FY 2019 Competitive Funding Opportunity: Pilot Program for 
Transit-Oriented Development Planning

AGENCY: Federal Transit Administration (FTA), DOT.

ACTION: Notice of Funding Opportunity (NOFO).

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) announces the 
opportunity to apply for approximately $19.19 million of funding under 
the Pilot Program for Transit-Oriented Development Planning (Catalog of 
Federal Domestic Assistance #20.500). As required by federal transit 
law and subject to funding availability, funds will be awarded 
competitively to support comprehensive planning associated with new 
fixed guideway and core capacity improvement projects.

DATES: Complete proposals must be submitted electronically through the 
GRANTS.GOV ``APPLY'' function by 11:59 p.m. EDT November 18, 2019. 
Prospective applicants should initiate the process by registering on 
the GRANTS.GOV website promptly to ensure completion of the application 
process before the submission deadline. Instructions for applying can 
be found on FTA's website at https://www.transit.dot.gov/TODPilot and 
in the ``FIND'' module of GRANTS.GOV. The GRANTS.GOV funding 
opportunity ID is FTA-2019-010-TPE. Mail and fax submissions will not 
be accepted.

FOR FURTHER INFORMATION CONTACT: Ken Cervenka, FTA Office of Planning 
and Environment, (202) 493-0512, or [email protected]. A TDD is 
available at 1-800-877-8339 (TDD/FIRS).

SUPPLEMENTARY INFORMATION: 

Table of Contents

A. Program Description
B. Federal Award Information
C. Eligibility Information
D. Application and Submission Information
E. Application Review Information
F. Federal Award Administration Information
G. Federal Awarding Agency Contacts
H. Technical Assistance and Other Program Information
    Appendix A: Registration in SAM and GRANTS.GOV

A. Program Description

    Section 20005(b) of the Moving Ahead for Progress in the 21st 
Century Act (MAP-21; Pub. L. 112-141, July 6, 2012), with funding 
authorized by 49 U.S.C. 5338(a)(2)(B), authorizes FTA to award funds 
under the Pilot Program for Transit-Oriented Development (TOD) Planning 
(TOD Pilot Program) through a competitive process, as described in this 
notice, to local communities to integrate land use and transportation 
planning with a new fixed guideway or core capacity improvement transit 
capital project as defined in Federal transit statute. (See section C 
of this NOFO for more information about eligibility.)
    As outlined in MAP-21, the TOD Pilot Program is intended to fund 
comprehensive planning that supports economic development, ridership, 
multimodal connectivity and accessibility, increased transit access for 
pedestrian and bicycle traffic, and mixed-use development near transit 
stations. The TOD Pilot Program also encourages identification of 
infrastructure needs and engagement with the private sector.
    Consistent with direction in MAP-21, FTA is seeking comprehensive 
planning projects covering an entire transit capital project corridor, 
rather than proposals that involve planning for individual station 
areas or only a small section of the corridor. To ensure any proposed 
planning work reflects the needs and aspirations of the local community 
and results in concrete, specific deliverables and outcomes, transit 
project sponsors must partner with entities with land use planning 
authority in the transit project corridor to conduct the planning work.

B. Federal Award Information

    Federal transit law authorizes FTA to make grants for eligible 
comprehensive planning projects under Section 20005(b) of MAP-21, with 
funding authorized by 49 U.S.C. 5338(a)(2)(B). FTA intends to award all 
available funding to selected applicants responding to this NOFO.
    Only proposals from eligible recipients for eligible activities 
will be considered for funding. FTA anticipates minimum grant awards of 
$250,000 and maximum grant awards of $2,000,000.

