DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 40
[Docket No. RM17-13-000; Order No. 850]
Supply Chain Risk Management Reliability Standards
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Federal Energy Regulatory Commission (Commission) approves
supply chain risk management Reliability Standards CIP-013-1 (Cyber
Security--Supply Chain Risk Management), CIP-005-6 (Cyber Security--
Electronic Security Perimeter(s)) and CIP-010-3 (Cyber Security--
Configuration Change Management and Vulnerability Assessments)
submitted by the North American Electric Reliability Corporation
(NERC). In addition, the Commission directs NERC to develop and submit
modifications to the supply chain risk management Reliability Standards
so that the scope of the Reliability Standards include Electronic
Access Control and Monitoring Systems.
DATES: This rule is effective December 26, 2018.
FOR FURTHER INFORMATION CONTACT:
Simon Slobodnik (Technical Information) Office of Electric
Reliability, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426, (202) 502-6707, [email protected].
Patricia Eke (Technical Information) Office of Electric
Reliability, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426, (202) 502-8388, [email protected].
Kevin Ryan (Legal Information) Office of the General Counsel,
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, (202) 502-6840, [email protected].
SUPPLEMENTARY INFORMATION:
Before Commissioners: Cheryl A. LaFleur, Neil Chatterjee, and
Richard Glick.
1. Pursuant to section 215(d)(2) of the Federal Power Act (FPA),
the Commission approves supply chain risk management Reliability
Standards CIP-013-1 (Cyber Security--Supply Chain Risk Management),
CIP-005-6 (Cyber Security--Electronic Security Perimeter(s)) and CIP-
010-3 (Cyber Security--Configuration Change Management and
Vulnerability Assessments).\1\ The North American Electric Reliability
Corporation (NERC), the Commission-certified Electric Reliability
Organization (ERO), submitted the supply chain risk management
Reliability Standards for approval in response to a Commission
directive in Order No. 829.\2\ As discussed below, we approve the
supply chain risk management Reliability Standards as they are
responsive to Order No. 829 and improve the electric industry's
cybersecurity posture by requiring that entities mitigate certain
cybersecurity risks associated with the supply chain for BES Cyber
Systems.\3\
---------------------------------------------------------------------------
\1\ 16 U.S.C. 824o(d)(2).
\2\ Revised Critical Infrastructure Protection Reliability
Standards, Order No. 829, 156 FERC ] 61,050, at P 43 (2016).
\3\ BES Cyber System is defined as ``[o]ne or more BES Cyber
Assets logically grouped by a responsible entity to perform one or
more reliability tasks for a functional entity.'' Glossary of Terms
Used in NERC Reliability Standards (NERC Glossary), http://www.nerc.com/files/glossary_of_terms.pdf. The acronym BES refers to
the bulk electric system.
---------------------------------------------------------------------------
[[Page 53993]]
2. The Commission has previously explained that the global supply
chain affords significant benefits to customers, including low cost,
interoperability, rapid innovation, and a variety of product features
and choice.\4\ Despite these benefits, the global supply chain creates
opportunities for adversaries to directly or indirectly affect the
management or operations of companies with potential risks to end
users. Supply chain risks include insertion of counterfeits or
malicious software, unauthorized production, tampering, or theft, as
well as poor manufacturing and development practices. Based on the
record in this proceeding, we conclude that the supply chain risk
management Reliability Standards largely address these supply chain
cybersecurity risks as set out within the scope of Order No. 829. Among
other things, the supply chain risk management Reliability Standards
are forward-looking and objective-based and require each affected
entity to develop and implement a plan that includes security controls
for supply chain management for industrial control system hardware,
software, and services associated with bulk electric system
operations.\5\ Consistent with Order No. 829, the Reliability Standards
focus on the following four security objectives: (1) Software integrity
and authenticity; (2) vendor remote access protections; (3) information
system planning; and (4) vendor risk management and procurement
controls.
---------------------------------------------------------------------------
\4\ Revised Critical Infrastructure Protection Reliability
Standards, Notice of Proposed Rulemaking, 152 FERC ] 61,054, at PP
61-62 (2015).
\5\ Order No. 829, 156 FERC ] 61,050 at P 2.
---------------------------------------------------------------------------
3. The Commission also approves the supply chain risk management
Reliability Standards' associated violation risk factors and violation
severity levels. Regarding the Reliability Standards' implementation
plan and effective date, we approve NERC's proposed implementation
period of 18 months following the effective date of a Commission order.
The NOPR proposed to reduce the implementation period to 12 months.\6\
However, as discussed below, the NOPR comments provide sufficient
justification for adopting the 18-month implementation period proposed
by NERC. Specifically, the comments clarify that technical upgrades are
likely necessary to meet the Reliability Standards' security
objectives, which could involve longer time-horizon capital budgets and
planning cycles.
---------------------------------------------------------------------------
\6\ Supply Chain Risk Management Reliability Standards, Notice
of Proposed Rulemaking, 83 FR 3433 (January 25, 2018), 162 FERC ]
61,044 (2018) (NOPR).
---------------------------------------------------------------------------
4. While the supply chain risk management Reliability Standards
address the Commission's directive in Order No. 829, we determine that
there remains a significant cybersecurity risk associated with the
supply chain for BES Cyber Systems because the approved Reliability
Standards do not address Electronic Access Control and Monitoring
Systems (EACMS).\7\ As we observed in the NOPR, it is widely recognized
that the types of access and monitoring functions that are included
within NERC's definition of EACMS, such as firewalls, are integral to
protecting industrial control systems.\8\ Moreover, as stated in Order
No. 848, EACMS, which include, for example, firewalls, authentication
servers, security event monitoring systems, intrusion detection systems
and alerting systems, control electronic access into Electronic
Security Perimeters (ESP), play a significant role in the protection of
high and medium impact BES Cyber Systems.\9\ Once an EACMS is
compromised, an attacker could more easily enter the ESP and
effectively control the BES Cyber System or Protected Cyber Asset.\10\
For example, the Department of Homeland Security's Industrial Control
Systems Cyber Emergency Response Team (ICS-CERT) identifies firewalls
as ``the first line of defense within an ICS network environment'' that
``keep the intruder out while allowing the authorized passage of data
necessary to run the organization.'' \11\ ICS-CERT further explains
that firewalls ``act as sentinels, or gatekeepers, between zones . . .
[and] [w]hen properly configured, they will only let essential traffic
cross security boundaries[,] . . . [i]f they are not properly
configured, they could easily pass unauthorized or malicious users or
content.'' \12\ Accordingly, if EACMS are compromised, that could
adversely affect the reliable operation of associated BES Cyber
Systems.\13\ Given the significant role that EACMS play in the
protection scheme for medium and high impact BES Cyber Systems, we
determine that EACMS should be within the scope of the supply chain
risk management Reliability Standards to provide minimum protection
against supply chain attack vectors.
---------------------------------------------------------------------------
\7\ EACMS are defined as ``Cyber Assets that perform electronic
access control or electronic access monitoring of the Electronic
Security Perimeter(s) or BES Cyber Systems. This includes
Intermediate Systems.'' NERC Glossary. Reliability Standard CIP-002-
5.1a (Cyber Security -- BES Cyber System Categorization) states that
examples of EACMS include ``Electronic Access Points, Intermediate
Systems, authentication servers (e.g., RADIUS servers, Active
Directory servers, Certificate Authorities), security event
monitoring systems, and intrusion detection systems.'' Reliability
Standard CIP-002-5.1a (Cyber Security -- BES Cyber System
Categorization) Section A.6 at 6.
\8\ NOPR, 162 FERC ] 61,044 at P 37.
\9\ Cyber Security Incident Reporting Reliability Standards,
Order No. 848, 164 FERC ] 61,033, at P 10 (2018). ESP is defined as
``[t]he logical border surrounding a network to which BES Cyber
Systems are connected using a routable protocol.'' NERC Glossary.
\10\ Order No. 848, 164 FERC ] 61,033 at P 10.
\11\ ICS-CERT, Recommended Practice: Improving Industrial
Control System Cybersecurity with Defense-in-Depth Strategies at 23,
https://ics-cert.us-cert.gov/sites/default/files/recommended_practices/NCCIC_ICS-CERT_Defense_in_Depth_2016_S508C.pdf.
\12\ Id.
\13\ NOPR, 162 FERC ] 61,044 at P 37.
---------------------------------------------------------------------------
5. To address this gap, pursuant to section 215(d)(5) of the
FPA,\14\ the Commission directs NERC to develop modifications to
include EACMS associated with medium and high impact BES Cyber Systems
within the scope of the supply chain risk management Reliability
Standards.\15\ We direct NERC to submit the directed modifications
within 24 months of the effective date of this final rule.
---------------------------------------------------------------------------
\14\ 16 U.S.C. 824o(d)(5).
\15\ Reliability Standard CIP-002-5.1a (Cyber Security System
Categorization) provides a ``tiered'' approach to cybersecurity
requirements, based on classifications of high, medium and low
impact BES Cyber Systems.
---------------------------------------------------------------------------
6. Further, the NERC proposal does not address Physical Access
Control Systems (PACS) \16\ and Protected Cyber Assets (PCA),\17\ with
the exception of the modifications in Reliability Standard CIP-005-6,
which apply to PCAs. We remain concerned that the exclusion of these
components may leave a gap in the supply chain risk management
Reliability Standards. Nevertheless, in contrast to EACMS, we believe
that more study is necessary to determine the impact of PACS and PCAs
in the context of the supply chain risk management Reliability
Standards.
[[Page 53994]]
We distinguish among EACMS and the other Cyber Assets because
compromise of PACS and PCAs are less likely. For example, a compromise
of a PACS, which would potentially grant an attacker physical access to
a BES Cyber System or PCA, is less likely since physical access is also
required. In addition, PCAs typically become vulnerable to remote
compromise only once EACMS have been compromised. Thus, we accept
NERC's commitment to evaluate the cybersecurity supply chain risks
presented by PACS and PCAs in the study of cybersecurity supply chain
risks directed by the NERC Board of Trustees (BOT) in its resolutions
of August 10, 2017.\18\ The Commission further directs NERC to file the
BOT-directed final report with the Commission upon its completion.\19\
---------------------------------------------------------------------------
\16\ PACS are defined as ``Cyber Assets that control, alert, or
log access to the Physical Security Perimeter(s), exclusive of
locally mounted hardware or devices at the Physical Security
Perimeter such as motion sensors, electronic lock control
mechanisms, and badge readers.'' NERC Glossary. Reliability Standard
CIP-002-5.1a states that examples include ``authentication servers,
card systems, and badge control systems.''Id.
\17\ PCAs are defined as ``[o]ne or more Cyber Assets connected
using a routable protocol within or on an Electronic Security
Perimeter that is not part of the highest impact BES Cyber System
within the same Electronic Security Perimeter. The impact rating of
Protected Cyber Assets is equal to the highest rated BES Cyber
System in the same [Electronic Security Perimeter].'' NERC Glossary.
