment
Tendon Surveillance Program,'' to
replace the reference to Regulatory
Guide 1.35 with a reference to
Section XI, Subsection IWL of the
American Society of Mechanical
Engineers Boiler and Pressure
Vessel Code. The proposed amendment
would also delete the provisions of
Surveillance Requirement 4.0.2 in
TS 6.25.
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Lillian M. Cuoco, Esq., Senior
Mailing Address. Counsel, Dominion Energy, Inc., 120
Tredegar Street, RS-2, Richmond, VA
23219.
Docket Nos........................ 50-336.
NRC Project Manager, Telephone Richard Guzman, 301-415-1030.
Number.
------------------------------------------------------------------------
DTE Electric Company; Fermi, Unit 2;
Monroe County, MI
------------------------------------------------------------------------
Application Date.................. November 8, 2019.
ADAMS Accession No................ ML19312A110.
Location in Application of NSHC... Pages 22-24, Enclosure 1.
Brief Description of Amendments... The proposed change would revise the
Technical Specifications (TSs) to
increase certain Surveillance
Requirement (SR) intervals from 18
months to 24 months. The proposed
modification to TS 5.5.15 would
also review the requested SR
interval increases in accordance
with NRC Generic Letter 91-04.
Additionally, the submittal also
proposes changes to TS 5.5.7,
``Ventilation Filter Testing
Program,'' and TS 5.5.14, ``Control
Room Envelope Habitability
Program,'' to increase the current
18-month testing intervals to 24
months.
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Jon P. Christinidis, DTE Energy,
Mailing Address. Expert Attorney--Regulatory, 688
WCB, One Energy Plaza, Detroit, MI
48226
Docket Nos........................ 50-341.
NRC Project Manager, Telephone Booma Venkataraman, 301-415-2934.
Number.
------------------------------------------------------------------------
[[Page 7791]]
DTE Electric Company; Fermi, Unit 2;
Monroe County, MI
------------------------------------------------------------------------
Application Date.................. December 6, 2019.
ADAMS Accession No................ ML19340A088.
Location in Application of NSHC... Pages 11-12, Enclosure 1.
Brief Description of Amendments... The proposed change would revise TS
3.6.4.1, ``Secondary Containment,''
Surveillance Requirement (SR)
3.6.4.1.1. The SR would be revised
to allow conditions during which
the secondary containment pressure
may not meet the SR pressure
requirements. In addition, SR
3.6.4.1.3 would be modified to
acknowledge that secondary
containment access openings may be
open for entry and exit when no
movement of recently irradiated
fuel is in progress. An
administrative change is also
requested for SR 3.6.4.1.5.
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Jon P. Christinidis, DTE Energy,
Mailing Address. Expert Attorney--Regulatory, 688
WCB, One Energy Plaza, Detroit, MI
48226.
Docket Nos........................ 50-341.
NRC Project Manager, Telephone Booma Venkataraman, 301-415-2934.
Number.
------------------------------------------------------------------------
Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant,
Units 1 and 2;
Calvert County, MD
------------------------------------------------------------------------
Application Date.................. December 11, 2019.
ADAMS Accession No................ ML19346E536.
Location in Application of NSHC... Pages 12 and 13 of Attachment 1.
Brief Description of Amendments... The proposed amendments would revise
certain frequency and voltage
acceptance criteria for steady-
state emergency diesel generator
surveillance testing in Calvert
Cliffs Technical Specification
3.8.1, ``AC Sources--Operating.''
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Tamra Domeyer, Associate General
Mailing Address. Counsel, Exelon Generation Company,
LLC, 4300 Winfield Road,
Warrenville, IL 60555.
Docket Nos........................ 50-317, 50-318.
NRC Project Manager, Telephone Michael L. Marshall, Jr., 301-415-
Number. 2871.
------------------------------------------------------------------------
Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit
1;
Dauphin County, PA
------------------------------------------------------------------------
Application Date.................. November 12, 2019.
ADAMS Accession No................ ML19316C659.
Location in Application of NSHC... Pages 6, 7, and 8 of Attachment 1.
Brief Description of Amendments... The proposed amendment would delete
permanently defueled Technical
Specification (TS) 3/4.1.4,
``Handling of Irradiated Fuel with
the Fuel Handling Building Crane,''
once the replacement fuel handling
building crane is installed and
made operable. The proposed
amendment would also correct two
minor omissions that are
administrative in nature, which
were identified during
implementation of Three Mile Island
Nuclear Station, Unit 1,
permanently defueled TS Amendment
No. 297. The proposed changes would
revise the Appendix A, TSs, List of
Figures, to include Figure 5-1,
``Extended Plot Plan,'' and add the
proper page number, 5-1a, to
permanently defueled TS Figure 5-
1a.
