[Federal Register Volume 83, Number 233 (Tuesday, December 4, 2018)]
[Proposed Rules]
[Pages 62540-62550]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-25506]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Parts 19 and 52
[FAR Case 2016-011; Docket No. 2016-0011, Sequence No. 1]
RIN 9000-AN35
Federal Acquisition Regulation: Revision of Limitations on
Subcontracting
AGENCY: Department of Defense (DoD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: DoD, GSA, and NASA are proposing to amend the Federal
Acquisition Regulation (FAR) to implement the final rule published by
the Small Business Administration implementing section 1651 of the
National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2013,
which revised and standardized the limitations on subcontracting,
including the nonmanufacturer rule, that apply to small business
concerns under FAR part 19 procurements.
DATES: Interested parties should submit comments to the Regulatory
Secretariat Division at one of the addresses shown below on or before
February 4, 2019 to be considered in the formulation of a final rule.
ADDRESSES: Submit comments in response to FAR Case 2016-011 by any of
the following methods:
Regulations.gov: http://www.regulations.gov.
Submit comments via the Federal eRulemaking portal by entering
``FAR Case 2016-011'' under the heading ``Enter Keyword or ID'' and
selecting ``Search.'' Select the link ``Comment Now'' that corresponds
with ``FAR Case 2016-011.'' Follow the instructions provided on the
screen. Please include your name, company name (if any), and ``FAR Case
2016-011'' on your attached document.
Mail: General Services Administration, Regulatory-
Secretariat Division (MVCB), ATTN: Lois Mandell, 1800 F Street NW, 2nd
floor, Washington, DC 20405.
Instructions: Please submit comments only and cite ``FAR case 2016-
011'' in all correspondence related to this case. All comments received
will be posted without change to http://www.regulations.gov, including
any personal and/or business confidential information provided. To
confirm receipt of your comment(s), please check www.regulations.gov,
approximately two to three days after submission to verify posting
(except allow 30 days for posting of comments submitted by mail).
FOR FURTHER INFORMATION CONTACT: For clarification of content, contact
Ms. Mahruba Uddowla, Procurement Analyst, at 703-605-2868. For
information pertaining to status or publication schedules, contact the
Regulatory Secretariat Division at 202-501-4755. Please cite ``FAR Case
2016-011.''
SUPPLEMENTARY INFORMATION:
I. Background
DoD, GSA, and NASA are proposing to revise the FAR to implement
regulatory changes made by the SBA in its final rule published in the
Federal Register at 81 FR 34243 on May 31, 2016. SBA's final rule
implements the statutory requirements of section 1651 of the NDAA for
FY 2013 (15 U.S.C. 657s). Section 1651 revised and standardized the
limitations on subcontracting, including the nonmanufacturer rule, that
apply to small business concerns under FAR part 19 procurements. SBA's
final rule became effective on June 30, 2016.
Prior to passage of section 1651 of the NDAA for FY 2013, the
limitations on subcontracting and the nonmanufacturer rule were
inconsistent across the small business programs. For example, for
awards under some small business programs, the prime contractor was
required to perform a certain percentage of work itself, whereas under
other programs, the prime contractor could include subcontracts to
``similarly situated entities'' in the percentage of work it performed.
The method for
[[Page 62541]]
calculating compliance with the limitations on subcontracting also
varied across small business programs.
Section 1651 of the NDAA for FY 2013 changed the focus of the
limitations on subcontracting rules. Instead of requiring a percentage
of work to be performed by a prime contractor, the limitations on
subcontracting rules now limit subcontracting to a percentage of the
overall award amount to be spent by the prime on subcontractors. As a
result, the prime contractor no longer has to track the percentage of
costs incurred that it spends performing work itself; it only has to
track the percentage of the overall award amount (i.e., contract price)
that it spends on subcontractors. For small businesses, this change
will reduce a substantial burden associated with tracking and
demonstrating compliance with the limitations on subcontracting.
In addition, the percentage of the award amount that the prime
contractor spends on subcontractors who are similarly situated entities
is not considered subcontracted for purposes of compliance with the
limitations on subcontracting. The statute and SBA's implementing
regulations define ``similarly situated entity'' as a subcontractor
that has the same small business program status as that which qualified
the prime contractor for the award and that is considered small for the
North American Industry Classification System (NAICS) code the prime
contractor assigned to the subcontract the subcontractor will perform.
Work performed by similarly situated entities is counted as if it were
performed by the prime contractor in determining compliance with the
limitations on subcontracting.
These important changes give small businesses greater flexibility
on how they choose to comply with the limitations on subcontracting.
Under the current FAR clauses, there is only one way for a small
business to comply with the limitations: It must spend the required
amount on work performed in-house. As proposed in this rule, there will
be more than one way to comply with the limitations, and the small
business will be able to choose how to comply. For example, a small
business that is in compliance with the existing FAR clause will be
able to comply with the new limitations on subcontracting.
Alternatively, a small business can decide to subcontract more than it
did before, and it will be able to comply with the new limitations
where it would not have complied before, as long as the amount spent on
subcontracts does not exceed 50 percent of the price of the prime
contract, for other than construction contracts; different percentages
apply for construction contracts. Finally, a small business can decide
to subcontract work to a similarly situated entity, in any amount of
its choosing, that it previously subcontracted or performed in-house,
and it will be in compliance with the new limitations on subcontracting
because work performed by a similarly situated entity is counted as if
it were performed by the prime contractor. In short, the new rules will
make it easier for prime contractors to do business with Federal
agencies by giving them more, and less burdensome, options for pursuing
and winning larger contracts than before.
SBA's final rule specified that similarly situated entities must
also comply with the limitations on subcontracting. Requiring prime
contractors and their similarly situated entity subcontractors to
comply with the limitations on subcontracting will ensure that the
benefits from small business and socioeconomic set-aside and sole-
source contracts flow to the intended parties. SBA's final rule also
provided updated guidance on the nonmanufacturer rule, including the
process for obtaining waivers to the nonmanufacturer rule and the
proper application of these waivers to procurements.
The SBA rule also clarified that the limitations on subcontracting
and the nonmanufacturer rule do not apply to small business set-aside
contracts valued at or below $150,000, but do apply to set-aside and
sole-source awards under the other small business programs regardless
of dollar value. This proposed rule reflects the same clarification.
Thus, this rule provides that the limitations on subcontracting and the
nonmanufacturer rule clauses are prescribed for small business set-
asides that are expected to exceed $150,000, and for requirements set
aside for or awarded on a sole-source basis to 8(a) participants,
Historically Underutilized Business Zone (HUBZone) small business,
service-disabled veteran-owned small business (SDVOSB), economically
disadvantaged women-owned small business (EDWOSB), or Women-Owned Small
Business(WOSB) concerns eligible under the WOSB program.
II. Discussion and Analysis
This proposed rule would amend FAR parts 19 and 52. This rule
implements the revised and standardized limitations on subcontracting
through a single FAR clause applicable to every small business program,
instead of continuing to implement through multiple FAR clauses that
were specific to particular small business programs. Similarly, this
proposed rule creates a new FAR clause implementing the revised and
standardized the nonmanufacturer rule across all the small business
programs.
These changes are summarized in the following paragraphs:
A. Nonmanufacturer rule implementation. Paragraph (f) in section
19.102 is deleted, and 19.502-2 and 19.1303(e) are revised to remove
the outdated nonmanufacturer rule guidance. New section 19.103,
Nonmanufacturer rule, provides full and updated guidance on the
application of the nonmanufacturer rule, including the requirements
associated with the nonmanufacturer rule and the circumstances and
procedures related to waivers. This section clarifies that the
nonmanufacturer rule does not apply to small business set-aside
acquisitions at or below $150,000, but does apply to 8(a), HUBZone,
SDVOSB, EDWOSB, and WOSB set-aside and sole-source acquisitions
regardless of dollar value. Previous references to 19.102(f) at 19.303
and 19.1403 have been updated to refer to the new 19.103 section.
