DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-26-000]
Dominion Energy Transmission, Inc.; Notice of Schedule for
Environmental Review of the West Loop Project
On December 18, 2018, Dominion Energy Transmission, Inc. (DETI)
filed an application in Docket No. CP19-26-000 requesting a Certificate
of Public Convenience and Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the West Loop Project
(Project), and would provide 150,000 dekatherms per day of natural gas
to a new power plant that is being built in Columbiana County, Ohio to
replace retiring coal-fired power and help meet the increasing demand
for electricity in the Midwest.
[[Page 10311]]
On December 31, 2018, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA May 28, 2019
90-day Federal Authorization Decision Deadline August 26, 2019
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The West Loop Project consists of 5.1 miles of natural gas pipeline
loop in Beaver County, Pennsylvania; modifications at two existing
compressor stations in Beaver County Pennsylvania and Carroll County,
Ohio; and other appurtenant facilities at existing aboveground
facilities in Beaver and Lawrence Counties, Pennsylvania.
Background
On January 9, 2019, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed West Loop Project
and Request for Comments on Environmental Issues (NOI). The NOI was
sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. No comments have been received.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and
``Docket Number'' excluding the last three digits (i.e., CP19-26), and
follow the instructions. For assistance with access to eLibrary, the
helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: March 14, 2019.
Kimberly D. Bose,
Secretary.