[Federal Register Volume 84, Number 94 (Wednesday, May 15, 2019)]
[Notices]
[Pages 21768-21769]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-10049]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3185-005]


Pembroke Hydro Associates LP; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Application for Non-capacity Amendment.
    b. Project No: P-3185-005.
    c. Date Filed: March 21, 2019.
    d. Applicant: Pembroke Hydro Associates Limited Partnership, a 
subsidiary of Eagle Creek Renewable Energy.
    e. Name of Project: Webster Pembroke Hydroelectric Project.
    f. Location: The project is located on the Suncook River between 
the towns of Pembroke and Allentown in Merrimack County, New Hampshire.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Robert A. Gates, Eagle Creek Renewable 
Energy, 65 Madison Ave., Suite 500, Morristown, New Jersey 07960, (973) 
998-8403.
    i. FERC Contact: Kurt Powers, (202) 502-8949, [email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: 30 days from the issuance date of this notice by the 
Commission.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-3185-005.
    k. Description of Request: The exemptee proposes to remove a 
portion of stacked stone blocks, of varying dimensions, and stone cap 
blocks from the Pembroke Dam. The removal area totals approximately 30 
linear feet or 380 square feet of the existing dam. The stone blocks 
would be removed one by one via a crane that would be placed on a pad 
located on previously disturbed grass adjacent to the Emerson Mill 
Condos. The stone blocks would be taken off-site and either donated or 
disposed of properly. The work is expected to take two to three weeks 
to complete. The exemptee would continue to meet minimum flow 
requirements during the work.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number P-3185 in the docket number field to access the 
documents. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email [email protected], for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above and at the Commission's 
Public Reference Room, located at 888 First Street NE, Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the

[[Page 21769]]

requirements of 18 CFR 4.34(b). All comments, motions to intervene, or 
protests should relate to project works which are the subject of the 
license amendment. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: May 9, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-10049 Filed 5-14-19; 8:45 am]