[Federal Register Volume 83, Number 208 (Friday, October 26, 2018)]
[Notices]
[Pages 54168-54172]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-23103]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice of Final Federal Agency Actions on Proposed Highway
Projects in Texas
AGENCY: Texas Department of Transportation (TxDOT), Federal Highway
Administration (FHWA), U.S. Department of Transportation.
ACTION: Notice of limitation on claims for judicial review of actions
by TxDOT and Federal agencies.
-----------------------------------------------------------------------
SUMMARY: This notice announces actions taken by TxDOT and Federal
agencies that are final. The environmental review, consultation, and
other actions required by applicable Federal environmental laws for
these projects are being, or have been, carried-out by TxDOT and a
Memorandum of Understanding dated December 16, 2014, and executed by
FHWA and TxDOT. The actions relate to various proposed highway projects
in the State of Texas. Those actions grant licenses, permits, and
approvals for the projects.
DATES: By this notice, TxDOT is advising the public of final agency
actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review
of TxDOT and Federal agency actions on the highway project will be
barred unless the claim is filed on or before March 25, 2019. If the
Federal law that authorizes judicial review of a claim provides a time
period of less than 150 days for filing such a claim, then that shorter
time period still applies.
FOR FURTHER INFORMATION CONTACT: Carlos Swonke, Environmental Affairs
Division, Texas Department of Transportation, 125 East 11th Street,
Austin, Texas 78701; telephone: (512) 416-2734; email:
[email protected]. TxDOT's normal business hours are 8:00 a.m.-
5:00 p.m. (central time), Monday through Friday.
SUPPLEMENTARY INFORMATION: Notice is hereby given that TxDOT and
Federal agencies have taken final agency actions by issuing licenses,
permits, and approvals for the highway projects in the State of Texas
that are listed below.
The actions by TxDOT and Federal agencies and the laws under which
such actions were taken are described in the Categorical Exclusion (CE)
or Environmental Assessment (EA) issued in connection with the projects
and in other key project documents. The CE or EA, and other key
documents for the listed projects are available by contacting TxDOT at
the address provided above.
This notice applies to all TxDOT and Federal agency decisions as of
the issuance date of this notice and all laws under which such actions
were taken, including but not limited to:
1. General: National Environmental Policy Act (NEPA) [42 U.S.C.
4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].
2. Air: Clean Air Act, 42 U.S.C. 7401-7671(q).
3. Land: Section 4(f) of the Department of Transportation Act of
1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers),
23 U.S.C. 319.
4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and
Section 1536], Marine Mammal Protection Act [16 U.S.C. 1361], Fish and
Wildlife Coordination Act [16 U.S.C. 661-667(d)], Migratory Bird Treaty
Act [16 U.S.C. 703-712].
5. Historic and Cultural Resources: Section 106 of the National
Historic Preservation Act of 1966, as amended [54 U.S.C. 300101 et
seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C.
470(aa)-11]; Archeological and Historic Preservation Act [54 U.S.C.
312501 et seq.]; Native American Grave Protection and Repatriation Act
(NAGPRA) [25 U.S.C. 3001-3013].
6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C.
2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C.
1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251-
1377 (Section 404, Section 401, Section 319); Land and Water
Conservation Fund (LWCF), 16 U.S.C. 4601-4604; Safe Drinking Water Act
(SDWA), 42 U.S.C. 300(f)-300(j)(6); Rivers and Harbors Act of 1899, 33
U.S.C. 401-406; Wild and Scenic Rivers Act, 16 U.S.C. 1271-1287;
Emergency Wetlands Resources Act, 16 U.S.C. 3921, 3931; TEA-21 Wetlands
Mitigation, 23 U.S.C. 103(b)(6)(m), 133(b)(11); Flood Disaster
Protection Act, 42 U.S.C. 4001-4128.