New clause 52.219-XX, Nonmanufacturer Rule, implements the
requirements in solicitations and contracts. The prescription for this
clause is added at 19.508(g). References to this prescription were
added at 19.811-3(f), 19.1309(d), 19.1407(c), and 19.1507(d). The
outdated nonmanufacturer rule has been removed from the clauses at
52.219-3, 52.219-6 and its Alternate I, 52.219-7 and its Alternate I,
52.219-18 and its Alternate II, 52.219-27, 52.219-29, and 52.219-30.
The prescriptions have been removed from subparts 19.5 and 19.8 for the
following clauses: Alternate I of 52.219-6, Alternate I of 52.219-7,
and Alternate II of 52.219-18. However, paragraph (f) of the clause at
52.219-4, Notice of Price Evaluation Preference for HUBZone Small
Business Concerns, is not revised because the application of the
nonmanufacturer rule to acquisitions in which the HUBZone price
evaluation preference is used is still under review.
The following provisions and clause are updated to clarify when the
size standard for nonmanufacturers applies: 52.204-8, 52.212-1, 52.219-
1, and 52.219-28. Additionally, the definition of ``nonmanufacturer
rule'' is deleted from 19.001.
B. Limitations on subcontracting implementation. The clause at
52.219-14, Limitations on Subcontracting, is revised to implement the
updated limitations on subcontracting requirements in solicitations and
[[Page 62542]]
contracts. The prescription for this clause at 19.508(e) is revised to
apply to all small business programs. References to this prescription
were added at 19.1309(c), 19.1407(b), and 19.1507(c), and revised at
19.811-3(e). Additionally, the clause at 52.219-4 is revised to reflect
the updated limitations on subcontracting.
The outdated limitations on subcontracting guidance is removed from
the following clauses: 52.219-3, 52.219-27, 52.219-29, and 52.219-30.
The following clauses have been deleted: Alternate I of 52.219-3 and
Alternate I of 52.219-4. In addition, the prescriptions for these
clauses at 19.1309 have been deleted. The outdated limitations on
subcontracting text at 19.1308 is deleted.
Lastly, the definition of ``similarly situated entity'' is added to
19.001 to support the implementation of the updated limitations on
subcontracting.
C. Conforming changes. The clause at 52.212-5 is revised to include
52.219-XX, Nonmanufacturer Rule, and to update the dates of clauses
revised in this rule.
III. Applicability to Contracts at or Below the Simplified Acquisition
Threshold and for Commercial Items, Including Commercially Available
Off-the-Shelf Items
The Federal Acquisition Regulatory (FAR) Council has made the
following preliminary determinations with respect to the proposed
rule's application of section 1651 of the NDAA for FY 2013 to contracts
at or below the simplified acquisition threshold (SAT) and for the
acquisition of commercial items, including commercially available off-
the-shelf (COTS) items. Discussion of these preliminary determinations
is set forth below. The FAR Council will consider public feedback
before making a final determination on the scope of the final rule.
A. Applicability to Contracts at or Below the SAT.
Pursuant to 41 U.S.C. 1905, a provision of law is not applicable to
acquisitions at or below the SAT unless the law (i) contains criminal
or civil penalties; (ii) specifically refers to 41 U.S.C. 1905 and
states that the law applies to acquisitions at or below the SAT; or
(iii) the FAR Council makes a written determination that it is not in
the best interest of the Federal Government to exempt contracts or
subcontracts at or below the SAT. If none of these conditions are met,
the FAR is required to include the statutory requirement(s) on a list
of provisions of law that are inapplicable to acquisitions at or below
the SAT.
The purpose of this rule is to implement section 1651 of the NDAA
for FY 2013. Section 1651 provides revised limitations on
subcontracting that apply across all small business programs. It also
requires that the limitations on subcontracting be determined based on
the percentage of the overall award amount that a prime contractor
spends on its subcontractors. In addition, section 1651 provides that
the percentage of the award amount that the prime contractor spends on
subcontractors who are similarly situated entities is not considered
subcontracted for purposes of the limitations on subcontracting in
section 1651.
These statutory requirements are reflected in SBA's final rule
published in the Federal Register at 81 FR 34243, on May 31, 2016,
which did not exempt acquisitions at or below the SAT that are set
aside for, or awarded on a sole-source basis to, 8(a) program
participants, HUBZone, service-disabled veteran-owned, women-owned, or
economically disadvantaged women-owned small business concerns. SBA's
final rule did exempt acquisitions at or below the SAT that are set
aside for small businesses.
The law is silent on the applicability of these requirements to
acquisitions at or below the SAT and does not independently provide for
criminal or civil penalties; nor does it include terms making express
reference to 41 U.S.C. 1905 and its application to acquisitions at or
below the SAT. Therefore, it does not apply to acquisitions at or below
the SAT unless the FAR Council makes a written determination as
provided at 41 U.S.C. 1905.
Application of the law to acquisitions at or below the SAT will
maximize the positive impact set-aside and sole-source contracts
provide for small businesses in the socioeconomic programs (e.g.,
HUBZone, 8(a), service-disabled veteran-owned, and women-owned small
business programs) by ensuring these benefits extend to the many
contracts valued below the SAT. According to fiscal year 2015 data from
the Federal Procurement Data System (FPDS), more than 70 percent of the
number of acquisitions that were set aside or sole-sourced under the
socioeconomic programs were in amounts at or below the SAT. Failure to
apply section 1651 to the maximum extent possible would exclude a
significant number of acquisitions, which would not advance the
interests of small businesses and increase their opportunities in the
Federal marketplace. Further, the primary FAR clauses implementing the
limitations on subcontracting and the nonmanufacturer rule are
currently prescribed for use in solicitations and contracts at or below
the SAT that are set aside for, or awarded on a sole-source basis to,
8(a) program participants, HUBZone, service-disabled veteran-owned,
women-owned, or economically disadvantaged women-owned small business
concerns. This rule merely revises these clauses to implement the
requirements of section 1651. Exclusion of these acquisitions would
create confusion among contractors and the Federal contracting
workforce. Under the FAR clauses amended by this rule, contractors are
already required to comply with the limitations on subcontracting and
the nonmanufacturer rule. The new requirements will result in
substantial savings for contractors.
For these reasons, it is in the best interest of the Federal
Government to apply the requirements of the rule to acquisitions at or
below the SAT.
B. Applicability to Contracts for the Acquisition of Commercial Items
Pursuant to 41 U.S.C. 1906, acquisitions of commercial items (other
than acquisitions of COTS items, which are addressed in 41 U.S.C. 1907)
are exempt from a provision of law unless the law (i) contains criminal
or civil penalties; (ii) specifically refers to 41 U.S.C. 1906 and
states that the law applies to acquisitions of commercial items; or
(iii) the FAR Council makes a written determination and finding that it
would not be in the best interest of the Federal Government to exempt
contracts for the procurement of commercial items from the provision of
law. If none of these conditions are met, the FAR is required to
include the statutory requirement(s) on a list of provisions of law
that are inapplicable to acquisitions of commercial items.
