[Federal Register Volume 84, Number 141 (Tuesday, July 23, 2019)]
[Proposed Rules]
[Pages 35365-35368]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-15749]


=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 1, 2, 25 and 27

[GN Docket No. 18-122; RM-11791; RM-11778; DA 19-678]


Wireless Telecommunications Bureau, International Bureau, Office 
of Engineering and Technology, and Office of Economics and Analytics 
Seek Focused Additional Comment in 3.7-4.2 GHz Band Proceeding

AGENCY: Federal Communications Commission.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: In this document, we invite interested parties to supplement 
the record to address issues raised by commenters in response to the 
Commission's July 2018 Notice of Proposed Rulemaking Specifically, 
among other issues, the Bureaus and Offices seek comment on proposed 
auction-based approaches, other transition mechanisms to introduce new

[[Page 35366]]

flexible-use licensing in the band, appropriate repurposing 
methodologies, Fixed Satellite Service earth station protection 
criteria, and technical rules, as well as specifically seeking 
additional comment on the recent filings by: ACA Connects--America's 
Communications Association (ACA Connects), the Competitive Carriers 
Association (CCA), Charter Communications, Inc. (Charter); AT&T; and 
the Wireless internet Service Providers Association (WISPA), Google, 
and Microsoft.

DATES: Comments are due on or before August 7, 2019; reply comments on 
or before August 14, 2019.

ADDRESSES: You may submit comments, identified by GN Docket No. 18-122, 
by any of the following methods:
     Federal Communications Commission's website: https://www.fcc.gov/ecfs/. Follow the instructions for submitting comments.
     People with Disabilities: Contact the FCC to request 
reasonable accommodations (accessible format documents, sign language 
interpreters, CART, etc.) by email: [email protected], phone: 202-418-0530 
or TTY: 202-418-0432.
    For detailed instructions for submitting comments and additional 
information on the rulemaking process, see the SUPPLEMENTARY 
INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT:  Matthew Pearl of the Wireless 
Telecommunications Bureau, at [email protected] or (202)418-2607. 
For information regarding Initial Paperwork Reduction Act, contact 
Cathy Williams, Office of Managing Director, at (202) 418-2918 or 
[email protected].

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's 
document, DA 19-678, (WTB, IB, OET, OEA July 19, 2019), GN Docket No. 
18-122, RM-11791, RM-11778. The complete text of this document, as well 
as comments, reply comments, and ex parte submissions, is available for 
public inspection and copying from 8 a.m. to 4:30 p.m. Eastern Time 
(ET) Monday through Thursday or from 8 a.m. to 11:30 a.m. ET on Fridays 
in the FCC Reference Information Center, 445 12th Street SW, Room CY-
A257, Washington, DC 20554. The complete text is available on the 
Commission's website at http://wireless.fcc.gov, or by using the search 
function on the ECFS web page at http://www.fcc.gov/cgb/ecfs/. 
Alternative formats are available to persons with disabilities by 
calling the Consumer & Governmental Affairs Bureau at (202) 418-0530 
(voice), (202) 418-0432 (tty).

