[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16849-16853]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06829]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Indian Affairs
[178A2100DD/AAKC001030/A0A501010.999900 253G]
Rate Adjustments for Indian Irrigation Projects
AGENCY: Bureau of Indian Affairs, Interior.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Indian Affairs (BIA) owns or has an interest in
irrigation projects located on or associated with various Indian
reservations throughout the United States. We are required to establish
irrigation assessment rates to recover the costs to administer,
operate, maintain, and rehabilitate these projects. We are notifying
you that we have adjusted the irrigation assessment rates at several of
our irrigation projects and facilities to reflect current costs of
administration, operation, maintenance, and rehabilitation.
DATES: The irrigation assessment rates are current as of January 1,
2016.
FOR FURTHER INFORMATION CONTACT: For details about a particular BIA
irrigation project or facility, please use the tables in the
SUPPLEMENTARY INFORMATION section to contact the regional or local
office where the project or facility is located.
SUPPLEMENTARY INFORMATION: A Notice of Proposed Rate Adjustment was
published in the Federal Register on August 5, 2016 (81 FR 51927) to
propose adjustments to the irrigation assessment rates at several BIA
irrigation projects. The public and interested parties were provided an
opportunity to submit written comments during the 60-day period that
ended October 4, 2016.
Did BIA defer or change any proposed rate increases?
Yes. For the Flathead and Duck Valley Indian Irrigation Projects
the rate increase to $33.50 and $6.30, respectively, as published in
the proposed notice for the 2016 rate was not implemented. The final
2016 rate will remain at the 2015 amounts of $26.00 and $5.30. All
other rates are to be implemented at the respective irrigation project
as published.
Did BIA receive any comments on the proposed irrigation assessment rate
adjustments?
No. The BIA did not receive any comments to the proposed irrigation
assessment rate adjustment.
Does this notice affect me?
This notice affects you if you own or lease land within the
assessable acreage of one of our irrigation projects or if you have a
carriage agreement with one of our irrigation projects.
Where can I get information on the regulatory and legal citations in
this notice?
You can contact the appropriate office(s) stated in the tables for
the
[[Page 16850]]
irrigation project that serves you, or you can use the Internet site
for the Government Printing Office at www.gpo.gov.
What authorizes you to issue this notice?
Our authority to issue this notice is vested in the Secretary of
the Interior (Secretary) by 5 U.S.C. 301 and the Act of August 14, 1914
(38 Stat. 583; 25 U.S.C. 385). The Secretary has in turn delegated this
authority to the Assistant Secretary--Indian Affairs under Part 209,
Chapter 8.1A, of the Department of the Interior's Departmental Manual.
Whom can I contact for further information?
The following tables are the regional and project/agency contacts
for our irrigation facilities.
------------------------------------------------------------------------
Project name Project/agency contacts
------------------------------------------------------------------------
Northwest Region Contacts
------------------------------------------------------------------------
Stanley Speaks, Regional Director, Bureau of Indian Affairs, Northwest
Regional Office, 911 NE. 11th Avenue, Portland, OR 97232-4169,
Telephone: (503) 231-6702.
------------------------------------------------------------------------
Flathead Indian Irrigation Project Pete Plant, Acting Superintendent,
Pete Plant, Irrigation Project
Manager, P.O. Box 40, Pablo, MT
59855, Telephones: (406) 675-2700
ext. 1300 Superintendent, (406) 745-
2661 ext. 2 Project Manager.
Fort Hall Irrigation Project...... David Bollinger, Irrigation Project
Manager, Building #2 Bannock Ave,
Fort Hall, ID 83203-0220,
Telephone: (208) 238-6264
Wapato Irrigation Project......... David Shaw, Superintendent, Larry
Nelson, Acting Project
Administrator, P.O. Box 220,
Wapato, WA 98951-0220, Telephones:
(509) 865-2421 Superintendent,
(509) 877-3155 Acting Project
Administrator.
