Take notice that on April 18, 2019, Columbia Gulf Transmission, LLC
(Columbia Gulf), 700 Louisiana Street, Suite 700, Houston, Texas 77002,
filed in the above referenced docket an application pursuant to section
7(c) and section 7(b) of the Natural Gas Act (NGA), and Part 157 of the
Commission's regulations requesting abandoning authority, authorizing
the replacement of: (i) Approximately 1,350 feet (ft.) of existing 30-
inch-diameter pipeline of Mainline 100; (ii) approximately 1,300 ft. of
existing 30-inch-diameter pipeline of Mainline 200, referred to as the
Mainline 100 and Mainline 200 Replacement Project. All as more fully
set forth in the application which is on file with the Commission and
open to public inspection. The filing is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website web at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at [email protected] or call toll-free, (866) 208-3676 or
TYY, (202) 502-8659.
Any questions concerning this application may be directed to Dave
Hammel, U.S. Legal, Columbia Gulf Transmission, LLC, 700 Louisiana St,
Houston, TX 77002-2700, by telephone at (832) 320-5861.
Columbia Gulf requests pre-determination of rolled-in treatment of
rates and surcharges in accordance with the Commission's Policy
Statement in Docket No. PL99-3-000. The estimated cost of the project
will be $18,919,720.
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commentors will not be required to serve
copies of filed documents on all other parties. However, the non-party
commentors will not receive copies of all documents filed by other
parties or issued by the
[[Page 19912]]
Commission and will not have the right to seek court review of the
Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at http://www.ferc.gov. Persons unable to file electronically should
submit an original and 7 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: May 22, 2019.
Dated: May 1, 2019.
Kimberly D. Bose,
Secretary.