Comment Filing Procedures

    Pursuant to sections 1.415 and 1.419 of the Commission's rules, 47 
CFR 1.415, 1.419, interested parties may file comments and replies on 
or before the dates indicated on the first page of this document. 
Comments and replies may be filed using the Commission's Electronic 
Comment Filing System (ECFS).
     Electronic Filers: Comments may be filed electronically 
using the internet by accessing ECFS: https://www.fcc.gov/ecfs/. Filers 
should follow the instructions provided on the website for submitting 
comments. In completing the transmittal screen, filers should include 
their full name, U.S. Postal Service mailing address, and the 
applicable docket number, GN Docket No. 18-122.
     Paper Filers: Parties who choose to file by paper must 
file an original and one copy of each filing. If more than one docket 
or rulemaking number appears in the caption of this proceeding, filers 
must submit two additional copies for each additional docket or 
rulemaking number. Filings can be sent by hand or messenger delivery, 
by commercial overnight courier, or by first-class or overnight U.S. 
Postal Service mail. All filings must be addressed to the Commission's 
Secretary, Office of the Secretary, Federal Communications Commission.
    [cir] All hand-delivered or messenger-delivered paper filings for 
the Commission's Secretary must be delivered to FCC Headquarters at 445 
12th Street SW, Room TW-A325, Washington, DC 20554. The filing hours 
are 8:00 a.m. to 7:00 p.m. All hand deliveries must be held together 
with rubber bands or fasteners. Any envelopes and boxes must be 
disposed of before entering the building.
    [cir] Commercial overnight mail (other than U.S. Postal Service 
Express Mail and Priority Mail) must be sent to 9050 Junction Drive, 
Annapolis Junction, MD 20701.
    [cir] U.S. Postal Service first-class, Express, and Priority mail 
must be addressed to 445 12th Street SW, Washington DC 20554.
    People with Disabilities. To request materials in accessible 
formats for people with disabilities (Braille, large print, electronic 
files, audio format), send an email to [email protected] or call the 
Consumer and Governmental Affairs Bureau at 202-418-0530 (voice), 844-
432-2275 (videophone), or 202-418-0432 (TTY).

Initial Paperwork Reduction Act of 1995 Analysis

    This document does not contain proposed information collection 
requirements subject to the Paperwork Reduction Act of 1995, Public Law 
104-13. In addition, therefore, it does not contain any proposed 
information collection burden for small business concerns with fewer 
than 25 employees, pursuant to the Small Business Paperwork Relief Act 
of 2002, Public Law 107-198, see 44 U.S.C. 3506(c)(4).

Ex Parte Rules

    Pursuant to section 1.1200(a) of the Commission's rules, this 
document shall be treated as a ``permit-but-disclose'' proceeding in 
accordance with the Commission's ex parte rules. Persons making ex 
parte presentations must file a copy of any written presentation or a 
memorandum summarizing any oral presentation within two business days 
after the presentation (unless a different deadline applicable to the 
Sunshine period applies). Persons making oral ex parte presentations 
are reminded that memoranda summarizing the presentation must (1) list 
all persons attending or otherwise participating in the meeting at 
which the ex parte presentation was made, and (2) summarize all data 
presented and arguments made during the presentation. If the 
presentation consisted in whole or in part of the presentation of data 
or arguments already reflected in the presenter's written comments, 
memoranda or other filings in the proceeding, the presenter may provide 
citations to such data or arguments in his or her prior comments, 
memoranda, or other filings (specifying the relevant page and/or 
paragraph numbers where such data or arguments can be found) in lieu of 
summarizing them in the memorandum. Documents shown or given to 
Commission staff during ex parte meetings are deemed to be written ex 
parte presentations and must be filed consistent with section 
1.1206(b). In proceedings governed by section 1.49(f) or for which the 
Commission has made available a method of electronic filing, written ex 
parte presentations and memoranda summarizing oral ex parte 
presentations, and all attachments thereto, must be filed through the 
electronic comment filing system available for that proceeding, and 
must be filed in their native format (e.g., .doc, .xml, .ppt, 
searchable .pdf). Participants in this proceeding should familiarize 
themselves with the Commission's ex parte rules.

[[Page 35367]]