------------------------------------------------------------------------
Rocky Mountain Region Contacts
------------------------------------------------------------------------
Darryl LaCounte, Regional Director, Bureau of Indian Affairs, Rocky
Mountain Regional Office, 2021 4th Avenue North, Billings, MT 59101,
Telephone: (406) 247-7943.
------------------------------------------------------------------------
Blackfeet Irrigation Project...... Thedis Crowe, Superintendent, Greg
Tatsey, Irrigation Project Manager,
Box 880, Browning, MT 59417,
Telephones: (406) 338-7544,
Superintendent, (406) 338-7519,
Irrigation Project Manager.
Crow Irrigation Project........... Vianna Stewart, Superintendent, John
Anevski, Acting Irrigation Project
Manager, P.O. Box 69, Crow Agency,
MT 59022, Telephones: (406) 638-
2672, Superintendent, (406) 247-
7998, Acting Irrigation Project
Manager.
Fort Belknap Irrigation Project... John St. Pierre, Superintendent,
Vacant, Irrigation Project Manager,
(Project operation & maintenance
contracted to Tribes), R.R.1, Box
980, Harlem, MT 59526, Telephones:
(406) 353-2901, Superintendent,
(406) 353-8454, Irrigation Project
Manager (Tribal Office).
Fort Peck Irrigation Project...... Howard Beemer, Superintendent, Huber
Wright, Acting Irrigation Project
Manager, P.O. Box 637, Poplar, MT
59255, Telephones: (406) 768-5312,
Superintendent, (406) 653-1752,
Irrigation Project Manager.
Wind River Irrigation Project..... Norma Gourneau, Superintendent, John
Anevski, Acting Irrigation Project
Manager, P.O. Box 158, Fort
Washakie, WY 82514, Telephones:
(307) 332-7810, Superintendent,
(307) 247-7998, Acting Irrigation
Project Manager.
------------------------------------------------------------------------
Southwest Region Contacts
------------------------------------------------------------------------
William T. Walker, Regional Director, Bureau of Indian Affairs,
Southwest Regional Office, 1001 Indian School Road, Albuquerque, NM
87104, Telephone: (505) 563-3100.
------------------------------------------------------------------------
Pine River Irrigation Project..... Priscilla Bancroft, Superintendent,
Vickie Begay, Irrigation Project
Manager, P.O. Box 315, Ignacio, CO
81137-0315, Telephones: (970) 563-
4511, Superintendent, (970) 563-
9484, Irrigation Project Manager.
------------------------------------------------------------------------
Western Region Contacts
------------------------------------------------------------------------
Bryan Bowker, Regional Director, Bureau of Indian Affairs, Western
Regional Office, 2600 N. Central Ave., 4th Floor Mailroom, Phoenix, AZ
85004, Telephone: (602) 379-6600.
------------------------------------------------------------------------
Colorado River Irrigation Project. Kellie Youngbear Superintendent,
Gary Colvin, Irrigation Project
Manager, 12124 1st Avenue, Parker,
AZ 85344, Telephone: (928) 669-
7111.
Duck Valley Irrigation Project.... Joseph McDade, Superintendent,
(Project operation & management
compacted to Tribes), 2719 Argent
Ave., Suite 4, Gateway Plaza, Elko,
NV 89801, Telephone: (775) 738-
5165, (208) 759-3100, (Tribal
Office).
Yuma Project, Indian Unit......... Denni Shields, Superintendent, 256
South Second Avenue, Suite D, Yuma,
AZ 85364, Telephone: (928) 782-
1202.
San Carlos Irrigation Project, Ferris Begay, Project Manager,
Indian Works and Joint Works. Clarence Begay, Irrigation Manager,
13805 N. Arizona Boulevard,
Coolidge, AZ 85128, Telephone:
(520) 723-6225.
Uintah Irrigation Project......... Bart Stevens Superintendent, Ken
Asay, Irrigation System Manager,
P.O. Box 130, Fort Duchesne, UT
84026, Telephone: (435) 722-4300,
(435) 722-4344.
Walker River Irrigation Project... Robert Eben, Superintendent, 311 E.
