[Federal Register Volume 84, Number 28 (Monday, February 11, 2019)]
[Notices]
[Pages 3232-3242]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-01865]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[OMB Control Number 1010-0176; Docket ID: BOEM-2018-0016]


Agency Information Collection Activities; 30 CFR 585, Renewable 
Energy and Alternate Uses of Existing Facilities on the Outer 
Continental Shelf

AGENCY: Bureau of Ocean Energy Management, Interior.

ACTION: Notice of information collection; request for comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Paperwork Reduction Act of 1995, the 
Bureau of Ocean Energy Management (BOEM) is proposing to renew an 
information collection.

DATES: Interested persons are invited to submit comments on or before 
April 12, 2019.

ADDRESSES: Send your comments on this information collection request 
(ICR) by mail to the BOEM Information Collection Clearance Officer, 
Anna Atkinson, Bureau of Ocean Energy Management, 45600 Woodland Road, 
Sterling, Virginia 20166; or by email to [email protected]. Please 
reference OMB Control Number 1010-0176 in the subject line of your 
comments.

FOR FURTHER INFORMATION CONTACT: To request additional information 
about this ICR, contact Anna Atkinson by email, or by telephone at 703-
787-1025.

SUPPLEMENTARY INFORMATION: In accordance with the Paperwork Reduction 
Act of 1995, we provide the general public and other Federal agencies 
with an opportunity to comment on new, proposed, revised, and 
continuing collections of information. This helps us assess the impact 
of our information collection requirements and minimize the public's 
reporting burden. It also helps the public understand our information 
collection requirements and provide the requested data in the desired 
format.
    We are soliciting comments on the proposed ICR that is described 
below. We are especially interested in public comment addressing the 
following issues: (1) Is the collection necessary to the proper 
functions of BOEM; (2) will this information be processed and used in a 
timely manner; (3) is the estimate of burden accurate; (4) how might 
BOEM enhance the quality, utility, and clarity of the information to be 
collected; and (5) how might BOEM minimize the burden of this 
collection on the respondents, including minimizing the burden through 
the use of information technology.
    Comments that you submit in response to this notice are a matter of 
public record. We will include or summarize each comment in our request 
to Office of Management and Budget (OMB) for approval of this ICR. 
Before including your address, phone number, email address, or other 
personal identifying information in your comment, you should be aware 
that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comments to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.
    Abstract: The information collection request concerns the paperwork 
requirements in the regulations under 30 CFR part 585, Renewable Energy 
and Alternate Uses of Existing Facilities on the Outer Continental 
Shelf (OCS) issued pursuant to the OCS Lands Act, as amended (43 U.S.C. 
1331 et seq. and 43 U.S.C. 1801 et seq.). The OCS Lands Act at 
subsection 8(p) (43 U.S.C. 1337(p)) authorizes the Secretary of the 
Interior to issue leases, easements, or rights-of way on the OCS for 
activities that produce or support production, transportation, or 
transmission of energy from sources other than oil and gas, including 
renewable energy. Subsection 8(p) directs the Secretary of the Interior 
to issue any necessary regulations to carry out the OCS renewable 
energy program. The Secretary delegated this authority to BOEM. BOEM 
has issued regulations for OCS renewable energy activities at 30 CFR 
part 585; this notice concerns the reporting and recordkeeping elements 
required by these regulations.
    Respondents are lessees and grantees submitting plans for--and, if 
such plans are approved, constructing, operating, maintaining, and 
decommissioning--commercial and noncommercial renewable energy projects 
on the OCS. BOEM must ensure that these activities are carried out in a 
manner that provides for, among other things, safety, protection of the 
environment, and consideration of other users of the OCS. In order to 
execute its duties, BOEM requires information regarding potential 
purchasers of leases, grants, and rights-of-way, their proposed 
activities and their payments to the Treasury and financial assurance.
    BOEM uses forms to collect some information to ensure proper and 
efficient administration of OCS renewable energy leases and grants and 
to document the financial responsibility of lessees and grantees. Forms 
BOEM-0002, BOEM-0003, BOEM-0004, and BOEM-0006 are used by renewable 
energy entities on the OCS to assign a lease interest, designate an 
operator, and to assign or relinquish a lease or grant. Form BOEM-0005 
was designed to document a surety's guarantee of the performance of 
lessees and grantees with respect to bonds issued on behalf of OCS 
renewable energy lessees, grantees, and operators. BOEM maintains the 
submitted forms as official lease and grant records pertaining to 
operating responsibilities, ownership, and financial responsibility.
    BOEM protects proprietary information in accordance with the 
Freedom of Information Act (5 U.S.C. 552) and the Department of the 
Interior's implementing regulations (43 CFR part 2), and under 
regulations at 30 CFR 585.113, addressing disclosure of data and 
information to be made available to the public and others.
    Title of Collection: 30 CFR 585, Renewable Energy and Alternate 
Uses of Existing Facilities on the Outer Continental Shelf.
    OMB Control Number: 1010-0176.
    Form Number:
     BOEM-0002, Outer Continental Shelf (OCS) Renewable Energy 
Assignment of Grant;
     BOEM-0003, Assignment of Record Title Interest in Federal 
OCS Renewable Energy Lease;
     BOEM-0004, Outer Continental Shelf (OCS) Renewable Energy 
Lease or Grant Relinquishment Application;
     BOEM-0005, Outer Continental Shelf (OCS) Renewable Energy 
Lessee's, Grantee's, and Operator's Bond; and

[[Page 3233]]

     BOEM-0006, Outer Continental Shelf (OCS) Renewable Energy 
Lease or Grant Designation of Operator.
    Type of Review: Extension of a currently approved collection.
    Respondents/Affected Public: Companies interested in renewable 
energy-related uses on the OCS and holders of leases and grants under 
30 CFR part 585.
    Total Estimated Number of Annual Responses: 267 responses.
    Total Estimated Number of Annual Burden Hours: 18,784 hours.
    Respondent's Obligation: Mandatory or Required to Obtain or Retain 
a Benefit.
    Frequency of Collection: On occasion or annually.
    Total Estimated Annual Non-hour Burden Cost: $3,816,000 non-hour 
costs. The non-hour cost burdens consist of service fees for BOEM 
document/study preparation, costs for paying a contractor instead of 
BOEM, and costs for a site-specific study and report to evaluate the 
cause of harm to natural resources.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this collection is 18,784 hours. The following 
table details the individual components and estimated hour burdens. In 
calculating the burdens, we assumed that respondents perform certain 
requirements in the normal course of their activities. We consider some 
information collection activities to be usual and customary and took 
that into account in estimating the burden.
    The following table details the individual BOEM components and 
respective burden hours of this ICR. In calculating the burden hours, 
we assumed that respondents perform certain usual and customary 
requirements in the normal course of their activities.

