DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2165-091]


Duke Energy Carolinas, LLC; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amended Shoreline Management Plan.
    b. Project No: 2165-091.
    c. Date Filed: December 20, 2018.
    d. Applicant: Alabama Power Company.
    e. Name of Project: Warrior River Hydroelectric Project.
    f. Location: The Black Warrior River and Sipsey Fork in Cullman, 
Walker, Winston, and Tuscaloosa counties, Alabama.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Laura Winston, Alabama Power Company, 600 
18th Street North, Shoreline Management 12N-0791, Birmingham, Alabama 
35203, (205) 257-4847.
    i. FERC Contact: Mark Carter, (678) 245-3083, [email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: March 25, 2019.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2165-091. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: As required by ordering paragraph (D) of 
the January 7, 2013 Order Modifying and Approving Shoreline Management 
Plan, Alabama Power Company (licensee) underwent a six-year review 
process (including stakeholder consultation) and as a result, requests 
Commission approval of an amended shoreline management plan (SMP) for 
the project. The licensee proposes minor changes to the approved SMP, 
as follows: (1) Removing the requirement for a shoreline

[[Page 6779]]

classification called Developed National Forest Service Lands; (2) 
expansion of the residential non-project use permitting process (e.g., 
for closed-loop geothermal systems and dry hydrants); and (3) expanding 
the licensee's authority to permit existing reservoir crossings (e.g., 
roads, bridges, utility lines, etc.).
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov using the eLibrary 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
commenting, protesting or intervening; and (4) otherwise comply with 
the requirements of 18 CFR 385.2001 through 385.2005. All comments, 
motions to intervene, or protests must set forth their evidentiary 
basis. Any filing made by an intervenor must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Dated: February 21, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-03437 Filed 2-27-19; 8:45 am]
BILLING CODE 6717-01-P