The purpose of this rule is to implement section 1651 of the NDAA
for FY 2013. Section 1651 provides revised limitations on
subcontracting that apply across all small business programs. It also
requires that the limitations on subcontracting be determined based on
the percentage of the overall award amount that a prime contractor
spends on its subcontractors. In addition, section 1651 provides that
the percentage of the award amount that the prime contractor spends on
subcontractors who are similarly situated entities is not considered
subcontracted for purposes of the limitations on subcontracting in
section 1651.
[[Page 62543]]
These statutory requirements are reflected in SBA's final rule
published in the Federal Register at 81 FR 34243, on May 31, 2016,
which did not exempt acquisitions of commercial items.
The law is silent on the applicability of these requirements to
acquisitions of commercial items and does not independently provide for
criminal or civil penalties; nor does it include terms making express
reference to 41 U.S.C. 1906 and its application to acquisitions of
commercial items. Therefore, it does not apply to acquisitions of
commercial items unless the FAR Council makes a written determination
as provided at 41 U.S.C. 1906.
The law furthers the Administration's goal of simplifying the
acquisition process and facilitating easier access to the Federal
marketplace, in this case for small business contractors who make up an
important component of the Government's industrial base. It advances
the interests of small business prime contractors by making it easier
to comply with the limitations on subcontracting, which makes it
possible for those contractors to compete for larger contracts than
they could in the past. The law also advances the interests of small
business subcontractors by encouraging small business prime contractors
to award more subcontracts to similarly situated small businesses.
Exclusion of a large segment of Federal contracting, such as
acquisitions for commercial items, will limit the full implementation
of these objectives. Further, the primary FAR clauses implementing the
limitations on subcontracting and the nonmanufacturer rule are
currently prescribed for use in solicitations and contracts for
commercial items. Exclusion of acquisitions for commercial items from
these requirements would create confusion among contractors and the
Federal contracting workforce. The burden on contractors would not
increase significantly if the requirements of section 1651 were applied
to acquisitions for commercial items. Under the FAR clauses amended by
this rule, contractors are already required to comply with the
limitations on subcontracting and the nonmanufacturer rule. The new
requirements will result in substantial savings for contractors.
For these reasons, it is in the best interest of the Federal
Government to apply the requirements of the rule to the acquisition of
commercial items.
C. Applicability to Contracts for the Acquisition of COTS Items
Pursuant to 41 U.S.C. 1907, acquisitions of COTS items will be
exempt from a provision of law unless the law (i) contains criminal or
civil penalties; (ii) specifically refers to 41 U.S.C. 1907 and states
that the law applies to acquisitions of COTS items; (iii) concerns
authorities or responsibilities under the Small Business Act (15 U.S.C.
644) or bid protest procedures developed under the authority of 31
U.S.C. 3551 et seq., 10 U.S.C. 2305(e) and (f), or 41 U.S.C. 3706 and
3707; or (iv) the Administrator for Federal Procurement Policy makes a
written determination and finding that would not be in the best
interest of the Federal Government to exempt contracts for the
procurement of COTS items from the provision of law. If none of these
conditions are met, the FAR is required to include the statutory
requirement(s) on a list of provisions of law that are inapplicable to
acquisitions of COTS items.
The purpose of this rule is to implement section 1651 of the NDAA
for FY 2013. Section 1651 provides revised limitations on
subcontracting that apply across all small business programs. It also
requires that the limitations on subcontracting be determined based on
the percentage of the overall award amount that a prime contractor
spends on its subcontractors. In addition, section 1651 provides that
the percentage of the award amount that the prime contractor spends on
subcontractors who are similarly situated entities is not considered
subcontracted for purposes of the limitations in section 1651.
These statutory requirements are reflected in SBA's final rule
published in the Federal Register at 81 FR 34243, on May 31, 2016,
which did not exempt acquisitions of COTS items.
The law is silent on the applicability of these requirements to
acquisitions of COTS items and does not independently provide for
criminal or civil penalties; nor does it include terms making express
reference to 41 U.S.C. 1907 and its application to acquisitions of COTS
items. Therefore, it does not apply to acquisitions of COTS items
unless the Administrator for Federal Procurement Policy makes a written
determination as provided at 41 U.S.C. 1907.
The law furthers the Administration's goal of simplifying the
acquisition process and facilitating easier access to the Federal
marketplace, in this case for small business contractors who make up an
important component of the Government's industrial base. It advances
the interests of small business prime contractors by making it easier
to comply with the limitations on subcontracting, which makes it
possible for those contractors to compete for larger contracts than
they could in the past. The law also advances the interests of small
business subcontractors by encouraging small business prime contractors
to award more subcontracts to similarly situated small businesses.
Exclusion of a large segment of Federal contracting, such as
acquisitions for COTS items, will limit the full implementation of
these objectives. Further, the primary FAR clauses implementing the
limitations on subcontracting and the nonmanufacturer rule are
currently prescribed for use in solicitations and contracts for COTS
items. Exclusion of acquisitions for COTS items from these requirements
would create confusion among contractors and the Federal contracting
workforce. The burden on contractors would not increase significantly
if the requirements of section 1651 were applied to acquisitions for
COTS items. Under the FAR clauses amended by this rule, contractors are
already required to comply with the limitations on subcontracting and
the nonmanufacturer rule. The new requirements will result in
substantial savings for contractors.
For these reasons, it is in the best interest of the Federal
Government to apply the requirements of the rule to the acquisition of
COTS items.
IV. Expected Cost Savings
The purpose of this rule is to implement statutory authorities and
SBA regulations that are designed to make it easier and less burdensome
for small business prime contractors to comply with requirements
related to how much work they may subcontract under Federal contracts
and task and delivery orders (i.e., the ``limitations on
subcontracting''). The proposed changes to these requirements would
both ease compliance costs and provide more authorized ways to
subcontract. Section 1651 of the NDAA for FY 2013 revised and
standardized the limitations on subcontracting, including the
nonmanufacturer rule. The nonmanufacturer rule is the requirement that
the prime contractor provide an end product manufactured by a small
business in the United States or its outlying areas. The limitations on
subcontracting and the nonmanufacturer rule are meant to ensure that
the benefits of contracts and orders awarded to small businesses flow
to the intended beneficiaries.
[[Page 62544]]
Prior to section 1651, the limitations on subcontracting and the
nonmanufacturer rule were inconsistent across the small business
programs. For example, under the 8(a) and WOSB Programs, the prime
contractor was required to perform a certain percentage of work itself,
whereas under the HUBZone and SDVOSB Programs, the prime contractor
could include subcontracts to other HUBZone small business or SDVOSB
concerns in the percentage of work it performed. Similarly, with regard
to the nonmanufacturer rule, a prime contractor for a contract or order
set aside or awarded on a sole-source basis under the HUBZone Program
was required to provide products manufactured by another HUBZone small
business, but for awards under the other small business programs, the
prime contractor was required to provide products manufactured by any
small business.
In addition, the basis of the limitations on subcontracting has
changed. Prior to section 1651, the limitations on subcontracting were
calculated as a percentage of work to be performed by a prime
contractor; the calculation was based on the contractor's costs to
perform the contract (e.g., salaries and other allowable costs under
FAR part 31). As a result of section 1651, the limitations on
subcontracting will be calculated as a percentage of the overall
contract or order amount (i.e., the contract price, including costs and
profit or fee) to be spent by the prime contractor on subcontractors.
For small businesses, this change will reduce the burden associated
with tracking and documenting compliance with the limitations on
subcontracting.
