[Federal Register Volume 84, Number 184 (Monday, September 23, 2019)]
[Notices]
[Pages 49723-49724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20506]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-509-000]


Texas Eastern Transmission, LP; Notice of Application

    Take notice that on September 4, 2019, Texas Eastern Transmission, 
LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed 
in Docket No. CP19-509-000 an application pursuant to section 7(c) of 
the Natural Gas Act (NGA) requesting a certificate of public 
convenience and necessity to excavate, elevate, and replace certain 
segments of four different natural gas pipelines (Lines 10, 15, 25, and 
30) and appurtenant facilities located in Marshall County, West 
Virginia. The Marshall County Mine Panel 19E Project is designed to 
maintain the safe and efficient operation of Texas Eastern's pipeline 
facilities at certificated design capacities for the duration of 
planned longwall mining activities in the area beneath Texas Eastern's 
pipelines. Texas Eastern estimates the cost of the project to be 
approximately $38 million and proposes to re-install the pipeline 
belowground after subsidence has stabilized and the 2020-2021 heating 
season has ended, all as more fully described in the application which 
is on file with the Commission and open to public inspection.
    The filing is available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's website web at 
http://www.ferc.gov using the eLibrary link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to Lisa 
A. Connolly, Director, Rates and Certificates, Texas Eastern 
Transmission, LP, P.O. Box 1642 Houston, Texas 77251-1642, by telephone 
at (713) 627-4102, or by email [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list

[[Page 49724]]

maintained by the Secretary of the Commission and will receive copies 
of all documents filed by the applicant and by all other parties. A 
party must submit 3 copies of filings made in the proceeding with the 
Commission and must provide a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commenters will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new Natural Gas Act 
section 3 or section 7 proceeding.\1\ Persons desiring to become a 
party to a certificate proceeding are to intervene in a timely manner. 
If seeking to intervene out-of-time, the movant is required to show 
good cause why the time limitation should be waived, and should provide 
justification by reference to factors set forth in Rule 214(d)(1) of 
the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 
50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on October 8, 2019.

    Dated: September 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-20506 Filed 9-20-19; 8:45 am]
 BILLING CODE 6717-01-P