C. Eligibility Information

1. Eligible Applicants

    Applicants under the TOD Pilot Program must be FTA grantees (i.e., 
existing direct and designated recipients) as of the publication date 
of this NOFO. An applicant must either be the project sponsor of an 
eligible transit capital project as defined below in section C, 
subsection 3 or an entity with land use planning authority in an 
eligible transit capital project corridor. Except in cases where an 
applicant is both the sponsor of an eligible transit

[[Page 49176]]

project and has land use authority in at least a portion of the transit 
project corridor, the transit project sponsor and at least one entity 
in the project corridor with land use planning authority must partner 
on the proposed comprehensive planning project. Documentation of this 
partnership must be included with the application; see section D, 
subsection 2 of this NOFO for further information.
    Only one application per transit capital project corridor may be 
submitted to FTA. Multiple applications submitted for a single transit 
capital project corridor indicate that partnerships are not in place 
and FTA will reject all of the applications.

2. Cost Sharing or Matching

    The maximum Federal funding share is 80 percent.
    Eligible sources of local match include the following: cash from 
non-Government sources other than revenues from providing public 
transportation services; revenues derived from the sale of advertising 
and concessions; amounts received under a service agreement with a 
State or local social service agency or private social service 
organization; revenues generated from value capture financing 
mechanisms; or funds from an undistributed cash surplus; replacement or 
depreciation cash fund or reserve; or new capital. In-kind 
contributions are permitted. Transportation Development Credits 
(formerly referred to as Toll Revenue Credits) may not be used to 
satisfy the local match requirement. FTA may prioritize projects 
proposed with a higher non-Federal share.

3. Other Eligibility Criteria

i. Eligible Transit Projects
    Any comprehensive planning work proposed for funding under the TOD 
Pilot Program must be associated with an eligible transit capital 
project. Although not required to be part of the Capital Investment 
Grant program, to be eligible, the proposed transit capital project 
must be a new fixed guideway project or a core capacity improvement 
project as defined in Section 5309(a) of title 49, United States Code.
    A fixed guideway is a public transportation facility:
    (A) using and occupying a separate right-of-way for the exclusive 
use of public transportation;
    (B) using rail;
    (C) using a fixed catenary system;
    (D) for a passenger ferry system; or
    (E) for a bus rapid transit system.
    A new fixed guideway capital project is defined in statute to be:
    (A) a new fixed guideway project that is a minimum operable segment 
or extension to an existing fixed guideway system; or
    (B) a fixed guideway bus rapid transit project that is a minimum 
operable segment or an extension to an existing bus rapid transit 
system.
    A fixed guideway bus rapid transit project is defined more 
specifically in statute as a bus capital project:
    (A) In which the majority of the project operates in a separated 
right-of-way dedicated for public transportation use during peak 
periods;
    (B) that represents a substantial investment in a single route in a 
defined corridor or subarea; and
    (C) that includes features that emulate the services provided by 
rail fixed guideway public transportation systems, including:
    (i) Defined stations;
    (ii) traffic signal priority for public transportation vehicles;
    (iii) short headway bidirectional services for a substantial part 
of weekdays and weekend days; and
    (iv) any other features the Secretary may determine are necessary 
to produce high-quality public transportation services that emulate the 
services provided by rail fixed guideway public transportation systems.
    A core capacity improvement project is defined in statute as a 
substantial corridor-based capital investment in an existing fixed 
guideway system that increases the capacity of the corridor by not less 
than 10 percent. The term does not include project elements designed to 
maintain a state of good repair of the existing fixed guideway system.
    Comprehensive planning work in a corridor for a transit capital 
project that does not meet the statutory definition above of either a 
new fixed guideway project or a core capacity improvement project is 
not eligible under the TOD Pilot Program.
ii. Eligible Activities
    Any comprehensive planning efforts funded under the TOD Pilot 
Program must address all six aspects of the general authority 
stipulated in Section 20005(b)(2) of MAP-21:
    i. Enhances economic development, ridership, and other goals 
established during the project development and engineering processes;
    ii. facilitates multimodal connectivity and accessibility;
    iii. increases access to transit hubs for pedestrian and bicycle 
traffic;
    iv. enables mixed-use development;
    v. identifies infrastructure needs associated with the eligible 
project; and
    vi. includes private sector participation.
    MAP-21 also requires the comprehensive planning effort to advance 
the metropolitan planning organization's metropolitan transportation 
plan. Further, MAP-21 requires applicants to establish performance 
criteria for the comprehensive planning effort.
    Following are examples of the types of substantial deliverables 
that may result from the comprehensive planning work. Substantial 
deliverables are reports, plans and other materials that represent the 
key accomplishments of the comprehensive planning effort and that must 
be submitted to FTA as each is completed. Substantial deliverables may 
include, but are not restricted to, the following:
    i. A comprehensive plan report that includes corridor development 
policies and station development plans, a proposed timeline, and 
recommended financing strategies for these plans;
    ii. A strategic plan report that includes corridor specific 
planning strategies and program recommendations to support 
comprehensive planning;
    iii. Revised TOD-focused zoning codes and/or resolutions;
    iv. A report evaluating and recommending financial tools to 
encourage TOD implementation such as land banking, value capture, and 
development financing;
    v. Policies to encourage TOD, including actions that reduce 
regulatory barriers that unnecessarily raise the costs of housing 
development or impede the development of affordable housing; and/or
    vi. Local or regional resolutions to implement TOD plans and/or 
establish TOD funding mechanisms.
iii. Ineligible Activities
    Applications should not include the following activities:
    i. TOD planning work in a single transit capital project station 
area;
    ii. Transit project development activities that would be 
reimbursable under an FTA capital grant, such as project planning, the 
design and engineering of stations and other facilities, environmental 
analyses needed for the transit capital project, or costs associated 
with specific joint development activities;
    iii. Capital projects, such as land acquisition, construction, and 
utility relocation; and
    iv. Site- or parcel-specific planning, such as the design of 
individual structures.