Washington Street, Carson City, NV
89701, Telephone: (775) 887-3500.
------------------------------------------------------------------------
[[Page 16851]]
What irrigation assessments or charges are adjusted by this notice?
The rate table below contains the current rates for all irrigation
projects where we recover costs of administering, operating,
maintaining, and rehabilitating them. The table also contains the final
rates for the 2016 calendar year and subsequent years where applicable.
An asterisk immediately following the rate category notes the
irrigation projects where 2016 rates are different from the 2015 rates.
----------------------------------------------------------------------------------------------------------------
Final 2015 Final 2016 Final 2017
Project name Rate category rate rate rate **
----------------------------------------------------------------------------------------------------------------
Northwest Region Rate Table
----------------------------------------------------------------------------------------------------------------
Flathead Indian Irrigation Project Basic-per acre--A....... $26.00 $26.00 $26.00
(See Note #1).
Basic-per acre--B....... 13.00 13.00 13.00
Minimum Charge per tract 75.00 75.00 75.00
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Final 2015 Final 2016
Project name Rate category rate rate
----------------------------------------------------------------------------------------------------------------
Fort Hall Irrigation Project.................. Basic per acre *................ $49.00 $52.00
Minimum Charge per tract *...... 35.00 37.00
Fort Hall Irrigation Project--Minor Units..... Basic per acre *................ 27.00 31.00
Minimum Charge per tract *...... 35.00 37.00
Fort Hall Irrigation Project--Michaud......... Basic per acre *................ 50.50 55.00
Pressure per acre *............. 72.50 83.00
Minimum Charge per tract *...... 35.00 37.00
Wapato Irrigation Project--Toppenish/Simcoe Minimum Charge per bill *....... 24.00 25.00
Units.
Basic per acre *................ 24.00 25.00
Wapato Irrigation Project--Ahtanum Units...... Minimum Charge per bill *....... 25.00 30.00
Basic per acre *................ 25.00 30.00
Wapato Irrigation Project--Satus Unit......... Minimum Charge per bill......... 79.00 79.00
``A'' Basic per acre............ 79.00 79.00
``B'' Basic per acre............ 85.00 85.00
Wapato Irrigation Project--Additional Works... Minimum Charge per bill *....... 75.00 78.00
Basic per acre *................ 75.00 78.00
Wapato Irrigation Project--Water Rental....... Minimum Charge.................. 86.00 86.00
Basic per acre.................. 86.00 86.00
----------------------------------------------------------------------------------------------------------------
Rocky Mountain Region Rate Table
----------------------------------------------------------------------------------------------------------------
Blackfeet Irrigation Project.................. Basic-per acre.................. 20.00 20.00
Crow Irrigation Project--Willow Creek O&M Basic-per acre *................ 24.80 26.00
(includes Agency, Lodge Grass #1, Lodge Grass
#2, Reno, Upper Little Horn, and Forty Mile
Units).
Crow Irrigation Project--All Others (includes Basic-per acre *................ 24.80 26.00
Bighorn, Soap Creek, and Pryor Units).
Crow Irrigation Project--Two Leggins Unit..... Basic-per acre.................. 14.00 14.00
Crow Irrigation Two Leggins Drainage District. Basic-per acre.................. 2.00 2.00
Fort Belknap Irrigation Project............... Basic-per acre *................ 15.00 16.00
Fort Peck Irrigation Project.................. Basic-per acre.................. 26.00 26.00
Wind River Irrigation Project--Units 2, 3 and Basic-per acre *................ 21.00 22.50
4.
Wind River Irrigation Project--Unit 6......... Basic-per acre.................. 21.00 21.00
Wind River Irrigation Project--LeClair Basic-per acre *................ 25.70 47.00
District (see Note#2).
Wind River Irrigation Project--Crow Heart Unit Basic-per acre *................ 14.00 15.50
Wind River Irrigation Project--A Canal Unit... Basic-per acre *................ 14.00 15.50
Wind River Irrigation Project--Riverton Valley Basic-per acre *................ 21.00 26.00
Irrigation District.