Reliability Standard CIP-002-5.1a states that examples include, to
the extent they are within the Electronic Security Perimeter, ``file
servers, ftp servers, time servers, LAN switches, networked
printers, digital fault recorders, and emission monitoring
systems.'' Id.
\18\ NERC Board of Trustees, Proposed Additional Resolutions for
Agenda Item 9.a: Cyber Security--Supply Chain Risk Management--CIP-
005-6, CIP-010-3, and CIP-013-1 (August 10, 2017).
\19\ As discussed later in this final rule, the NOPR proposed to
direct NERC to file the BOT-directed interim report, due 12 months
from the date of the BOT resolutions, as well as the final report,
which is due 18 months from the date of the BOT resolutions. On
September 7, 2018, NERC filed the BOT-directed interim report in
this docket.
---------------------------------------------------------------------------
I. Background
A. Section 215 and Mandatory Reliability Standards
7. Section 215 of the FPA requires a Commission-certified ERO to
develop mandatory and enforceable Reliability Standards, subject to
Commission review and approval. Reliability Standards may be enforced
by the ERO, subject to Commission oversight, or by the Commission
independently.\20\ Pursuant to section 215 of the FPA, the Commission
established a process to select and certify an ERO,\21\ and
subsequently certified NERC.\22\
---------------------------------------------------------------------------
\20\ 16 U.S.C. 824o(e).
\21\ Rules Concerning Certification of the Electric Reliability
Organization; and Procedures for the Establishment, Approval, and
Enforcement of Electric Reliability Standards, Order No. 672, FERC
Stats. & Regs. ] 31,204, order on reh'g, Order No. 672-A, FERC
Stats. & Regs. ] 31,212 (2006).
\22\ North American Electric Reliability Corp., 116 FERC ]
61,062, order on reh'g and compliance, 117 FERC ] 61,126 (2006),
aff'd sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009).
---------------------------------------------------------------------------
B. Order No. 829
8. In Order No. 829, the Commission directed NERC to develop a new
or modified Reliability Standard that addresses supply chain risk
management for industrial control system hardware, software and
computing and networking services associated with bulk electric system
operations.\23\ Specifically, the Commission directed NERC to develop a
forward-looking, objective-based Reliability Standard that would
require responsible entities to develop and implement a plan with
supply chain management security controls focused on four security
objectives: (1) Software integrity and authenticity; (2) vendor remote
access; (3) information system planning; and (4) vendor risk management
and procurement controls.\24\
---------------------------------------------------------------------------
\23\ Order No. 829, 156 FERC ] 61,050 at P 43.
\24\ Id. P 45.
---------------------------------------------------------------------------
9. The Commission explained that verification of software integrity
and authenticity is intended to reduce the likelihood that an attacker
could exploit legitimate vendor patch management processes to deliver
compromised software updates or patches to a BES Cyber System.\25\ For
vendor remote access, the Commission stated that the objective is
intended to address the threat that vendor credentials could be stolen
and used to access a BES Cyber System without the responsible entity's
knowledge, as well as the threat that a compromise at a trusted vendor
could traverse over an unmonitored connection into a responsible
entity's BES Cyber System.\26\ As to information system planning, Order
No. 829 indicated that the objective is intended to address the risk
that responsible entities could unintentionally plan to procure and
install unsecure equipment or software within their information
systems, or could unintentionally fail to anticipate security issues
that may arise due to their network architecture or during technology
and vendor transitions.\27\ For vendor risk management and procurement
controls, the Commission explained that this objective is intended to
address the risk that responsible entities could enter into contracts
with vendors that pose significant risks to the responsible entities'
information systems, as well as the risk that products procured by a
responsible entity fail to meet minimum security criteria. This
objective also addresses the risk that a compromised vendor would not
provide adequate notice and related incident response to responsible
entities with whom that vendor is connected.\28\
---------------------------------------------------------------------------
\25\ Id. P 49.
\26\ Id. P 52.
\27\ Id. P 57.
\28\ Id. P 60.
---------------------------------------------------------------------------
10. Order No. 829 stated that while responsible entities should be
required to develop and implement a plan, NERC need not impose any
specific controls or ``one-size-fits-all'' requirements.\29\ In
addition, the Commission stated that NERC's response to the Order No.
829 directive should respect the Commission's jurisdiction under FPA
section 215 by only addressing the obligations of responsible entities
and not by directly imposing any obligations on non-jurisdictional
suppliers, vendors or other entities that provide products or services
to responsible entities.\30\
---------------------------------------------------------------------------
\29\ Id. P 13.
\30\ Id. P 21.
---------------------------------------------------------------------------
C. NERC Petition and Proposed Reliability Standards
11. On September 26, 2017, NERC submitted for Commission approval
proposed Reliability Standards CIP-013-1, CIP-005-6, and CIP-010-3 and
their associated violation risk factors and violation severity levels,
implementation plan, and effective date.\31\ NERC states that the
purpose of the Reliability Standards is to enhance the cybersecurity
posture of the electric industry by requiring responsible entities to
take additional actions to address cybersecurity risks associated with
the supply chain for BES Cyber Systems. NERC explains that the
Reliability Standards are designed to augment the existing controls
required in the currently-effective CIP Reliability Standards that help
mitigate supply chain risks, providing increased attention on
minimizing the attack surfaces of information and communications
technology products and services procured to support reliable bulk
electric system operations, consistent with Order No. 829.
---------------------------------------------------------------------------
\31\ Reliability Standards CIP-013-1, CIP-005-6, and CIP-010-3
are not attached to this final rule. The Reliability Standards are
available on the Commission's eLibrary document retrieval system in
Docket No. RM17-13-000 and on the NERC website, www.nerc.com.
---------------------------------------------------------------------------
12. NERC states that the supply chain risk management Reliability
Standards apply only to medium and high impact BES Cyber Systems. NERC
explains that the goal of the CIP Reliability Standards is to ``focus[]
industry resources on protecting those BES Cyber Systems with
heightened risks to the [bulk electric system] . . . [and] that the
requirements applicable to low impact BES Cyber Systems, given their
lower risk profile, should not be overly burdensome to divert resources
from the protection of medium and high impact BES Cyber Systems.'' \32\
NERC further maintains that the standard drafting team chose to limit
the applicability of the Reliability Standards to medium and high
impact BES Cyber Systems because the supply chain risk management
Reliability Standards are ``consistent with the type of existing CIP
cybersecurity requirements applicable
[[Page 53995]]
to high and medium impact BES Cyber Systems as opposed to those
applicable to low impact BES Cyber Systems.'' \33\
---------------------------------------------------------------------------
\32\ NERC Petition at 16-17.
\33\ Id. at 18.
---------------------------------------------------------------------------
13. NERC states that the standard drafting team also excluded
EACMS, PACS, and PCAs from the scope of the supply chain risk
management Reliability Standards, with the exception of the
modifications in Reliability Standard CIP-005-6, which apply to PCAs.
NERC explains that although certain requirements in the existing CIP
Reliability Standards apply to EACMS, PACS, and PCAs due to their
association with BES Cyber Systems (either by function or location),
the standard drafting team determined that the supply chain risk
management Reliability Standards should focus on high and medium impact
BES Cyber Systems only. NERC states that this determination was based
on the conclusion that applying the proposed Reliability Standards to
EACMS, PACS, and PCAs ``would divert resources from protecting medium
and high BES Cyber Systems.'' \34\
---------------------------------------------------------------------------
\34\ Id. at 20.
---------------------------------------------------------------------------
14. NERC asserts that with respect to low impact BES Cyber Systems
and EACMS, PACS, and PCAs, while not mandatory, NERC expects that these
assets will likely be subject to responsible entity supply chain risk
management plans required by Reliability Standard CIP-013-1.
Specifically, NERC explains that ``[r]esponsible [e]ntities may
implement a single process for procuring products and services
associated with their operational environments.'' \35\ NERC contends
that ``by requiring that entities implement supply chain cybersecurity
risk management plans for high and medium impact BES Cyber Systems,
those plans would likely also cover their low impact BES Cyber
Systems.'' \36\ NERC also claims that responsible entities ``may also
use the same vendors for procuring PACS, EACMS, and PCAs as they do for
their high and medium impact BES Cyber Systems such that the same
security considerations may be addressed for those Cyber Assets.'' \37\
---------------------------------------------------------------------------
\35\ Id.
\36\ Id. at 19.
\37\ Id. at 20.
---------------------------------------------------------------------------
Proposed Reliability Standard CIP-013-1
15. NERC states that the focus of proposed Reliability Standard
CIP-013-1 is on the steps that responsible entities must take ``to
consider and address cybersecurity risks from vendor products and
services during BES Cyber System planning and procurement.'' \38\ NERC
explains that proposed Reliability Standard CIP-013-1 does not require
any specific controls or mandate ``one-size-fits-all'' requirements due
to the differences in needs and characteristics of responsible entities
and the diversity of bulk electric system environments, technologies,
and risks. NERC states that the goal of the proposed Reliability
Standard is ``to help ensure that responsible entities establish
organizationally-defined processes that integrate a cybersecurity risk
management framework into the system development lifecycle.'' \39\ NERC
observes that, among other things, proposed Reliability Standard CIP-
013-1 addresses the risk associated with information system planning,
as well as vendor risk management and procurement controls, the third
and fourth objectives outlined in Order No. 829.
---------------------------------------------------------------------------
\38\ Id. at 22.
\39\ Id. at 23.
---------------------------------------------------------------------------
16. NERC maintains that, consistent with Order No. 829, responsible
entities need not apply their supply chain risk management plans to the
acquisition of vendor products or services under contracts executed
prior to the effective date of Reliability Standard CIP-013-1, nor
would such contracts need to be renegotiated or abrogated to comply
with the Reliability Standard. In addition, NERC indicates that,
consistent with the development of a forward looking Reliability
Standard, it would not expect entities in the middle of procurement
activities for an applicable product or service at the time of the
effective date of Reliability Standard CIP-013-1 to begin those
activities anew to implement their supply chain cybersecurity risk
management plan.
17. With regard to assessing compliance with Reliability Standard
CIP-013-1, NERC states that NERC and Regional Entities would focus on
whether responsible entities: (1) Developed processes reasonably
designed to (i) identify and assess risks associated with vendor
products and services in accordance with Part 1.1 and (ii) ensure that
the security items listed in Part 1.2 are an integrated part of
procurement activities; and (2) implemented those processes in good
faith. NERC explains that NERC and Regional Entities will evaluate the
steps a responsible entity took to assess risks posed by a vendor and
associated products or services and, based on that risk assessment, the
steps the entity took to mitigate those risks, including the
negotiation of security provisions in its agreements with the vendor.