Synopsis

    1. By this document, the Wireless Telecommunications Bureau, 
International Bureau, Office of Engineering and Technology, and Office 
of Economics and Analytics (Bureaus and Offices) invite interested 
parties to supplement the record to address issues raised by commenters 
in response to the Commission's July 2018 Notice of Proposed Rulemaking 
in GN Docket No. 18-122 (33 FCC Rcd 6915) (Notice). In the document, 
the Commission sought comment on several approaches, including auction-
based approaches, for making some or all of the 3.7-4.2 GHz band (C-
Band) available for terrestrial, flexible use. The Commission also 
sought comment on other issues essential to the introduction of new 
terrestrial wireless services in the band, including incumbent 
protection criteria, technical and licensing rules, and appropriate 
methodologies for transitioning or protecting existing Fixed Satellite 
Service and Fixed Service operators in the band.
    2. In response to the document, commenters proposed auction-based 
approaches and other transition mechanisms to introduce new flexible-
use licensing in the band. Commenters also espoused different views on 
appropriate repurposing methodologies, Fixed Satellite Service earth 
station protection criteria, technical rules, and other issues raised 
in the document. The Bureaus and Offices seek additional comment on the 
recent filings by: (1) ACA Connects--America's Communications 
Association (ACA Connects), the Competitive Carriers Association (CCA), 
Charter Communications, Inc. (Charter) (collectively, ACA Connects 
Coalition); (2) AT&T; and (3) the Wireless internet Service Providers 
Association (WISPA), Google, and Microsoft.
    3. The ACA Connects Coalition, which collectively represents both 
incumbent C-band earth station users and wireless providers that seek 
to use this spectrum to provide 5G services, recently submitted a joint 
proposal for repurposing a large portion of the C-band for 5G use. 
Their proposal consists of three key elements that would make 370 
megahertz of C-band spectrum available for flexible wireless use on a 
nationwide basis: (1) A Commission-driven auction that would award new 
terrestrial licenses and assign obligations for transition costs; (2) a 
plan to transition certain Fixed Satellite Service earth station 
operators to fiber; and (3) a plan for satellite operators to repack 
remaining earth station users to the upper portion of the band.
    4. Implementing such a proposal would entail a multi-step, 
Commission-driven transition process. First, the Commission would 
conduct an auction to award new flexible-use licenses--this could be a 
traditional auction, such as an auction of overlay license rights, or 
potentially an incentive auction. Under such an approach, bidders 
acquiring new terrestrial licenses through the auction would be 
required by rule to contribute to a fund that would cover the costs of 
the fiber transition, reimburse satellite operators and their 
customers, and further compensate operators and users. Incumbent earth 
stations would be mandatorily relocated and repacked.
    5. The remaining elements of the ACA Connects Coalition proposal 
involve using the common pool of funds for a combination of 
transitioning certain earth stations to fiber, repacking remaining 
earth station users to the upper portion of the band, and providing 
compensation to satellite providers. Video programmers and multichannel 
video programming distributors (MVPDs) would transition the delivery of 
video programming to MVPDs from C-band Fixed Satellite Service use to 
terrestrial fiber delivery. Simultaneous with the MVPD transition, 
satellite operators would repack services used by non-MVPD earth 
station users, such as radio and television broadcasters, to the upper 