Section 1651 also applied the concept of ``similarly situated
entities'' to all small business programs. A similarly situated entity
is a small business subcontractor that has the same small business
program status as that which qualified the prime contractor for the
prime contract. The percentage of the contract or order amount that the
prime contractor spends on subcontractors who are similarly situated
entities is not considered subcontracted for purposes of compliance
with the limitations on subcontracting. Prior to section 1651, small
businesses that wanted to work together to comply with the limitations
on subcontracting were required to form a joint venture or a new legal
entity (except in small business programs where the concept of
similarly situated entities was already applied). The concept of
similarly situated entities eliminates the need for paperwork,
coordination, and other costs associated with forming such a joint
venture or new legal entity simply to comply with the limitations on
subcontracting.
These important changes allow small businesses greater flexibility
on how they choose to comply with the limitations on subcontracting.
The impact is illustrated in the following example of a non-
construction contract:
------------------------------------------------------------------------
Limitations on
subcontracting Previous New
------------------------------------------------------------------------
Contract Value.............. $1,000.............. $1,000
Small Business' Cost of $800................ Not tracked.
Contract Performance
incurred for personnel.
LOS Requirement............. Must spend $400-- May pay up to $500
i.e., 50 percent of (50 percent of the
the cost of contract price) to
contract a non-similarly
performance situated entity,
incurred for its e.g., large
own personnel. business, AND/OR
subcontract to a
similarly situated
entity without
limitation.
------------------------------------------------------------------------
Under the current limitations on subcontracting, the small business
only has one way to comply. In the example above, it must spend at
least $400 on its own employees and, therefore, must be able to track
its contract costs to ensure compliance with the requirement. Under the
new limitations on subcontracting, there are multiple and less costly
ways to comply, and the small business can choose the most efficient
option, as demonstrated below:
The small business can continue to spend $400 on its own
employees and subcontract $400 to any business, as it did to comply
with the previous limitations on subcontracting. Because the prime
contractor is not subcontracting more than $500 to businesses that are
not similarly situated entities, it will meet the new limitations on
subcontracting.
The small business can subcontract to any combination of
similarly situated and non-similarly situated entities and remain in
compliance with the new limitations on subcontracting as long as the
amount spent on non-similarly situated entities does not exceed $500.
For example, the small business can subcontract $500 to any business
and spend $300 on its own employees, or subcontract $500 to any
business, $100 to a similarly situated entity, and spend only $200 on
its own employees.
SBA's final rule specified that similarly situated entities must
also comply with the limitations on subcontracting. As part of
implementing section 1651, the Small Business Administration (SBA) made
a few more revisions to their regulations that are reflected in this
FAR rule:
The nonmanufacturer rule does not apply to small business
set-asides at or below $150,000. Note that currently, the FAR applies
the nonmanufacturer rule to small business set-asides above $25,000.
Waivers of the nonmanufacturer rule will now be allowed
for procurements under the HUBZone Program. Such waivers allow a
HUBZone small business to provide the product of any size business.
In the event SBA grants a nonmanufacturer rule waiver
after the issuance of a solicitation, but before award, contracting
officers are required to amend that solicitation to notify potential
offerors of the waiver and to give them more time to submit proposals.
The above changes drive both costs and savings; however, the rule
is expected to result in net savings to small entities, as well as to
the Government. Since the rule will only revise regulations under the
various small business programs, there will be no costs or savings to
large businesses.
The following is a summary of the estimated public cost savings
calculated in perpetuity in 2016 dollars at a 7-percent discount rate:
------------------------------------------------------------------------
------------------------------------------------------------------------
Present Value at 7 percent............................. -$271,391,140
Annualized 7 percent................................... -$18,997,380
------------------------------------------------------------------------
The full cost analysis narrative can be accessed at http://www.regulations.gov.
V. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess
all costs and benefits of available regulatory alternatives and, if
regulation is necessary, to select regulatory
[[Page 62545]]
approaches that maximize net benefits (including potential economic,
environmental, public health and safety effects, distributive impacts,
and equity). E.O. 13563 emphasizes the importance of quantifying both
costs and benefits, of reducing costs, of harmonizing rules, and of
promoting flexibility. This is a significant regulatory action and,
therefore, was subject to review under Section 6(b) of E.O. 12866,
Regulatory Planning and Review, dated September 30, 1993. This rule is
not a major rule under 5 U.S.C. 804.
VI. Executive Order 13771
This rule is considered to be an E.O. 13771 deregulatory action.
Details on the estimated cost savings can be found in section IV. of
this preamble.
VII. Regulatory Flexibility Act
The change may have a significant economic impact on a substantial
number of small entities within the meaning of the Regulatory
Flexibility Act, 5 U.S.C. 601, et seq. The Initial Regulatory
Flexibility Analysis (IRFA) has been performed and is summarized as
follows:
DoD, GSA, and NASA are proposing to amend the Federal
Acquisition Regulation (FAR) to implement regulatory changes made by
the Small Business Administration (SBA) in its final rule published
in the Federal Register at 81 FR 34243 on May 31, 2016. SBA's final
rule implements the statutory requirements of section 1651 of the
National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2013.
Section 1651 revised and standardized the limitations on
subcontracting, including the nonmanufacturer rule, that apply to
small business concerns under FAR part 19 procurements.
The objectives of this proposed rule are to apply the
limitations on subcontracting consistently to the small business
concerns identified in FAR 19.000(a)(3) and to change the method of
calculation to the percentage of the award amount to be spent on
subcontractors. The legal basis for the rule is section 1651 of the
NDAA for FY 2013, codified at section 46 of the Small Business Act
(15 U.S.C. 657s).
This rule may have a positive economic impact on small
businesses, because it will make application of the limitations on
subcontracting and the nonmanufacturer rule uniform across all small
business programs and make it easier to calculate compliance with
the limitations on subcontracting. Through the ability to meet the
limitations by means of subcontracts with similarly situated
entities, this rule will make it possible for small businesses to
compete for larger contracts than they could in the past. The rule
will encourage small business prime contractors to award
subcontracts to other, similarly situated, small businesses.
Analysis of the System for Award Management (SAM) indicates there
are over 321,938 small business registrants. Firms looking to be
prime contractors of Government contracts are required to register
in SAM. However, firms do not need to register in SAM to participate
in subcontracting. Thus, the number of small business firms impacted
by this rule may be greater than the number of firms registered in
SAM.
This proposed rule does not include any new reporting or
recordkeeping requirements for small entities. This rule does not
include any new compliance requirements. The FAR already required
compliance with the limitations on subcontracting and the
nonmanufacturer rule for small business prime contractors receiving
awards pursuant to set-aside and sole-source acquisitions under part
19. This rule simply revises the limitations on subcontracting and
the nonmanufacturer rule to match that required by section 1651 of
the NDAA for FY 2013. According to the Federal Procurement Data
System (FPDS), in fiscal year 2015 there were 45,963 small business
prime contractors performing on acquisitions to which the
limitations on subcontracting or the nonmanufacturer rule would
apply.
The proposed rule does not duplicate, overlap, or conflict with
any other Federal rules.
There are no known significant alternative approaches to the
proposed rule that would meet the requirements of the applicable
statute.
The Regulatory Secretariat Division has submitted a copy of the
IRFA to the Chief Counsel for Advocacy of the Small Business
Administration. A copy of the IRFA may be obtained from the Regulatory
Secretariat Division. DoD, GSA, and NASA invite comments from small
business concerns and other interested parties on the expected impact
of this rule on small entities.
DoD, GSA, and NASA will also consider comments from small entities
concerning the existing regulations in subparts affected by this rule
consistent with 5 U.S.C. 610. Interested parties must submit such
comments separately and should cite 5 U.S.C. 610 (FAR Case 2016-011) in
correspondence.