Proposed Modifications in Reliability Standard CIP-005-6
18. Proposed Reliability Standard CIP-005-6 includes two new parts,
Parts 2.4 and 2.5, to address vendor remote access, which is the second
objective discussed in Order No. 829. NERC explains that the new parts
work in tandem with proposed Reliability Standard CIP-013-1,
Requirement R1.2.6, which requires responsible entities to address
Interactive Remote Access and system-to-system remote access when
procuring industrial control system hardware, software, and computing
and networking services associated with bulk electric system
operations. NERC states that proposed Reliability Standard CIP-005-6,
Requirement R2.4 requires one or more methods for determining active
vendor remote access sessions, including Interactive Remote Access and
system[hyphen]to[hyphen]system remote access. NERC explains that the
security objective of Requirement R2.4 is to provide awareness of all
active vendor remote access sessions, both Interactive Remote Access
and system[hyphen]to[hyphen]system remote access, that are taking place
on a responsible entity's system.
Proposed Modifications in Reliability Standard CIP-010-3
19. Proposed Reliability Standard CIP-010-3 includes a new part,
Part 1.6, to address software integrity and authenticity, the first
objective addressed in Order No. 829, by requiring that the publisher
is identified and the integrity of all software and patches are
confirmed. NERC explains that proposed Reliability Standard CIP-010-3,
Requirement R1.6 requires responsible entities to verify software
integrity and authenticity prior to a change from the existing baseline
configuration, if the software source provides a method to do so.
Specifically, NERC states that proposed Reliability Standard CIP-010-3,
Requirement R1.6 requires that responsible entities verify the identity
of the software source and the integrity of the software obtained by
the software sources prior to installing software that changes
established baseline configurations, when methods are available to do
so. NERC asserts that the security objective of proposed Requirement
R1.6 is to ensure that the software being installed in the BES Cyber
System was not modified without the awareness of the software supplier
and is not counterfeit. NERC contends that these steps help reduce the
[[Page 53996]]
likelihood that an attacker could exploit legitimate vendor patch
management processes to deliver compromised software updates or patches
to a BES Cyber System.
BOT Resolutions
20. In the petition, NERC states that in conjunction with the
adoption of the supply chain risk management Reliability Standards, on
August 10, 2017, the BOT adopted resolutions regarding supply chain
risk management. In particular, the BOT directed NERC management, in
collaboration with appropriate NERC technical committees, industry
representatives, and appropriate experts, including representatives of
industry vendors, to further study the nature and complexity of
cybersecurity supply chain risks, including risks associated with low
impact assets not currently subject to the supply chain risk management
Reliability Standards. The BOT further directed NERC to develop
recommendations for follow-up actions that will best address any issues
identified. Finally, the BOT directed that NERC management provide an
interim progress report no later than 12 months after the adoption of
these resolutions (i.e., by August 10, 2018) and a final report no
later than 18 months after the adoption of the resolutions (i.e., by
February 10, 2019). In its petition, NERC states that ``over the next
18 months, NERC, working with various stakeholders, will continue to
assess whether supply chain risks related to low impact BES Cyber
Systems, PACS, EACMS and PCA necessitate further consideration for
inclusion in a mandatory Reliability Standard.'' \40\
---------------------------------------------------------------------------
\40\ Id. at 20-21.
---------------------------------------------------------------------------
Implementation Plan
21. NERC's proposed implementation plan provides that the supply
chain risk management Reliability Standards become effective on the
first day of the first calendar quarter that is 18 months after the
effective date of a Commission order approving them. NERC states that
the proposed implementation period is designed to afford responsible
entities sufficient time to develop and implement their supply chain
cybersecurity risk management plans required under proposed Reliability
Standard CIP-013-1 and implement the new controls required in proposed
Reliability Standards CIP-005-6 and CIP-010-3.
D. Notice of Proposed Rulemaking
22. On January 18, 2018, the Commission issued a NOPR proposing to
approve supply chain risk management Reliability Standards CIP-013-1,
CIP-005-6, and CIP-010-3 (83 FR 3422, January 25, 2018). The NOPR
stated that the supply chain risk management Reliability Standards
``will enhance existing protections for bulk electric system
reliability by addressing the four objectives set forth in Order No.
829: (1) Software integrity and authenticity; (2) vendor remote access;
(3) information system planning; and (4) vendor risk management and
procurement controls.'' \41\ Accordingly, the NOPR proposed to
determine that the supply chain risk management Reliability Standards
constitute substantial progress in addressing the supply chain
cybersecurity risks identified by the Commission in Order No. 829.\42\
---------------------------------------------------------------------------
\41\ NOPR, 162 FERC ] 61,044 at P 29.
\42\ Id. P 30.
---------------------------------------------------------------------------
23. The NOPR proposed to approve the supply chain risk management
Reliability Standards' associated violation risk factors and violation
severity levels. However, with respect to the implementation plan and
effective date, the NOPR proposed to reduce the implementation period
from the first day of the first calendar quarter that is 18 months
following the effective date of a Commission order approving the
proposed Reliability Standards, as proposed by NERC, to the first day
of the first calendar quarter that is 12 months following the effective
date of a Commission order.\43\
---------------------------------------------------------------------------
\43\ Id. P 44.
---------------------------------------------------------------------------
24. The NOPR proposed to determine that a significant cybersecurity
risk associated with the supply chain for BES Cyber Systems persists
because the proposed supply chain risk management Reliability Standards
exclude EACMS, PACS, and PCAs, with the exception of the modifications
in Reliability Standard CIP-005-6, which apply to PCAs. To address this
gap, pursuant to section 215(d)(5) of the FPA, the NOPR proposed to
direct NERC to develop modifications to the CIP Reliability Standards
to include EACMS associated with medium and high impact BES Cyber
Systems within the scope of the supply chain risk management
Reliability Standards. In addition, the Commission proposed to direct
that NERC evaluate the cybersecurity supply chain risks presented by
PACS and PCAs in the study of cybersecurity supply chain risks directed
by the NERC BOT in its resolutions of August 10, 2017.
25. The Commission received fifteen comments on the NOPR.
E. Interim BOT-Directed Report
26. On September 7, 2018, NERC submitted to the Commission an
informational filing containing the BOT-directed interim report
prepared by the Electric Power Research Institute (EPRI).\44\ The
interim report explains that EPRI analyzed:
---------------------------------------------------------------------------
\44\ NERC, Informational Filing regarding Proposed Supply Chain
Risk Management Reliability Standards, Docket No. RM17-13-000
(September 7, 2018) (NERC Interim Report).
---------------------------------------------------------------------------
(1) Information regarding bulk electric system products and
manufacturers; (2) emerging vendor practices and industry standards;
and (3) the applicability of the CIP Reliability Standards to supply
chain risks. The interim report concludes with three categories of
identified next steps for further analysis and investigation.
27. First, EPRI identifies four noteworthy industry practices, not
already required by the CIP Reliability Standards, which may
potentially reduce future supply chain risks if implemented correctly:
(1) Third-party accreditation processes; (2) secure hardware delivery;
(3) threat-informed procurement language; and (4) processes related to
unsupported or open-source technology. Second, EPRI recommends further
study in modeling and assessing the potential impact of common-mode
vulnerabilities, especially those targeting low-impact BES Cyber
Systems. EPRI states that ``risks of common-mode vulnerabilities . . .
can be mitigated if supply chain security practices are applied
uniformly across cyber asset types.'' \45\ Finally, EPRI recommends
various methods to obtain additional data on industry practices. These
methods included issuing pre-audit surveys and questionnaires;
targeting outreach to bulk electric system vendors; developing standard
vendor data sheets related to the CIP Reliability Standards; and
independently testing legacy assets. In its accompanying filing, NERC
states its intention to continue to study supply chain risks over the
coming months, develop recommendations for follow-up actions, and
present a final report to the NERC BOT at its February 2019 meeting.
---------------------------------------------------------------------------
\45\ Id. at 5-1.
---------------------------------------------------------------------------
II. Discussion
28. Pursuant to section 215(d)(2) of the FPA, the Commission
approves supply chain risk management Reliability Standards CIP-013-1,
CIP-005-6, and CIP-010-3 as just, reasonable, not unduly discriminatory
[[Page 53997]]
or preferential, and in the public interest. We determine that the
supply chain risk management Reliability Standards will enhance
existing protections for bulk electric system reliability by addressing
the four objectives identified in Order No. 829: (1) Software integrity
and authenticity; (2) vendor remote access; (3) information system
planning; and (4) vendor risk management and procurement controls.
29. Reliability Standard CIP-013-1 addresses information system
planning and vendor risk management and procurement controls by
requiring that responsible entities develop and implement one or more
documented supply chain cybersecurity risk management plan(s) for high
and medium impact BES Cyber Systems. The required plans must address,
as applicable, a baseline set of six security concepts: (1) Vendor
security event notification; (2) coordinated incident response; (3)
vendor personnel termination notification; (4) product/services
vulnerability disclosures; (5) verification of software integrity and
authenticity; and (6) coordination of vendor remote access controls.
Reliability Standard CIP-005-6 addresses vendor remote access by
creating two new requirements for determining active vendor remote
access sessions and for having one or more methods to disable active
vendor remote access sessions. Reliability Standard CIP-010-3 addresses
software authenticity and integrity by creating a new requirement that
responsible entities verify the identity of the software source and the
integrity of the software obtained from the software source prior to
installing software that changes established baseline configurations,
when methods are available to do so.
30. While we determine that the approved supply chain risk
management Reliability Standards constitute substantial progress in
addressing the supply chain cybersecurity risks identified in Order No.
829, as discussed below, we find that the exclusion of EACMS from the
scope of the Reliability Standards presents risks to the cybersecurity
of the bulk electric system. As explained in Order No. 848, EACMS are
defined in the NERC Glossary as ``Cyber Assets that perform electronic
access control or electronic access monitoring of the Electronic
Security Perimeter(s) or BES Cyber Systems. This includes Intermediate
Systems.'' Among other things, EACMS include firewalls, authentication
servers, security event monitoring systems, intrusion detection systems
and alerting systems. The purpose of an ESP, in turn, is to manage
electronic access to BES Cyber Systems to support the protection of the
BES Cyber Systems against compromise that could lead to misoperation or
instability in the bulk electric system.\46\ The record indicates that
the vulnerabilities associated with EACMS are well understood and
appropriate for mitigation. Thus, pursuant to section 215(d)(5) of the
FPA, we direct NERC to develop modifications to the CIP Reliability
Standards to include EACMS within the scope of the supply chain risk
management Reliability Standards. We direct NERC to submit the directed
modifications within 24 months of the effective date of this final
rule.
---------------------------------------------------------------------------
\46\ Order No. 848, 164 FERC ] 61,033 at PP 39-40.