                                                  Burden Table
----------------------------------------------------------------------------------------------------------------
                                      Reporting and
    Section(s) in 30 CFR 585          recordkeeping           Hour burden      Average number of   Annual burden
                                     requirement \1\                           annual responses        hours
----------------------------------------------------------------------------------------------------------------
                                            Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                          Subpart A--General Provisions
----------------------------------------------------------------------------------------------------------------
102; 105; 110..................   These sections contain general references to responsibilities,               0
                                    submitting requests, applications, plans, notices, reports,
                                  and/or supplemental information needed to support requests for
                                    BOEM approval--burdens covered under specific requirements.
----------------------------------------------------------------------------------------------------------------
102(e).........................  State(s), local          1.................  2 agreements......               2
                                  government(s), and/or
                                  Indian Tribe(s) enter
                                  into task force or
                                  joint planning or
                                  coordination agreement
                                  with BOEM.
----------------------------------------------------------------------------------------------------------------
103; 904;......................  Request general          2.................  6 requests........              12
                                  departures not
                                  specifically covered
                                  elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
105(c).........................  Make oral requests or    1.................  5 requests........               5
                                  notifications and
                                  submit written follow
                                  up within 3 business
                                  days not specifically
                                  covered elsewhere in
                                  part 585.
----------------------------------------------------------------------------------------------------------------
106; 107; 213(e); 230(f);        Submit evidence of       2.................  20 submissions....              40
 302(a); 408(b)(7); 409(c);       qualifications to hold
 1005(d); 1007(c); 1013(b)(7).    a lease or grant;
                                  submit required
                                  supporting information
                                  (electronically if
                                  required).
----------------------------------------------------------------------------------------------------------------
106(b)(1)......................  Request exception from   1.................  1 exception.......               1
                                  exclusion or
                                  disqualification from
                                  participating in
                                  transactions covered
                                  by Federal non-
                                  procurement debarment
                                  and suspension system.
----------------------------------------------------------------------------------------------------------------
106(b)(2), 118(c), 225(b); 436;  Request reconsideration   Requirement not considered IC under 5               0
 437; 527(c); 705(c)(2); 1016.    and/or hearing.                    CFR 1320.3(h)(9).
----------------------------------------------------------------------------------------------------------------
108; 530(b)....................  Notify BOEM within 3     1.................  1 notice..........               1
                                  business days after
                                  learning of any action
                                  filed alleging
                                  respondent is
                                  insolvent or bankrupt.
----------------------------------------------------------------------------------------------------------------
109............................  Notify BOEM in writing    Requirement not considered IC under 5               0
                                  of merger, name                    CFR 1320.3(h)(1).
                                  change, or change of
                                  business form no later
                                  than 120 days after
                                  earliest of either the
                                  effective date or
                                  filing date.
----------------------------------------------------------------------------------------------------------------
111............................  Within 30 days of        .5................  4 submissions.....               2
                                  receiving bill, submit
                                  processing fee
                                  payments for BOEM
                                  document or study
                                  preparation to process
                                  applications and other
                                  requests.
                                                         -------------------------------------------------------
                                                                       4 payments x $4,000 = $16,000
----------------------------------------------------------------------------------------------------------------
111(b)(2), (3).................  Submit comments on       2.................  4 requests........               8
                                  proposed processing
                                  fee or request
                                  approval to perform or
                                  directly pay
                                  contractor for all or
                                  part of any document,
                                  study, or other
                                  activity, to reduce
                                  BOEM processing costs.
----------------------------------------------------------------------------------------------------------------

[[Page 3234]]

