[Federal Register Volume 83, Number 124 (Wednesday, June 27, 2018)]
[Notices]
[Pages 30199-30202]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13757]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 052-00025 and 052-00026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc.; Vogtle Electric
Generating Plant, Units 3 and 4; Changes to Construction Fitness-for-
Duty Commitments
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to comment, request
a hearing, and petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Combined Licenses (NPF-91 and NPF-92),
issued to Southern Nuclear Operating Company, Inc. (SNC), and Georgia
Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG
Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the
City of Dalton, Georgia (together ``the licensees''), for construction
and operation of the Vogtle Electric Generating Plant (VEGP), Units 3
and 4, located in Burke County, Georgia.
DATES: Submit must be filed by July 27, 2018. Requests for a hearing or
petition for leave to intervene must be filed by August 27, 2018.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: May Ma, Office of Administration, Mail
Stop: TWFN-7-A60, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Paul B. Kallan, Office of New
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-000;
telephone: 301-415-2809; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2008-0252 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
application for amendment, dated June 15, 2018, is available in ADAMS
under Accession No. ML18166A347.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2008-0252 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into
ADAMS.
[[Page 30200]]
The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Introduction
The NRC is considering issuance of an amendment to Combined License
Nos. NPF-91 and NPF-92, issued to SNC and Georgia Power Company for
operation of the VEGP, Units 3 and 4, located in Burke County, Georgia.
The proposed changes would revise commitments related to the
construction fitness-for-duty (FFD) program described in the VEGP,
Units 3 and 4 Updated Final Safety Analysis Report (UFSAR).
Specifically, the change would involve the creation of a new type of
FFD Authorization that would allow construction workers temporary
access to the construction site pending completion of all pre-access
FFD requirements. The individual will not be given assignments to work
on safety or security-related structures, systems, and components prior
to the completion of the FFD requirements.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in 10 CFR 50.92, this means that operation of the
facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes to the Vogtle Electric Generating Plant
(VEGP) 3 and 4 Updated Final Safety Analysis Report (UFSAR)
commitment related to the construction worker Fitness-for-Duty (FFD)
program do not affect the design of a system, structure, or
component (SSC) used to meet the design bases of the nuclear plant.
Nor do the changes affect the construction or operation of the
nuclear plant itself, so there is no change to the probability or
consequences of an accident previously evaluated. Changing the VEGP
3 and 4 FFD program commitments do not affect prevention and
mitigation of abnormal events (e.g., accidents, anticipated
operational occurrences, earthquakes, floods, or turbine missiles)
or their safety or design analyses. No safety-related SSC or
function is adversely affected. The changes neither involve nor
interface with any SSC accident initiator or initiating sequence of
events, so the probabilities of the accidents evaluated in the UFSAR
are not affected. Because the changes do not involve any safety-
related SSC or function used to mitigate an accident, the
consequences of the accidents evaluated in the UFSAR are not
affected.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
The proposed changes to the VEGP 3 and 4 UFSAR commitment
related to the construction worker FFD program do not affect the
operation of any systems or equipment that may initiate a new or
different kind of accident or alter any SSC such that a new accident
initiator or initiating sequence of events is created. The changes
do not affect the design of an SSC used to meet the design bases of
the nuclear plant. Nor do the changes affect the construction or
operation of the nuclear plant. Consequently, there is no new or
different kind of accident from any accident previously evaluated.
The changes do not affect safety-related equipment, nor do they
affect equipment that, if it failed, could initiate an accident or a
failure of a fission product barrier. In addition, the changes do
not result in a new failure mode, malfunction, or sequence of events
that could affect safety or safety-related equipment.
No analysis is adversely affected. No system or design function
or equipment qualification is adversely affected by the changes.
