DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2622-013]


Turners Falls Hydro, LLC; Notice of Application Accepted for 
Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2622-013.
    c. Date Filed: February 4, 2019.
    d. Applicant: Turners Falls Hydro, LLC (Turners Falls Hydro).
    e. Name of Project: Turners Falls Project.
    f. Location: On the Connecticut River, in the power canal of the 
Turners Falls Hydroelectric Project No. 1889, in Franklin County, 
Massachusetts. No federal lands are occupied by the project works or 
located within the project boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Michael Scarzello, Director, Eagle Creek 
Renewable Energy, LLC, 65 Madison Avenue, Suite 500, Morristown, NJ 
07960; Phone at (973) 998-8400, or email at 
[email protected].
    i. FERC Contact: Amanda Gill, (202) 502-6773 or 
[email protected].

[[Page 35110]]

    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket number P-2622-013.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. Project Description: The proposed Turners Falls Project would 
consist of: (1) An existing 10-foot-long, 20-foot-wide, 12- to 22-foot-
high forebay; (2) a 20-foot-wide, 22-foot-high trashrack with 1.5-inch 
clear-bar spacing; (3) two headgates; (4) an 8.5-foot-diameter, 50-
foot-long steel penstock; (5) a 3,847-square foot powerhouse containing 
one 937-kilowatt vertical Francis-type turbine-generator unit; (6) a 
50-foot-long, underground flume; (7) an 80-foot-long, 10-foot-wide 
tailrace; (8) a 1,000-foot-long, 13.8-kilovolt transmission line; (9) 
and appurtenant facilities.
    When generating, the project withdraws up to 289 cubic feet per 
second from FirstLight Hydro Generating Company's power canal for the 
Turners Falls Hydroelectric Project No. 1889, and discharges directly 
into the Connecticut River. Turners Falls Hydro operates the project in 
a run-of-river mode with an average annual generation of approximately 
1,512 megawatt-hours. Turners Falls Hydro proposes to continue 
operating the project in a run-of-river mode and does not propose any 
new construction or modifications to the project.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the Montague Public Library, Carnegie Library Branch 
located at 201 Avenue A, Turners Falls, MA 01376.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title PROTEST, 
or MOTION TO INTERVENE; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

Issue Scoping Document 1 for Comments--July 2019
Request Additional Information (if necessary)--August 2019
Issue Scoping Document 2--September 2019
Issue Notice of Ready for Environmental Analysis--September 2019
Issue Notice of Availability of Environmental Assessment--April 2020

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.