----------------------------------------------------------------------------------------------------------------
Southwest Region Rate Table
----------------------------------------------------------------------------------------------------------------
Pine River Irrigation Project................. Minimum Charge per tract........ 50.00 50.00
Basic-per acre *................ 17.00 18.00
----------------------------------------------------------------------------------------------------------------
Western Region Rate Table
----------------------------------------------------------------------------------------------------------------
Colorado River Irrigation Project............. Basic per acre up to 5.75 acre- $54.00 $54.00
feet.
Excess Water per acre-foot over 17.00 17.00
5.75 acre-feet.
Duck Valley Irrigation Project................ Basic per acre.................. 5.30 5.30
Yuma Project, Indian Unit (See Note #3)....... Basic per acre up to 5.0 acre- 108.50 113.00
feet *.
Excess Water per acre-foot over 24.50 24.50
5.0 acre-feet.
Basic per acre up to 5.0 acre- 108.50 113.00
feet (Ranch 5) *.
----------------------------------------------------------------------------------------------------------------
[[Page 16852]]
----------------------------------------------------------------------------------------------------------------
Project name Rate category Final 2015 rate Final 2016 rate Final 2017 rate **
----------------------------------------------------------------------------------------------------------------
San Carlos Irrigation Project Basic per acre *.. $35.00 $30.00 $25.00.
(Joint Works) (See Note #4).
-------------------------------------------------------------------------------
Final 2016--2017 Construction Water Rate Schedule:
Off project On project On project
construction. construction--gra construction--pum
vity water. p water
----------------------------------------------------------------------------------------------------------------
Administrative Fee $300.00 $300.00 $300.00.
Usage Fee......... $250.00 per month. No Fee............ $100.00 per acre
foot.
Excess Water Rate $5.00 per 1,000 No Charge......... No Charge.
[dagger]. gal.
----------------------------------------------------------------------------------------------------------------
[dagger] The excess water rate applies to all water used in excess of 50,000
gallons in any one month.
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Final 2015 Final 2016
Project name Rate category rate rate
----------------------------------------------------------------------------------------------------------------
San Carlos Irrigation Project (Indian Works) Basic per acre *................ $86.00 $81.00
(See Note#5).
Uintah Irrigation Project..................... Basic per acre.................. 18.00 18.00
Minimum Bill.................... 25.00 25.00
Walker River Irrigation Project............... Basic per acre.................. 31.00 31.00
----------------------------------------------------------------------------------------------------------------
* Notes irrigation projects where rates are adjusted.
** The requirement for a final 2017 Rate is only applicable to the Flathead and San Carlos Irrigation Projects
due to their specific billing requirements.
Note #1: Federal Register Notice on April 29, 2016 established the 2016 rate for the Flathead Irrigation Project
(81 FR 25691). This notice makes final the 2017 rate for the Flathead Irrigation Project.
Note #2: The O&M rate varies yearly based upon the budget submitted by the LeClair District.
Note #3: The O&M rate for the Yuma Project, Indian Unit has two components. The first component is the O&M rate
established by the Bureau of Reclamation (BOR), the owner and operator of the Project. The BOR rate for 2016
is $110/acre. The second component is for the O&M rate established by BIA to cover administrative costs
including billing and collections for the Project. The 2016 BIA rate is $3.00/acre.
Note #4:The construction water rate schedule identifies the fees assessed for use of irrigation water for non-
irrigation purposes. Federal Register Notice on April 29, 2016 established the 2016 rate for the SCIP-JW (81
FR 25691). This notice makes final the 2017 rate for the SCIP-JW.
Note #5: The 2016 O&M rate for the San Carlos Irrigation Project--Indian Works has three components. The first
component is the O&M rate established by the San Carlos Irrigation Project--Indian Works, the owner and
operator of the Project; this rate is $51 per acre. The second component is for the O&M rate established by
the San Carlos Irrigation Project--Joint Works and is determined to be $25.00 per acre. The third component is
the O&M rate established by the San Carlos Irrigation Project Joint Control Board and is $5 per acre.