[[Page 49177]]

D. Application and Submission Information

1. Address

    Applications must be submitted electronically through GRANTS.GOV. 
General information for submitting applications through GRANTS.GOV can 
be found at https://www.transit.dot.gov/funding/grants/applying/applying-fta-funding along with specific instructions for the forms and 
attachments required for submission. Mail and fax submissions will not 
be accepted.

2. Content and Form of Application Submission

    Proposals should include only a completed SF 424 Mandatory form 
(downloaded from GRANTS.GOV) and the following attachments to the 
completed SF 424:
    i. A completed Applicant and Proposal Profile supplemental form for 
the TOD Pilot Program (supplemental form) found on the FTA website at 
https://www.transit.dot.gov/TODPilot. The information on the 
supplemental form will be used to determine applicant and project 
eligibility for the program, and to evaluate the proposal against the 
selection criteria described in part E of this notice;
    ii. A map of the proposed study area showing the transit project 
alignment and stations, major roadways, major landmarks, and the 
geographic boundaries of the proposed comprehensive planning 
activities;
    iii. Documentation of a partnership between the transit project 
sponsor and an entity in the project corridor with land use planning 
authority to conduct the comprehensive planning work, if the applicant 
does not have both of these responsibilities. Documentation may consist 
of a memorandum of agreement or letter of intent signed by all parties 
that describes the parties' roles and responsibilities in the proposed 
comprehensive planning project; and
    iv. Documentation of any funding commitments for the proposed 
comprehensive planning work.
    Information such as the applicant's name, Federal amount requested, 
local match amount, description of the study area, etc. may be 
requested in varying degrees of detail on both the SF 424 form and 
supplemental form. Applicants must fill in all fields unless stated 
otherwise on the forms. Applicants should use both the ``Check Package 
for Errors'' and the ``Validate Form'' buttons on both forms to check 
all required fields, and ensure that the Federal and local amounts 
specified are consistent. In the event of errors with the supplemental 
form, FTA recommends saving the form on your computer and ensuring that 
JavaScript is enabled in your PDF reader. The information listed below 
MUST be included on the SF 424 and supplemental forms for TOD Pilot 
Program funding applications.
    The SF 424 and supplemental form will prompt applicants to address 
the following items:
    1. Provide the name of the lead applicant and, if applicable, the 
specific co-sponsors submitting the application.
    2. Provide the applicant's Dun and Bradstreet Data Universal 
Numbering System (DUNS) number.
    3. Provide contact information including: Contact name, title, 
address, phone number, and email address.
    4. Specify the Congressional district(s) where the planning project 
will take place.
    5. Identify whether the planning project is located in a qualified 
opportunity zone designated pursuant to 26 U.S.C. 1400Z-1.
    6. Identify the project title and project scope to be funded, 
including anticipated substantial deliverables and the milestones at 
when they will be provided to FTA.
    7. Identify and describe an eligible transit project that meets the 
requirements of section C, subsection 3 of this notice.
    8. Provide evidence of a partnership between the transit project 
sponsor and at least one agency with land use authority in the transit 
capital project corridor, as described earlier in this subsection.
    9. Address the six aspects of general authority under MAP-21 
Section 20005(b)(2).
    10. Address each evaluation criterion separately, demonstrating how 
the project responds to each criterion as described in section E.
    11. Provide a line-item budget for the total planning effort, with 
enough detail to indicate the various key components of the 
comprehensive planning project.
    12. Identify the Federal amount requested.
    13. Document the matching funds, including amount and source of the 
match (may include local or private sector financial participation in 
the project). Describe whether the matching funds are committed or 
planned, and include documentation of the commitments.
    14. Address whether other Federal funds have been sought or 
received for the comprehensive planning project.
    15. Provide a schedule and process for the development of the 
comprehensive plan that includes anticipated dates for incorporating 
the planning work effort into the region's unified planning work 
program, completing major tasks and substantial deliverables, and 
completing the overall planning effort.
    16. Describe how the comprehensive planning work advances the 
metropolitan transportation plan of the metropolitan planning 
organization.
    17. Propose performance criteria for the development and 
implementation of the comprehensive planning work.
    18. Identify potential State, local or other impediments to the 
products of the comprehensive planning work and its implementation, and 
how the work will address them.
    FTA will not consider any additional materials submitted by 
applicants in its evaluation of proposals. The total length of the 
completed supplemental form and documentation of partnerships and 
funding commitments should be no more than 15 pages.