8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988
Floodplain Management; E.O. 12898, Federal Actions to Address
Environmental Justice in Minority Populations and Low Income
Populations; E.O. 11593 Protection and Enhancement of Cultural
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America;
E.O. 13175 Consultation and Coordination with Indian Tribal
Governments; E.O. 11514 Protection and Enhancement of Environmental
Quality; E.O. 13112 Invasive Species. (Catalog of Federal Domestic
Assistance Program Number 20.205, Highway Planning and Construction.)
The projects subject to this notice are:
1. Conflans Road from Valley View Lane to State Highway (SH) 161 in
Dallas County, Texas. The proposed improvements would include the
extension of existing Conflans Road on new location in the City of
Irving. The new roadway would be a four-lane divided section that would
begin at Valley View Lane and end at SH 161. The length of the proposed
project is
[[Page 54169]]
approximately 0.881 miles. The purpose of the proposed project is to
improve mobility and provide improved system connectivity. The actions
by TxDOT and Federal agencies and the laws under which such actions
were taken are described in the Final Environmental Assessment (EA)
approved on July 12, 2018, Finding of No Significant Impact (FONSI)
issued on September 7, 2018 and other documents in the TxDOT project
file. The EA and other documents in the TxDOT project file are
available by contacting TxDOT at the address provided above or the
TxDOT Dallas District Office at 4777 E Highway 80, Mesquite, TX 75150;
telephone: (214) 320-4480.
2. SH 155 from 0.3 Miles East of U.S. 259 to Glendia Drive in
Upshur County, Texas. The purpose of this project is to widen SH 155
from a two-lane roadway to a four-lane roadway with a center left turn
to improve safety and mobility for the traveling public. Total length
of the project is approximately 0.69 miles. The actions by TxDOT and
Federal agencies and the laws under which such actions were taken are
described in the Categorical Exclusion Determination issued on April 2,
2018 and other documents in the TxDOT project file. The Categorical
Exclusion Determination and other documents in the TxDOT project file
are available by contacting TxDOT at the address provided above or the
TxDOT Atlanta District Office at 701 East Main St., Atlanta, TX 75551;
telephone: (903) 799-1306.
3. US 83/84 construct overpass and relocate ramps, from south of FM
204 to south of FM 707, Taylor County, Texas. The project consists of
the construction of ramp safety improvements and the construction of a
new overpass on U.S.-83 at FM 204 (Clark/Remington Road). This portion
of US-83 includes a northern segment of approximately 0.5-miles from
south of Iberis Road/County Road (CR) 164 to south of Saddle Creek
Road, adjacent to the Lakes at Saddle Creek residential development.
The purpose of the project is to enhance connectivity and increase
safety in the area. The actions by TxDOT and Federal agencies and the
laws under which such actions were taken are described in the
Categorical Exclusion Determination issued on July 17, 2017 and other
documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents in the TxDOT project file are
available by contacting TxDOT at the address provided above or the
TxDOT Abilene District Office at 4250 N Clack; telephone: (325) 676-
6817.
4. IH 30 from FM 3419 to FM 989, in Bowie County, Texas. This
project would construct one-way frontage roads, entrance and exit
ramps, and turnarounds on Interstate Highway (IH) 30 in Bowie County,
Texas. The total length of the project is approximately 2.6 miles. The
purpose of this project is to improve safety, mobility, traffic
operations, and local circulation for the traveling public. The actions
by TxDOT and Federal agencies and the laws under which such actions
were taken are described in the Categorical Exclusion Determination
issued on August 1, 2018 and other documents in the TxDOT project file.
The Categorical Exclusion Determination and other documents in the
TxDOT project file are available by contacting TxDOT at the address
provided above or the TxDOT Atlanta District Office at 701 East Main
St., Atlanta, TX 75551; telephone: (903) 799-1306.
5. BS 71F Bridge Construction; at Colorado River in Colorado
County, Texas. The proposed project would construct a new concrete
bridge adjacent to the existing truss bridge over the Colorado River.