 
111(b)(3)......................  Perform, conduct,        12,000............  1 submission......          12,000
                                  develop, etc., all or
                                  part of any document,
                                  study, or other
                                  activity; and provide
                                  results to BOEM to
                                  reduce BOEM processing
                                  fee.
----------------------------------------------------------------------------------------------------------------
111(b)(3)......................  Pay contractor for all              3 studies x $950,000 = $2,850,000
                                  or part of any
                                  document, study, or
                                  other activity, and
                                  provide results to
                                  BOEM to reduce BOEM
                                  processing costs.
----------------------------------------------------------------------------------------------------------------
111(b)(7); 118(a); 436(c)......  Appeal BOEM estimated     Exempt under 5 CFR 1320.4(a)(2), (c).               0
                                  processing costs,
                                  decisions, or orders
                                  pursuant to 30 CFR 590.
----------------------------------------------------------------------------------------------------------------
115(c).........................  Request approval to use  1.................  1 request.........               1
                                  later edition of a
                                  document incorporated
                                  by reference or
                                  alternative compliance.
----------------------------------------------------------------------------------------------------------------
118(c); 225(b).................  Within 15 days of bid     Requirement not considered IC under 5               0
                                  rejection, request                 CFR 1320.3(h)(9).
                                  reconsideration of bid
                                  decision or rejection.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  45 responses......          12,072
----------------------------------------------------------------------------------------------------------------
                                          $2,866,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                               Subpart B--Issuance of OCS Renewable Energy Leases
----------------------------------------------------------------------------------------------------------------
200; 224; 231; 235; 236; 238...   These sections contain references to information submissions,                0
                                   approvals, requests, applications, plans, payments, etc., the
                                       burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
210; 211(a-c); 212 thru 216....  Submit nominations and    Not considered IC as defined in 5 CFR               0
                                  general comments in                  1320.3(h)(4).
                                  response to Federal
                                  Register notices on
                                  Request for Interest
                                  in OCS Leasing, Call
                                  for Information and
                                  Nominations (Call),
                                  Area Identification,
                                  and Notices of Sale.
                                  Includes industry,
                                  State & local
                                  governments.
----------------------------------------------------------------------------------------------------------------
210; 211(a-c); 212 thru 216....  Submit required          4.................  30 responses......             120
                                  information in
                                  response to Federal
                                  Register notices on
                                  Request for Interest
                                  in OCS Leasing, Call
                                  for Information and
                                  Nominations (Call),
                                  Area Identification,
                                  and Notices of Sale.
                                  Includes industry,
                                  State & local
                                  governments.
----------------------------------------------------------------------------------------------------------------
211(d); 216; 220 thru 223;       Submit bid, payments,    5.................  12 bids...........              60
 231(c)(2).                       and required
                                  information in
                                  response to Federal
                                  Register Final Sale
                                  Notice.
----------------------------------------------------------------------------------------------------------------
224............................  Within 10 business       1.................  2 lease executions               2
                                  days, execute 3 copies
                                  of lease form and
                                  return to BOEM with
                                  required payments,
                                  including evidence
                                  that agent is
                                  authorized to act for
                                  bidder; if applicable,
                                  submit information to
                                  support delay in
                                  execution--competitive
                                  leases.
----------------------------------------------------------------------------------------------------------------
230; 231(a)....................  Submit unsolicited       5.................  2 requests........              10
                                  request and
                                  acquisition fee for a
                                  commercial or limited
                                  lease.
----------------------------------------------------------------------------------------------------------------
231(b).........................  Submit comments in       4.................  4 comments........              16
                                  response to public
                                  notice re interest of
                                  unsolicited request
                                  for a lease.
----------------------------------------------------------------------------------------------------------------
231(g).........................  Within 10 business days  2.................  2 leases..........               4
                                  of receiving lease
                                  documents, execute
                                  lease; file financial
                                  assurance and
                                  supporting
                                  documentation--noncomp
                                  etitive leases.
----------------------------------------------------------------------------------------------------------------
231(g).........................  Within 45 days of            Burdens covered by information                   0
                                  receiving lease           collections approved for ONRR 30 CFR
                                  copies, submit rent                   Chapter XII.
                                  and rent information.
----------------------------------------------------------------------------------------------------------------
235(b); 236(b).................  Request additional time  1.................  3 requests........               3
                                  to extend preliminary
                                  or site assessment
                                  term of commercial or
                                  limited lease,
                                  including revised
                                  schedule for SAP, COP,
                                  or GAP submission.
----------------------------------------------------------------------------------------------------------------
237(b).........................  Request lease be dated   1.................  1 request.........               1
                                  and effective 1st day
                                  of month in which
                                  signed.
----------------------------------------------------------------------------------------------------------------

[[Page 3235]]

 
238............................  Submit request for       4.................  1 request.........               4
                                  renewable energy
                                  research lease.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  57 responses......             220
----------------------------------------------------------------------------------------------------------------
                      Subpart C--ROW Grants and RUE Grants for Renewable Energy Activities
----------------------------------------------------------------------------------------------------------------
306; 309; 315; 316.............   These sections contain references to information submissions,                0
                                   approvals, requests, applications, plans, payments, etc., the
                                       burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
302(a); 305; 306...............  Submit copies of a       5.................  1 request.........               5
                                  request for a new or
                                  modified ROW or RUE
                                  and required
                                  information, including
                                  qualifications to hold
                                  a grant, in format
                                  specified.
----------------------------------------------------------------------------------------------------------------
308(a).........................  Submit comments in       4.................  2 comments........               8
                                  response to public
                                  notice of grant
                                  auction.
----------------------------------------------------------------------------------------------------------------
308(a)(2), (b); 315; 316.......  Submit bid and payments  5.................  1 bid.............               5
                                  in response to Federal
                                  Register notice of
                                  auction for a ROW or
                                  RUE grant.
----------------------------------------------------------------------------------------------------------------
309............................  Submit decision to       2.................  1 submission......               2
                                  accept or reject terms
                                  and conditions of
                                  noncompetitive ROW or
                                  RUE grant.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  5 responses.......              20
----------------------------------------------------------------------------------------------------------------
                                    Subpart D--Lease and Grant Administration
----------------------------------------------------------------------------------------------------------------
400; 401; 402; 405; 409; 416,     These sections contain references to information submissions,                0
 433.                              approvals, requests, applications, plans, payments, etc., the
                                       burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
401(b).........................  Take measures directed   100...............  1 report..........             100
                                  by BOEM in cessation
                                  order and submit
                                  reports in order to
                                  resume activities.
----------------------------------------------------------------------------------------------------------------
405(d).........................  Submit written notice     Requirement not considered IC under 5               0
                                  of change of address.              CFR 1320.3(h)(1).
----------------------------------------------------------------------------------------------------------------
405(e); Form BOEM-0006.........  If designated operator   1.................  1 notice..........               1
                                  (DO) changes, notify
                                  BOEM and identify new
                                  DO for BOEM approval.
----------------------------------------------------------------------------------------------------------------
408 thru 411; Forms BOEM-0002    Within 90 days after     1 (30 minutes per   2 requests/                      2
 and BOEM-0003.                   last party executes a    form x 2 forms =    submissions.
                                  transfer agreement,      1 hour).
                                  submit copies of a
                                  lease or grant
                                  assignment
                                  application, including
                                  originals of each
                                  instrument creating or
                                  transferring ownership
                                  of record title,
                                  eligibility and other
                                  qualifications; and
                                  evidence that agent is
                                  authorized to execute
                                  assignment, in format
                                  specified.
----------------------------------------------------------------------------------------------------------------
415(a)(1); 416; 420(a), (b);     Submit request for       10................  1 request.........              10
 428(b).                          suspension and
                                  required information/
                                  payment no later than
                                  90 days prior to lease
                                  or grant expiration.
----------------------------------------------------------------------------------------------------------------
417(b).........................  Conduct, and if          100...............  1 study/submission             100
                                  required pay for, site-
                                  specific study to
                                  evaluate cause of harm
                                  or damage; and submit
                                  copies of study and
                                  results, in format
                                  specified.
                                                         -------------------------------------------------------
                                                  1 study x $950,000 = $950,000
----------------------------------------------------------------------------------------------------------------
425 thru 428; 652(a); 235(a),    Request lease or grant   6.................  1 request.........               6
 (b).                             renewal no later than
                                  180 days before
                                  termination date of
                                  your limited lease or
                                  grant, or no later
                                  than 2 years before
                                  termination date of
                                  operations term of
                                  commercial lease.
                                  Submit required
                                  information.
----------------------------------------------------------------------------------------------------------------
435; 658(c)(2); Form BOEM-0004.  Submit copies of         1.................  1 submission......               1
                                  application to
                                  relinquish lease or
                                  grant, in format
                                  specified.
----------------------------------------------------------------------------------------------------------------
436; 437.......................  Provide information for   Requirement not considered IC under 5               0
                                  reconsideration of                 CFR 1320.3(h)(9).
                                  BOEM decision to
                                  contract or cancel
                                  lease or grant area.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  8 responses.......             220
                                                                             -----------------------------------

