DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. UL20-1-000]
Northern States Power Company--Wisconsin: Notice of Pending
Jurisdictional Inquiry and Soliciting Comments, Protests, and Motions
To Intervene
On December 30, 2019, and supplemented on January 22, 2020,
Northern States Power Company--Wisconsin filed a preliminary
application document (PAD) and notice of intent to file a license
application for the Saxon Falls and Superior Falls Hydroelectric
Projects (FERC Project Nos. 2610 and 2587, respectively). Commission
staff's review of the PAD found information stating that the Gile
Flowage was created to augment river flows in the Montreal River during
the summer and winter low-flow periods at the downstream Saxon Falls
and Superior Falls Projects, and that both projects depend on flow
augmentation from Gile Flowage during these periods. The Gile Flowage
is in Iron County, Wisconsin. As a result, the Commission is beginning
a review of the Gile Flowage to determine whether it is subject to the
Commission's mandatory licensing jurisdiction under section 23 of the
Federal Power Act (FPA).
Pursuant to section 23(b)(1) of the FPA, 16 U.S.C. 817(1) (2018), a
non-federal hydroelectric project must be licensed (unless it has a
still-valid pre-1920 federal permit) if it: (1) Is located on a
navigable water of the United States, (2) occupies lands or
reservations of the United States, (3) uses the surplus water or water
power from a government dam; or (4) is located on a stream over which
Congress has Commerce Clause jurisdiction, is constructed or modified
on or after August 26, 1935, and affects the interests of interstate or
foreign commerce.
Section 4(e) of the FPA authorizes the Commission to issue licenses
for hydroelectric project works, including reservoirs. Section 23(b)(1)
of the FPA requires (with exceptions not relevant here) a Commission
license for the operation of non-federal hydroelectric project works,
including reservoirs, that are used to generate electric power on any
navigable waters of the United States. Storage reservoirs that are not
directly connected to other project works must be licensed if they are
necessary or appropriate in the maintenance and operation of a complete
unit of hydropower improvement or development. The Commission makes
this finding by examining the facts in each case, considering the
reservoir's effect on downstream generation and its storage capacity,
location, and purpose, to determine if there are significant generation
benefits to a downstream project or projects. The Commission has found,
and the D.C. Circuit has affirmed, that a contribution to downstream
electric generation of at least 2 percent amounts to a significant
generation benefit.\1\
---------------------------------------------------------------------------
\1\ See Domtar Maine Corp., Inc. v. FERC, 347 F.3d 304, 309
(D.C. Cir. 2003); Chippewa and Flambeau Improvement Co. v. FERC, 325
F.3d 353 (D.C. Cir. 2003).
---------------------------------------------------------------------------
The Commission is soliciting comments, motions to intervene, and
protests in these proceedings. Comments, motions to intervene, and
protests must be filed by thirty (30) days from notice or March 2,
2020. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules and Practice and
Procedure, 18 CFR 385.210, 211, and 214. In determining the appropriate
action to take, the Commission will consider all protests or comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date.
The Commission strongly encourages electronic filing. Please file
comments, protests, and motions to intervene using the Commission's
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number UL20-1-000.
For further information, please contact Jennifer Polardino at (202)
502-6437 or [email protected].
Dated: January 31, 2020.
Kimberly D. Bose,
Secretary.