DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2420-054]


PacifiCorp; Notice of Intent To File License Application, Filing 
of Pre-Application Document (Pad), Commencement of Pre-Filing Process, 
and Scoping; Request for Comments on the Pad and Scoping Document, and 
Identification of Issues and Associated Study Requests

    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Pre-filing Process.
    b. Project No.: 2420-054.
    c. Dated Filed: March 29, 2019.
    d. Submitted By: PacifiCorp.
    e. Name of Project: Cutler Hydroelectric Project.
    f. Location: On the Bear River near the city of Logan in Box Elder 
and Cache counties in Utah. The project does not occupy any federal 
lands.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: Eva Davies, Cutler Licensing 
Project Manager, PacifiCorp, 1407 West North Temple, Room 210, Salt 
Lake City, Utah 84115.
    i. FERC Contact: Khatoon Melick at (202) 502-8433 or email at: 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item o below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC ] 
61,076 (2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR, Part 402 and (b) the State Historic 
Preservation Officer, as required by section 106, National Historic 
Preservation Act, and the implementing regulations of the Advisory 
Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating PacifiCorp as the 
Commission's non-federal representative for carrying out informal 
consultation, pursuant to section 7 of the Endangered Species Act and 
section 106 of the National Historic Preservation Act.
    m. PacifiCorp filed with the Commission a Pre-Application Document 
(PAD; including a proposed process plan and schedule), pursuant to 18 
CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for download on PacifiCorp's 
project relicensing website at: http://www.pacificorp.com/es/hydro/hl/cutler/index.html.
    o. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. With this notice, we are soliciting comments on the PAD and 
Commission's staff Scoping Document 1 (SD1), as well as study requests. 
All comments on the PAD and SD1, and study requests should be sent to 
the address above in paragraph h. In addition, all comments on the PAD 
and SD1, study requests, requests for cooperating agency status, and 
all communications to and from Commission staff related to the merits 
of the potential application must be filed with the Commission.
    The Commission strongly encourages electronic filing. Please file 
all documents using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected]. In lieu of electronic filing, you may send 
a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2420-054.
    All filings with the Commission must bear the appropriate heading: 
``Comments on Pre-Application Document,'' ``Study Requests,'' 
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency 
Status,'' or ``Communications to and from Commission Staff.'' Any 
individual or entity interested in submitting study requests, 
commenting on the PAD or SD1, and any agency requesting cooperating 
status must do so by July 29, 2019.
    q. Although our current intent is to prepare an environmental 
assessment (EA), there is the possibility that an Environmental Impact 
Statement (EIS) will be required. Nevertheless, this notice, associated 
scoping meeting, and our scoping process will satisfy the NEPA scoping 
requirements, irrespective of whether an EA or EIS is issued by the 
Commission.

[[Page 25802]]

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the times and places noted below. The daytime meeting 
will focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:

Daytime Scoping Meeting

    Date and Time: Thursday, June 27, 2019 at 9:00 a.m.
    Location: Riverwoods Conference Center, 615 S Riverwoods Parkway, 
Logan, UT 84321.
    Phone Number: (435) 750-5151.

Evening Scoping Meeting

    Date and Time: Thursday, June 27, 2019 at 7:00 p.m.
    Location: Riverwoods Conference Center, 615 S Riverwoods Parkway, 
Logan, UT 84321.
    Phone Number: (435) 750-5151.
    SD1, which outlines the subject areas to be addressed in the 
environmental document, was mailed to the individuals and entities on 
the Commission's mailing list. Copies of SD1 will be available at the 
scoping meetings, or may be viewed on the web at http://www.ferc.gov, 
using the ``eLibrary'' link. Follow the directions for accessing 
information in paragraph n. Based on all oral and written comments, a 
Scoping Document 2 (SD2) may be issued. SD2 may include a revised 
process plan and schedule, as well as a list of issues, identified 
through the scoping process.

Environmental Site Review

    The potential applicant and Commission staff will conduct an 
Environmental Site Review of the project on Wednesday, June 26, 2019, 
starting at 9:00 a.m. All participants should meet at Cutler Marsh 
Marina recreation site--also known as Valley View Marina--located on 
the west side of Cutler Reservoir on Highway 30, just west of the 
Highway 30 bridge over the reservoir. Driving directions: Starting at 
L.W.'s Truck Stop in Logan, Utah (southwest corner of 1000 W and 200 
N), drive west on Highway 30 (also 200 N) approximately 5 miles. After 
crossing Cutler Reservoir, the Cutler Marsh Marina Recreation Site will 
be on the south side of the highway; turn left from the highway into 
the gravel parking lot. All participants are responsible for their own 
transportation. Recommended gear: Closed toe shoes, good for walking 1-
2 miles in, hat, sunscreen, water bottle, binoculars (optional, for 
wildlife viewing). Anyone with questions about the site visit should 
contact Ms. Miriam Hugentobler with PacifiCorp at: (801) 652-8983. 
Lunch and extra water will be provided by PacifiCorp. For lunch RSVPs 
please contact Ms. Miriam Hugentobler at (801) 652-8983 or email her 
at: [email protected].

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
federal, state, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n. of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will be placed 
in the public records of the project.

    Dated: May 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-11594 Filed 6-3-19; 8:45 am]
BILLING CODE 6717-01-P