Consultation and Coordination With Tribal Governments (Executive Order
13175)
The Department of the Interior strives to strengthen its
government-to-government relationship with Indian Tribes through a
commitment to consultation with Indian Tribes and recognition of their
right to self-governance and Tribal sovereignty. We have evaluated this
notice under the Department's consultation policy and under the
criteria of Executive Order 13175 and have determined there to be
substantial direct effects on federally recognized Tribes because the
irrigation projects are located on or associated with Indian
reservations. To fulfill its consultation responsibility to Tribes and
Tribal organizations, BIA communicates, coordinates, and consults on a
continuing basis with these entities on issues of water delivery, water
availability, and costs of administration, operation, maintenance, and
rehabilitation of projects that concern them. This is accomplished at
the individual irrigation project by project, agency, and regional
representatives, as appropriate, in accordance with local protocol and
procedures. This notice is one component of our overall coordination
and consultation process to provide notice to, and request comments
from, these entities when we adjust irrigation assessment rates.
Actions Concerning Regulations That Significantly Affect Energy Supply,
Distribution, or Use (Executive Order 13211)
The rate adjustments are not a significant energy action under the
definition in Executive Order 13211. A Statement of Energy Effects is
not required.
Regulatory Planning and Review (Executive Order 12866)
These rate adjustments are not a significant regulatory action and
do not need to be reviewed by the Office of Management and Budget under
Executive Order 12866.
Regulatory Flexibility Act
These rate adjustments are not a rule for the purposes of the
Regulatory Flexibility Act because they establish ``a rule of
particular applicability relating to rates.'' 5 U.S.C. 601(2).
Unfunded Mandates Reform Act of 1995
These rate adjustments do not impose an unfunded mandate on state,
local, or tribal governments in the aggregate, or on the private
sector, of more than $130 million per year. They do not have a
significant or unique effect on state, local, or tribal governments or
the private sector. Therefore, the Department is not required to
prepare a statement containing the information required by the Unfunded
Mandates Reform Act (2 U.S.C. 1531 et seq.).
Takings (Executive Order 12630)
These rate adjustments do not effect a taking of private property
or otherwise have ``takings'' implications under Executive Order 12630.
The rate adjustments do not deprive the public, state, or local
governments of rights or property.
Federalism (Executive Order 13132)
Under the criteria in section 1 of Executive Order 13132, these
rate adjustments do not have sufficient federalism implications to
warrant the preparation of a federalism summary impact statement
because they will not affect the States, the relationship between the
national government and
[[Page 16853]]
the States, or the distribution of power and responsibilities among
various levels of government. A federalism summary impact statement is
not required.
Civil Justice Reform (Executive Order 12988)
This notice complies with the requirements of Executive Order
12988. Specifically, in issuing this notice, the Department has taken
the necessary steps to eliminate drafting errors and ambiguity,
minimize potential litigation, and provide a clear legal standard for
affected conduct as required by section 3 of Executive Order 12988.
Paperwork Reduction Act of 1995
These rate adjustments do not affect the collections of information
which have been approved by the Office of Information and Regulatory
Affairs, Office of Management and Budget, under the Paperwork Reduction
Act of 1995. The OMB Control Number is 1076-0141 and expires June 30,
2019.
National Environmental Policy Act
The Department has determined that these rate adjustments do not
constitute a major Federal action significantly affecting the quality
of the human environment and that no detailed statement is required
under the National Environmental Policy Act of 1969, 42 U.S.C. 4321-
4370(d), pursuant to 43 CFR 46.210(i). In addition, the rate
adjustments do not present any of the 12 extraordinary circumstances
listed at 43 CFR 46.215.
Data Quality Act
In developing this notice, we did not conduct or use a study,
experiment, or survey requiring peer review under the Data Quality Act
(Pub. L. 106-554).
Dated: March 29, 2017.
Michael S. Black,
Acting Assistant Secretary--Indian Affairs.
[FR Doc. 2017-06829 Filed 4-5-17; 8:45 am]
BILLING CODE 4337-15-P