VIII. Paperwork Reduction Act
The Paperwork Reduction Act (44 U.S.C. chapter 35) does apply;
however, these changes to the FAR do not impose additional information
collection requirements to the paperwork burden previously approved
under OMB Control Number 3245-0374, titled: Certification for the
Women-Owned Small Business Federal Contract Program.
List of Subjects in 48 CFR Parts 19 and 52
Government procurement.
Dated: November 19, 2018.
William F. Clark,
Director, Office of Government-wide Acquisition Policy, Office of
Acquisition Policy, Office of Government-wide Policy.
Therefore, DoD, GSA, and NASA are proposing to amend 48 CFR parts
19 and 52 as set forth below:
0
1. The authority citation for 48 CFR parts 19 and 52 continues to read
as follows:
Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51
U.S.C. 20113.
PART 19--SMALL BUSINESS PROGRAMS
0
2. Amend section 19.001 by removing the definition ``Nonmanufacturer
rule'' and adding, in alphabetical order, the definition ``Similarly
situated entity'' to read as follows:
19.001 Definitions.
* * * * *
``Similarly situated entity'' means a first-tier subcontractor,
including an independent contractor, that has the same small business
program status as that which qualified the prime contractor for the
award; and is considered small for the NAICS code the prime contractor
assigned to the subcontract the subcontractor will perform. An example
of a similarly situated entity is a first-tier subcontractor that is a
HUBZone small business concern for a HUBZone set-aside or sole-source
award under the HUBZone Program.
19.102 [Amended]
0
3. Amend section 19.102 by removing paragraph (f).
0
4. Add section 19.103 to read as follows.
19.103 Nonmanufacturer rule.
(a) Application. (1) The nonmanufacturer rule applies to small
business set-asides above $150,000; it does not apply to small business
set-asides at or below $150,000. The nonmanufacturer rule applies to
all set-aside and sole-source awards under the 8(a), HUBZone, Service-
Disabled Veteran-Owned Small Business, Women-Owned Small Business
programs regardless of dollar value.
(2) The nonmanufacturer rule applies to nonmanufacturers in
accordance with paragraph (b) and to kit assemblers who are
nonmanufacturers in accordance with paragraph (c).
(b) Nonmanufacturers. Any concern, including suppliers, that
submits an offer for a set-aside or a sole-source award in accordance
with part 19, other than on a construction or service
[[Page 62546]]
acquisition, but proposes to furnish an end item that it did not itself
manufacture, process, or produce (i.e., a ``nonmanufacturer''), is
required to--
(1) Provide an end item that a small business has manufactured,
processed, or produced in the United States or its outlying areas (see
paragraph (d) of this section for determining the manufacturer of an
end item);
(2) Not exceed 500 employees;
(3) Be primarily engaged in the retail or wholesale trade and
normally sell the type of item being supplied; and
(4) Take ownership or possession of the item(s) with its personnel,
equipment, or facilities in a manner consistent with industry practice;
for example, providing storage, transportation, or delivery.
(c) Kit assemblers. When the end item being acquired is a kit of
supplies--
(1) The offeror may not exceed 500 employees; and
(2) At least 50 percent of the total cost of the components of the
kit shall be manufactured, processed, or produced in the United States
or its outlying areas by business concerns that are small under the
size standards for the NAICS codes of the components of the kit.
(d) Identification of manufacturers. For the purposes of applying
the nonmanufacturer rule, the manufacturer, processor, or producer is
the concern that manufactures, processes, or produces an end item with
its own facilities (i.e., transforms raw materials, miscellaneous
parts, or components into the end item being acquired). See 13 CFR
121.406(b)(2).
(e) Waiver of nonmanufacturer rule. (1) SBA may grant an individual
or a class waiver to the nonmanufacturer rule to allow a
nonmanufacturer to provide the end item of an other than small business
without regard to the place of manufacture, processing, or production.
(i) Class waiver. An agency may request that SBA waive the
requirement at paragraph (b)(1) or (c)(2) of this section for a
specific product or class of products. SBA may issue a waiver when SBA
has determined that there are no small business manufacturers,
processors, or producers in the United States or its outlying areas for
a specific product or class of products.
(ii) Individual waiver. The contracting officer may request a
waiver of the requirements at paragraph (b)(1) or (c)(2) of this
section for an individual acquisition once the contracting officer
determines through market research that no known small business
manufacturers, processors, or producers in the United States or its
outlying areas can reasonably be expected to offer an end item meeting
the requirements of the solicitation. An individual waiver applies only
to a specific acquisition.
(2) Waiver requests. Requests for waivers shall include the content
specified at 13 CFR 121.1204 and shall be sent via email to
[email protected] or by mail to the--Director, Office of Government
Contracting, Small Business Administration, 409 Third Street SW,
Washington, DC 20416.
(3) List of class waivers. The current listing of class waivers is
available at http://www.sba.gov/content/class-waivers, or contact the
SBA Office of Government Contracting.
(4) Notification of waiver. The contracting officer shall provide
potential offerors with written notification of any class or individual
waiver in the solicitation. If providing the notification after
solicitation issuance, the contracting officer shall provide potential
offerors a reasonable amount of additional time to respond to the
solicitation.
(f) Multiple-item acquisitions. (1) If at least 50 percent of the
estimated acquisition cost is composed of items that are manufactured,
processed, or produced by small business concerns, then a waiver of the
nonmanufacturer rule is not required. There is no requirement that each
item acquired in a multiple-item acquisition be manufactured,
processed, or produced by a small business in the United States or its
outlying areas.
(2) If more than 50 percent of the estimated acquisition cost is
composed of items manufactured, processed, or produced by other than
small business concerns, then a waiver is required. SBA may grant an
individual waiver for one or more items in an acquisition in order to
ensure that at least 50 percent of the cost of the items to be supplied
by the nonmanufacturer comes from small business manufacturers,
processors, and producers in the United States or its outlying areas or
are subject to a waiver.
(3) If a small business offeror is both a manufacturer of item(s)
and a nonmanufacturer of other item(s) for an acquisition, the
contracting officer shall apply the manufacturer size standard.
19.303 [Amended]
0
5. Amend section 19.303 by removing from paragraph (a)(2) ``of
19.102(f)'' and adding ``of 19.103'' in its place.
19.502-2 [Amended]
0
6. Amend section 19.502-2 by removing paragraph (c).
0
7. Amend section 19.508 by--
0
a. Revising paragraphs (c), (d) and (e); and
0
b. Adding paragraph (g).
The revisions and addition read as follows:
19.508 Solicitation provisions and contract clauses.
* * * * *
(c) The contracting officer shall insert the clause at 52.219-6,
Notice of Total Small Business Set-Aside, in solicitations and
contracts involving total small business set-asides or reserves. This
includes multiple-award contracts when orders may be set aside for any
of the small business concerns identified in 19.000(a)(3), as described
in 8.405-5 and 16.505(b)(2)(i)(F). Use the clause at 52.219-6 with its
Alternate I when including FPI in the competition in accordance with
19.504.
(d) The contracting officer shall insert the clause at 52.219-7,
Notice of Partial Small Business Set-Aside, in solicitations and
contracts involving partial small business set-asides. This includes
part or parts of multiple-award contracts, including those described in
38.101. Use the clause at 52.219-7 with its Alternate I when including
FPI in the competition in accordance with 19.504.
(e) The contracting officer shall insert the clause at 52.219-14,
Limitations on Subcontracting, in solicitations and contracts for
supplies, services, and construction, if any portion of the requirement
is to be set aside or reserved for small business and the contract
amount is expected to exceed $150,000, and in any solicitations and
contracts that are set aside or awarded on a sole-source basis in
accordance with subparts 19.8, 19.13, 19.14, or 19.15, regardless of
dollar value. This includes multiple-award contracts when orders may be
set aside for small business concerns, as described in 8.405-5 and
16.505(b)(2)(i)(F).