---------------------------------------------------------------------------
31. In addition, while PACS and PCAs also present concerns, we
agree with NERC and others that further study is warranted with regard
to the impacts and benefits of directing that the ERO address the risks
associated with PACS and PCAs in the supply chain risk management
Reliability Standards. Accordingly, we accept NERC's commitment to
evaluate the cybersecurity supply chain risks presented by PACS and
PCAs in the cybersecurity supply chain risks study directed by the BOT.
The Commission further directs NERC to file the BOT-directed final
report with the Commission upon its completion.
32. In the sections below, we discuss the following issues: (A)
Inclusion of EACMS in the supply chain risk management Reliability
Standards; (B) inclusion of PACS and PCAs in the BOT-directed study on
cybersecurity supply chain risks and filing of the BOT-directed final
report with the Commission; (C) supply chain risk management
Reliability Standards' implementation plan and effective date; and (D)
other issues raised in the NOPR comments.
A. Inclusion of EACMS in CIP Reliability Standards
1. NOPR
33. The NOPR observed that the supply chain risk management
Reliability Standards do not apply to low impact BES Cyber Systems or
Cyber Assets associated with medium and high impact BES Cyber Systems
(i.e., EACMS, PACS, and PCAs). The NOPR, however, recognized that the
BOT-directed study on cybersecurity supply chain risks will examine the
risks posed by low impact BES Cyber Systems.\47\ While acknowledging
NERC's commitment to study these issues, as evinced by the BOT-directed
study, the NOPR proposed to direct NERC to modify the supply chain risk
management Reliability Standards to include within their scope EACMS
associated with medium and high impact BES Cyber Systems.\48\
---------------------------------------------------------------------------
\47\ NOPR, 162 FERC ] 61,044 at P 33.
\48\ Id. P 39.
---------------------------------------------------------------------------
34. Specifically, the NOPR explained that BES Cyber Systems have
associated Cyber Assets, which, if compromised, pose a threat to the
BES Cyber System by virtue of, inter alia, the security control
function they perform.\49\ In particular, EACMS support BES Cyber
Systems and are part of the network and security architecture that
allows BES Cyber Systems to work as intended by performing electronic
access control or electronic access monitoring of the ESP or BES Cyber
Systems.
---------------------------------------------------------------------------
\49\ Reliability Standard CIP-002-5.1a (Cyber Security--BES
Cyber System Categorization), Background at 6.
---------------------------------------------------------------------------
35. The NOPR indicated that since EACMS support and enable BES
Cyber System operation, misoperation and unavailability of EACMS that
support a given BES Cyber System could also contribute to misoperation
of a BES Cyber System or render it unavailable, which could adversely
affect bulk electric system reliability. The NOPR also explained that
EACMS control electronic access, including interactive remote access,
into the ESP that protects high and medium impact BES Cyber Systems. As
the NOPR further noted, an attacker does not need physical access to
the facility housing a BES Cyber System in order to gain access to a
BES Cyber System or PCA via an EACMS compromise. The NOPR concluded
that EACMS represent the most likely route an attacker would take to
access a BES Cyber System or PCA within an ESP.\50\
---------------------------------------------------------------------------
\50\ NOPR, 162 FERC ] 61,044 at P 35.
---------------------------------------------------------------------------
2. Comments
36. NERC does not support the proposed directive to include EACMS
within the scope of the supply chain risk management Reliability
Standards at this time. NERC indicates that it is currently analyzing
supply chain risks associated with EACMS, among other things, as part
of the BOT-directed study of supply chain risks related to low impact
BES Cyber Systems. NERC explains that the ``study will help identify
and differentiate the risks presented by various types of EACMS'' to
help in any directed standards development process.\51\ NERC requests
that the Commission refrain from issuing a directive on EACMS until the
results of the BOT-directed study to
[[Page 53998]]
assess supply chain risks associated with EACMS are received.\52\
---------------------------------------------------------------------------
\51\ NERC Comments at 6.
\52\ Id. at 4-6.
---------------------------------------------------------------------------
37. Most commenters agree with NERC that the Commission should
approve the supply chain risk management Reliability Standards as filed
and not direct the inclusion of EACMS at this time. Instead, Trade
Associations, EEI, ITC, IRC, and MISO TOs support evaluating in the
BOT-directed study the possibility of including EACMS in the supply
chain risk management Reliability Standards.\53\
---------------------------------------------------------------------------
\53\ Trade Associations Comments at 10, EEI Comments at 10, ITC
Comments at 5, IRC Comments at 3.
---------------------------------------------------------------------------
38. Trade Associations contend that first allowing completion of
the BOT-directed study would allow NERC to assess the diversity of
EACMS that perform control or monitoring functions with varying risk
levels and ``is likely to provide more specific information and
analysis concerning whether any category of EACMS might be
appropriately included within the scope of the supply chain Reliability
Standards.'' \54\ Trade Associations also maintain that first having
the BOT-directed study results will facilitate a more efficient and
effective standards development process.
---------------------------------------------------------------------------
\54\ Trade Associations Comments at 10.
---------------------------------------------------------------------------
39. While also supportive of awaiting the results of the BOT-
directed study, EEI asserts that EACMS are protected under existing CIP
Reliability Standards. EEI cites Reliability Standards CIP-005-5,
Requirements R1, Part 1.3 and R2, Parts 2.1-2.3, CIP-007-6,
Requirements R1, Part 1.1, R2, R3, R4, and R5, and CIP-010-2,
Requirement 2, Part 2.1 as protecting EACMS against compromise.\55\
Moreover, EEI states that the likelihood of compromise of an EACMS from
potential supply chain-derived threats was not addressed in the NOPR
and ``should be evaluated before directing a CIP Standard scope
expansion.'' \56\ Even so, EEI supports further evaluating the
feasibility, as well as the benefits, of adding EACMS to the supply
chain risk management Reliability Standards. EEI contends that waiting
for the BOT-directed study will allow industry time to gain experience
implementing the supply chain risk management Reliability Standard
requirements as well as help identify potential follow-up actions.\57\
---------------------------------------------------------------------------
\55\ EEI Comments at 8.
\56\ Id.
\57\ Id. at 10.
---------------------------------------------------------------------------
40. MISO TOs likewise aver that EACMS, while important, are ``not
unprotected'' under currently-effective CIP Reliability Standards. MISO
TOs, like EEI, reference Reliability Standard CIP-007-6 (Cyber Security
-- System Security Management), which requires responsible entities to
manage system security by specifying select technical, operational, and
procedural requirements in support of protecting BES Cyber Systems.
MISO TOs state that this Reliability Standard applies to EACMS. AECC
also contends that the existing CIP Reliability Standards already
sufficiently cover any risks associated with EACMS.\58\ In particular,
AECC states that ``CIP-005-6 already addresses vendor-initiated remote
access . . . [and] developing technology services for BEC Cyber Systems
under CIP-010-3 inherently already requires coverage for EACMS, PACS,
and PCAs due to the nature of the technology.'' \59\
---------------------------------------------------------------------------
\58\ AECC Comments at 2-3.
\59\ Id. at 3.
---------------------------------------------------------------------------
41. ITC, IRC, and MISO TOs assert that including EACMS within the
supply chain risk management Reliability Standards would constitute a
substantial expansion of the Reliability Standards and would require
significant additional resources for compliance, without a commensurate
improvement in bulk electric system reliability. According to ITC, the
record does not contradict NERC's technical assessment that inclusion
of EACMS within the supply chain risk management Reliability Standards
is not justified. ITC claims that the NOPR, while ``descriptively
accurate,'' misunderstands the purpose and function of EACMS, which,
ITC states, are intended to protect the ESP and the BES Cyber Assets
contained therein and are not intended to provide a reliability
function. ITC concludes that misoperation of an EACMS, while serious,
does not rise to the level of a direct threat to the reliability of the
bulk electric system.
42. IRC similarly believes that including EACMS within the scope of
the supply chain risk management Reliability Standards would require
``significant resources and effort'' and because EACMS vendors supply
such systems to a larger market than just the power sector there would
need to be coordination with other industries before implementing a
supply chain risk management Reliability Standard for EACMS.\60\ MISO
TOs also contend that including EACMS would affect numerous pieces of
equipment and assets, with associated costs, system changes, and other
burdens, without showing commensurate benefits.\61\
---------------------------------------------------------------------------
\60\ IRC Comments at 2-3.
\61\ MISO TO Comments at 16.
---------------------------------------------------------------------------
43. Idaho Power, for its part, does not believe that EACMS should
be included in the scope of the supply chain risk management
Reliability Standards based on its view that EACMS are used in other
industries and are not specific to critical infrastructure. Instead,
Idaho Power states that the focus should be on correctly configuring
EACMS devices as opposed to addressing procurement practices.\62\
---------------------------------------------------------------------------
\62\ Idaho Power Comments at 2.
---------------------------------------------------------------------------
44. Appelbaum, Reclamation, Resilient Societies, Isologic, Mabee,
and MPUC support the NOPR directive regarding EACMS associated with
medium and high impact BES Cyber Systems. In addition, the commenters
urge the Commission to extend the scope of the supply chain risk
management Reliability Standards to low impact BES Cyber Systems.\63\
MPUC states, for example, that the supply chain risk management
Reliability Standards should apply to all BES Cyber System assets,
unless the specific asset can be shown to be completely isolated from
the bulk electric system.\64\ Resilient Societies states that the
supply chain risk management Reliability Standards should apply to low
impact BES Cyber Systems since the compromise of a low impact BES Cyber
System could lead to the compromise of medium or high impact BES Cyber
Systems.\65\
---------------------------------------------------------------------------
\63\ Appelbaum Comments at 6, Reclamation Comments at 7,
Resilient Societies Comments at 3-4, Isologic Comments at 3, Mabee
Comments at 4, MPUC Comments at 6.
\64\ MPUC Comments at 6.
\65\ Resilient Societies Comments at 3.
---------------------------------------------------------------------------
45. APS states that it supports the NOPR proposal to direct NERC to
modify the supply chain risk management Reliability Standards to
include EACMS associated with medium and high impact BES Cyber Systems.
However, APS contends that the Commission should delay their inclusion
until NERC and industry complete their analysis of the potential need
to separate the functions reflected in the current EACMS definition
(e.g., electronic access control versus electronic access monitoring).
APS states that, including EACMS that perform electronic access control
functions within the scope of the supply chain risk management
Reliability Standards ``represents good cybersecurity posture . . .
[h]owever, at this time, the definition of EACMS is not sufficiently
mature to make the necessary distinction discussed above.'' \66\
---------------------------------------------------------------------------
\66\ APS Comments at 5.