3. Unique Entity Identifier and System for Award Management (SAM)

    Each applicant is required to: (1) Register in SAM before 
submitting an application; (2) provide a valid unique entity 
identifier; and (3) continue to maintain an active SAM registration 
with current information at all times during which the applicant has an 
active Federal award or an application or plan under consideration by 
FTA. These requirements do not apply if the applicant: (1) Is an 
individual; (2) is excepted from the requirements under 2 CFR 25.110(b) 
or (c); or (3) has an exception approved by FTA under 2 CFR 25.110(d). 
FTA may not make an award until the applicant has complied with all 
applicable unique entity identifier and SAM requirements. If an 
applicant has not fully complied with the requirements by the time FTA 
is ready to make an award, FTA may determine that the applicant is not 
qualified to receive an award and use that determination as a basis for 
making a Federal award to another applicant. Registration in SAM may 
take as little as 3-5 business days, but since there could be 
unexpected steps or delays, FTA recommends allowing ample time, up to 
several weeks, for completion of all steps. For additional information 
on obtaining a unique entity identifier, please visit www.sam.gov.

4. Submission Dates and Times

    Project proposals must be submitted electronically through http://www.GRANTS.GOV by 11:59 p.m. November 18, 2019. GRANTS.GOV attaches a 
time stamp to each application at the time of submission. Proposals 
submitted after the deadline will only be considered under

[[Page 49178]]