The purpose of the project is to provide a safer crossing over the
Colorado River and construct a new bridge to allow for the future
rehabilitation of a historic truss bridge. The actions by TxDOT and
Federal agencies and the laws under which such actions were taken are
described in the Categorical Exclusion Determination issued on December
14, 2016 and other documents in the TxDOT project file. The Categorical
Exclusion Determination and other documents in the TxDOT project file
are available by contacting TxDOT at the address provided above or the
TxDOT Yoakum District Office at 403 Huck St., Yoakum, TX 77995;
telephone: (361) 293-4436.
6. State Highway 242 (SH 242) from Interstate Highway 45 to U.S.
Highway 59 in Montgomery County, Texas. The project will consist of
upgrading approximately 17.25 miles of SH 242, all within existing
right-of-way. The current undivided two lane roadway will be expanded
to a four-lane divided roadway separated by a depressed grassy median.
The purpose of the project is to add capacity, improve mobility and
traffic safety, and meet current roadway design standards. The actions
by TxDOT and Federal agencies and the laws under which such actions
were taken are described in the Categorical Exclusion Determination
issued on March 3, 2017 and other documents in the TxDOT project file.
The Categorical Exclusion Determination and other documents in the
TxDOT project file are available by contacting TxDOT at the address
provided above or the TxDOT Houston District Office located at 7600
Washington Avenue, Houston, Texas 77007; telephone: (713) 802-5076.
7. Greens Road from J.F. Kennedy Boulevard to US Highway 59 in
Harris County, Texas. The approximately 2.27 mile project will require
approximately 18.6 acres of new right-of-way and will consist of
widening Greens Road from 2 to 4 lanes with a raised median, sidewalks,
new street lighting, drainage improvements and a shared use lane to
accommodate bicycle usage. The purpose of the project is to improve
mobility and enhance safety. The actions by TxDOT and Federal agencies
and the laws under which such actions were taken are described in the
Categorical Exclusion Determination issued on January 23, 2017 and
other documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents in the TxDOT project file are
available by contacting TxDOT at the address provided above or the
TxDOT Houston District Office located at 7600 Washington Avenue,
Houston, Texas 77007; telephone: (713) 802-5076.
8. Interstate Highway 10 (I-10) from Farm-to-Market (FM) 359 to FM
3538 in Waller and Austin Counties, Texas. The project will consist of
reconstructing approximately 16 miles of I-10, all within existing
right-of-way, to add one additional through lane in each direction,
rebuilding or replacing overpasses, converting the existing frontage
road system from two-way to one-way and replacing the existing bridges
over the Brazos River. The purpose of the project is to add capacity,
improve mobility and traffic safety, enhance the hurricane evacuation
network, and improve roadway horizontal and vertical alignments
including clearance at bridges. The actions by TxDOT and Federal
agencies and the laws under which such actions were taken are described
in the Categorical Exclusion Determination issued on November 20, 2017
and other documents in the TxDOT project file. The Categorical
Exclusion Determination and other documents in the TxDOT project file
are available by contacting TxDOT at the address provided above or the
TxDOT Houston District Office located at 7600 Washington Avenue,
Houston, Texas 77007; telephone: (713) 802-5076.
9. Interstate Highway 45 (I-45) from Farm-to-Market 1764 to north
of the Galveston Causeway Bridge in Galveston County, Texas. The
project will reconstruct and widen I-45 from a six-lane interstate to
an eight-lane
[[Page 54170]]
interstate for approximately 10 miles and will require approximately
8.7 acres of new right-of-way. The purpose of the project is to add
capacity, improve mobility and traffic safety, and enhance the
hurricane evacuation network. The actions by TxDOT and Federal agencies
and the laws under which such actions were taken are described in the
Categorical Exclusion Determination issued on May 16, 2018 and other
documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents in the TxDOT project file are
available by contacting TxDOT at the address provided above or the
TxDOT Houston District Office located at 7600 Washington Avenue,
Houston, Texas 77007; telephone (713) 802-5076.
10. FM 407 at Denton Creek in Denton County, Texas. The proposed
project would replace and widen the existing bridge at Denton Creek,
bridge class culvert at Denton Creek Slough, and roadway approaches
including the addition of a culvert extension just north of the bridge.