---------------------------------------------------------------------------
[[Page 53999]]
3. Commission Determination
46. Pursuant to section 215(d)(5) of the FPA, we adopt the NOPR
proposal and direct NERC to develop modifications to include EACMS
associated with medium and high impact BES Cyber Systems within the
scope of the supply chain risk management Reliability Standards. While
we are sensitive to the position taken by NERC and other commenters
that the Commission should not issue a directive until after completion
of the BOT-directed final report, we conclude that the record before us
supports directing NERC to include at least some subset of EACMS
associated with medium and high impact BES Cyber Systems at this time.
We are not persuaded by comments advocating delay in view of the
forthcoming BOT-directed final report because the standard drafting
team will have the benefit of the BOT-directed final report, which is
due in February 2019, when developing the directed Reliability Standard
modifications.\67\
---------------------------------------------------------------------------
\67\ As we have imposed a 24-month deadline for NERC to file the
modified supply chain risk management Reliability Standards, the
standard drafting team will have ample time to review and
incorporate the findings in the BOT-directed final report.
---------------------------------------------------------------------------
47. We continue to believe that EACMS represent the most likely
route an attacker would take to access a BES Cyber System or PCA within
an ESP based on the functions they perform.\68\ EACMS support BES Cyber
Systems and are part of the network and security architecture that
allows BES Cyber Systems to work as intended because they perform
electronic access control or electronic access monitoring of the ESP or
BES Cyber Systems. In particular, EACMS control electronic access,
including interactive remote access, into the ESP that protects high
and medium impact BES Cyber Systems. One specific function of
electronic access control is to prevent malware or malicious actors
from gaining access to the BES Cyber Systems and PCAs within the
ESP.\69\ Given the significant role that EACMS play in the protection
scheme for medium and high impact BES Cyber Systems, we determine that
EACMS should be within the scope of the supply chain risk management
Reliability Standards to provide minimum protection against supply
chain attack vectors.
---------------------------------------------------------------------------
\68\ See NOPR, 162 FERC ] 61,044 at P 35.
\69\ Id.
---------------------------------------------------------------------------
48. No commenter disagreed with the NOPR that misoperation or
unavailability of EACMS that support a given BES Cyber System could
contribute to the misoperation of the BES Cyber System or render it
unavailable, which could pose a significant risk to reliable operation.
Instead, commenters generally agree that EACMS perform important
security-related functions.\70\ For example, NERC states that a
compromised firewall ``may allow unfettered access to the ESP.'' \71\
EEI also agrees that the compromise of certain EACMS that control
access could adversely affect the reliable operation of an associated
BES Cyber System, although EEI asserts that other CIP Reliability
Standards adequately protect those EACMS.\72\ Although some commenters,
as discussed below, maintain that the reliability benefit of including
EACMS in the supply chain risk management Reliability Standards is
outweighed by the perceived costs, these commenters do not challenge
the proposition that misoperation or unavailability of EACMS has
negative reliability ramifications. For example, ITC, while opposing
the NOPR directive, recognizes that misoperation of an EACMS is
``serious'' and ``[w]ere CIP resources infinite, it would no doubt
increase BES reliability by some degree to include EACMS within this
Standard.'' \73\
---------------------------------------------------------------------------
\70\ See NERC Comments at 5-6, Appelbaum Comments at 5-6, APS
Comments at 5, EEI Comments at 7-8, IRC Comments at 3, Idaho Power
Comments at 2, MPUC Comments at 6.
\71\ NERC Comments at 5.
\72\ EEI Comments at 7-8.
\73\ ITC Comments at 5.
---------------------------------------------------------------------------
49. We disagree with the comments asserting that existing CIP
Reliability Standards adequately protect EACMS against supply chain-
based threats. While existing CIP Reliability Standards include
requirements that address aspects of supply chain risk management,
existing Reliability Standards do not adequately protect EACMS based on
the four security objectives in Order No. 829.\74\ The CIP Reliability
Standards cited by EEI, MISO TOs and AECC address aspects of electronic
access control, systems security management, and configuration
monitoring, but they do not address protection from supply chain
threats such as insertion of counterfeits or malicious software,
unauthorized production, tampering, or theft, as well as poor
manufacturing and development practices. By contrast, the supply chain
risk management Reliability Standards approved in this final rule
specifically address the above listed supply chain threats, and, we
determine, should be extended to at least some subset of EACMS.
---------------------------------------------------------------------------
\74\ Order No. 829, 156 FERC ] 61,050 at P 71.
---------------------------------------------------------------------------
50. Specifically, the goal of the supply chain risk management
Reliability Standards is ``to help ensure that responsible entities
establish organizationally-defined processes that integrate a
cybersecurity risk management framework into the system development
life cycle.'' \75\ The current CIP Reliability Standards identified in
the comments, however, do not adequately address supply chain risks.
For example, while Reliability Standard CIP-005-5 provides a level of
electronic access protection for an ESP through controls applied to an
Electronic Access Point associated with an EACMS, those controls would
only apply after an asset is procured and deployed on a responsible
entity's system. In this situation, the EACMS at issue could already
contain built-in vulnerabilities making it susceptible to compromise
or, in the worst-case scenario, could have been compromised before
acquisition.
---------------------------------------------------------------------------
\75\ NERC Comments at 23.
---------------------------------------------------------------------------
51. Given the documented risks to the cyber posture of the bulk
electric system associated with EACMS, we are not persuaded to await
the completion of the BOT-directed final report before issuing a
directive regarding EACMS.\76\ Instead, it is reasonable to initiate
modification of the supply chain risk management Reliability Standards
based on the conclusion that at least some categories of EACMS should
be included. As discussed above, we are convinced that EACMS in general
are a known risk that should be protected under the supply chain risk
management Reliability Standards. But we leave it to the standard
drafting team to assess the various types of EACMS and their associated
levels of risk. We are confident that the standard drafting team will
be able to develop modifications that include only those EACMS whose
compromise by way of the cybersecurity supply chain can affect the
reliable operation of high and medium impact BES Cyber Systems. While
it will no doubt inform the standard drafting team's work, the BOT-
directed final report is not, in our view, likely to alter the
conclusion that at least some EACMS functions should be included in the
supply chain risk management Reliability Standards.\77\
---------------------------------------------------------------------------
\76\ See NERC Comments at 4-6, EEI Comments at 7-10, IRC
Comments at 3, ITC Comments at 5, Trade Associations at 8-12, MISO
TOs Comments at 16-18.
\77\ The BOT-directed interim report provides the example of a
situation where a firewall used to protect BES Cyber Systems within
an ESP was compromised due to supply chain vulnerability, noting
that each system within the ESP could be exposed due to its logical
proximity to the compromised firewalls. NERC Interim Report at 4-4.
---------------------------------------------------------------------------
[[Page 54000]]
52. The record does not support delaying a directive to modify the
CIP Reliability Standards to include EACMS. While commenters opposing
the NOPR proposal contend that the Commission should not act until NERC
has the results of the BOT-directed final report, we note that: (1)
NERC will have 24 months from the effective date of this final rule to
develop and submit the modified Reliability Standards; and (2) the BOT-
directed final report is due in the near term (i.e., February 2019).
Nothing in our directive prevents the standard drafting team from using
the findings in the BOT-directed final report to refine its
understanding of which types of EACMS functions present the greatest
risk and are worthy of inclusion in the supply chain risk management
Reliability Standards. Indeed, as discussed below, in view of the BOT-
directed study and the Commission's guidance, the standard drafting
team could modify the supply chain risk management Reliability
Standards to include an appropriate subset of EACMS functions similar
to the approach in Order No. 848.\78\
---------------------------------------------------------------------------
\78\ Order No. 848, 164 FERC ] 61,033 at PP 53-54.
---------------------------------------------------------------------------
53. As we have indicated above, including EACMS within the scope of
the supply chain risk management Reliability Standards is consistent
with the approach in Order No. 848 regarding cybersecurity incident
reporting. In Order No. 848, the Commission determined that EACMS that
perform certain functions are significant to bulk electric system
reliability so as to justify their being within the scope of the
cybersecurity incident reporting Reliability Standards. Specifically,
Order No. 848 addressed the identification of EACMS that should be
subject to mandatory reporting requirements:
With regard to identifying EACMS for reporting purposes, NERC's
reporting threshold should encompass the functions that various
electronic access control and monitoring technologies provide. Those
functions must include, at a minimum: (1) Authentication; (2)
monitoring and logging; (3) access control; (4) interactive remote
access; and (5) alerting.\79\
\79\ Id. P 54.
---------------------------------------------------------------------------
54. As with cybersecurity incident reporting, in the context of
this proceeding, if, for example, a vulnerability in the supply chain
for EACMS is found, we determine that responsible entities should have
processes in place to be notified of such vulnerabilities by the
vendor, as required by Reliability Standard CIP-013-1, Requirement
R1.2.4. We recognize that including EACMS within the scope of the
supply chain risk management Reliability Standards will impose a burden
on responsible entities. Nonetheless, the burden of possible
procurement inefficiencies or resource constraints must be weighed
against the significant risk of a cyber incident resulting from
unmitigated supply chain vulnerabilities.\80\
---------------------------------------------------------------------------
\80\ EEI Comments at 9, MISO TOs Comments at 16-17, ITC Comments
at 5.
---------------------------------------------------------------------------
55. It is also important to consider that in Order No. 848 the
Commission determined that the modified reporting Reliability Standard
need not include all EACMS as currently defined and, instead, the
standard drafting team may analyze the matter to determine an
appropriate subset of EACMS for reporting purposes.\81\ Likewise, the
standard drafting team that is formed in response to our present
directive may determine, based on the work done in response to Order
No. 848 as well as the results of the BOT-directed study, what EACMS
functions are most important to the reliable operation of the Bulk-
Power System and therefore should be included in the supply chain risk
management Reliability Standards.
---------------------------------------------------------------------------
\81\ Order No. 848, 164 FERC ] 61,033 at P 53.
---------------------------------------------------------------------------
56. We find the remaining objections to our directive unpersuasive.
BES Cyber Systems rely on EACMS to enable and secure the communications
capability that these systems depend on to control their assigned
portion of the bulk electric system. Commenters opposing the NOPR
directive fail to provide convincing examples of why EACMS should not
receive the same level of protection as the BES Cyber Systems with
which they are associated. In addition, contrary to EEI's assertion
that the ``likelihood of compromise'' is unclear, ample evidence exists
that supply chain vulnerabilities are an active issue for vendors, whom
malicious parties have intentionally targeted.\82\ By contrast,
commenters supporting the NOPR directive provided examples where
notable vendors of EACMS functions announced vulnerabilities,
specifically in firewall firmware.\83\ Reliability Standard CIP-013-1,
Requirement R1, Part 1.2.1, when applied to certain EACMS functions,
will require that responsible entities have processes to require
notification by the vendor of the discovery of such vulnerabilities,
representing a clear enhancement of the protections provided by the CIP
Reliability Standards.
---------------------------------------------------------------------------
\82\ EEI Comments at 8-9.