extraordinary circumstances not under the applicant's control. Mail and 
fax submissions will not be accepted.
    Within 48 hours after submitting an electronic application, the 
applicant should receive two email messages from GRANTS.GOV: (1) 
Confirmation of successful transmission to GRANTS.GOV; and (2) 
confirmation of successful validation by GRANTS.GOV. FTA will then 
validate the application and will attempt to notify any applicants 
whose applications could not be validated. If the applicant does not 
receive confirmation of successful validation or a notice of failed 
validation or incomplete materials, the applicant must address the 
reason for the failed validation, as described in the email notice, and 
resubmit before the submission deadline. If making a resubmission for 
any reason, include all original attachments regardless of which 
attachments were updated and check the box on the supplemental form 
indicating this is a resubmission. An application that is submitted at 
the deadline and cannot be validated will be marked as incomplete, and 
such applicants will not receive additional time to re-submit.
    Any addenda that FTA releases on the application process will be 
posted at https://www.transit.dot.gov/TODPilot. Important: FTA urges 
applicants to submit their applications at least 96 hours prior to the 
due date to allow time to receive the validation messages and to 
correct any problems that may have caused a rejection notification. 
GRANTS.GOV scheduled maintenance and outage times are announced on the 
GRANTS.GOV website at http://www.GRANTS.GOV. Deadlines will not be 
extended due to scheduled maintenance or outages.
    Applicants are encouraged to begin the registration process on the 
GRANTS.GOV site well in advance of the submission deadline. 
Registration is a multi-step process, which may take several weeks to 
complete before an application can be submitted. Registered applicants 
may still be required to take steps to keep their registration up to 
date before submissions can be made successfully: (1) Registration in 
the System for Award Management (SAM) is renewed annually and (2) 
persons making submissions on behalf of the Authorized Organization 
Representative (AOR) must be authorized in GRANTS.GOV by the AOR to 
make submissions. Instructions on the GRANTS.GOV registration process 
are listed in Appendix A.

5. Funding Restrictions

    See section C of this NOFO for detailed eligibility requirements. 
FTA emphasizes that any comprehensive planning projects funded through 
the TOD Pilot Program must be associated with an eligible transit 
project, specifically a new fixed guideway project or a core capacity 
improvement project as defined in Federal transit statute, 49 U.S.C. 
5309(a). Projects are not required to be within the Capital Investment 
Grant Program.

6. Other Submission Requirements

    Project proposals must be submitted electronically through http://www.GRANTS.GOV by 11:59 p.m. E.D.T. on November 18, 2019. Mail and fax 
submissions will not be accepted.

E. Application Review Information

1. Criteria

    FTA will evaluate proposals that include all components identified 
in section D of this notice according to the following three criteria:
a. Demonstrated Need
    FTA will evaluate each project to determine the need for funding 
based on the following factors:
    i. Potential state, local or other impediments to implementation of 
the products of the comprehensive planning effort, and how the workplan 
will address them;
    ii. How the proposed work will advance TOD implementation in the 
corridor and region;
    iii. Justification as to why Federal funds are needed for the 
proposed work; and
    iv. Extent to which the transit project corridor could benefit from 
TOD planning.
b. Strength of the Work Plan, Schedule and Process
    FTA will evaluate the strength of the work plan, schedule and 
process included in an application based on the following factors:
    i. Extent to which the schedule contains sufficient detail, 
identifies all steps needed to implement the work proposed, and is 
achievable;
    ii. The proportion of the project corridor covered by the work 
plan;
    iii. Extent of partnerships, including with non-public sector 
entities;
    iv. The partnerships' technical capability to develop, adopt and 
implement the comprehensive plans, based on FTA's assessment of the 
applicant's description of the policy formation, implementation, and 
financial roles of the partners, and the roles and responsibilities of 
proposed staff; and
    v. Whether the performance measures identified in the application 
relate to the goals of the comprehensive planning work.
c. Funding Commitments
    FTA will assess the status of local matching funds for the planning 
work. Applications demonstrating that matching funds for the proposed 
comprehensive planning work are committed will receive higher ratings 
from FTA on this factor. Proposed comprehensive planning projects for 
which matching funding sources have been identified, but are not yet 
committed, will be given lower ratings under this factor by FTA, as 
will proposed comprehensive planning projects for which in-kind 
contributions constitute the primary or sole source of matching funds.