The length of the proposed project is approximately .238 miles. The
purpose of the proposed project is to bring the structures to current
design standards and provide a safer approach to the two structures.
The actions by TxDOT and Federal agencies and the laws under which such
actions were taken are described in the documentation supporting the
Categorical Exclusion (CE) Determination issued on January 8, 2018, and
other documents in the TxDOT project file. The CE Determination and
other documents are available by contacting TxDOT at the address
provided above or the TxDOT Dallas District Office at 4777 E Highway
80, Mesquite, TX 75150; telephone: (214) 320-4480.
11. FM 148 from South of U.S. 80 to SP 557 in Kaufman County,
Texas. The proposed improvements would widen the roadway from two to
four lanes with a center turn lane and curb and gutter drainage.
Sidewalks and shared use lanes would provide accommodations for
pedestrians and bicyclists. The length of the proposed project is
approximately 1.1 miles. The purpose of the proposed project is to
improve mobility in the project area. The actions by TxDOT and Federal
agencies and the laws under which such actions were taken are described
in the documentation supporting the Categorical Exclusion Determination
issued on May 30, 2017, and other documents in the TxDOT project file.
The Categorical Exclusion Determination and other documents are
available by contacting TxDOT at the address provided above or the
TxDOT Dallas District Office at 4777 E Highway 80, Mesquite, TX 75150;
telephone: (214) 320-4480.
12. FM 455 from U.S. 75 to CR 286 in Collin County, Texas. The
proposed improvements would widen the roadway from a 2-lane rural to a
4-lane divided (6-lane ultimate) roadway. The length of the proposed
project is approximately 0.232 miles. The purpose of the proposed
project is to improve mobility in the project area. The actions by
TxDOT and Federal agencies and the laws under which such actions were
taken are described in the documentation supporting the Categorical
Exclusion Determination issued on November 9, 2017, and other documents
in the TxDOT project file. The Categorical Exclusion Determination and
other documents are available by contacting TxDOT at the address
provided above or the TxDOT Dallas District Office at 4777 E Highway
80, Mesquite, TX 75150; telephone: (214) 320-4480.
13. IH 20 Frontage Roads from North Main Street to Camp Wisdom Road
in Duncanville in Dallas County, Texas. The proposed improvements
include the construction of new concrete-paved eastbound frontage road
between Oriole Boulevard and E. Camp Wisdom Road, and westbound
frontage Road between N. Main Street and Oriole Boulevard. The new
eastbound frontage road would extend the existing frontage road to E.
Camp Wisdom Road. A portion of the existing eastbound frontage road
would be re-aligned and reconstructed. The new westbound frontage road
would extend west of Oriole Boulevard to the west. A section of the
westbound frontage road would be reconstructed to align with the new
proposed frontage road. The length of the proposed project is
approximately 0.63 miles. The purpose of the proposed project is to
improve access and circulation and increase safety in the project area.
The actions by TxDOT and Federal agencies and the laws under which such
actions were taken are described in the documentation supporting the
Categorical Exclusion Determination issued on March 10, 2017, and other
documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents are available by contacting TxDOT at
the address provided above or the TxDOT Dallas District Office at 4777
E Highway 80, Mesquite, TX 75150; telephone: (214) 320-4480.
14. U.S. 377 from IH 35E to South of FM 1830 in Denton County,
Texas. The proposed improvements would widen the roadway from two to
six lanes (three in each direction). The length of the proposed project
is approximately 1.68 miles. The purpose of the proposed project is to
accommodate increasing traffic and alleviate traffic congestion. The
actions by TxDOT and Federal agencies and the laws under which such
actions were taken are described in the documentation supporting the
Categorical Exclusion Determination issued on January 26, 2018, and
other documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents are available by contacting TxDOT at
the address provided above or the TxDOT Dallas District Office at 4777
E Highway 80, Mesquite, TX 75150; telephone: (214) 320-4480.
