[Federal Register Volume 84, Number 64 (Wednesday, April 3, 2019)]
[Notices]
[Pages 13031-13032]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-06457]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2221-039]


Empire District Electric Company; Notice of Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Non-project use of project lands and water.
    b. Project No: 2221-039.
    c. Date Filed: February 28, 2019.
    d. Applicant: Empire District Electric Company (licensee).
    e. Name of Project: Ozark Beach Hydroelectric Project.
    f. Location: The project is located on the White River in Taney 
County, Missouri.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Randy Richardson, Plant Manager, Empire 
District Electric Company, 3292 State Hwy Y, Forsyth, MO 65653; phone 
417-625-6138, [email protected].
    i. FERC Contact: Robert Ballantine at 202-502-6289, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: April 29, 2019.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2221-039. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee requests, on behalf of the 
City of Branson, Missouri, that the Commission approve a non-
hydroelectric project use of reservoir water to reflect the in-place, 
water withdrawal operation of the City's two drinking water treatment 
plants (Cliff Drive and Meadows). The project

[[Page 13032]]

license caps the licensee's ability to grant approval of water 
withdrawal requests, from the project reservoir, to no more than one 
million gallons per day (MGD). Water withdrawals greater that 1 MGD 
must be approved by the Commission. The plants currently withdrawal on 
average, 3.74 MGD and future expansion would raise the withdrawal to 
11.2 MGD.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling 202-502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 866-208-3676 or email 
[email protected], for TTY, call 202-502-8659. A copy is also 
available for inspection and reproduction at the address in item (h) 
above. Agencies may obtain copies of the application directly from the 
applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS; PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
commenting, protesting or intervening; and (4) otherwise comply with 
the requirements of 18 CFR 385.2001 through 385.2005. All comments, 
motions to intervene, or protests, must set forth their evidentiary 
basis. Any filing made by an intervenor must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Dated: March 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-06457 Filed 4-2-19; 8:45 am]
 BILLING CODE 6717-01-P