2. Review and Selection Process

    In addition to other FTA staff that may review the proposals, a 
technical evaluation committee will evaluate proposals based on the 
published evaluation criteria. Members of the technical evaluation 
committee and other FTA staff may request additional information from 
applicants, if necessary. Based on the findings of the technical 
evaluation committee, the FTA Administrator will determine the final 
selection of projects for program funding. Among the factors, in 
determining the allocation of program funds FTA may consider geographic 
diversity, diversity in the size of the grantees receiving funding, 
projects located in or that support public transportation service in a 
qualified opportunity zone designated pursuant to 26 U.S.C. 1400Z-1, 
and/or the applicant's receipt of other competitive awards. FTA may 
prioritize projects proposed with a higher local share.
    In addition to the criteria and considerations outlined in this 
section, the FTA Administrator will take into account the following key 
Departmental objectives:
    (A) Supporting economic vitality at the national and regional 
level;
    (B) Leveraging Federal funding to attract other, non-Federal 
sources of infrastructure investment, including value capture;
    (C) Using innovative approaches to improve safety and expedite 
project delivery;
    (D) Encourage State and local and tribal governments to reduce 
regulatory barriers that unnecessarily raise the costs of housing 
development or impede

[[Page 49179]]

the development of affordable housing; and
    (E) Holding grant recipients accountable for their performance and 
achieving specific, measurable outcomes identified by grant applicants.
    Prior to making an award, FTA is required to review and consider 
any information about the applicant that is in the Federal Awardee 
Performance and Integrity Information Systems (FAPIIS) accessible 
through SAM. An applicant may review and comment on information about 
itself that a Federal awarding agency previously entered. FTA will 
consider any comments by the applicant, in addition to the other 
information in FAPIIS, in making a judgment about the applicant's 
integrity, business ethics, and record of performance under Federal 
awards when completing the review of risk posed by applicants as 
described in the 2 CFR 200.205 Federal awarding agency review of risk 
posed by applicants.

F. Federal Award Administration Information

1. Federal Award Notices

    The FTA Administrator will announce the final project selections on 
the FTA website. Project recipients should contact their FTA Regional 
Offices for additional information regarding allocations for projects 
under the TOD Pilot Program. FTA will issue specific guidance to 
recipients regarding pre-award authority at the time of selection; see 
subsection 3 below for further information.

2. Award Administration

    Funds under the TOD Pilot Program are available to existing FTA 
grantees. The anticipated minimum and maximum award amounts are 
$250,000 and $2,000,000, respectively. Only proposals from eligible 
recipients for eligible activities will be considered for funding. Due 
to funding limitations, applicants that are selected for funding may 
receive less than the amount originally requested. In those cases, 
applicants must be able to demonstrate that the proposed comprehensive 
planning projects are still viable and can be completed with the amount 
awarded.

3. Administrative and National Policy Requirements

i. Pre-Award Authority
    FTA will issue specific guidance to recipients regarding pre-award 
authority at the time of selection. FTA does not provide pre-award 
authority for competitive funds until projects are selected and even 
then there are Federal requirements that must be met before costs are 
incurred. Funds under this NOFO cannot be used to reimburse applicants 
for otherwise eligible expenses incurred prior to FTA award of a Grant 
Agreement until FTA has issued pre-award authority for selected 
projects, or unless FTA has issued a ``Letter of No Prejudice'' for the 
project before the expenses are incurred. For more information about 
FTA's policy on pre-award authority, please see the FY 2019 
Apportionment Notice published on July 3, 2019. https://www.govinfo.gov/content/pkg/FR-2019-07-03/pdf/2019-14248.pdf.
ii. Grant Requirements
    If selected, awardees will apply for a grant through FTA's Transit 
Award Management System (TrAMS). Recipients of TOD Pilot Program funds 
are subject to the grant requirements of the Section 5303 Metropolitan 
Planning program, including those of FTA Circular 8100.1C and Circular 
5010.1E. All competitive grants, regardless of award amount, will be 
subject to the Congressional Notification and release process. 
Technical assistance regarding these requirements is available from 
each FTA regional office.
iii. Planning
    FTA encourages applicants to notify the appropriate metropolitan 
planning organizations in areas likely to be served by the funds made 
available under this program. Selected projects must be incorporated 
into the unified planning work programs of metropolitan areas before 
they are eligible for FTA funding or pre-award authority.
iv. Standard Assurances
    The applicant assures that it will comply with all applicable 
Federal statutes, regulations, executive orders, FTA circulars, and 
other Federal administrative requirements in carrying out any project 
supported by the FTA grant. The applicant acknowledges that it is under 
a continuing obligation to comply with the terms and conditions of the 
grant agreement issued for its project with FTA. The applicant 
understands that Federal laws, regulations, policies, and 
administrative practices might be modified from time to time and may 
affect the implementation of the project. The applicant agrees that the 
most recent Federal requirements will apply to the project, unless FTA 
issues a written determination otherwise. The applicant must submit the 
Certifications and Assurances before receiving a grant if it does not 
have current certifications on file.