\83\ Resilient Societies Comments at 3 (noting a February 2016
Cisco ``critical'' security advisory on a vulnerability that could
allow an unauthenticated, remote attacker to obtain full control of
its Industrial Security Appliance line of firewalls, and a December
2015 Juniper ``out-of-cycle security advisory'' on unauthorized code
identified in a specific operating system that could allow an
attacker to access some firewalls).
---------------------------------------------------------------------------
57. Although some commenters question the importance of the EACMS
monitoring function, we note that these systems work in concert with
access control systems to alert of possible intrusion.\84\ Standard
monitoring systems such as intrusion detection systems are an essential
component designed to recognize suspicious activity and collect data
used for incident reporting. A compromised intrusion detection system
may provide false information and generate false alarms. Indeed, a
compromised intrusion detection system may not only negate the value of
the reported information, but could also potentially provide misleading
information. Various intrusion detection system modules collect user
logs, provide audit trails and indicate whether suspicious activity is
malicious or normal. An attacker could change the various settings,
removing or inserting false information. A compromised intrusion
detection system may also allow the attacker to manipulate the system
continuously without generating an alarm. In addition, an attacker may
alter the compromised system such that it will deny legitimate activity
and accept malicious activity.\85\
---------------------------------------------------------------------------
\84\ EEI Comments at 7, APS Comments at 3-5, MISO TOs Comments
17-18.
\85\ International Journal of Information Sciences and
Techniques (IJIST) Vol.6, No.1/2, March 2016, Cyber Attacks on
Intrusion Detection Systems at P 195, http://aircconline.com/ijist/V6N2/6216ijist20.pdf.
---------------------------------------------------------------------------
58. For the reasons discussed above, we adopt the NOPR proposal
and, pursuant to section 215(d)(5) of the FPA, direct NERC to develop
modifications to the CIP Reliability Standards to include EACMS
associated with medium and high impact BES Cyber Systems within the
scope of the supply chain risk management Reliability Standards. We
direct NERC to submit the directed modifications within 24 months of
the effective date of this final rule.
B. Study of PACS and PCAs in the BOT-Directed Cybersecurity Supply
Chain Risk Study
1. NOPR
59. The NOPR stated that it would be appropriate to await the
findings from the BOT-directed study on cybersecurity supply chain
risks before considering
[[Page 54001]]
whether low impact BES Cyber Systems should be addressed in the supply
chain risk management Reliability Standards. The NOPR explained that
the BOT resolutions stated that the BOT-directed study should examine
the risks posed by low impact BES Cyber Systems, but the BOT
resolutions did not identify PACS and PCAs as subjects of the study.
The NOPR noted, however, that NERC's petition suggests that NERC will
evaluate PACS and PCAs as part of the BOT-directed study.\86\
---------------------------------------------------------------------------
\86\ NOPR, 162 FERC ] 61,044 at P 27 (citing NERC Petition at 21
(``over the next 18 months, NERC, working with various stakeholders,
will continue to assess whether supply chain risks related to low
impact BES Cyber Systems, PACS, EACMS, and PCA necessitate further
consideration for inclusion in a mandatory Reliability Standard'')).
---------------------------------------------------------------------------
60. The NOPR proposed to direct that NERC, consistent with the
representation made in NERC's petition, include PACS and PCAs in the
BOT-directed study and to await the findings of the study's final
report before considering further action. The NOPR indicated that the
risks posed by EACMS also apply to varying degrees to PACS and PCAs.
However, the NOPR explained the distinction between EACMS and the other
Cyber Assets: For example, a compromise of a PACS through the supply
chain, which would potentially grant an attacker physical access to a
BES Cyber System or PCA, is more difficult since it would also require
physical access. Physical access is not required to take advantage of a
compromised EACMS. Accordingly, the NOPR proposed immediate action to
provide for the protection of EACMS, because they represent the most
likely route an attacker would take to access a BES Cyber System or PCA
within an ESP, while possible action on other Cyber Assets can await
completion of the BOT-directed study's final report.\87\
---------------------------------------------------------------------------
\87\ NOPR, 162 FERC ] 61,044 at P 42.
---------------------------------------------------------------------------
61. In addition to proposing to direct NERC to include PACS and
PCAs in the BOT-directed study, the NOPR proposed to direct that NERC
file the study's interim and final reports with the Commission upon
their completion.\88\
---------------------------------------------------------------------------
\88\ Id. P 43.
---------------------------------------------------------------------------
2. Comments
62. NERC concurs with the NOPR proposal and states that the
Commission should ``await the results of the Board-requested study
before considering whether low impact BES Cyber Systems, PACS, and PCAs
should be addressed in the proposed Reliability Standards.'' \89\ NERC
maintains that the BOT-directed report will help determine whether the
supply chain risk management Reliability Standards are appropriately
scoped to mitigate the risks identified by the Commission.\90\
---------------------------------------------------------------------------
\89\ NERC Comments at 4.
\90\ Id. at 5.
---------------------------------------------------------------------------
63. EEI and Trade Associations support the supply chain risk
management Reliability Standards' exclusion of low impact BES Cyber
Systems. EEI agrees with the NOPR proposal to wait for NERC to study
the supply chain risks posed by low impact BES Cyber Systems as well as
PACS and PCAs before directing further modifications.\91\ Trade
Associations also ``strongly support'' limiting the supply chain risk
management Reliability Standards' applicability to medium and high
impact BES Cyber Systems.\92\
---------------------------------------------------------------------------
\91\ EEI Comments at 3.
\92\ Trade Associations Comments at 7.
---------------------------------------------------------------------------
64. Other commenters contend that low impact BES Cyber Systems pose
a significant risk and disagree with the view that excluding such
assets will focus industry resources on protecting systems with
heightened risk, while not being overly burdensome. For example,
Resilient Societies maintains that cyber attackers could use low impact
BES Cyber Systems as network entry points to attack high and medium
impact BES Cyber Systems, with a potential coordinated cyberattack on
multiple low impact facilities causing a cascading collapse.\93\
Similarly, Appelbaum asserts that ``if a large number of [low impact
BES Cyber Systems] are compromised, then the effort to correct or
replace the compromised assets could be significant.'' \94\ Reclamation
also recommends including low impact BES Cyber Systems in the proposed
Reliability Standards in order to avoid gaps that could compromise bulk
electric system security.\95\
---------------------------------------------------------------------------
\93\ Resilient Societies Comments at 3-4.
\94\ Appelbaum Comments at 6.
\95\ Reclamation Comments at 1.
---------------------------------------------------------------------------
65. MPUC states that many of the concerns identified in the NOPR
apply to all classifications of BES Cyber Systems and that responsible
entities should be required to apply the supply chain risk management
Reliability Standards to all BES Cyber System assets, unless the
entities can show the assets in question to be completely isolated.\96\
Reclamation has similar concerns and states that the supply chain risk
management Reliability Standards should apply to all BES Cyber System
impact ratings, including low impact.\97\ Mabee cautions against giving
industry the discretion to determine which cyber systems are ``easy''
to protect and which are ``burdensome'' to protect.\98\ Isologic also
disagrees with the exclusion of low impact BES Cyber Systems and
contends that awaiting the BOT-directed final report would unduly delay
an examination by the Commission of risks involving the ``massive array
of unprotected [low impact] transmission substations.'' \99\
---------------------------------------------------------------------------
\96\ MPUC Comments at 6.
\97\ Reclamation Comments at 1.
\98\ Mabee Comments at 4.
\99\ Isologic Comments at 5.
---------------------------------------------------------------------------
3. Commission Determination
66. We accept NERC's commitment to evaluate the cybersecurity
supply chain risks presented by low impact BES Cyber Systems, PACS, and
PCAs in the study of cybersecurity supply chain risks directed by the
NERC BOT. In light of that commitment, we conclude it is not necessary
to separately direct that NERC expand the scope of the BOT-directed
study. However, we adopt the NOPR proposal to direct NERC to file the
BOT-directed study's final report with the Commission upon its
completion.
67. We continue to believe that it is appropriate to await the
findings from the BOT-directed final report on cybersecurity risks
before considering whether low impact BES Cyber Systems, PACS and PCAs
should be addressed in modified supply chain risk management
Reliability Standards.\100\ While we do not prejudge the findings from
the forthcoming final report, at this time we find that NERC is taking
adequate and timely steps to study whether low impact BES Cyber
Systems, PACS and PCAs should be included in the supply chain risk
management Reliability Standards. Given that the BOT-directed final
report is scheduled to be completed in February 2019, we do not view
our determination as unduly delaying consideration of this important
issue. Once NERC submits the BOT-directed final report, the Commission
will be in a better position to consider what further steps, if any,
should be taken to provide for the reliability of the bulk electric
system.
---------------------------------------------------------------------------
\100\ NOPR, 162 FERC ] 61,044 at P 40.
---------------------------------------------------------------------------
C. Implementation Plan
1. NOPR
68. The NOPR stated that the 18-month implementation period
proposed by NERC may not be justified based on the anticipated effort
required to develop and implement a supply chain risk management plan.
The NOPR explained that while, according to NERC, the proposed
implementation period is ``designed to afford responsible entities
sufficient time to develop and implement their supply
[[Page 54002]]
chain cybersecurity risk management plans required under proposed
Reliability Standard CIP-013-1 and implement the new controls required
in proposed Reliability Standards CIP-005-6 and CIP-010-3,'' the
security objectives of the proposed Reliability Standards are process-
based and do not prescribe technology that might justify an extended
implementation period.\101\ Accordingly, the NOPR proposed to reduce
the time for implementation such that the supply chain risk management
Reliability Standards would become effective the first day of the first
calendar quarter that is 12 months, as opposed to NERC's 18 months,
following the effective date of a Commission order approving the
Reliability Standards.
---------------------------------------------------------------------------
\101\ NOPR, 162 FERC ] 61,044 at P 44 (citing NERC Petition at
35).
---------------------------------------------------------------------------
2. Comments
69. NERC does not support the NOPR proposal to reduce the
implementation period for the supply chain risk management Reliability
Standards to 12 months. NERC states that the proposed 18-month
implementation period is intended to give responsible entities adequate
time to develop and implement a supply chain risk management plan
required under proposed Reliability Standard CIP-013-1, as well as to
implement new controls required under proposed Reliability Standards
CIP-005-6 and CIP-010-3. NERC explains that although proposed
Reliability Standard CIP-013-1 is process-based, the development and
implementation of the underlying Reliability Standard requirements
``involves performing a complex risk assessment process for planning
and procuring BES Cyber Systems.'' \102\
---------------------------------------------------------------------------
\102\ NERC Comments at 7.
---------------------------------------------------------------------------
70. Other commenters support NERC's proposed 18-month
implementation period and contend that 12 months is not enough time for
responsible entities to develop and implement the plan and controls
required under the supply chain risk management Reliability Standards.