[[Page 3236]]

 
                                           $950,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                            Subpart E--Payments and Financial Assurance Requirements
----------------------------------------------------------------------------------------------------------------
An * indicates the primary cites for providing bonds or other financial assurance, and the                     0
 burdens include any previous or subsequent references throughout part 585 to furnish, replace,
 or provide additional bonds, securities, or financial assurance (including riders,
 cancellations, replacements). This subpart contains references to other information
 submissions, approvals, requests, applications, plans, etc., the burdens for which are covered
 elsewhere in part 585. In the future BOEM may require electronic filings of certain
 submissions.
----------------------------------------------------------------------------------------------------------------
500 thru 509; 1011.............  Submit payor                 Burdens covered by information                   0
                                  information, payments     collections approved for ONRR 30 CFR
                                  and payment                           Chapter XII.
                                  information, and
                                  maintain auditable
                                  records according to
                                  ONRR regulations or
                                  guidance.
----------------------------------------------------------------------------------------------------------------
506(c)(4)......................  Submit documentation of  15 min............  2 submissions.....               1
                                  the gross annual
                                  generation of
                                  electricity produced
                                  by the generating
                                  facility on the lease--
                                  use same form as
                                  authorized by the EIA.
                                  (DOE/EIA OMB Control
                                  Number 1905-0129
                                  covers burden to
                                  gather info and fill
                                  out form. BOEM's
                                  burden is for
                                  submitting a copy).
----------------------------------------------------------------------------------------------------------------
510; 506(c)(3).................  Submit application and   1.................  1 submission......               1
                                  required information
                                  for waiver or
                                  reduction of rental or
                                  other payment.
----------------------------------------------------------------------------------------------------------------
* 515; 516; 525(a) thru (f)....  Execute and provide      1.................  2 bonds...........               2
                                  $100,000 minimum lease-
                                  specific bond or other
                                  approved security; or
                                  increase bond level if
                                  required.
----------------------------------------------------------------------------------------------------------------
* 516(a)(2), (3), (b), (c);      Execute and provide      1.................  2 bonds...........               2
 517; 525(a) thru (f).            commercial lease
                                  supplemental bonds in
                                  amounts determined by
                                  BOEM.
----------------------------------------------------------------------------------------------------------------
516(a)(4); 521(c)..............  Execute and provide      1.................  1 bond............               1
                                  decommissioning bond
                                  or other financial
                                  assurance; schedule
                                  for providing the
                                  appropriate amount.
----------------------------------------------------------------------------------------------------------------
517(c)(1)......................  Submit comments on       1.................  1 submission......               1
                                  proposed adjustment to
                                  bond amounts.
----------------------------------------------------------------------------------------------------------------
517(c)(2)......................  Request bond reduction   5.................  1 request.........               5
                                  and submit evidence to
                                  justify.
----------------------------------------------------------------------------------------------------------------
* 520; 521; 525(a) thru (f);     Execute and provide      1.................  1 bond............               1
 Form BOEM-0005.                  $300,000 minimum
                                  limited lease or grant-
                                  specific bond or
                                  increase financial
                                  assurance and submit
                                  required information.
----------------------------------------------------------------------------------------------------------------
525(g).........................  Surety notice to lessee  1.................  1 surety notice...               1
                                  or ROW/RUE grant
                                  holder and BOEM within
                                  5 business days after
                                  initiating surety
                                  insolvency or
                                  bankruptcy proceeding,
                                  or Treasury
                                  decertifies surety.
----------------------------------------------------------------------------------------------------------------
* 526 Form BOEM-0005...........  In lieu of surety bond,  2.................  1 pledge..........               2
                                  pledge other types of
                                  securities, including
                                  authority for BOEM to
                                  sell and use proceeds
                                  and submit required
                                  information (1 hour
                                  for form).
----------------------------------------------------------------------------------------------------------------
526(c).........................  Provide annual           1.................  1 statement.......               1
                                  certified statements
                                  describing the nature
                                  and market value,
                                  including brokerage
                                  firm statements/
                                  reports.
----------------------------------------------------------------------------------------------------------------
* 527; 531.....................  Demonstrate financial    10................  1 demonstration...              10
                                  worth/ability to carry
                                  out present and future
                                  financial obligations,
                                  annual updates, and
                                  related or subsequent
                                  actions/records/
                                  reports, etc.
----------------------------------------------------------------------------------------------------------------
528............................  Provide third-party      10................  1 submission......              10
                                  indemnity; financial
                                  information/
                                  statements; additional
                                  information related to
                                  bonds; executed
                                  guarantor agreement
                                  and supporting
                                  information/
                                  documentation/
                                  agreements.
----------------------------------------------------------------------------------------------------------------

[[Page 3237]]