15. I-820/SH 121 Northeast Interchange Project, I-820 from SH 121/
183 to Randol Mill Road, SH 121 from Handley Ederville Road to the
south interchange with I-820, Tarrant County. TxDOT is proposing to
reconstruct I-820 and SH 121 interchange in northern Tarrant County.
The proposed actions would take place within the cities of North
Richland Hills, Richland Hills, Hurst, and Fort Worth. The proposed
project would reconstruct I-820 from approximately 2,000 feet north of
Pipeline Road/Glenview Drive, at the northern I-820/SH 121/SH 183
interchange, to approximately 3,200 feet south of Randol Mill Rd.
Additionally, SH 121 would be reconstructed from the southern I-820/SH
121 interchange to approximately 5,000 feet west of Handley-Ederville
Rd. These improvements would also include the addition of connections
providing direct access between SH 121 with I-820 and SH 121 with
Trinity Boulevard. The proposed project would provide infrastructure to
reduce traffic congestion on existing roadways; to provide a safer,
more convenient route for traveling through the area; and to increase
mobility and provide access (including improved emergency service
access) to area. The actions by TxDOT and Federal agencies and the laws
under which such actions were taken are described in the Categorical
Exclusion Determination issued on November 7, 2017 and other documents
in the TxDOT project file. The Categorical Exclusion Determination and
other documents in the TxDOT project file are available by contacting
TxDOT at the address provided above or the TxDOT Fort Worth District
Office at 2501 S W Loop 820, Fort Worth, Texas 76133; telephone: (817)
370-6744.
16. Loop 337 from I-35 to Hillcrest Drive, Comal County. The
project would widen Loop 337 from a 2-lane roadway to a 4-lane divided
roadway with a wide
[[Page 54171]]
median. The project is approximately 7.3 miles in length. The actions
by TxDOT and Federal agencies and the laws under which such actions
were taken are described in the Categorical Exclusion Determination
issued on June 7, 2017, and other documents in the TxDOT project file.
The Categorical Exclusion Determination and other documents in the
TxDOT project file are available by contacting TxDOT at the address
provided above or the TxDOT San Antonio District Office at 4615 NW Loop
410, San Antonio, TX 78229; telephone: (210) 615-5839.
17. RM 2222 from Bonaventure Drive to Ribelin Ranch Drive, Travis
County, Texas. The project includes widening RM 2222 from a 4-lane to
6-lane divided roadway. The project is approximately 1.2 miles in
length. The actions by TxDOT and Federal agencies and the laws under
which such actions were taken are described in the Categorical
Exclusion Determination issued on March 23, 2018, and other documents
in the TxDOT project file. The Categorical Exclusion Determination and
other documents in the TxDOT project file are available by contacting
TxDOT at the address provided above or the TxDOT Austin District Office
at 7901 North I-35, Austin, TX 78753; telephone: (512) 832-7000.
18. SH 71 from the SH 71/U.S. 183 interchange to Presidential
Blvd., Travis County Texas. The project includes modifications to SH 71
to improve eastbound access to the Austin-Bergstrom International
Airport. The project is approximately 2 miles in length. The actions by
TxDOT and Federal agencies and the laws under which such actions were
taken are described in the Categorical Exclusion Determination issued
on January 11, 2017, and other documents in the TxDOT project file. The
Categorical Exclusion Determination and other documents in the TxDOT
project file are available by contacting TxDOT at the address provided
above or the TxDOT Austin District Office at 7901 North I-35, Austin,
TX 78753; telephone: (512) 832-7000.
19. RM 620 from Cornerwood Drive to Wyoming Springs Drive,
Williamson County, Texas. The project includes restriping RM 620 from a
four-lane to a six-lane roadway. The project is approximately 2 miles
in length. The actions by TxDOT and Federal agencies and the laws under
which such actions were taken are described in the Categorical
Exclusion Determination issued on May 1, 2017, and other documents in
the TxDOT project file. The Categorical Exclusion Determination and
other documents in the TxDOT project file are available by contacting
TxDOT at the address provided above or the TxDOT Austin District Office
at 7901 North I-35, Austin, TX 78753; telephone (512) 832-7000.