* * * * *
(g)(1) The contracting officer shall insert the clause at 52.219-
XX, Nonmanufacturer Rule, in solicitations and contracts when the item
being acquired has been assigned a manufacturing or supply NAICS code
and--
(i) Any portion of the requirement is set aside for small business
and is expected to exceed $150,000; or
(ii) The requirement is set aside or awarded on a sole-source basis
in accordance with subparts 19.8, 19.13, 19.14, or 19.15, regardless of
dollar value.
(2) The contracting officer shall not insert the clause at 52.219-
XX when SBA has waived the nonmanufacturer rule (see 19.103(e)).
[[Page 62547]]
0
8. Amend section 19.811-3 by
0
a. Revising paragraphs (d) and (e); and
0
b. Adding a new paragraph (f).
The revision and addition read as follows:
19.811-3 Contract clauses.
* * * * *
(d) The contracting officer shall insert the clause at 52.219-18,
Notification of Competition Limited to Eligible 8(a) Participants, in
competitive solicitations and contracts when the acquisition is
accomplished using the procedures of 19.805. Use the clause at 52.219-
18 with its Alternate I when competition is to be limited to 8(a)
concerns within one or more specific SBA districts pursuant to 19.804-
2.
(e) The contracting officer shall insert the clause at 52.219-14,
Limitations on Subcontracting, in accordance with the prescription at
19.508(e).
(f) The contracting officer shall insert the clause at 52.219-XX,
Nonmanufacturer Rule, in accordance with the prescription at 19.508(g).
0
9. Amend section 19.1303 by revising paragraph (e) to read as follows:
19.1303 Status as a HUBZone small business concern.
* * * * *
(e) A HUBZone small business concern may submit an offer for
supplies as a nonmanufacturer if it meets the requirements of the
nonmanufacturer rule set forth at 13 CFR 121.406.
19.1308 [Removed and Reserved]
0
10. Remove and reserve section 19.1308.
0
11. Revise section 19.1309 to read as follows:
19.1309 Contract clauses.
(a) The contracting officer shall insert the clause at 52.219-3,
Notice of HUBZone Set-Aside or Sole-Source Award, in solicitations and
contracts for acquisitions that are set aside, or reserved for, or
awarded on a sole-source basis to, HUBZone small business concerns
under 19.1305 or 19.1306. This includes multiple-award contracts when
orders may be set aside for HUBZone small business concerns as
described in 8.405-5 and 16.505(b)(2)(i)(F).
(b) The contracting officer shall insert the clause at 52.219-4,
Notice of Price Evaluation Preference for HUBZone Small Business
Concerns, in solicitations and contracts for acquisitions conducted
using full and open competition.
(c) The contracting officer shall insert the clause at 52.219-14,
Limitations on Subcontracting, in accordance with the prescription at
19.508(e).
(d) The contracting officer shall insert the clause at 52.219-XX,
Nonmanufacturer Rule, in accordance with the prescription at 19.508(g).
19.1403 [Amended]
0
11. Amend section 19.1403 by removing from paragraph (d) ``19.102(f)''
and adding ``19.103'' in its place.
0
12. Revise section 19.1407 to read as follows:
19.1407 Contract clauses.
(a) The contracting officer shall insert the clause at 52.219-27,
Notice of Service-Disabled Veteran-Owned Small Business Set-Aside, in
solicitations and contracts for acquisitions that are set aside or
reserved for, or awarded on a sole-source basis to, service-disabled
veteran-owned small business concerns under 19.1405 and 19.1406. This
includes multiple-award contracts when orders may be set aside for
service-disabled veteran-owned small business concerns as described in
8.405-5 and 16.505(b)(2)(i)(F).
(b) The contracting officer shall insert the clause at 52.219-14,
Limitations on Subcontracting, in accordance with the prescription at
19.508(e).
(c) The contracting officer shall insert the clause at 52.219-XX,
Nonmanufacturer Rule, in accordance with the prescription at 19.508(g).
0
13. Amend section 19.1507 by--
0
a. Removing from paragraph (a) ``clause 52.219-29'' and adding ``clause
at 52.219-29'' in its place;
0
b. Removing from paragraph (b) ``clause 52.219-30'' and adding ``clause
at 52.219-30'' in its place; and
0
c. Adding paragraphs (c) and (d) to read as follows:
19.1507 Contract clauses.
* * * * *
(c) The contracting officer shall insert the clause at 52.219-14,
Limitations on Subcontracting, in accordance with the prescription at
19.508(e).
(d) The contracting officer shall insert the clause at 52.219-XX,
Nonmanufacturer Rule, in accordance with the prescription at 19.508(g).
PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES
0
14. Amend section 52.204-8 by revising the date of the provision and
paragraph (a)(3) to read as follows:
52.204-8 Annual Representations and Certifications.
* * * * *
Annual Representations and Certifications (Date)
* * * * *
(a)(3) If the acquisition is set aside for small business and has a
value above $150,000, or is an 8(a), HUBZone, Service-Disabled Veteran-
Owned, Economically Disadvantaged Women-Owned, or Women-Owned Small
Business set-aside or sole-source award regardless of dollar value, the
small business size standard for a concern that submits an offer for a
set-aside or sole-source award in accordance with part 19, other than
on a construction or service acquisition, but proposes to furnish an
end item that it did not itself manufacture, process, or produce is 500
employees.
* * * * *
0
15. Amend section 52.212-1 by revising the date of the provision and
paragraph (a) to read as follows:
52.212-1 Instructions to Offerors--Commercial Items.
* * * * *
Instructions to Offerors--Commercial Items (Date)
(a) North American Industry Classification System (NAICS) code and
small business size standard. The NAICS code and small business size
standard for this acquisition appear in Block 10 of the solicitation
cover sheet (SF 1449). However, if the acquisition is set aside for
small business and has a value above $150,000, or is an 8(a), HUBZone,
Service-Disabled Veteran-Owned, Economically Disadvantaged Women-Owned,
or Women-Owned Small Business set-aside or sole-source award regardless
of dollar value, the small business size standard for a concern that
submits an offer for a set-aside or sole-source award in accordance
with part 19, other than on a construction or service acquisition, but
proposes to furnish an end item that it did not itself manufacture,
process, or produce is 500 employees.
* * * * *
0
16. Amend section 52.212-5 by--
0
a. Revising the date of the clause and paragraphs (b)(11), (b)(12),
(b)(14), (b)(15), (b)(19), (b)(21), (b)(22), (b)(23), and (b)(24);
0
b. Redesignating paragraphs (b)(25) through (b)(60) as paragraphs
(b)(26) through (b)(61), respectively; and
0
c. Adding a new paragraph (b)(25).
The revisions and additions read as follows:
52.212-5 Contract Terms and Conditions Required To Implement Statutes
or Executive Orders--Commercial Items.
* * * * *
[[Page 62548]]
Contract Terms and Conditions Required to Implement Statutes or
Executive Orders--Commercial Items (Date)
* * * * *
(b) * * *
__ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award
(DATE) (15 U.S.C. 657a).
__ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone
Small Business Concerns (DATE) (if the offeror elects to waive the
preference, it shall so indicate in its offer) (15 U.S.C. 657a).
* * * * *
__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside
(DATE) (15 U.S.C. 644).
__ (ii) Alternate I (DATE).
__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside
(DATE) (15 U.S.C. 644).
