[Federal Register Volume 84, Number 129 (Friday, July 5, 2019)]
[Notices]
[Pages 32168-32169]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-14323]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9045-6]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/ nepa/.
Weekly receipt of Environmental Impact Statements
Filed 06/24/2019 Through 06/28/2019
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20190147, Final, NRCS, NAT, Adoption--Feral Swine Damage 
Management: A National Approach, Review Period Ends: 08/05/2019, 
Contact: Nell Fuller 202-720-6303. The Natural Resource Conservation 
Service (NRCS) has adopted the Animal and Plant Health Inspection 
Service (APHIS) Final EIS No. 20150165, filed 06/05/2015 with the EPA. 
NRCS was not a cooperating agency on this project. Therefore, 
recirculation of the document is necessary under Section 1506.3(b) of 
the CEQ Regulations.
EIS No. 20190148, Final, NPS, FL, Gulf Islands National Seashore Final 
Personal Watercraft Plan, Review Period Ends: 08/05/2019, Contact: Dan 
Brown 850-934-2613
EIS No. 20190149, Final, OSM, UT, Adoption--Alton Coal Tract Lease by 
Application, Contact: Gretchen Pinkham 303-293-5088. The Office of 
Surface Mining Reclamation and Enforcement (OSMRE) has adopted the U.S. 
Bureau of Land Management. Final EIS No. 20180160, filed 07/12/2018 
with the EPA. OSMRE was a cooperating agency on the project and 
recirculation of the document is not necessary under Section 1506.3(c) 
of the CEQ Regulations.
EIS No. 20190150, Draft, USFS, OR, Bear Creek Cluster Allotment 
Management Plans, Comment Period Ends: 08/19/2019, Contact: Beth Peer 
541-416-6463
EIS No. 20190151, Final Supplement, USN, HI, Surveillance Towed Array 
Sensor System Low Frequency Active (SURTASS LFA) Sonar, Review Period 
Ends: 08/05/2019, Contact: Ronald Carmichael 703-695-5269
EIS No. 20190152, Final, BLM, OR, Adoption--Swan Lake North Pumped 
Storage Project, Review Period Ends: 08/05/2019, Contact: Terry Austin 
541-885-4142. The U.S. Bureau of Land Management (BLM) has adopted the 
Federal Energy Regulatory Commission (FERC) Final EIS No. 20180333, 
filed 01/25/2019 with the EPA. BLM was not a cooperating agency on this 
project. Therefore, recirculation of the document is necessary under 
Section 1506.3(b) of the CEQ Regulations.
EIS No. 20190153, Final, TVA, TN, 2019 Integrated Resource Plan Final 
Environmental Impact Statement, Review Period Ends: 08/05/2019, 
Contact: Matthew Higdon 865-632-8051
EIS No. 20190154, Draft, FERC, AK, Alaska LNG Project-Draft 
Environmental Impact Statement, Comment Period Ends: 08/19/2019, 
Contact: Office of External Affairs 866-208-3372
EIS No. 20190155, Revised Draft, USACE, FL, Lake Okeechobee Watershed 
Restoration Project Revised Draft Integrated Project Implementation 
Report and Environmental Impact Statement, Comment Period Ends: 08/19/
2019, Contact: Dr. Gretchen Ehlinger 904-232-1682
EIS No. 20190156, Final, VA, CA, Adoption--Westside Subway Extension 
Transit Corridor Project Extension of the Existing Metro Purple Line 
and Metro Red Line Heavy Rail Subway Los Angeles County Metropolitan 
Transportation Authority Los Angeles County CA, Review Period Ends: 08/
05/2019, Contact: Glenn Elliott 202-632-5879. The U.S. Department of 
Veterans Affairs (VA) has adopted the Federal Transit Administration 
Final EIS No. 20120072, filed 03/15/2012 with the EPA. The VA was not a 
cooperating agency on this project. Therefore, recirculation of the 
document is necessary under Section 1506.3(b) of the CEQ Regulations.
EIS No. 20190157, Final Supplement, VA, CA, Adoption--Westside Purple 
Line Extension Section 4(f) Evaluation, Review Period Ends: 08/05/2019, 
Contact: Glenn Elliott 202-632-5879. The U.S. Department of Veterans 
Affairs (VA) has adopted the Federal Transit Administration Final EIS 
No. 20170235, filed 11/24/2017 with the EPA. The VA was not a 
cooperating agency on this project. Therefore, recirculation of the 
document is necessary under Section 1506.3(b) of the CEQ Regulations.

Amended Notice

EIS No. 20170161, Draft, USFS, MT, Withdrawn--Kootenai Forest-Wide 
Young Growth Vegetation

[[Page 32169]]

Management Project, Contact: Quinn Carver 406-283-7695. Revision to FR 
Notice Published 08/25/2017; Officially Withdrawn per request of the 
submitting agency.

    Dated: July 1, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-14323 Filed 7-3-19; 8:45 am]
 BILLING CODE 6560-50-P