20. SH 71 at Ross Road and Kellam Road, Travis County, Texas. The
project includes constructing an overpass at Ross Road and Kellam Road
with 2-lane east bound and west bound frontage roads. The project is
approximately 2 miles in length. The actions by TxDOT and Federal
agencies and the laws under which such actions were taken are described
in the Categorical Exclusion Determination issued on August 30, 2017,
and other documents in the TxDOT project file. The Categorical
Exclusion Determination and other documents in the TxDOT project file
are available by contacting TxDOT at the address provided above or the
TxDOT Austin District Office at 7901 North I-35, Austin, TX 78753;
telephone: (512) 832-7000.
21. FM 1103 from I-35 to Rodeo Way Drive, Guadalupe and Comal
Counties, Texas. The project would widen Loop 1103 from a 2-lane
roadway to a 4-lane roadway with a continuous left turn lane. The
project is approximately 3.83 miles in length. The actions by TxDOT and
Federal agencies and the laws under which such actions were taken are
described in the Categorical Exclusion Determination issued on April
11, 2018, and other documents in the TxDOT project file. The
Categorical Exclusion Determination and other documents in the TxDOT
project file are available by contacting TxDOT at the address provided
above or the TxDOT San Antonio District Office at 4615 NW Loop 410, San
Antonio, TX 78229; telephone: (210) 615-5839.
22. I-10 from I-410 to Loop 1604, Bexar County, Texas. The project
includes adding one main lane in each direction, reconstructing the
existing I-10 main lanes to address deteriorating pavement conditions
and adding auxiliary lanes between entrance and exit ramps where
needed. Existing main lane bridge structures and culverts would be
replaced and/or widened as needed. The project is approximately 6.2
miles in length. The actions by TxDOT and Federal agencies and the laws
under which such actions were taken are described in the Categorical
Exclusion Determination issued on January 18, 2018, and other documents
in the TxDOT project file. The Categorical Exclusion Determination and
other documents in the TxDOT project file are available by contacting
TxDOT at the address provided above or the TxDOT San Antonio District
Office at 4615 NW Loop 410, San Antonio, TX 78229; telephone: (210)
615-5839.
23. Loop 1604 from U.S. 281 to FM 1303, Bexar County, Texas. The
project includes widening Loop 1604 from a 2-lane roadway to a 4-lane
divided roadway with shoulders and pedestrian accommodations. The
project is approximately 8.1 miles in length. The actions by TxDOT and
Federal agencies and the laws under which such actions were taken are
described in the Categorical Exclusion Determination issued on May 9,
2018, and other documents in the TxDOT project file. The Categorical
Exclusion Determination and other documents in the TxDOT project file
are available by contacting TxDOT at the address provided above or the
TxDOT San Antonio District Office at 4615 NW Loop 410, San Antonio, TX
78229; telephone: (210) 615-5839.
24. I-410 at I-10 interchange, Bexar County, Texas. The project
includes replacing the cloverleaf with direct connectors, reconfiguring
and reconstructing main lanes, ramps, frontage roads, and surface
street connections, including a continuous flow interchange to connect
WW White Road with Corner Parkway. The project is approximately 8.87
miles in length. The actions by TxDOT and Federal agencies and the laws
under which such actions were taken are described in the Categorical
Exclusion Determination issued on May 17, 2018 and other documents in
the TxDOT project file. The Categorical Exclusion Determination and
other documents in the TxDOT project file are available by contacting
TxDOT at the address provided above or the TxDOT San Antonio District
Office at 4615 NW Loop 410, San Antonio, TX 78229; telephone: (210)
615-5839.
