Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on January 17, 2019, Columbia Gas Transmission, 
LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-
2700, filed an application pursuant to sections 7(b) and 7(c) of the 
Natural Gas Act (NGA) and Part 157 of the Commission's regulations for 
authorization to replace and upgrade its VNG Suffolk No. 3 Meter 
Station, located in Suffolk, Virginia. Columbia states that the 
proposed project will increase the delivery capability of that meter 
station by 8,270 dekatherms per day while maintaining Columbia's 
current certificated capacity levels. Columbia asserts that there will 
be no change in pipeline system capacity as a result of the proposed 
project. Columbia estimates the cost of the project to be approximately 
$6.3 million, all as more fully set forth in the application, which is 
on file with the Commission and open for public inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the eLibrary link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC at [email protected] or toll 
free at (866) 208-3676, or TTY, (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Jonathan Scullion, Regulatory and Commercial Law, TransCanada 
Corporation, 700 Louisiana Street, Houston, Texas 77002, by telephone 
at (832) 320-5520.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made with the Commission and must provide a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this

[[Page 2216]]

project should submit an original and two copies of their comments to 
the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commenters will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new NGA section 3 or 
section 7 proceeding.\1\ Persons desiring to become a party to a 
certificate proceeding are to intervene in a timely manner. If seeking 
to intervene out-of-time, the movant is required to show good cause why 
the time limitation should be waived, and should provide justification 
by reference to factors set forth in Rule 214(d)(1) of the Commission's 
Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 
50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: February 21, 2019.

    Dated: January 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-01187 Filed 2-5-19; 8:45 am]