NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-280 and 50-281; NRC-2018-0280]
Virginia Electric and Power Company; Dominion Energy Virginia:
Surry Power Station, Unit Nos. 1 and 2
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft supplemental environmental impact statement; request for
comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for
public comment draft plant-specific Supplement 6, Second Renewal, to
the Generic Environmental Impact Statement (GEIS) for License Renewal
of Nuclear Plants, NUREG-1437, regarding the subsequent renewal of
Facility Operating License Nos. DPR-32 and DPR-37 for an additional 20
years of operation for Surry Power Station, Unit Nos. 1 and 2 (Surry).
The Surry facility is located in Surry County, Virginia. Possible
alternatives to the proposed action (subsequent license renewal)
include no action and reasonable replacement power alternatives.
DATES: The staff will hold a webinar on the draft Environmental Impact
Statement in November, including a presentation on the preliminary
findings and a transcribed public comment session. The webinar details
will be announced in the near future. Submit either electronic or
written comments by December 10, 2019. Comments received after this
date will be considered, if it is practical to do so, but the NRC is
able to ensure consideration only for comments received on or before
this date.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0280. Address
questions about NRC docket IDs to Anne Frost; telephone: 301-287-9232;
email: [email protected]. For technical questions, contact the
individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, ATTN: Program Management, Announcements and Editing Staff,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Tam Tran, Office of Nuclear Material
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001; telephone: 301-415-3617; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2018-0280 when contacting the NRC
about
[[Page 56489]]
the availability of information regarding this document. You may obtain
publicly-available information related to this document by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0280.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that the document is referenced here.
Draft plant-specific Supplement 6, Second Renewal, to the GEIS for
License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS
under Accession No. ML19274C676.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
Library: A copy of draft plant-specific Supplement 6,
Second Renewal, to the GEIS for License Renewal of Nuclear Plants,
NUREG-1437, is available at the following location: Williamsburg
Regional Library, 515 Scotland St., Williamsburg, VA 23185.
B. Submitting Comments
Please include Docket ID NRC-2018-0280 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed. The NRC will post all comment submissions at https://www.regulations.gov/ as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Discussion
The NRC is issuing for public comment draft plant-specific
Supplement 6, Second Renewal, to the GEIS for License Renewal of
Nuclear Plants, NUREG-1437, regarding the subsequent renewal of
Facility Operating License Nos. DPR-32 and DPR-37 for an additional 20
years of operation for Surry, Unit Nos. 1 and 2. Draft plant-specific
Supplement 6, Second Renewal, to the GEIS includes the preliminary
analysis that evaluates the environmental impacts of the proposed
action and alternatives to the proposed action. The NRC's preliminary
recommendation is that the adverse environmental impacts of subsequent
license renewal for Surry are not so great that preserving the option
of subsequent license renewal for energy-planning decisionmakers would
be unreasonable.
Dated at Rockville, Maryland, this 17th day of October 2019.
For the Nuclear Regulatory Commission.
John Tappert,
Director, Division of Rulemaking, Environmental, and Financial Support,
Office of Nuclear Material Safety and Safeguards.