portion of the C-band, and resources would be made available to protect 
these remaining C-band customers from harmful interference by out-of-
band 5G emissions, using interference prevention measures such as 
installing antenna filters, repointing antennas, and changing antennas' 
frequencies or polarization. The common pool of funds would be used to 
further compensate satellite operators for lost revenue resulting from 
the transition to fiber. In the document, the Commission sought comment 
on a similar hybrid approach to transition the band, whereby satellite 
operators would relinquish their rights to a certain amount of spectrum 
that would then be made available for terrestrial use nationwide, and 
additional spectrum could be made available on a geographic basis in 
areas where it is cost-efficient to transition earth stations to other 
forms of transmission, such as fiber. The Commission noted that fiber 
is most prevalent in urban areas, and sought comment on whether it 
would be feasible to transition certain regions based on the existence 
of fiber, and if so, how such a transition could be accomplished. The 
Bureaus and Offices seek comment on each of the elements of the ACA 
Connects Coalition proposal, both individually and as a package, and 
how each element could further the Commission's goal of maximizing the 
terrestrial use of this spectrum while protecting incumbent earth 
station users.
    6. The Bureaus and Offices also seek comment on the viability of 
variants on the ACA Connects Coalition approach. For example, the 
Bureaus and Offices seek comment on mandatory relocation and repacking 
requirements that would use fiber delivery (potentially redundant fiber 
delivery) but maintain the C-band delivery of MVPD video programming 
via non-urban ``super'' head-ends. How much spectrum could be cleared--
nationwide or regionally--using this approach? What transport 
facilities would be required to transmit video content from 
consolidated earth station receive sites (i.e., satellite dish farms) 
to endpoints closer to existing receive-only earth stations or would 
the data centers just bypass satellite dish farms? How would the number 
and location of those consolidated receive sites be determined and who 
would own and operate those sites? How would sufficient network 
reliability be achieved? Is complete network redundancy necessary or 
can required reliability levels be achieved through other means? Should 
winning bidders have the option to build the redundant fiber themselves 
(or agree amongst themselves on who should build the redundant fiber) 
rather than contribute to a pool? The Bureaus and Offices seek comment 
on the likely costs of constructing and maintaining fiber networks and 
interconnecting the head-ends to ensure fiber delivery to the locations 
of existing earth stations. To what extent is fiber readily available 
to all affected end users? How and to what extent should the costs of 
the fiber transition be addressed? How could the Commission best align 
the incentives of those building any fiber delivery routes with those 
required to pay for such routes? More broadly, what if any rights to 
mandatorily relocate and repack existing earth stations should accrue 
to any new terrestrial licensees? What obligations should redound with 
such rights--for example, what costs must be covered by any such 
licensees (and particularly are a lost opportunity to receive revenues 
a valid cost for these purposes)? The Bureaus and Offices also seek 
comment on how long it would take to implement this transition.
    7. In addition, the Bureaus and Offices seek comment on appropriate 
characteristics of the licenses that could be offered at auction to 
promote a transition and accomplish the type of

