NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-277 and 50-278; NRC-2018-0266]


Exelon Generation Company, LLC; Peach Bottom Atomic Power 
Station; Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; withdrawal by applicant.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has granted the 
request of Exelon Generation Company, LLC to withdraw its application 
dated September 27, 2018, for proposed amendments to Renewed Facility 
Operating License Nos. DPR-44 and DPR-56. The proposed amendments would 
have modified Technical Specification (TS) 3.3.6.2, ``Secondary 
Containment Isolation Instrumentation.''

DATES: March 27, 2019.

ADDRESSES: Please refer to Docket ID NRC-2018-0266 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0266. Address 
questions about Docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ``Peach Bottom, Units 2 and 3, 
License Amendment Request--Technical Specifications Section 3.3.6.2 
Functions 3 and 4 Applicability Changes Pertaining to Reactor Building 
and Refueling Floor Ventilation,'' is available in ADAMS under 
Accession No. ML18271A009.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Jennifer Tobin, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 
20555-0001; telephone: 301-415-2328; email: [email protected].

SUPPLEMENTARY INFORMATION: The NRC has granted the request of Exelon 
Generation Company, LLC (the licensee) to withdraw its September 27, 
2018, application (ADAMS Accession No. ML18271A009) for proposed 
amendments to Renewed Facility Operating License Nos. DPR-44 and DPR-56 
for the Peach Bottom Atomic Power Station, Units 2 and 3, respectively, 
located in York County, Pennsylvania.
    The proposed amendments would have authorized revisions to TS 
3.3.6.2, ``Secondary Containment Isolation Instrumentation,'' to modify 
the applicability of Functions 3 and 4. Specifically, Function 3 
(reactor building ventilation exhaust radiation--high) would have been 
revised to only be required when Function 4 (refueling floor 
ventilation exhaust radiation--high) was not maintained. Function 4 
would have been revised to only be required when Function 3 was not 
maintained. Further, this change would have clarified which standby gas 
treatment subsystems were required to be put into operation or declared 
inoperable as described in TS 3.3.6.2, Condition C, for Required 
Actions C.2.1 and C.2.2.
    On November 20, 2018, a Federal Register notice was published (83 
FR 58612) indicating a finding of no significant impact for the 
proposed license amendment. On March 11, 2019 (ADAMS Accession No. 
ML19071A062), the licensee sent a letter requesting withdrawal of the 
license amendment application.

    Dated at Rockville, Maryland, this 21st day of March, 2019.

    For the Nuclear Regulatory Commission.
Jennifer C. Tobin,
Project Manager, Plant Licensing Branch LPL-1, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2019-05804 Filed 3-26-19; 8:45 am]