This activity will not allow for a new fission product release path,
nor will it result in a new fission product barrier failure mode,
nor create a new sequence of events that would result in significant
fuel cladding failures.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed changes to the VEGP 3 and 4 UFSAR commitment
related to the construction worker FFD program do not alter any
safety-related equipment, applicable design codes, code compliance,
design function, or safety analysis. Consequently, no safety
analysis or design basis acceptance limit/criterion is challenged or
exceeded by the proposed changes, thus the margin of safety is not
reduced.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves no significant hazards
consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period should circumstances change during the 30-day comment period
such that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. Should the Commission take action
prior to the expiration of either the comment period or the notice
period, the Commission will publish a notice of issuance in the Federal
Register. Should the Commission make a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
III. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and a petition to intervene (petition)
with respect to the action. Petitions shall be filed in accordance with
the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR
part 2. Interested persons should consult a current copy of 10 CFR
2.309,
[[Page 30201]]
which is available at the NRC's PDR, located at One White Flint North,
Room O1-F21, 11555 Rockville Pike (first floor), Rockville, Maryland
20852. The NRC's regulations are accessible electronically from the NRC
Library on the NRC's website at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed within 60 days, the Commission
or a presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the petition; and the Secretary or the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition shall set forth with
particularity the interest of the petitioner in the proceeding, and how
that interest may be affected by the results of the proceeding. The
petition should specifically explain the reasons why intervention
should be permitted with particular reference to the following general
requirements: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest. The petition
must also set forth the specific contentions which the petitioner seeks
to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner shall provide a brief explanation of the bases for the
contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to those specific sources and
documents of which the petitioner is aware and on which the petitioner
intends to rely to establish those facts or expert opinion to support
its position on the issue. The petition must include sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact. Contentions shall be limited to
matters within the scope of the proceeding. The contention must be one
which, if proven, would entitle the petitioner to relief. A petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions consistent with the NRC's regulations, policies, and
procedures.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 60-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii).
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of any amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1).
The petition should state the nature and extent of the petitioner's
interest in the proceeding. The petition should be submitted to the
Commission by August 27, 2018. The petition must be filed in accordance
with the filing instructions in the ``Electronic Submissions (E-
Filing)'' section of this document, and should meet the requirements
for petitions set forth in this section, except that under 10 CFR
2.309(h)(2) a State, local governmental body, or Federally-recognized
Indian Tribe, or agency thereof does not need to address the standing
requirements in 10 CFR 2.309(d) if the facility is located within its
boundaries. A State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person who does not wish, or is not
qualified, to become a party to the proceeding may, in the discretion
of the presiding officer, be permitted to make a limited appearance
pursuant to the provisions of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or written statement of position on
the issues, but may not otherwise participate in the proceeding. A
limited appearance may be made at any session of the hearing or at any
prehearing conference, subject to the limits and conditions as may be
imposed by the presiding officer. Details regarding the opportunity to
make a limited appearance will be provided by the presiding officer if
such sessions are scheduled.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene (hereinafter
``petition''), and documents filed by interested governmental entities
participating under 10 CFR 2.315(c), must be filed in accordance with
the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562, August 3, 2012). The E-Filing process requires participants
to submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Participants may
not submit paper copies of their filings unless they seek an exemption
in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition (even
in instances in which the participant, or its counsel or
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will
[[Page 30202]]
establish an electronic docket for the hearing in this proceeding if
the Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are available on the NRC's public website at
http://www.nrc.gov/site-help/e-submittals/adjudicatory-sub.html.
Participants may attempt to use other software not listed on the
website, but should note that the NRC's E-Filing system does not
support unlisted software, and the NRC Electronic Filing Help Desk will
not be able to offer assistance in using unlisted software.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a petition.
Submissions should be in Portable Document Format (PDF). Additional
guidance on PDF submissions is available on the NRC's public website at
http://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is
considered complete at the time the documents are submitted through the
NRC's E-Filing system. To be timely, an electronic filing must be
submitted to the E-Filing system no later than 11:59 p.m. Eastern Time
on the due date. Upon receipt of a transmission, the E-Filing system
time-stamps the document and sends the submitter an email notice
confirming receipt of the document. The E-Filing system also
distributes an email notice that provides access to the document to the
NRC's Office of the General Counsel and any others who have advised the
Office of the Secretary that they wish to participate in the
proceeding, so that the filer need not serve the documents on those
participants separately. Therefore, applicants and other participants
(or their counsel or representative) must apply for and receive a
digital ID certificate before a hearing petition to intervene is filed
so that they can obtain access to the document via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at http://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 7 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing a document in this manner are
responsible for serving the document on all other participants. Filing
is considered complete by first-class mail as of the time of deposit in
the mail, or by courier, express mail, or expedited delivery service
upon depositing the document with the provider of the service. A
presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the
presiding officer subsequently determines that the reason for granting
the exemption from use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a request to intervene will require
including information on local residence in order to demonstrate a
proximity assertion of interest in the proceeding. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
For further details with respect to this action, see the
application for license amendment dated June 15, 2018.
Attorney for licensee: Mr. M. Stanford Blanton, Balch & Bingham
LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2015.
NRC Branch Chief: Jennifer Dixon-Herrity.
Dated at Rockville, Maryland, this 21st day of June, 2018.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-13757 Filed 6-26-18; 8:45 am]
BILLING CODE 7590-01-P