[Federal Register Volume 84, Number 207 (Friday, October 25, 2019)]
[Notices]
[Pages 57409-57410]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-23325]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2413-126]


Georgia Power Company; Notice of Application Accepted for Filing, 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Federal Energy Regulatory Commission and is available 
for public inspection:

    a. Type of Application: Non-Project Use of Project lands and 
Waters--Sand Mine.
    b. Project No.: 2413-126.
    c. Date Filed: August 30, 2019.
    d. Applicant: Georgia Power Company (licensee).
    e. Name of Project: Wallace Pumped Storage Hydroelectric Project.
    f. Location: The proposed non-project sand mine is located in the 
northern

[[Page 57410]]

part of Lake Oconee, the project reservoir, in Greene County, Georgia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Herbie Johnston, Hydro General Manager, 600 
North 18th Street, Bin 16N-8180, Birmingham, AL 35203.
    i. FERC Contact: Michael Calloway at (202) 502-8041 or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, and comments using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. The first page of any filing should 
include docket number P-2413-126.
    k. Description of Request: The license filed a request to permit a 
non-project use of project lands and waters to allow River Sand 
Incorporated to dredge throughout an approximately 2-mile stretch of 
the upper project reservoir in Greene County, Georgia for the purposes 
of commercial sand mining. The sorting area will be located on 6 acres 
of privately-owned land within the project boundary that the licensee 
has flowage rights over. The mine operator expects the year round 
operation of the sand mine will extract 5,000 to 25,000 tons of 
sediment per year. The operation will not be conducted on U.S. Forest 
Service Land.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call (866) 208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS; PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to the non-project use 
application. Agencies may obtain copies of plans directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: October 21, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-23325 Filed 10-24-19; 8:45 am]
 BILLING CODE 6717-01-P