25. FM 659 (Zaragoza Road)/Montwood Drive/Loop (LP) 375 (Joe Battle
Boulevard) interchange in El Paso County, Texas. The proposed project
will improve traffic operations by reducing weaving movements, improve
bicycle and pedestrian access in the area through the addition of bike
lanes and sidewalks, and improve connectivity/operations by extending
FM 659 within the project limits. The purpose of the proposed project
is to provide connectivity. The actions by TxDOT and Federal agencies
and the laws under which such actions were taken are described in the
Categorical Exclusion Determination issued on September 5, 2017, and
other documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents in the TxDOT project file are
available by contacting TxDOT at the
[[Page 54172]]
address provided above or the TxDOT El Paso District Office at 13301
Gateway West, El Paso, TX 79928-5410; telephone: (915) 790-4203.
26. IH 10 from Hamshire Road to FM 365, Jefferson County, Texas.
TxDOT proposes to widen and reconstruct I-10 from a four-lane divided
facility to a six-lane highway with a concrete median barrier. The
project length is 6.8 miles. The purpose of the project is to improve
safety and increase mobility by widening and reconstructing I-10. The
actions by TxDOT and Federal agencies and the laws under which such
actions were taken are described in the Categorical Exclusion
Determination issued on July 21, 2017 and other documents in the TxDOT
project file. The Categorical Exclusion Determination and other
documents in the TxDOT project file are available by contacting TxDOT
at the address provided above or the TxDOT Beaumont District Office at
8350 Eastex Freeway, Beaumont, Texas 77708; telephone: (409) 898-5745.
27. SH 73 from FM 1663 to Kiker Road in Chambers and Jefferson
counties, Texas. The proposed project will construct a grade separation
at the SH 124 intersection with continuous frontage roads, ramps, and
U-turn improvements. The purpose of the proposed project is to increase
safety in the project area. The actions by TxDOT and Federal agencies
and the laws under which such actions were taken are described in the
Categorical Exclusion Determination issued on March 6, 2018, and other
documents in the TxDOT project file. The Categorical Exclusion
Determination and other documents in the TxDOT project file are
available by contacting TxDOT at the address provided above or the
TxDOT, Beaumont District Office at 8350 Eastex Freeway, Beaumont, Texas
77708; telephone: (409) 898-5745.
28. FM 676 (5 Mile Road) from SH 364 (La Homa Road) to SH 107 in
Hidalgo County, Texas. The proposed project would include the widening
of FM 676 from a two lane roadway to a four lane curb and gutter
roadway with a two-way left turn lane, sidewalks, and drainage
structures. The purpose of the proposed project is to improve safety
for traffic operations along the corridor. The actions by TxDOT and
Federal agencies and the laws under which such actions were taken are
described in the Categorical Exclusion Determination issued on October
4, 2018, and other documents in the TxDOT project file. The Categorical
Exclusion Determination and other documents in the TxDOT project file
are available by contacting TxDOT at the address provided above or the
TxDOT Pharr District Office at 600 W. U.S. Expressway 83, Pharr, TX
78577; telephone (956) 702-6100.
29. SH 5 from SH 121 to CR 375 in Collin County, Texas. The
proposed improvements would widen and reconstruct the roadway from two
lanes to a four-lane divided urban roadway. The improved roadway would
have an inside 12-foot wide travel lane, 14-foot wide outside shared
use lane, and five to six-foot wide sidewalks with curb and gutter in
each direction. The traffic lanes would be separated by a 42-foot wide
raised central median. The length of the proposed project is
approximately 8.58 miles. The purpose of the proposed project is to
reduce congestion and improve mobility. The actions by TxDOT and
Federal agencies and the laws under which such actions were taken are
described in the Final Environmental Assessment (EA) approved on
September 26, 2018, Finding of No Significant Impact (FONSI) issued on
September 26, 2018 and other documents in the TxDOT project file. The
EA and other documents are available by contacting TxDOT at the address
provided above or the TxDOT Dallas District Office at 4777 E. Highway
80, Mesquite, TX 75150; telephone: (214) 320-4480.
Authority: 23 U.S.C. 139(l)(1).
Issued on: October 17, 2018.
Michael T. Leary,
Director, Planning and Program Development, Federal Highway
Administration.
[FR Doc. 2018-23103 Filed 10-25-18; 8:45 am]
BILLING CODE 4910-22-P