__ (ii) Alternate I (DATE) of 52.219-7.
* * * * *
__ (19) 52.219-14, Limitations on Subcontracting (DATE) (15 U.S.C.
657s).
* * * * *
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small
Business Set-Aside (DATE) (15 U.S.C. 657f).
__ (22) 52.219-28, Post Award Small Business Program
Rerepresentation (DATE) (15 U.S.C. 632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award
to, Economically Disadvantaged Women-Owned Small Business Concerns
(DATE) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award
to, Women-Owned Small Business Concerns Eligible Under the Women-Owned
Small Business Program (DATE) (15 U.S.C. 637(m)).
__ (25) 52.219-XX, Nonmanufacturer Rule (DATE) (15 U.S.C. 657s).
* * * * *
0
17. Amend section 52.219-1 by--
0
a. Revising the date of the provision;
0
b. Removing from paragraph (b)(1) ``--'' and adding a space in its
place; and
0
c. Revising paragraph (b)(3) to read as follows:
52.219-1 Small Business Program Representations.
* * * * *
Small Business Program Representations (Date)
* * * * *
(b) * * *
(3) If the acquisition is set aside for small business and has a
value above $150,000, or is an 8(a), HUBZone, Service-Disabled Veteran-
Owned, Economically Disadvantaged Women-Owned, or Women-Owned Small
Business set-aside or sole-source award regardless of dollar value, the
small business size standard for a concern that submits an offer, other
than on a construction or service acquisition, but proposes to furnish
an end item that it did not itself manufacture, process, or produce is
500 employees.
* * * * *
0
18. Amend section 52.219-3 by--
0
a. Revising the date of the clause;
0
b. Revising paragraph (a);
0
c. Removing from paragraph (b)(3) ``set-aside'' and adding ``set
aside'' in its place;
0
d. Removing paragraphs (d), (e), and (f);
0
e. Redesignating paragraph (g) as paragraph (d); and
0
f. Removing Alternate I.
The revision reads as follows:
52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award.
As prescribed in 19.1309(a), insert the following clause:
Notice of HUBZone Set-Aside or Sole-Source Award (Date)
(a) Definition. ``HUBZone small business concern,'' as used in
this clause, means a small business concern, certified by the Small
Business Administration (SBA), that appears on the List of Qualified
HUBZone Small Business Concerns maintained by the SBA (13 CFR
126.103).
* * * * *
0
19. Amend section 52.219-4 by--
0
a. Revising the date of the clause and paragraphs (a), (d) and (e) to
read as follows; and
0
b. Removing Alternate I.
52.219-4 Notice of Price Evaluation Preference for HUBZone Small
Business Concerns.
* * * * *
Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (Date)
(a) Definition. ``Similarly situated entity,'' as used in this
clause, means a first-tier subcontractor, including an independent
contractor, that has the same small business program status as that
which qualified the prime contractor for the award; and is considered
small for the NAICS code the prime contractor assigned to the
subcontract the subcontractor will perform. An example of a similarly
situated entity is a first-tier subcontractor that is a HUBZone small
business concern for a HUBZone set-aside or sole-source award under the
HUBZone Program.
* * * * *
(d) Agreement. By submission of an offer and execution of a
contract, a HUBZone small business concern agrees that, in the case of
a contract for--
(1) Services (except construction), it will not pay more than 50
percent of the amount paid by the Government for contract performance
to subcontractors that are not similarly situated entities. Any work
that a similarly situated entity further subcontracts will count
towards the 50 percent subcontract amount that cannot be exceeded;
(2) Supplies (other than procurement from a nonmanufacturer of such
supplies), it will not pay more than 50 percent of the amount paid by
the Government for contract performance, excluding the cost of
materials (see 13 CFR 125.1), to subcontractors that are not similarly
situated entities. Any work that a similarly situated entity further
subcontracts will count toward the 50 percent subcontract amount that
cannot be exceeded;
(3) General construction, it will not pay more than 85 percent of
the amount paid by the Government for contract performance, excluding
the cost of materials, to subcontractors that are not similarly
situated entities. Any work that a similarly situated entity further
subcontracts will count towards the 85 percent subcontract amount that
cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more
than 75 percent of the amount paid by the Government for contract
performance, excluding the cost of materials, to subcontractors that
are not similarly situated entities. Any work that a similarly situated
entity further subcontracts will count towards the 75 percent
subcontract amount that cannot be exceeded.
(e) A HUBZone joint venture agrees that the aggregate of the
HUBZone small business concerns to the joint venture, not each concern
separately, will perform the applicable requirements specified in
paragraph (d) of this clause.
* * * * *
0
20. Amend section 52.219-6 by--
0
a. Revising the date of the clause;
0
b. Removing paragraph (d);
0
c. Removing Alternate I;
0
d. Redesignating Alternate II as Alternate I; and
0
e. Revising the date of newly redesignated Alternate I.
The revisions read as follows:
52.219-6 Notice of Total Small Business Set-Aside.
* * * * *
[[Page 62549]]
Notice of Total Small Business Set-Aside (Date)
* * * * *
Alternate I (DATE). As prescribed in 19.508(c), substitute the
following paragraph (c) for paragraph (c) of the basic clause:
* * * * *
0
21. Amend section 52.219-7 by--
0
a. Revising the date of the clause;
0
b. Removing paragraph (c);
0
c. Removing Alternate I;
0
d. Redesignating Alternate II as Alternate I; and
0
e. Revising the newly redesignated Alternate I.
The revision reads as follows:
52.219-7 Notice of Partial Small Business Set-Aside.
* * * * *
Notice of Partial Small Business Set-Aside (Date)
* * * * *
Alternate I (Date). As prescribed in 19.508(d), add the following
paragraph (c) to the basic clause:
(c) Notwithstanding paragraph (b) of this clause, offers from
Federal Prison Industries, Inc., will be solicited and considered
for both the set-aside and non-set-aside portion of this
requirement.
0
22. Amend section 52.219-14 by--
0
a. Removing from the introductory text of the clause ``or 19.811-
3(e)'';
0
b. Revising the date of the clause;
0
c. Redesignating paragraph (c) as paragraph (e) and paragraph (b) as
paragraph (c);
0
d. Revising newly designated paragraphs (c) and (e); and
0
e. Adding paragraphs (b), (d), and (f).
The revisions and additions read as follows:
52.219-14 Limitations on Subcontracting.
* * * * *
Limitations on Subcontracting (Date)
* * * * *
(b) Definition. ``Similarly situated entity,'' as used in this
clause, means a first-tier subcontractor, including an independent
contractor, that has the same small business program status as that
which qualified the prime contractor for the award; and is considered
small for the NAICS code the prime contractor assigned to the
subcontract the subcontractor will perform. An example of a similarly
situated entity is a first-tier subcontractor that is a HUBZone small
business concern for a HUBZone set-aside or sole-source award under the
HUBZone Program.
(c) Applicability. This clause applies only to--
(1) Contracts that have been set aside or reserved any of the small
business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set
aside for any of the small business concerns identified in
19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in
accordance with subparts 19.8, 19.13, 19.14, and 19.15; and
(4) Orders set aside for any of the small business concerns
identified in 19.000(a)(3) under multiple-award contracts as described
in 8.405-5 and 16.505(b)(2)(i)(F).
(d) Independent contractors. An independent contractor shall be
considered a subcontractor.
(e) By submission of an offer and execution of a contract, the
Offeror/Contractor agrees that, in the case of a contract for--
(1) Services (except construction), it will not pay more than 50
percent of the amount paid by the Government for contract performance
to subcontractors that are not similarly situated entities. Any work
that a similarly situated entity further subcontracts will count
towards the 50 percent subcontract amount that cannot be exceeded;
(2) Supplies (other than procurement from a nonmanufacturer of such
supplies), it will not pay more than 50 percent of the amount paid by
the Government for contract performance, excluding the cost of
materials, to subcontractors that are not similarly situated entities.