4. Reporting

    Post-award reporting requirements include submission of Federal 
Financial Reports and Milestone Progress Reports in FTA's electronic 
grants management system on a quarterly basis. Awardees must also 
submit copies of the substantial deliverables identified in the work 
plan to the FTA regional office at the corresponding milestones.

G. Federal Awarding Agency Contact

    For program-specific questions, please contact Ken Cervenka, Office 
of Planning and Environment, (202) 493-0512, email: 
[email protected]. A TDD is available at 1-800-877-8339 (TDD/FIRS). 
Any addenda that FTA releases on the application process will be posted 
at https://www.transit.dot.gov/TODPilot. To ensure applicants receive 
accurate information about eligibility or the program, the applicant is 
encouraged to contact FTA directly, rather than through intermediaries 
or third parties. FTA staff may also conduct briefings on the FY 2019 
competitive grants selection and award process upon request.

H. Technical Assistance and Other Program Information

    This program is not subject to Executive Order 12372, 
``Intergovernmental Review of Federal Programs.'' FTA will consider 
applications for funding only from eligible recipients for eligible 
projects as listed in Section C.
    Complete applications must be submitted through Grants.gov by 11:59 
p.m. EDT November 18, 2019. For issues with Grants.gov please contact 
Grants.gov by phone at 1-800-518-4726 or by email at 
[email protected]. Contact information for FTA's regional offices can 
be found on FTA's website at www.transit.dot.gov.

K. Jane Williams,
Acting Administrator.

Appendix A

Registration in Sam and Grants.gov

    Registration in Brief:
    Registration takes approximately 3-5 business days, but allow 4 
weeks for completion of all steps.

Step 1: Obtain DUNS Number

    Same day. If requested by phone (1-866-705-5711) DUNS is 
provided immediately. If your organization does not have one, you 
will need to go to the Dun & Bradstreet website at http://fedgov.dnb.com/webform [EXIT Disclaimer] to obtain the number. * 
Information for Foreign Registrants.*Webform requests take 1-2 
business days.

[[Page 49180]]

Step 2: Register With SAM

    Three to five business days or up to two weeks. If you already 
have a TIN, your SAM registration will take 3-5 business days to 
process. If you are applying for an EIN please allow up to 2 weeks. 
Ensure that your organization is registered with the System for 
Award Management (SAM) at System for Award Management (SAM). If your 
organization is not, an authorizing official of your organization 
must register.

Step 3: Username & Password

    Same day. Complete your AOR (Authorized Organization 
Representative) profile on Grants.gov and create your username and 
password. You will need to use your organization's DUNS Number to 
complete this step. https://apply07.grants.gov/apply/OrcRegister.

Step 4: AOR Authorization

    *Same day. The E-Business Point of Contact (E-Biz POC) at your 
organization must login to Grants.gov to confirm you as an 
Authorized Organization Representative (AOR). Please note that there 
can be more than one AOR for your organization. In some cases the E-
Biz POC is also the AOR for an organization. *Time depends on 
responsiveness of your E-Biz POC.

Step 5: Track AOR Status

    At any time, you can track your AOR status by logging in with 
your username and password. Login as an Applicant (enter your 
username & password you obtained in Step 3) using the following 
link: Applicant_profile.jsp.