 
528(c)(6); 532(b)..............  Guarantor/Surety         1.................  1 request.........               1
                                  requests BOEM
                                  terminate period of
                                  liability and notifies
                                  lessee or ROW/RUE
                                  grant holder, etc.
----------------------------------------------------------------------------------------------------------------
* 529..........................  In lieu of surety bond,  2.................  1 request.........               2
                                  request authorization
                                  to establish
                                  decommissioning
                                  account, including
                                  pledge of Treasury
                                  securities and any
                                  requirement commitment
                                  of a stream of
                                  revenues.
----------------------------------------------------------------------------------------------------------------
530............................  Notify BOEM promptly of  1.................  1 notice..........               1
                                  lapse in bond or other
                                  security/action filed
                                  alleging lessee,
                                  surety or guarantor et
                                  al is insolvent or
                                  bankrupt.
----------------------------------------------------------------------------------------------------------------
533(a)(2)(ii), (iii)...........  Provide agreement from   3.................  1 submission......               3
                                  surety issuing new
                                  bond to assume all or
                                  portion of outstanding
                                  liabilities.
----------------------------------------------------------------------------------------------------------------
536(b).........................  Within 10 business days  16................  1 demonstration                  8
                                  following BOEM notice,                       every 2 years.
                                  lessee, grant holder,
                                  or surety agrees to
                                  and demonstrates to
                                  BOEM that lease will
                                  be brought into
                                  compliance.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  21 responses......              53
----------------------------------------------------------------------------------------------------------------
                                  Subpart F--Plans and Information Requirements
----------------------------------------------------------------------------------------------------------------
Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations                0
 Plans (COPs), and General Activities Plans (GAPs); and the burdens include any previous or
 subsequent references throughout part 585 to submission and approval. This subpart contains
 references to other information submissions, approvals, requests, applications, plans, etc.,
 the burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
** 600(a); 601(a), (b); 605      Within time specified    240...............  2 SAPs............             480
 thru 614; 238; 810.              after issuance of a
                                  competitive lease or
                                  grant, or within time
                                  specified after
                                  determination of no
                                  competitive interest,
                                  submit copies of SAP,
                                  including required
                                  information to assist
                                  BOEM to comply with
                                  NEPA/CZMA such as
                                  hazard info, air
                                  quality, SEMS, and all
                                  required information,
                                  certifications,
                                  requests, etc., in
                                  format specified.
----------------------------------------------------------------------------------------------------------------
** 600(b); 601(c), (d)(1);       If requesting an         1,000.............  2 COPs............           2,000
 606(b); 618; 620 thru 629;       operations term for
 632; 633; 810.                   commercial lease,
                                  within time specified
                                  before the end of site
                                  assessment term,
                                  submit copies of COP,
                                  or FERC license
                                  application, including
                                  required information
                                  to assist BOEM to
                                  comply with NEPA/CZMA
                                  such as hazard info,
                                  air quality, SEMS, and
                                  all required
                                  information, surveys
                                  and/or their results,
                                  reports,
                                  certifications,
                                  project easements,
                                  supporting data and
                                  information, requests,
                                  etc., in format
                                  specified.
----------------------------------------------------------------------------------------------------------------
** 600(c); 601(a), (b); 640      Within time specified    240...............  2 GAP.............             480
 thru 648; 651; 238; 810.         after issuance of a
                                  competitive lease or
                                  grant, or within time
                                  specified after
                                  determination of no
                                  competitive interest,
                                  submit copies of GAP,
                                  including required
                                  information to assist
                                  BOEM to comply with
                                  NEPA/CZMA such as
                                  hazard info, air
                                  quality, SEMS, and all
                                  required information,
                                  surveys and reports,
                                  certifications,
                                  project easements,
                                  requests, etc., in
                                  format specified.
----------------------------------------------------------------------------------------------------------------
** 601(d)(2); 622; 628(f); 632;  Submit revised or        50................  1 revised or                    50
 634; 658(c)(3); 907.             modified COPs,                               modified COP.
                                  including project
                                  easements, and all
                                  required additional
                                  information.
----------------------------------------------------------------------------------------------------------------
602 \2\........................  Until BOEM releases      2.................  9 records/                      18
                                  financial assurance,                         submissions.
                                  respondents must
                                  maintain, and provide
                                  to BOEM if requested,
                                  all data and
                                  information related to
                                  compliance with
                                  required terms and
                                  conditions of SAP,
                                  COP, or GAP.
----------------------------------------------------------------------------------------------------------------
** 613(a), (d), (e); 617.......  Submit revised or        50................  1 revised or                    50
                                  modified SAPs and                            modified SAP.
                                  required additional
                                  information.
----------------------------------------------------------------------------------------------------------------

[[Page 3238]]