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Tamra Domeyer, Associate General
Mailing Address. Counsel, Exelon Generation Company,
LLC, 4300 Winfield Road,
Warrenville, IL 60555.
Docket Nos........................ 50-289.
NRC Project Manager, Telephone Justin Poole, 301-415-2048.
Number.
------------------------------------------------------------------------
FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant, Unit
1;
Lake County, OH
------------------------------------------------------------------------
Application Date.................. December 18, 2019.
ADAMS Accession No................ ML19352D673.
Location in Application of NSHC... Pages 3-4, Enclosure 1.
Brief Description of Amendments... The proposed amendment would revise
the technical specifications for
the safety limit on minimum
critical power ratio (MCPR) to
reduce the need for cycle-specific
changes in accordance with
Technical Specification Task Force
(TSTF)-564, ``Safety Limit MCPR.''
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Rick Giannantonio, General Counsel,
Mailing Address. FirstEnergy Corporation, Mail Stop
A-GO-15, 76 South Main Street,
Akron, OH 44308.
Docket Nos........................ 50-440.
NRC Project Manager, Telephone Scott Wall, 301-415-2855.
Number.
------------------------------------------------------------------------
FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant, Unit
1;
Lake County, OH
------------------------------------------------------------------------
Application Date.................. December 18, 2019.
ADAMS Accession No................ ML19352D548.
Location in Application of NSHC... Pages 10-11, Enclosure 1.
Brief Description of Amendments... FirstEnergy Nuclear Operating
Company, Perry Nuclear Power Plant,
Unit 1, Lake County, OH.
[[Page 7792]]
Proposed Determination............ The proposed amendment would modify
the non-destructive examination
inspection interval for refueling
special lifting devices from
annually, or prior to each use,
typically at each refueling outage,
to a 10-year interval.
Name of Attorney for Licensee, Rick Giannantonio, General Counsel,
Mailing Address. FirstEnergy Corporation, Mail Stop
A-GO-15, 76 South Main Street,
Akron, OH 44308.
Docket Nos........................ 50-440.
NRC Project Manager, Telephone Scott Wall, 301-415-2855.
Number.
------------------------------------------------------------------------
FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant, Unit
1;
Lake County, OH
------------------------------------------------------------------------
Application Date.................. December 18, 2019.
ADAMS Accession No................ ML19352E549.
Location in Application of NSHC... Pages 15-17, Enclosure 1.
Brief Description of Amendments... The proposed amendment would revise
the fire protection program
licensing basis and abandon in
place the general area heat
detection system in the drywell.
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Rick Giannantonio, General Counsel,
Mailing Address. FirstEnergy Corporation, Mail Stop
A-GO-15, 76 South Main Street,
Akron, OH 44308.
Docket Nos........................ 50-440.
NRC Project Manager, Telephone Scott Wall, 301-415-2855.
Number.
------------------------------------------------------------------------
Nine Mile Point Nuclear Station and Exelon Generation Company, LLC; Nine
Mile Point Nuclear Station, Unit 2;
Oswego County, NY
------------------------------------------------------------------------
Application Date.................. October 31, 2019.
ADAMS Accession No................ ML19304B653.
Location in Application of NSHC... Attachment 1, Pages 5 and 6.
Brief Description of Amendments... The proposed amendment would allow
the use of risk-informed completion
times in the Nine Mile Point, Unit
2, Technical Specifications. The
proposed changes are based on
Technical Specifications Task Force
Traveler, TSTF-505, Revision 2,
``Provide Risk-Informed Extended
Completion Times--RITSTF Initiative
4b'' (ADAMS Accession No.
ML18183A493).
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Jason Zorn, Associate General
Mailing Address. Counsel, Exelon Generation Company,
LLC, 101 Constitution Ave. NW,
Suite 400, Washington, DC 20001.
Docket Nos........................ 50-410.
NRC Project Manager, Telephone Michael L. Marshall, Jr., 301-415-
Number. 2871.
------------------------------------------------------------------------
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1
and 2;
Surry County, VA
------------------------------------------------------------------------
Application Date.................. October 30, 2019.
ADAMS Accession No................ ML19309D199.
Location in Application of NSHC... Pages 19, 20, and 21 of Attachment
1.
Brief Description of Amendments... The proposed amendment would revise
the Technical Specification 3.16,
``Emergency Power System,'' to
allow a one-time 14-day allowed
outage time for replacement of the
Reserve Station Service Transformer
C 5KV cables to Transfer Bus F.
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Lillian M. Cuoco, Esq., Senior
Mailing Address. Counsel, Dominion Energy, Inc., 120
Tredegar Street, RS-2, Richmond, VA
23219.
Docket Nos........................ 50-280, 50-281.
NRC Project Manager, Telephone Thomas Vaughn, 301-415-5897.
Number.