EEI, Idaho Power, IRSC, MISO TOs, and Trade Associations contend that
while the Commission is correct that the requirements in the
Reliability Standards are process-based, certain requirements will
require technology enhancements, as well as coordination with
vendors.\103\ For example, Trade Associations state that Reliability
Standard CIP-005-6 will require work with vendors to facilitate the
ability to disable vendor remote access, while Reliability Standard
CIP-010-3 will also require technology upgrades.\104\ APS does not
agree with the NOPR's assessment that a 12-month implementation period
is reasonable, noting the potential need for new technology and the
limitations imposed by capital budget and planning cycles.\105\ ITC and
MISO TOs argue that the Commission does not have the legal authority to
modify the implementation period unilaterally for a proposed
Reliability Standard.
---------------------------------------------------------------------------
\103\ See EEI Comments at 3-4, Idaho Power Comments at 3-4, IRC
Comments at 4, Trade Associations Comments at 12-13.
\104\ Trade Associations Comments at 12-13 (citing NOPR, 152
FERC ] 61,054 at P 44).
\105\ APS Comments at 5-7.
---------------------------------------------------------------------------
71. Appelbaum supports a shortened implementation period for
proposed Reliability Standards CIP-010-3 and CIP-005-6, for the reasons
stated in the NOPR, but contends that an 18-month implementation period
for proposed Reliability Standard CIP-013-1 is more appropriate.
Specifically, Appelbaum notes that the proposed Reliability Standard
includes new risk planning and documentation requirements that will
take time to implement. Appelbaum also contends that the risk
assessment will likely involve multiple vendors and various different
assets. Appelbaum states that an 18-month implementation period would
provide the time to develop a supply chain risk management policy and
associated processes, and then apply the processes to current and
future procurement activities.\106\
---------------------------------------------------------------------------
\106\ Appelbaum Comments at 4.
---------------------------------------------------------------------------
3. Commission Determination
72. We do not adopt the NOPR proposal to reduce the implementation
period and instead approve the implementation plan and effective date
as proposed by NERC. The NOPR proposal was largely based on the premise
that the security objectives of the supply chain risk management
Reliability Standards are process-based and do not prescribe technology
that might justify a longer implementation period. However, based on
the comments, we are persuaded that technical upgrades are likely
necessary to meet the security objectives of the supply chain risk
management Reliability Standards, which could involve longer time-
horizon capital budgets and planning cycles.
73. While the Commission could, as Appelbaum suggests, direct an
18-month implementation period for Reliability Standard CIP-013-1 and a
12-month period for Reliability Standards CIP-005-6 and CIP-010-3, we
conclude that different timelines could complicate implementation and
potentially increase the administrative burden of implementation
without a commensurate improvement in security.
74. Based on the discussion above, we do not adopt the NOPR
proposal and approve NERC's proposed implementation plan whereby the
supply chain risk management Reliability Standards will be effective on
the first day of the first calendar quarter that is 18 months following
the effective date of this final rule.
D. Other Issues
1. Comments
75. Certain commenters raised additional issues not addressed in
the NOPR. MISO TOs, APS, and Trade Associations request clarification
regarding the term ``vendor.'' Specifically, APS seeks clarification of
the definition of ``vendor'' and on the applicability of Reliability
Standard CIP-013-1 to those vendors that would only provide services
associated with a BES Cyber System that is already procured and in
service.\107\ APS also seeks clarification on whether responsible
entities are required to perform individualized vendor assessments for
every in-scope procurement activity.\108\
---------------------------------------------------------------------------
\107\ APS Comments at 9-11.
\108\ Id.
---------------------------------------------------------------------------
76. MISO TOs contend that the Commission should clarify that the
supply chain risk management Reliability Standards do not apply to
vendors and that responsible entities will not be responsible for
vendor noncompliance. MISO TOs also request that the Commission clarify
that responsible entities do not have any obligation to work only with
compliant vendors.\109\
---------------------------------------------------------------------------
\109\ MISO TOs Comments at 7-9.
---------------------------------------------------------------------------
77. APS also seeks clarification regarding the scope of access
intended within the term ``system-to-system access.'' \110\ As an
example, APS asserts that, although there is a connection, User
Datagram Protocol would not qualify as ``system-to-system access'' and
seeks clarification regarding the scope of connections that would
qualify as ``system-to-system access.'' \111\
---------------------------------------------------------------------------
\110\ APS Comments at 9-11.
\111\ Id.
---------------------------------------------------------------------------
2. Commission Determination
78. The Supplemental Materials for Reliability Standard CIP-013-1
explain the meaning of the term ``vendor.'' Specifically, the
Supplemental Materials state that a vendor ``is limited to those
persons, companies, or other organizations with whom the
[[Page 54003]]
[r]esponsible [e]ntity, or its affiliates, contracts with to supply BES
Cyber Systems and related services.'' \112\ The Supplemental Materials
also note that a vendor, for purposes of the supply chain risk
management Reliability Standards, may include: (i) Developers or
manufacturers of information systems, system components, or information
system services; (ii) product resellers; or (iii) system
integrators.\113\
---------------------------------------------------------------------------
\112\ Reliability Standard CIP-013-1 at 12.
\113\ Id.
---------------------------------------------------------------------------
79. With regard to vendor-related compliance concerns, vendors are
not subject to the supply chain risk management Reliability Standards.
As NERC explains, ``the proposed Reliability Standards apply only to
registered entities and do not directly impose obligations on
suppliers, vendors or other entities that provide products or services
to registered entities.'' \114\ This is consistent with the
Commission's guidance in Order No. 829 that ``any action taken by NERC
in response to the Commission's directive to address the supply chain-
related reliability gap should respect `section 215 jurisdiction by
only addressing the obligations of responsible entities' and `not
directly impose obligations on suppliers, vendors or other entities
that provide products or services to responsible entities.' '' \115\
---------------------------------------------------------------------------
\114\ NERC Petition at 14.
\115\ Order No. 829, 156 FERC ] 61,050 at P 21.
---------------------------------------------------------------------------
80. As to the question of responsible entity liability for vendor
noncompliance, NERC explains that ``any resulting obligation that a
supplier, vendor or other entity accepts in providing products or
services to the registered entity is a contractual matter between the
registered entity and the third party outside the scope of the proposed
Reliability Standard[.]'' \116\ The security objective of the supply
chain risk management Reliability Standards is to ``ensure that
[r]esponsible [e]ntities consider the security, integrity, quality, and
resilience of the supply chain, and take appropriate mitigating action
when procuring BES Cyber Systems to address threats and vulnerabilities
in the supply chain.'' \117\ Therefore, while a responsible entity is
not directly liable for vendor actions, the responsible entity is
required to mitigate any resulting risks. Finally, the supply chain
risk management Reliability Standards do not dictate a responsible
entity's contracting decision.
---------------------------------------------------------------------------
\116\ NERC Petition at 17.
\117\ Id. at 13.
---------------------------------------------------------------------------
81. As to the term ``system-to-system,'' NERC explains that the
objective of Reliability Standard CIP-005-6, Requirement R2.4 is for
entities to have visibility of active vendor remote access sessions,
including Interactive Remote Access and system-to-system remote access,
taking place on their system.\118\ Reliability Standard CIP-005-6
requires entities to have a method to determine all active vendor
remote access sessions.\119\
---------------------------------------------------------------------------
\118\ Id. at 31.
\119\ See Reliability Standard CIP-005-6 at 28.
---------------------------------------------------------------------------
III. Information Collection Statement
82. The FERC-725B information collection requirements contained in
this final rule are subject to review by the Office of Management and
Budget (OMB) under section 3507(d) of the Paperwork Reduction Act of
1995.\120\ OMB's regulations require approval of certain information
collection requirements imposed by agency rules.\121\ Upon approval of
a collection of information, OMB will assign an OMB control number and
expiration date. Respondents subject to the filing requirements of this
rule will not be penalized for failing to respond to these collections
of information unless the collections of information display a valid
OMB control number. In the NOPR, the Commission solicited comments on
the Commission's need for this information, whether the information
will have practical utility, the accuracy of the burden estimates, ways
to enhance the quality, utility, and clarity of the information to be
collected or retained, and any suggested methods for minimizing
respondents' burden, including the use of automated information
techniques. The Commission did not receive any comments on the specific
burden estimates discussed below.
---------------------------------------------------------------------------
\120\ 44 U.S.C. 3507(d).
\121\ 5 CFR 1320.11.
---------------------------------------------------------------------------
83. The Commission bases its paperwork burden estimates on the
changes in paperwork burden presented by the approved CIP Reliability
Standard CIP-013-1 and the approved revisions to CIP Reliability
Standard CIP-005-6 and CIP-010-3 as compared to the current Commission-
approved Reliability Standards CIP-005-5 and CIP-010-2, respectively.
As discussed above, the final rule addresses several areas of the CIP
Reliability Standards through Reliability Standard CIP-013-1,
Requirements R1, R2, and R3. Under Requirement R1, responsible entities
would be required to have one or more processes to address the
following baseline set of security concepts, as applicable, in their
procurement activities for high and medium impact BES Cyber Systems:
(1) Vendor security event notification processes (Part 1.2.1); (2)
coordinated incident response activities (Part 1.2.2); (3) vendor
personnel termination notification for employees with access to remote
and onsite systems (Part 1.2.3); (4) product/services vulnerability
disclosures (Part 1.2.4); (5) verification of software integrity and
authenticity (Part 1.2.5); and (6) coordination of vendor remote access
controls (Part 1.2.6). Requirement R2 mandates that each responsible
entity implement its supply chain cybersecurity risk management plan.
Requirement R3 requires a responsible entity to review and obtain the
CIP Senior Manager's approval of its supply chain risk management plan
at least once every 15 calendar months in order to ensure that the plan
remains up-to-date.
84. Separately, Reliability Standard CIP-005-6, Requirement R2.4
requires one or more methods for determining active vendor remote
access sessions, including Interactive Remote Access and
system[hyphen]to[hyphen]system remote access. Reliability Standard CIP-
005-6, Requirement R2.5 requires one or more methods to disable active
vendor remote access, including Interactive Remote Access and
system[hyphen]to[hyphen]system remote access. Reliability Standard CIP-
010-3, Requirement R1.6 requires responsible entities to verify
software integrity and authenticity in the operational phase, if the
software source provides a method to do so.