 
612; 647.......................  Submit copy of SAP or    1.................  2 leases..........               2
                                  GAP consistency
                                  certification and
                                  supporting
                                  documentation,
                                  including
                                  noncompetitive leases.
----------------------------------------------------------------------------------------------------------------
615(a).........................  Notify BOEM in writing   1.................  2 notices.........               2
                                  within 30 days of
                                  completion of
                                  construction and
                                  installation
                                  activities under SAP.
----------------------------------------------------------------------------------------------------------------
615(b).........................  Submit annual report     30................  4 reports.........             120
                                  summarizing findings
                                  from site assessment
                                  activities.
----------------------------------------------------------------------------------------------------------------
615(c).........................  Submit annual, or at     40................  4 certifications..             160
                                  other time periods as
                                  BOEM determines, SAP
                                  compliance
                                  certification,
                                  effectiveness
                                  statement,
                                  recommendations,
                                  reports, supporting
                                  documentation, etc.
----------------------------------------------------------------------------------------------------------------
617(a).........................  Notify BOEM in writing   10................  1 notice..........              10
                                  before conducting any
                                  activities not
                                  approved, or provided
                                  for, in SAP; provide
                                  additional information
                                  if requested.
----------------------------------------------------------------------------------------------------------------
627(c).........................  Submit oil spill         193...............  1 submission......             193
                                  response plan
                                  compliant with BSEE 30
                                  CFR part 254.
----------------------------------------------------------------------------------------------------------------
631............................  Request deviation from   2.................  1 request.........               2
                                  approved COP schedule.
----------------------------------------------------------------------------------------------------------------
633(b).........................  Submit annual, or at     50................  9 certifications..             450
                                  other time periods as
                                  BOEM determines, COP
                                  compliance
                                  certification,
                                  effectiveness
                                  statement,
                                  recommendations,
                                  reports, supporting
                                  documentation, etc.
----------------------------------------------------------------------------------------------------------------
634(a).........................  Notify BOEM in writing   10................  1 notice..........              10
                                  before conducting any
                                  activities not
                                  approved or provided
                                  for in COP, and
                                  provide additional
                                  information if
                                  requested.
----------------------------------------------------------------------------------------------------------------
635............................  Notify BOEM any time     1.................  1 notice..........               1
                                  commercial operations
                                  cease without an
                                  approved suspension.
----------------------------------------------------------------------------------------------------------------
636(a).........................  Notify BOEM in writing   1.................  2 notices.........               2
                                  no later than 30 days
                                  after commencing
                                  activities associated
                                  with placement of
                                  facilities on lease
                                  area.
----------------------------------------------------------------------------------------------------------------
636(b).........................  Notify BOEM in writing   1.................  2 notices.........               2
                                  no later than 30 days
                                  after completion of
                                  construction and
                                  installation
                                  activities.
----------------------------------------------------------------------------------------------------------------
636(c).........................  Notify BOEM in writing   1.................  1 notice..........               1
                                  at least 7 days before
                                  commencing commercial
                                  operations.
----------------------------------------------------------------------------------------------------------------
** 642(b); 648; 655; 658(c)(3).  Submit revised or        50................  1 revised or                    50
                                  modified GAPs and                            modified GAP.
                                  required additional
                                  information.
----------------------------------------------------------------------------------------------------------------
651............................  Before beginning         30................  2 surveys/reports.              60
                                  construction of OCS
                                  facility described in
                                  GAP, complete survey
                                  activities identified
                                  in GAP and submit
                                  initial findings.
                                  [This only includes
                                  the time involved in
                                  submitting the
                                  findings; it does not
                                  include the survey
                                  time as these surveys
                                  would be conducted as
                                  good business
                                  practice.].
----------------------------------------------------------------------------------------------------------------
653(a).........................  Notify BOEM in writing   1.................  2 notices.........               2
                                  within 30 days of
                                  completing
                                  installation
                                  activities under the
                                  GAP.
----------------------------------------------------------------------------------------------------------------
653(b).........................  Submit annual report     30................  4 reports.........             120
                                  summarizing findings
                                  from activities
                                  conducted under
                                  approved GAP.
----------------------------------------------------------------------------------------------------------------
653(c).........................  Submit annual, or at     40................  4 certifications..             160
                                  other time periods as
                                  BOEM determines, GAP
                                  compliance
                                  certification,
                                  recommendations,
                                  reports, etc.
----------------------------------------------------------------------------------------------------------------

[[Page 3239]]

 
655(a).........................  Notify BOEM in writing   10................  1 notice..........              10
                                  before conducting any
                                  activities not
                                  approved or provided
                                  for in GAP, and
                                  provide additional
                                  information if
                                  requested.
----------------------------------------------------------------------------------------------------------------
656............................  Notify BOEM any time     1.................  1 notice..........               1
                                  approved GAP
                                  activities cease
                                  without an approved
                                  suspension.
----------------------------------------------------------------------------------------------------------------
658(c)(1)......................  If after construction,   3.................  1 notice/evidence.               3
                                  cable or pipeline
                                  deviate from approved
                                  COP or GAP, notify
                                  affected lease
                                  operators and ROW/RUE
                                  grant holders of
                                  deviation and provide
                                  BOEM evidence of such
                                  notices.
----------------------------------------------------------------------------------------------------------------
659............................  Determine appropriate    70................  5 reports/                     350
                                  air quality modeling                         information.
                                  protocol, conduct air
                                  quality modeling, and
                                  submit 3 copies of air
                                  quality modeling
                                  report and 3 sets of
                                  digital files as
                                  supporting information
                                  to plans.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  69 responses......           4,789
----------------------------------------------------------------------------------------------------------------
                            Subpart G--Facility Design, Fabrication, and Installation
----------------------------------------------------------------------------------------------------------------
Three *** indicate the primary cites for the reports discussed in this subpart, and the burdens                0
 include any previous or subsequent references throughout part 585 to submitting and obtaining
 approval. This subpart contains references to other information submissions, approvals,
 requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
*** 700(a)(1), (b), (c); 701...  Submit Facility Design   200...............  1 report..........             200
                                  Report, including
                                  copies of the cover
                                  letter, certification
                                  statement, and all
                                  required information
                                  (1-3 paper or
                                  electronic copies as
                                  specified).
----------------------------------------------------------------------------------------------------------------
*** 700(a)(2); (b), (c); 702...  Submit copies of a       160...............  1 report..........             160
                                  Fabrication and
                                  Installation Report,
                                  certification
                                  statement and all
                                  required information,
                                  in format specified.
----------------------------------------------------------------------------------------------------------------
705(a)(3); 707; 712............  Certified Verification   100...............  1 interim report..             100
                                  Agent (CVA) conducts    100...............  1 final report....             100
                                  independent assessment
                                  of the facility design
                                  and submits copies of
                                  all reports/
                                  certifications to
                                  lessee or grant holder
                                  and BOEM--interim
                                  reports if required,
                                  in format specified.
                                                         -------------------------------------------------------
705(a)(3); 708; 709; 710; 712..  CVA conducts             100...............  1 interim report..             100
                                  independent             100...............  1 final report....             100
                                  assessments/
                                  inspections on the
                                  fabrication and
                                  installation
                                  activities, informs
                                  lessee or grant holder
                                  if procedures are
                                  changed or design
                                  specifications are
                                  modified; and submits
                                  copies of all reports/
                                  certifications to
                                  lessee or grant holder
                                  and BOEM--interim
                                  reports if required,
                                  in format specified.
----------------------------------------------------------------------------------------------------------------
*** 703; 705(a)(3); 712; 815...  CVA/project engineer     20................  1 interim report..              20
                                  monitors major project  15................  1 final report....              15
                                  modifications and
                                  repairs and submits
                                  copies of all reports/
                                  certifications to
                                  lessee or grant holder
                                  and BOEM--interim
                                  reports if required,
                                  in format specified.
                                                         -------------------------------------------------------
705(c).........................  Request waiver of CVA    40................  1 waiver..........              40
                                  requirement in
                                  writing; lessee must
                                  demonstrate standard
                                  design and best
                                  practices.
----------------------------------------------------------------------------------------------------------------
706............................  Submit for approval      16................  2 nominations.....              32
                                  with SAP, COP, or GAP,
                                  initial nominations
                                  for a CVA or new
                                  replacement CVA
                                  nomination, and
                                  required information.
----------------------------------------------------------------------------------------------------------------
708(b)(2)......................  Lessee or grant holder   1.................  1 notice..........               1
                                  notify BOEM if
                                  modifications
                                  identified by CVA/
                                  project engineer are
                                  accepted.
----------------------------------------------------------------------------------------------------------------
709(a) (14); 710(a)(2), (e) \2\  Make fabrication         1.................  3 records                        3
                                  quality control,                             retention.
                                  installation towing,
                                  and other records
                                  available to CVA/
                                  project engineer for
                                  review (retention
                                  required by Sec.
                                  585.714).
----------------------------------------------------------------------------------------------------------------
713............................  Notify BOEM within 10    1.................  1 notice..........               1
                                  business days after
                                  commencing commercial
                                  operations.
----------------------------------------------------------------------------------------------------------------