Any work that a similarly situated entity further subcontracts will
count towards the 50 percent subcontract amount that cannot be
exceeded;
(3) General construction, it will not pay more than 85 percent of
the amount paid by the Government for contract performance, excluding
the cost of materials, to subcontractors that are not similarly
situated entities. Any work that a similarly situated entity further
subcontracts will count towards the 85 percent subcontract amount that
cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more
than 75 percent of the amount paid by the Government for contract
performance, excluding the cost of materials, to subcontractors that
are not similarly situated entities. Any work that a similarly situated
entity further subcontracts will count towards the 75 percent
subcontract amount that cannot be exceeded.
(f) A joint venture agrees that, in the performance of the
contract, the applicable percentage specified in paragraph (e) of this
clause will be performed by the aggregate of the joint venture
participants.
0
23. Amend section 52.219-18 by--
0
a. Revising the date of the clause;
0
b. Removing paragraph (d)(1), redesignating paragraph (d)(2) as
paragraph (d) and
0
c. Removing Alternate II.
The revision reads as follows:
52.219-18 Notification of Competition Limited to Eligible 8(a)
Participants.
* * * * *
Notification of Competition Limited to Eligible 8(a) Participants
(Date)
* * * * *
0
24. Amend section 52.219-27 by--
0
a. Revising the date of the clause;
0
b. Removing paragraph (d);
0
c. Redesignating paragraph (e) as paragraph (d);
0
d. Revising the newly redesignated paragraph (d); and
0
e. Removing paragraph (f).
The revisions read as follows:
52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-
Aside.
* * * * *
Notice of Service-Disabled Veteran-Owned Small Business Set-Aside
(Date)
* * * * *
(d) A joint venture may be considered a service-disabled veteran
owned small business concern if--
(1) At least one member of the joint venture is a service-disabled
veteran-owned small business concern, and makes the following
representations:
(i) That it is a service-disabled veteran-owned small business
concern, and
(ii) That it is a small business concern under the North American
Industry Classification Systems (NAICS) code assigned to the
procurement;
(2) Each other concern is small under the size standard
corresponding to the NAICS code assigned to the procurement;
(3) The joint venture meets the requirements of paragraph 7 of the
explanation of Affiliates in 19.101 of the Federal Acquisition
Regulation; and
(4) The joint venture meets the requirements of 13 CFR 125.15(b).
* * * * *
0
25. Amend section 52.219-28 by revising the date of the clause and
paragraph (d) to read as follows:
52.219-28 Post-Award Small Business Program Rerepresentation.
* * * * *
Post-Award Small Business Program Rerepresentation (Date)
* * * * *
[[Page 62550]]
(d) If the acquisition was set aside for small business and has a
value above $150,000, or is an 8(a), HUBZone, Service-Disabled Veteran-
Owned, Economically Disadvantaged Women-Owned, or Women-Owned Small
Business set-aside or sole-source award regardless of dollar value, the
small business size standard for a Contractor providing a product which
it does not manufacture, process, or produce itself, for a contract
other than a construction or service contract, is 500 employees.
* * * * *
0
26. Amend section 52.219-29 by--
0
a. Revising the date of the clause;
0
b. Removing from the definition ``Economically disadvantaged women-
owned small business (EDWOSB)'' ``means- A small'' and adding ``means a
small'' in its place;
0
c. Removing from paragraph (c)(3) ``contracting officer'' and adding
``Contracting Officer'' in its place;
0
d. Removing paragraph (d);
0
e. Redesignating paragraph (e) as paragraph (d);
0
f. Removing newly redesignated paragraph (d)(4);
0
g. Redesignating paragraph (d)(5) as (d)(4) and revising newly
redesignated paragraph (d)(4); and
0
h. Removing paragraph (f).
The revisions read as follows:
52.219-29 Notice of Set-Aside for, or Sole-Source Award to,
Economically Disadvantaged Women-Owned Small Business Concerns.
* * * * *
Notice of Set-Aside for, or Sole-Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (Date)
* * * * *
(d) * * *
(4) The Contracting Officer executes the contract in the name of
the EDWOSB or joint venture.
* * * * *
0
27. Amend section 52.219-30 by--
0
a. Revising the date of the clause and the introductory text of
paragraph (a);
0
b. Removing from the second sentence of paragraph (c)(1) ``WOSB
program'' and adding ``WOSB Program'' in its place;
0
c. Removing paragraph (d);
0
d. Redesignating paragraph (e) as paragraph (d);
0
e. Removing newly redesignated paragraph (d)(4);
0
f. Redesignating paragraph (d)(5) as (d)(4) and revising newly
redesignated paragraph (d)(4);
0
g. Removing paragraph (f).
The revision reads as follows:
52.219-30 Notice of Set-Aside for, or Sole-Source Award to, Women-
Owned Small Business Concerns Eligible Under the Women-Owned Small
Business Program.
* * * * *
Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program
(Date)
(a) Definitions. As used in this clause--
* * * * *
(d) * * *
(4) The Contracting Officer executes the contract in the name of
the WOSB concern eligible under the WOSB Program or joint venture.
* * * * *
0
28. Add section 52.219-XX to read as follows:
52.219-XX Nonmanufacturer Rule.
As prescribed in 19.508(g), insert the following clause:
Nonmanufacturer Rule (Date)
(a) Definitions. As used in this clause--
``Manufacturer'' means the concern that transforms raw
materials, miscellaneous parts, or components into the end item.
Concerns that only minimally alter the item being procured do not
qualify as manufacturers of the end item. Concerns that add
substances, parts, or components to an existing end item to modify
its performance will not be considered the end item manufacturer,
where those identical modifications can be performed by and are
available from the manufacturer of the existing end item.
``Nonmanufacturer'' means a concern, including a supplier, that
provides an end item it did not manufacture, process, or produce.
(b) Applicability.
(1) This clause does not apply to contracts awarded pursuant to
the unrestricted portion of a partial set-aside or to a contractor
that is the manufacturer of the product or end item.
(2) This clause applies to--
(i) Contracts that have been awarded pursuant to a set-aside, in
total or in part, for any of the small business concerns identified
in 19.000(a)(3);
(ii) Contracts that have been awarded on a sole-source basis in
accordance with subparts 19.8, 19.13, 19.14, and 19.15; and
(iii) Orders set aside for any of the small business concerns
identified in 19.000(a)(3) under multiple-award contracts as
described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) Requirements.
(1) The Contractor shall--
(i) Provide an end item that a small business has manufactured,
processed, or produced in the United States or its outlying areas;
for kit assemblers who are nonmanufacturers, see paragraph (c)(2) of
this clause instead;
(ii) Be primarily engaged in the retail or wholesale trade and
normally sell the type of item being supplied; and
(iii) Take ownership or possession of the item(s) with its
personnel, equipment, or facilities in a manner consistent with
industry practice; for example, providing storage, transportation,
or delivery.
(2) When the end item being acquired is a kit of supplies, at
least 50 percent of the total cost of the components of the kit
shall be manufactured, processed, or produced in the United States
or its outlying areas by small business concerns. Where the
Government has specified an item for the kit that is not produced by
small business concerns in the United States or its outlying areas,
such item is excluded from the calculation of total cost.
(End of clause)
[FR Doc. 2018-25506 Filed 12-3-18; 8:45 am]
BILLING CODE 6820-EP-P