[[Page 35368]]

geographic clearing and fiber transition described in the ACA Connects 
Coalition Proposal or through centralized earth station receive sites. 
Would these approaches work better with particular license parameters 
(i.e., larger geographic license areas) and service rules that differ 
from those proposed in the document? The Bureaus and Offices also seek 
comment on how the Commission's approaches during the AWS-3 and 800 MHz 
transitions might inform this proceeding. For example, should the 
Commission designate a Transition Administrator or require the creation 
of a clearinghouse to facilitate the sharing of the costs for mandatory 
relocation and repacking? The Bureaus and Offices seek comment on these 
and any other relevant issues in the record.
    8. On May 23, 2019, AT&T submitted comments responding to the C-
Band Alliance's proposed technical criteria for operations in the band, 
particularly with respect to co-existence with incumbent Fixed 
Satellite Service earth stations. AT&T asserts that the C-Band 
Alliance's proposed technical criteria would constrain 5G deployment, 
and it proposes an alternate band plan to address its concerns. AT&T 
recommends dividing the 3.7-4.2 GHz band into three segments: (1) A 
largely unrestricted mobile terrestrial 5G segment in the bottom of the 
band (``Unrestricted Licenses''); (2) ``Adjacent Licenses'' in the 
middle of the band that would have to coordinate with or mitigate 
impact on Fixed Satellite Service; and (3) remaining Fixed Satellite 
Service spectrum in the top of the band. Unrestricted Licenses could 
operate using full power and would not be obligated to coordinate with 
Fixed Satellite Service earth stations; Adjacent Licenses would operate 
using lower power or subject to other limitations, or would be 
obligated to coordinate with nearby Fixed Satellite Service earth 
stations. AT&T also describes a number of technical issues that would 
benefit from further analysis in the record, including technical 
criteria necessary to determine appropriate protection thresholds for 
in-band and adjacent band Fixed Satellite Service earth stations, 
receiver filter performance, the ongoing operational needs of Fixed 
Satellite Service earth stations in the band, and out-of-band emission 
limits for terrestrial wireless devices.
    9. On July 15, 2019, WISPA, Google, and Microsoft filed a study 
conducted by Reed Engineering, which analyzed Fixed Satellite Service 
and fixed wireless point-to-multipoint co-channel coexistence in the 
3.7-4.2 GHz band. Among other conclusions, the Reed Study suggests that 
exclusion zones of about 10 kilometers are sufficient to protect most 
Fixed Satellite Service earth stations from harmful interference caused 
by properly-engineered co-channel point-to-multipoint broadband 
systems. The propagation model used in the study relied on Fixed 
Satellite Service earth station characteristics that require them to 
point upwards towards the geostationary satellite arc. Thus, the earth 
stations are specifically designed to mitigate their response to 
signals arriving from the horizon, such as terrestrial point-to-
multipoint links. Additionally, the study relied on the directional 
nature of fixed service antennas and clutter to assume reduced 
emissions at earth stations.
    10. The Bureaus and Offices seek comment on the technical issues 
raised by the ACA Connects Coalition proposal, AT&T's proposal, and the 
Reed Study, and on the questions raised therein. Specifically, what are 
the appropriate interference thresholds and protection criteria, how 
should they be modeled, and under what deployment assumptions? That is, 
how should protection criteria be calculated and implemented to achieve 
both in-band and adjacent band Fixed Satellite Service protections 
through coordination or other protection mechanisms? Should these 
criteria differ for telemetry, tracking, and command earth stations? 
Given the needs of next-generation wireless networks and the need to 
ensure continuity of service for current users of Fixed Satellite 
Service earth stations, what are the appropriate technical parameters 
for terrestrial base stations and end user devices in the band, 
including transmit power limits and out-of-band emission limits? The 
Bureaus and Offices also seek comment on suggestions by the ACA 
Connects Coalition, AT&T, and the Reed Study on ways to increase 
efficient shared use of the C-band through validation of earth station 
filters, protection zones around stations, analysis of the relevant 
parameters of earth stations for protection (e.g., elevation angles, 
range of pointing angles, and frequencies that are used), and other 
technical matters. For example, which filters are actually realizable 
and available to achieve the sharing goals of the various proposals? Is 
it possible to achieve the short-term sharing goals of the proposals 
given the need to retrofit multiple types of Fixed Satellite Service 
earth station front-end elements (e.g., Low Noise Block downconverter/
filter) and the susceptibility of Fixed Satellite Service receivers to 
Passive Intermodulation?
    11. The Bureaus and Offices also seek comment on appropriate 
parameters to manage co-existence of terrestrial stations with earth 
stations during any band transition where differing amounts of spectrum 
might be cleared during different time periods for nearby geographic 
areas. For example, ACA Connects suggests creating a zone where mobile 
handsets may have operating restrictions and another zone where base 
station power flux density would be limited. AT&T suggests that either 
lower power terrestrial stations or coordination procedures could be 
used to manage terrestrial operations on spectrum adjacent to fixed 
satellite service operations. Under either of these proposals, what 
technical parameters regarding power levels, power flux density levels, 
and coordination procedures are appropriate to achieve co and adjacent 
band operation during and after any transition period? The Bureaus and 
Offices also seek additional quantitative analysis and over-the-air 
field test results to strengthen the record on the service impact of 
specific interference levels, with results that can be independently 
reproduced by third parties.
    12. Over the past year, a robust and diverse record has been 
developed in this proceeding, providing new insights into the issues 
raised in the document. To ensure that the Commission has the 
information it needs to complete its deliberations, the Bureaus and 
Offices seek comment on the specific questions raised above. To that 
end, all commenters are encouraged to provide detailed proposals, 
including technical assessments, cost benefit analyses, and projected 
timelines to support their positions.

Federal Communications Commission.
Amy Brett,
Associate Chief, Competition and Infrastructure Policy Division, 
Wireless Telecommunications Bureau.
[FR Doc. 2019-15749 Filed 7-22-19; 8:45 am]
 BILLING CODE 6712-01-P