[[Page 3240]]

 
714 \2\........................  Until BOEM releases      100...............  1 lessee..........             100
                                  financial assurance,
                                  compile, retain, and
                                  make available to BOEM
                                  and/or CVA the as-
                                  built drawings, design
                                  assumptions/analyses,
                                  summary of fabrication
                                  and installation
                                  examination records,
                                  inspection results,
                                  and records of repairs
                                  not covered in
                                  inspection report.
                                  Record original and
                                  relevant material test
                                  results of all primary
                                  structural materials;
                                  retain records during
                                  all stages of
                                  construction.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  17 responses......             972
----------------------------------------------------------------------------------------------------------------
 Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted
                                           Under SAPs, COPs, and GAPs
----------------------------------------------------------------------------------------------------------------
801(c), (d)....................  Notify BOEM if           1.................  2 notices.........               2
                                  endangered or
                                  threatened species, or
                                  their designated
                                  critical habitat, may
                                  be in the vicinity of
                                  the lease or grant or
                                  may be affected by
                                  lease or grant
                                  activities.
----------------------------------------------------------------------------------------------------------------
801(e), (f)....................  Submit information to    6.................  2 submissions.....              12
                                  ensure proposed
                                  activities will be
                                  conducted in
                                  compliance with the
                                  Endangered Species Act
                                  (ESA) and Marine
                                  Mammal Protection Act
                                  (MMPA); including
                                  agreements and
                                  mitigating measures
                                  designed to avoid or
                                  minimize adverse
                                  effects and incidental
                                  take of endangered
                                  species or critical
                                  habitat.
----------------------------------------------------------------------------------------------------------------
802; 902(e)....................  Notify BOEM of           3.................  1 notice..........               3
                                  archaeological
                                  resource within 72
                                  hours of discovery.
----------------------------------------------------------------------------------------------------------------
802(b), (c)....................  If requested, conduct    10................  1 report..........              10
                                  further archaeological
                                  investigations and
                                  submit report/
                                  information.
----------------------------------------------------------------------------------------------------------------
802(d).........................  If applicable, submit    .5................  1 payment.........               1
                                  payment for BOEM costs
                                  in carrying out
                                  National Historic
                                  Preservation Act
                                  responsibilities.
----------------------------------------------------------------------------------------------------------------
803............................  If required, conduct     15................  2 survey/report...              30
                                  additional surveys to
                                  define boundaries and
                                  avoidance distances
                                  and submit report.
----------------------------------------------------------------------------------------------------------------
***810; 614; 627; 632(b); 651..  Submit safety            35................  2 submissions.....              70
                                  management system
                                  description with the
                                  SAP, COP, or GAP.
----------------------------------------------------------------------------------------------------------------
813(b)(1)......................  Report within 24 hours   .5................  2 reports.........               1
                                  when any required       1.................  1 written                        1
                                  equipment taken out of                       confirmation.
                                  service for more than
                                  12 hours; provide
                                  written confirmation
                                  if reported orally.
                                                         -------------------------------------------------------
813(b)(3)......................  Notify BOEM when         .5................  2 notices.........               1
                                  equipment returned to
                                  service; provide
                                  written confirmation
                                  if reported orally.
----------------------------------------------------------------------------------------------------------------
815(c).........................  When required, analyze   2.................  1 report..........               2
                                  cable, P/L, or
                                  facility damage or
                                  failures to determine
                                  cause and as soon as
                                  available submit
                                  comprehensive written
                                  report.
----------------------------------------------------------------------------------------------------------------
816............................  Submit plan of           2.................  1 plan/report.....               2
                                  corrective action
                                  report on observed
                                  detrimental effects on
                                  cable, P/L, or
                                  facility within 30
                                  days of discovery;
                                  take remedial action
                                  and submit report of
                                  remedial action within
                                  30 days after
                                  completion.
----------------------------------------------------------------------------------------------------------------
822(a)(2) (iii), (b)...........  Maintain records of      1.................  4 records                        4
                                  design, construction,                        retention.
                                  operation,
                                  maintenance, repairs,
                                  and investigation on
                                  or related to lease or
                                  ROW/RUE area; make
                                  available to BOEM for
                                  inspection.
----------------------------------------------------------------------------------------------------------------
823............................  Request reimbursement    2.................  1 request.........               2
                                  within 90 days for
                                  food, quarters, and
                                  transportation
                                  provided to BOEM reps
                                  during inspection.
----------------------------------------------------------------------------------------------------------------

[[Page 3241]]

