Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications;
Premium Energy Holdings, LLC
On May 9, 2019, Premium Energy Holdings, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Intermountain
Pumped Storage Project (Intermountain Project or project) to be located
on the Sevier River and Fool Creek, near the city of Delta, Millard
County, Utah. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would be a closed-loop pumped storage
hydropower facility. The applicant proposes three alternative upper
reservoirs: Dry Fork Reservoir, Mill Canyon Reservoir, or Williams
Reservoir. The proposed DMAD 2 Reservoir would be the lower reservoir
for each alternative.
Upper Reservoir Alternative 1: Dry Fork Reservoir
The Dry Fork Reservoir alternative consists of: (1) A 277-acre
upper reservoir having a total storage capacity of 39,612 acre-feet at
a normal maximum operating elevation of 6,200 feet mean sea level
(msl); (2) a 370-foot-high, 2,637-foot-long roller compacted concrete
upper reservoir dam; (3) a 1.2-mile-long, 38-foot-diameter concrete-
lined headrace tunnel; (4) a 0.16-mile-long, 34-foot-diameter concrete-
lined vertical shaft; (5) a 7.05-mile-long, 34-foot-diameter concrete-
lined horizontal tunnel; (6) five 0.10-mile-long, 22-foot-diameter
steel penstocks; (7) a 500-foot-long, 125-foot-wide, 150-foot-high
concrete-lined powerhouse located in an underground cavern, housing
five pump-turbine generator-motor units rated for 400 megawatts (MW)
each; and (8) a 1.2-mile-long, 40-foot-diameter concrete-lined tailrace
tunnel discharging into the proposed DMAD 2 Reservoir.
[[Page 51533]]
Upper Reservoir Alternative 2: Mill Canyon Reservoir
The Mill Canyon Reservoir alternative consists of: (1) A 210-acre
upper reservoir having a total storage capacity of 30,344 acre-feet at
a normal maximum operating elevation of 6,600 feet msl; (2) a 385-foot-
high, 2,223-foot-long roller compacted concrete upper reservoir dam;
(3) a 1.15-mile-long, 34-foot-diameter concrete-lined headrace tunnel;
(4) a 0.28-mile-long, 30-foot-diameter concrete-lined vertical shaft;
(5) a 7.6-mile-long, 30-foot-diameter concrete-lined horizontal tunnel;
(6) five 0.15-mile-long, 19-foot-diameter steel penstocks; (7) a 500-
foot-long, 125-foot-wide, 150-foot-high concrete-lined powerhouse
located in an underground cavern, housing five pump-turbine generator-
motor units rated for 400 MW each; and (8) a 1.7-mile-long, 36-foot-
diameter concrete-lined tailrace tunnel discharging into the proposed
DMAD 2 Reservoir.
Upper Reservoir Alternative 3: Williams Reservoir
The Williams Reservoir alternative consists of: (1) A 180-acre
upper reservoir having a total storage capacity of 28,063 acre-feet at
a normal maximum operating elevation of 7,140 feet msl; (2) a 475-foot-
high, 1,850-foot-long roller compacted concrete upper reservoir dam;
(3) a 1.1-mile-long, 30-foot-diameter concrete-lined headrace tunnel;
(4) a 0.4-mile-long, 27-foot-diameter concrete-lined vertical shaft;
(5) a 10.05-mile-long, 27-foot-diameter concrete-lined horizontal
tunnel; (6) five 0.10-mile-long, 17-foot-diameter steel penstocks; (7)
a 500-foot-long, 125-foot-wide, 150-foot-high concrete-lined powerhouse
located in an underground cavern, housing five pump-turbine generator-
motor units rated for 400 mW each; and (8) a 2.3-mile-long, 32-foot-
diameter concrete-lined tailrace tunnel discharging into the proposed
DMAD 2 Reservoir.
Lower Reservoir: DMAD 2 Reservoir
The proposed DMAD 2 Reservoir would consist of: (1) A 3,186-acre
lower reservoir having a total storage capacity 48,915 acre-feet at a
normal maximum operating elevation of 4,700 feet msl; and (2) a 45-
foot-high, 2,142-foot-long roller compacted concrete lower reservoir
dam.
Interconnection
For each upper reservoir alternative, project power would be
transmitted to the grid via: (1) Two new, approximately 11-mile-long,
345 kilovolt (kV) transmission lines extending from the powerhouse to
the existing Intermountain AC switchyard owned by Intermountain Power
(the point of interconnection); and (2) appurtenant facilities. The
estimated annual generation of the Intermountain Project under each of
the alternatives would be 6,900 gigawatt-hours.
Applicant Contact: Victor M. Rojas, Managing Director, Premium
Energy Holdings, LLC, 355 South Lemon Avenue, Suite A, Walnut,
California 91789; phone: (909) 595-5314.
FERC Contact: Kyle Olcott; phone: (202) 502-8963.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14993-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14993) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21142 Filed 9-27-19; 8:45 am]