[Federal Register Volume 84, Number 168 (Thursday, August 29, 2019)]
[Notices]
[Pages 45490-45491]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-18677]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-11-000]


Sabine Pass LNG, L.P.; Notice of Availability of the 
Environmental Assessment for the Proposed Third Berth Expansion Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the Third 
Berth Expansion Project (Project), proposed by Sabine Pass LNG, L.P. in 
the above-referenced docket. Sabine Pass LNG, L.P. requests 
authorization to construct and operate a third marine berth at the 
existing Sabine Pass LNG Terminal in Cameron Parish, Louisiana. The 
Project would also include the addition of piping, pipe racks, 
utilities, and other infrastructure necessary to transport liquefied 
natural gas (LNG) to the third berth.
    The EA assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
requirements of the National Environmental Policy Act (NEPA). The FERC 
staff concludes that approval of the proposed Project, with appropriate 
mitigating measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    The U.S. Army Corps of Engineers, U.S. Department of Energy, U.S. 
Department of Transportation, U.S. Coast Guard, U.S. Fish and Wildlife 
Service, and Louisiana Department of Wildlife and Fisheries 
participated as cooperating agencies in the preparation of the EA. 
Cooperating agencies have jurisdiction by law or special expertise with 
respect to resources potentially affected by the proposal and 
participate in the NEPA analysis.
    The Project would consist of the following facilities in Cameron 
Parish, Louisiana:
     A new marine berth to be dredged adjacent and southeast of 
the two existing marine berths along the Sabine Pass Channel;
     additional two tugs to the existing dedicated tug fleet;
     an LNG loading system consisting of a new platform, LNG 
loading and cooldown lines, and LNG loading arms (two liquid, one 
vapor, and one hybrid liquid/vapor);
     two new 30-inch-diameter loading lines to transfer LNG to 
the Third Berth loading platform;
     an LNG spill collection system to provide spill protection 
for the new LNG piping and equipment; and
     appurtenant facilities including, the customs/security 
building, analyzer shelters, telecommunications systems, digital 
control systems upgrades, security fencing, cathodic protection 
systems, elevated fire monitor towers, and gangway with associated 
gangway hydraulic power unit and local control panel.
    The Commission mailed a copy of the Notice of Availability to 
federal, state, and local government representatives and agencies; 
elected officials; environmental and public interest groups; Native 
American tribes; potentially affected landowners and other interested 
individuals and groups; and newspapers and libraries in the Project 
area. The EA is only available in electronic format. It may be viewed 
and downloaded from the FERC's website (www.ferc.gov), on the 
Environmental Documents page (https://www.ferc.gov/industries/gas/enviro/eis.asp). In addition, the EA may be accessed by using the 
eLibrary link on the FERC's website. Click on the eLibrary link 
(https://www.ferc.gov/docs-filing/elibrary.asp), click on General 
Search, and enter the docket number in the ``Docket Number'' field, 
excluding the last three digits (i.e., CP19-11). Be sure you have 
selected an appropriate date range. For assistance, please contact FERC 
Online Support at [email protected] or toll free at (866) 208-
3676, or for TTY, contact (202) 502-8659.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the EA's disclosure and discussion of potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. The more specific your comments, the 
more useful they will be. To ensure that the Commission has the 
opportunity to consider your comments prior to making its decision on 
this project, it is important that we receive your comments in 
Washington, DC on or before 5:00 p.m. Eastern Time on September 23, 
2019.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on eRegister. You must select the type of filing you are making. If you 
are filing a comment on a particular project, please select ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP19-11-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

[[Page 45491]]

    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214). Motions to intervene are more 
fully described at http://www.ferc.gov/resources/guides/how-to/intervene.asp. Only intervenors have the right to seek rehearing or 
judicial review of the Commission's decision. The Commission may grant 
affected landowners and others with environmental concerns intervenor 
status upon showing good cause by stating that they have a clear and 
direct interest in this proceeding which no other party can adequately 
represent. Simply filing environmental comments will not give you 
intervenor status, but you do not need intervenor status to have your 
comments considered.
    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link 
also provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: August 23, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-18677 Filed 8-28-19; 8:45 am]
 BILLING CODE 6717-01-P