 
824(a) \ 2\....................  Develop annual self-     24................  2 plans...........              48
                                  inspection plan
                                  covering all
                                  facilities; retain
                                  with records, and make
                                  available to BOEM upon
                                  request.
----------------------------------------------------------------------------------------------------------------
824(b).........................  Conduct annual self-     36................  2 reports.........              72
                                  inspection and submit
                                  report by November 1.
----------------------------------------------------------------------------------------------------------------
825............................  Based on API RP 2A-WSD,  60................  2 assessments/                 120
                                  perform assessment of                        actions.
                                  structures, initiate
                                  mitigation actions for
                                  structures that do not
                                  pass assessment
                                  process, retain
                                  information, and make
                                  available to BOEM upon
                                  request.
----------------------------------------------------------------------------------------------------------------
830(a), (c); 831 thru 833......  Immediately report       Oral .5...........  2 incidents.......               1
                                  incidents to BOEM via
                                  oral communications,
                                  submit written follow-
                                  up report within 15
                                  business days after
                                  the incident, and
                                  submit any required
                                  additional information.
                                                         -------------------------------------------------------
                                                          Written 4.........  1 incident........               4
----------------------------------------------------------------------------------------------------------------
830(d).........................  Report oil spills as     2.................  1.................               2
                                  required by BSEE 30
                                  CFR part 254.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  33 responses......             388
----------------------------------------------------------------------------------------------------------------
                                           Subpart I--Decommissioning
----------------------------------------------------------------------------------------------------------------
Four **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any
 previous or subsequent references throughout part 585 to submitting and obtaining approval. This subpart
 contains references to other information submissions, approvals, requests, applications, plans, etc., the
 burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
**** 902; 905, 906; 907;         Submit for approval, in  20................  1 application.....              20
 908(c); 909.                     format specified,
                                  copies of the SAP,
                                  COP, or GAP
                                  decommissioning
                                  application and site
                                  clearance plan at
                                  least 2 years before
                                  decommissioning
                                  activities begin, 90
                                  days after completion
                                  of activities, or 90
                                  days after
                                  cancellation,
                                  relinquishment, or
                                  other termination of
                                  lease or grant.
                                  Include documentation
                                  of coordination
                                  efforts w/States/CZMA
                                  agencies, local or
                                  tribal governments,
                                  requests that certain
                                  facilities remain in
                                  place for other
                                  activities, be
                                  converted to an
                                  artificial reef, or be
                                  toppled in place.
                                  Submit additional
                                  information/evidence
                                  requested or modify
                                  and resubmit
                                  application.
----------------------------------------------------------------------------------------------------------------
902(d); 908;...................  Notify BOEM at least 60  1.................  1 notice..........               1
                                  days before commencing
                                  decommissioning
                                  activities.
----------------------------------------------------------------------------------------------------------------
910............................  Within 60 days after     1.................  1 verification....               1
                                  removing a facility,
                                  verify to BOEM that
                                  site is cleared.
----------------------------------------------------------------------------------------------------------------
912............................  Within 60 days after     8.................  1 report..........               8
                                  removing a facility,
                                  cable, or pipeline,
                                  submit a written
                                  report.
----------------------------------------------------------------------------------------------------------------
 BOEM does not anticipate decommissioning activities for at least 5 years so the requirements have been given a
                                                 minimal burden.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  4 responses.......              30
----------------------------------------------------------------------------------------------------------------
             Subpart J--RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities
----------------------------------------------------------------------------------------------------------------
1004, 1005, 1006...............  Contact owner of         1.................  1 request.........               1
                                  existing facility and/
                                  or lessee of the area
                                  to reach preliminary
                                  agreement to use
                                  facility and obtain
                                  concurring signatures;
                                  submit request to BOEM
                                  for an alternative use
                                  RUE, including all
                                  required information/
                                  modifications.
----------------------------------------------------------------------------------------------------------------
1007(a), (b), (c)..............  Submit indication of     4.................  1 submission......               4
                                  competitive interest
                                  in response to Federal
                                  Register notice.
----------------------------------------------------------------------------------------------------------------

[[Page 3242]]

 
1007(c)........................  Submit description of    5.................  1 submission......               5
                                  proposed activities
                                  and required
                                  information in
                                  response to Federal
                                  Register notice of
                                  competitive offering.
----------------------------------------------------------------------------------------------------------------
1007(f)........................  Lessee or owner of       1.................  1 submission......               1
                                  facility submits
                                  decision to accept or
                                  reject proposals
                                  deemed acceptable by
                                  BOEM.
----------------------------------------------------------------------------------------------------------------
1010(c)........................  Request renewal of       6.................  1 request.........               6
                                  Alternate Use RUE.
----------------------------------------------------------------------------------------------------------------
1012; 1016(b)..................  Provide financial        1.................  1 submission......               1
                                  assurance as BOEM
                                  determines in
                                  approving RUE for an
                                  existing facility,
                                  including additional
                                  security if required.
----------------------------------------------------------------------------------------------------------------
1013...........................  Submit request for       1.................  1 request.........               1
                                  assignment of an
                                  alternative use RUE
                                  for an existing
                                  facility, including
                                  all required
                                  information.
----------------------------------------------------------------------------------------------------------------
1015...........................  Request relinquishment   1.................  1 request.........               1
                                  of RUE for an existing
                                  facility.
----------------------------------------------------------------------------------------------------------------
    Subtotal................................................................  8 responses.......              20
----------------------------------------------------------------------------------------------------------------
    Total Burden............................................................  267 responses.....          18,784
                                --------------------------------------------------------------------------------
                                             $3,816,000 Non-Hour
                                                 Cost Burdens
----------------------------------------------------------------------------------------------------------------
\1\ In the future, BOEM may require electronic filing of certain submissions.
\2\ Retention of these records is usual and customary business practice; the burden is primarily to make them
  available to BOEM and CVAs.

    An agency may not conduct or sponsor, and a person is not required 
to respond to, a collection of information unless it displays a 
currently valid OMB control number.
    The authority for this action is the Paperwork Reduction Act of 
1995 (44 U.S.C. 3501 et seq.).

Deanna Meyer-Pietruszka,
Chief, Office of Policy, Regulations, and Analysis.
[FR Doc. 2019-01865 Filed 2-8-19; 8:45 am]
BILLING CODE 4310-MR-P