85. The NERC Compliance Registry, as of December 2017, identifies
approximately 1,250 unique U.S. entities that are subject to mandatory
compliance with Reliability Standards. Of this total, we estimate that
288 entities will face an increased paperwork burden under the approved
Reliability Standards CIP-013-1, CIP-005-6, and CIP-010-3. Based on
these assumptions, we estimate the following reporting burden:
[[Page 54004]]
RM17-13-000 Final Rule
[Mandatory Reliability Standards for Critical Infrastructure Protection Reliability Standards]
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number
Number of of responses Total number Average burden & cost Total annual burden Cost per
respondents per of responses per response \122\ hours & total annual respondent ($)
respondent cost
(1) (2) (1) * (2) = (4)..................... (3) * (4) = (5)........ (5) / (1)
(3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Create supply chain risk management 288 1 288 546 hrs.; $44,226....... 157,248 hrs.; $44,226
plan (one-time) \123\ (CIP-013-1 R1). $12,737,088.
Updates and reviews of supply chain 288 1 288 30 hrs.; 2,430.......... 8,640 hrs.; 699,840.... 2,430
risk management plan (ongoing) \124\
(CIP-013-1 R2).
Develop Procedures to update remote 288 1 288 50 hrs.; 4,050.......... 14,400 hrs.; 1,166,400. 4,050
access requirements (one time) (CIP-
005-6 R1-R4).
Develop procedures for software 288 1 288 50 hrs.; 4,050.......... 14,400 hrs.; 1,166,400. 4,050
integrity and authenticity
requirements (one time) (CIP-010-3
R1-R4).
Total (one-time)................. .............. .............. 864 ........................ 186,048 hrs.; ..............
15,069,888.
Total (ongoing).................. .............. .............. 288 ........................ 8,640 hrs.; 699,840.... ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
The one-time burden of 186,048 hours will be averaged over three
years (186,048 hours / 3 = 62,016 hours/year over three years).
---------------------------------------------------------------------------
\122\ The loaded hourly wage figure (includes benefits) is based
on the average of the occupational categories for 2017 found on the
Bureau of Labor Statistics website (http://www.bls.gov/oes/current/naics2_22.htm):
Legal (Occupation Code: 23-0000): $143.68.
Information Security Analysts (Occupation Code 15-1122): $61.55.
Computer and Information Systems Managers (Occupation Code: 11-
3021): $96.51.
Management (Occupation Code: 11-0000): $94.28.
Electrical Engineer (Occupation Code: 17-2071): $66.90.
Management Analyst (Code: 43-0000): $63.32.
These various occupational categories are weighted as follows:
[($94.28)(.10) + ($61.55)(.315) + ($66.90)(.02) + ($143.68)(.15) +
($96.51)(.10) + ($63.32)(.315)] = $81.30. The figure is rounded to
$81.00 for use in calculating wage figures in this final rule.
\123\ One-time burdens apply in Year One only.
\124\ Ongoing burdens apply in Year 2 and beyond..
---------------------------------------------------------------------------
The ongoing burden of 8,640 hours applies to only Years 2 and
beyond.
The number of responses is also average over three years (864
responses (one-time) + (288 responses (Year 2) + 288 responses (Year
3)) / 3 = 480 responses.
The responses and burden for Years 1-3 will total respectively as
follows:
Year 1: 480 responses; 62,016 hours
Year 2: 480 responses; 62,016 hours + 8,640 hours = 70,656
hours
Year 3: 480 responses; 62,016 hours + 8,640 hours = 70,656
hours.
86. The following shows the annual cost burden for each year, based
on the burden hours in the table above:
Year 1: $15,069,888
Years 2 and beyond: $699,840
The paperwork burden estimate includes costs associated
with the initial development of a policy to address requirements
relating to: (1) Developing the supply chain risk management plan; (2)
updating the procedures related to remote access requirements (3)
developing the procedures related to software integrity and
authenticity. Further, the estimate reflects the assumption that costs
incurred in year 1 will pertain to plan and procedure development,
while costs in years 2 and 3 will reflect the burden associated with
maintaining the supply chain risk management plan and modifying it as
necessary on a 15-month basis.
87. Title: FERC-725B (Mandatory Reliability Standards, Revised
Critical Infrastructure Protection Reliability Standards).
Action: Information Collection, FERC-725B (Supply Chain Risk
Management Reliability Standards).
OMB Control No.: 1902-0248.
Respondents: Businesses or other for-profit institutions; not-for-
profit institutions.
Frequency of Responses: On Occasion.
Necessity of the Information: This final rule approves the
requested modifications to Reliability Standards pertaining to critical
infrastructure protection. As discussed above, the Commission approves
NERC's CIP Reliability Standards CIP-013-1, CIP-005-6, and CIP-010-3
pursuant to section 215(d)(2) of the FPA because they improve upon the
currently-effective suite of cybersecurity CIP Reliability Standards.
Internal Review: The Commission has reviewed the approved
Reliability Standards and made a determination that its action is
necessary to implement section 215 of the FPA.
88. Interested persons may obtain information on the reporting
requirements by contacting the following: Federal Energy Regulatory
Commission, 888 First Street NE, Washington, DC 20426 [Attention: Ellen
Brown, Office of the Executive Director, email: [email protected],
phone: (202) 502-8663, fax: (202) 273-0873].
89. For submitting comments concerning the collection(s) of
information and the associated burden estimate(s), please send your
comments to the Commission, and to the Office of Management and Budget,
Office of Information and Regulatory Affairs, 725 17th Street NW,
Washington, DC 20503 [Attention: Desk Officer for the Federal Energy
Regulatory Commission, phone: (202) 395-4638, fax: (202) 395-7285]. For
security reasons, comments to OMB should be submitted by email to:
[email protected]. Comments submitted to OMB should include
Docket Number RM17-13-000 and OMB Control Number 1902-0248.
IV. Environmental Analysis
90. The Commission is required to prepare an Environmental
Assessment or an Environmental Impact Statement for any action that may
have a significant adverse effect on the human
[[Page 54005]]
environment.\125\ The Commission has categorically excluded certain
actions from this requirement as not having a significant effect on the
human environment. Included in the exclusion are rules that are
clarifying, corrective, or procedural or that do not substantially
change the effect of the regulations being amended.\126\ The actions
taken herein fall within this categorical exclusion in the Commission's
regulations.
---------------------------------------------------------------------------
\125\ Regulations Implementing the National Environmental Policy
Act of 1969, Order No. 486, FERC Stats. & Regs. ] 30,783 (1987).
\126\ 18 CFR 380.4(a)(2)(ii).
---------------------------------------------------------------------------
V. Regulatory Flexibility Act Analysis
91. The Regulatory Flexibility Act of 1980 (RFA) generally requires
a description and analysis of proposed rules that will have significant
economic impact on a substantial number of small entities.\127\ The
Small Business Administration's (SBA) Office of Size Standards develops
the numerical definition of a small business.\128\ The SBA revised its
size standard for electric utilities (effective January 22, 2014) to a
standard based on the number of employees, including affiliates (from
the prior standard based on megawatt hour sales).\129\
---------------------------------------------------------------------------
\127\ 5 U.S.C. 601-12.
\128\ 13 CFR 121.101.
\129\ 13 CFR 121.201, Subsector 221.
---------------------------------------------------------------------------
92. Reliability Standards CIP-013-1, CIP-005-6, CIP-010-3 are
expected to impose an additional burden on 288 entities \130\
(reliability coordinators, generator operators, generator owners,
interchange coordinators or authorities, transmission operators,
balancing authorities, and transmission owners).
---------------------------------------------------------------------------
\130\ Public utilities may fall under one of several different
categories, each with a size threshold based on the company's number
of employees, including affiliates, the parent company, and
subsidiaries. For the analysis in this NOPR, we are using a 500
employee threshold due to each affected entity falling within the
role of Electric Bulk Power Transmission and Control (NAISC Code:
221121).
---------------------------------------------------------------------------
93. Of the 288 affected entities discussed above, we estimate that
approximately 248 or 86.2 percent of the affected entities are small
entities. We estimate that each of the 248 small entities to whom the
approved modifications to Reliability Standards CIP-013-1, CIP-005-6,
and CIP-010-3 apply will incur one-time costs of approximately $52,326
per entity to implement the approved Reliability Standards, as well as
the ongoing paperwork burden reflected in the Information Collection
Statement (approximately $2,430 per year per entity). We do not
consider the estimated costs for these 248 small entities to be a
significant economic impact. Accordingly, we certify that Reliability
Standards CIP-013-1, CIP-005-6, and CIP-010-3 will not have a
significant economic impact on a substantial number of small entities.
VI. Document Availability
94. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (http://www.ferc.gov) and
in the Commission's Public Reference Room during normal business hours
(8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE, Room 2A,
Washington, DC 20426.
95. From the Commission's Home Page on the internet, this
information is available on eLibrary. The full text of this document is
available on eLibrary in PDF and Microsoft Word format for viewing,
printing, and/or downloading. To access this document in eLibrary, type
the docket number of this document, excluding the last three digits, in
the docket number field. User assistance is available for eLibrary and
the Commission's website during normal business hours from the
Commission's Online Support at (202) 502-6652 (toll free at 1-866-208-
3676) or email at [email protected], or the Public Reference
Room at (202) 502-8371, TTY (202) 502-8659. Email the Public Reference
Room at [email protected].
VII. Effective Date and Congressional Notification
96. The final rule is effective December 26, 2018. The Commission
has determined that this final rule imposes no substantial effect upon
either NERC or NERC registered entities \131\ and, with the concurrence
of the Administrator of the Office of Information and Regulatory
Affairs of OMB, that this rule is not a ``major rule'' as defined in
section 351 of the Small Business Regulatory Enforcement Fairness Act
of 1996. This final rule is being submitted to the Senate, House, and
Government Accountability Office.
---------------------------------------------------------------------------
\131\ 5 U.S.C. 804(3)c.
By the Commission. Chairman McIntyre was not present at the
Commission Meeting held on October 18, 2018 and did not vote on this
---------------------------------------------------------------------------
item.
Issued: October 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Note: The following appendix will not appear in the Code of
Federal Regulations.
Appendix Commenters
------------------------------------------------------------------------
Abbreviation Commenter
------------------------------------------------------------------------
AECC.............................. Arkansas Electric Cooperative
Corporation.
Appelbaum......................... Jonathan Appelbaum.
APS............................... Arizona Public Service Company.
EEI............................... Edison Electric Institute.
Idaho Power....................... Idaho Power Company.
IRC............................... ISO/RTO Council.
Isologic.......................... Isologic LLC.
ITC............................... International Transmission Company.
Mabee............................. Michael Mabee.
MISO TOs.......................... MISO Transmission Owners.
MPUC.............................. Maine Public Utilities Commission.
NERC.............................. North American Electric Reliability
Corporation.
Reclamation....................... U.S. Bureau of Reclamation.
Resilient Societies............... Foundation for Resilient Societies.
Trade Associations................ American Public Power Association,
Electricity Consumers Resource
Council, Large Public Power
Council, National Rural Electric
Cooperative Association, and
Transmission Access Policy Study
Group.
------------------------------------------------------------------------
[FR Doc. 2018-23201 Filed 10-25-18; 8:45 am]