------------------------------------------------------------------------
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1
and 2;
Surry County, VA
------------------------------------------------------------------------
Application Date.................. December 6, 2019.
ADAMS Accession No................ ML19343A019.
Location in Application of NSHC... Pages 25 and 26 of Enclosure 1.
Brief Description of Amendments... The proposed amendments would modify
the current licensing basis by the
addition of a license condition to
allow the implementation of the
provisions of Title 10 of the Code
of Federal Regulations (10 CFR)
Section 50.69, ``Risk-Informed
Categorization and Treatment of
Structures, Systems and Components
for Nuclear Power Reactors.''
Proposed Determination............ NSHC.
Name of Attorney for Licensee, Lillian M. Cuoco, Esq., Senior
Mailing Address. Counsel, Dominion Energy, Inc., 120
Tredegar Street, RS-2, Richmond, VA
23219.
Docket Nos........................ 50-280, 50-281.
NRC Project Manager, Telephone Thomas Vaughn, 301-415-5897.
Number.
------------------------------------------------------------------------
[[Page 7793]]
III. Notice of Issuance of Amendments to Facility Operating Licenses
and Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed NSHC
determination, and opportunity for a hearing in connection with these
actions, was published in the Federal Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action, see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation, and/or Environmental Assessment as
indicated. All of these items can be accessed as described in the
``Obtaining Information and Submitting Comments'' section of this
document.
------------------------------------------------------------------------
------------------------------------------------------------------------
Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit Nos. 2
and 3;
New London County, WI, Virginia Electric and Power Company, Dominion
Nuclear Company; North Anna Power Station, Units 1 and 2; Louisa County,
VA,
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1
and 2;
Surry County, VA
------------------------------------------------------------------------
Date Issued....................... December 31, 2019.
ADAMS Accession No................ ML19305D248.
Amendment Nos..................... 119 (Millstone Unit 1), 336
(Millstone Unit 2), 274 (Millstone
Unit 3), 284 (North Anna Unit 1),
267 (North Anna Unit 2), 296 (Surry
Unit 1), and 296 (Surry Unit 2).
------------------------------------------------------------------------
Florida Power & Light Company, et al; St. Lucie Plant, Unit Nos. 1 and
2;
St. Lucie County, FL
------------------------------------------------------------------------
Date Issued....................... January 27, 2020.
ADAMS Accession No................ ML19266A072.
Amendment Nos..................... 250 (Unit 1) and 202 (Unit 2).
Brief Description of Amendments... The amendments revised the technical
specifications to allow for the
performance of selected emergency
diesel generator surveillance
requirements during power operation
and relocated two surveillance
requirements, for each unit, to
licensee control.
Docket Nos........................ 50-335, 50-389.
------------------------------------------------------------------------
Omaha Public Power District; Fort Calhoun Station, Unit No. 1;
Washington County, NE
------------------------------------------------------------------------
Date Issued....................... January 10, 2020.
ADAMS Accession No................ ML19346D680.
Amendment Nos..................... 300.
Brief Description of Amendments... The amendment replaced the Fort
Calhoun Station Permanently
Defueled Emergency Plan and
associated Permanently Defueled
Emergency Action Level (EAL)
technical bases document with an
Independent Spent Fuel Storage
Installation Only Emergency Plan
and associated EAL scheme.
Docket Nos........................ 50-285.
------------------------------------------------------------------------
PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2;
Salem County, NJ
------------------------------------------------------------------------
Date Issued....................... January 14, 2020.
ADAMS Accession No................ ML19330F156.
Amendment Nos..................... 331 (Unit 1) and 312 (Unit 2).
Brief Description of Amendments... The amendments adopted Technical
Specifications Task Force (TSTF)
Traveler TSTF-563, Revision 0,
``Revise Instrument Testing
Definitions to Incorporate the
Surveillance Frequency Control
Program.'' TSTF-563 revised the
technical specification definitions
of ``channel calibration'' and
``channel functional test.''
Docket Nos........................ 50-272, 50-311.
------------------------------------------------------------------------
Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
Susquehanna Steam Electric Station, Units 1 and 2; Susquehanna County,
PA
------------------------------------------------------------------------
Date Issued....................... January 13, 2020.
ADAMS Accession No................ ML19336D064.
Amendment Nos..................... 274 (Unit 1) and 256 (Unit 2).
Brief Description of Amendments... The amendments revised the technical
specification definition of
``shutdown margin'' based on
Technical Specifications Task Force
Traveler, TSTF-535, Revision 0,
``Revise Shutdown Margin Definition
to Address Advanced Fuel Designs.''
Docket Nos........................ 50-387, 50-388.
------------------------------------------------------------------------
[[Page 7794]]
Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
Susquehanna Steam Electric Station, Units 1 and 2; Susquehanna County,
PA
------------------------------------------------------------------------
Date Issued....................... January 17, 2020.
ADAMS Accession No................ ML19248A844.
Amendment Nos..................... 275 (Unit 1) and 257 (Unit 2).
Brief Description of Amendments... The amendments revised requirements
in Technical Specification (TS)
3.7.1, ``Residual Heat Removal
Service Water (RHRSW) System and
the Ultimate Heat Sink (UHS),'' and
TS 3.7.2, ``Emergency Service Water
(ESW) System,'' to temporarily
allow one division of the ESW and
RHRSW systems to be inoperable for
a total of 14 days to address
piping degradation. The changes are
temporary as annotated by a note in
each TS that specifies that the
allowance expires on June 25, 2027
for Susquehanna Unit 1 and June 25,
2026 for Unit 2. The amendments
also removed the tables of contents
from the TSs and placed them under
licensee control.
Docket Nos........................ 50-387, 50-388.
------------------------------------------------------------------------
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Units 1
and 2;
Berrien County, MI
------------------------------------------------------------------------
Date Issued....................... January 23, 2020.
ADAMS Accession No................ ML19329A011.
Amendment Nos..................... 349 (Unit No. 1) and 330 (Unit No.
2).
Brief Description of Amendments... The amendments revised the Donald C.
Cook Nuclear Plant (CNP), Unit Nos.
1 and 2, Technical Specifications
(TSs) to apply leak-before-break
methodology to the piping
associated with the CNP, Unit No.
2, accumulator, residual heat
removal system, and safety
injection systems and changed CNP,
Unit No. 2, TS 3.4.13, ``RCS
[Reactor Coolant System]
Operational LEAKAGE,'' to change
the value for unidentified leakage
from 1 gallon per minute (gpm) to
0.8 gpm. The amendments also
revised the CNP, Unit Nos. 1 and 2,
TS 3.4.15, ``RCS Leakage Detection
Instrumentation,'' to delete the
reference to the containment
humidity monitor.
Docket Nos........................ 50-315, 50-316.
------------------------------------------------------------------------
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
Plant,
Units 3 and 4; Burke County, GA
------------------------------------------------------------------------
Date Issued....................... January 8, 2020.
ADAMS Accession No................ ML19343C013.
Amendment Nos..................... 172 (Unit 3) and 170 (Unit 4).
Brief Description of Amendments... The amendments consisted of changes
to the Combined License Appendix A,
Technical Specifications (TS)
3.7.11, ``Spent Fuel Pool Boron
Concentration, Applicability and
Required Actions,'' to eliminate an
allowance to exit the Applicability
of Limiting Condition for Operation
3.7.11, ``Spent Fuel Pool Boron
Concentration,'' once a spent fuel
pool storage verification had been
performed. The amendments also
eliminated TS 3.7.11 Required
Action A.2.2, which provided an
option to perform a spent fuel pool
storage verification in lieu of
restoring spent fuel pool boron
concentration to within limits.
Docket Nos........................ 52-025 and 52-026
------------------------------------------------------------------------
IV. Previously Published Notice of Consideration of Issuance of
Amendments to Facility Operating Licenses and Combined Licenses,
Proposed No Significant Hazards Consideration Determination, and
Opportunity for a Hearing
The following notices were previously published as separate
individual notices. The notice content was the same as above. They were
published as individual notices either because time did not allow the
commission to wait for this biweekly notice or because the action
involved exigent circumstances. They are repeated here because the
biweekly notice lists all amendments issued or proposed to be issued
involving no significant hazards consideration.
For details, including the applicable notice period, see the
individual notice in the Federal Register on the day and page cited.
------------------------------------------------------------------------
------------------------------------------------------------------------
Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 3, LLC;
Indian Point Nuclear Generating Station, Unit No. 3; Westchester County,
NY
------------------------------------------------------------------------
Application Date.................. November 21, 2019.
ADAMS Accession No................ ML19325E913.
Brief Description of Amendment.... The proposed amendment would revise
Technical Specification (TS)
Surveillance Requirement 3.7.7.2 to
allow one of the backflow preventer
isolation valves on the Indian
Point Unit 3 city water header
supply to be maintained closed when
in the modes of applicability for
TS Limiting Condition for Operation
(LCO) 3.7.7 (i.e., during Modes 1,
2, and 3, and Mode 4 when the steam
generators are relied upon for heat
removal), provided that the
requirements of TS LCO 3.7.6 are
met.
Date & Cite of Federal Register January 17, 2020, 85 FR 3081.
Individual Notice.
Expiration Dates for Public February 18, 2020 (comments); March
Comments & Hearing Requests. 17, 2020 (hearing requests).
Docket Nos........................ 50-286.
------------------------------------------------------------------------
[[Page 7795]]
Dated at Rockville, Maryland, this 30th day of January 2020.
For the Nuclear Regulatory Commission.
Gregory F. Suber,
Deputy Director, Division of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.