NUCLEAR REGULATORY COMMISSION
[NRC-2017-0075]
Applications and Amendments to Facility Operating Licenses and
Combined Licenses Involving Proposed No Significant Hazards
Considerations and Containing Sensitive Unclassified Non-Safeguards
Information and Safeguards Information and Order Imposing Procedures
for Access to Sensitive Unclassified Non-Safeguards Information and
Safeguards Information
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; opportunity to comment, request a
hearing, and petition for leave to intervene; order imposing
procedures.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is
considering approval of one amendment request. The amendment request is
for Southern California Edison Company, San Onofre Nuclear Generating
Station, Units 1, 2, and 3 (SONGS). This amendment request contains
sensitive unclassified non-safeguards information (SUNSI) and
safeguards information (SGI). The proposed amendment would revise the
Physical Security Plan, Training and Qualification Plan, and Safeguards
Contingency Plan and remove the Cyber Security requirements from the
Facility Operating Licenses at SONGS to reflect the permanently
shutdown and defueled status of the facility. For this amendment
request, the NRC proposes to determine that it involves no significant
hazards consideration. Because the amendment request contains sensitive
unclassified non-safeguards information (SUNSI) and safeguards
information (SGI) an order imposes procedures to obtain access to SUNSI
and SGI for contention preparation.
DATES: Comments must be filed by May 4, 2017. A request for a hearing
must be filed by June 5, 2017. Any potential party as defined in Sec.
2.4 of title 10 of the Code of Federal Regulations (10 CFR), who
believes access to SUNSI and/or SGI is necessary to respond to this
[[Page 16423]]
notice must request document access by April 14, 2017.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0075. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Beverly Clayton, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-3475, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2017-0075, facility name, unit
number(s), plant docket number, application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly-available information related to this
action by any of the following methods:
Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0075.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2017-0075, facility name, unit
number(s), plant docket number, application date, and subject in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the NRC is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued, or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This notice includes a notice of an amendment containing SUNSI and
SGI.
III. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in 10 CFR 50.92, this means that operation
of the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated, or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated,
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment
period such that failure to act in a timely way would result, for
example, in derating or shutdown of the facility. If the Commission
takes action prior to the expiration of either the comment period or
the notice period, it will publish a notice of issuance in the Federal
Register. If the Commission makes a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555
[[Page 16424]]
Rockville Pike (first floor), Rockville, Maryland 20852. If a petition
is filed, the Commission or a presiding officer will rule on the
petition and, if appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by June
5, 2017. The petition must be filed in accordance with the filing
instructions in the ``Electronic Submissions (E-Filing)'' section of
this document, and should meet the requirements for petitions set forth
in this section, except that under 10 CFR 2.309(h)(2) a State, local
governmental body, or Federally recognized Indian Tribe, or agency
thereof does not need to address the standing requirements in 10 CFR
2.309(d) if the facility is located within its boundaries.
Alternatively, a State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may participate as a non-party under 10
CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at http://www.nrc.gov/site-help/
e-submittals/
[[Page 16425]]
getting-started.html. Once a participant has obtained a digital ID
certificate and a docket has been created, the participant can then
submit adjudicatory documents. Submissions must be in Portable Document
Format (PDF). Additional guidance on PDF submissions is available on
the NRC's public Web site at http://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the
document is submitted through the NRC's E-Filing system. To be timely,
an electronic filing must be submitted to the E-Filing system no later
than 11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public Web site at http://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
Southern California Edison Company, et al., Docket Nos. 50-206, 50-361,
and 50-362, San Onofre Nuclear Generating Station, Units 1, 2, and 3,
San Diego County, California
Date of amendment request: December 19, 2016. A publicly-available
version is in ADAMS under Package Accession No. ML17037D114.
Description of amendment request: This amendment request contains
sensitive unclassified non-safeguards information (SUNSI) and
safeguards information (SGI). The proposed amendment would revise the
Physical Security Plan, Training and Qualification Plan, and Safeguards
Contingency Plan (the ``Plan'' or ``Security Plan'') and remove the
Cyber Security requirements from the Facility Operating Licenses at the
San Onofre Nuclear Generating Station, Units 1, 2, and 3 (SONGS). The
Security Plan will supersede the current Physical Security Plan,
Training and Qualification Plan, and Safeguards Contingency Plan at
SONGS. These changes will more fully reflect the permanently shutdown
and defueled status of the facility, as well as the reduced scope of
potential radiological accidents and security concerns once all spent
fuel has been permanently moved to dry cask storage within the onsite
SONGS independent spent fuel storage installation (ISFSI), an activity
which is currently scheduled for completion in 2019.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The irradiated fuel at SONGS is currently stored in the Units 2
and 3 spent fuel pool (SFP) and at the SONGS ISFSI. In this
condition, the number of credible accidents/transients is
significantly smaller than for a plant authorized to operate the
reactor or emplace or retain fuel in the reactor vessel. In
addition, the proposed Plan reflects the future site configuration
where all the remaining spent fuel in the SFP has been moved to the
ISFSI with no intention to return spent fuel to the SFP. In this
configuration, the Fuel Handling Accident would no longer be
credible. The probability and consequences of the remaining SONGS
Updated Final Safety Analysis Report (UFSAR) Chapter 15 events are
not significantly affected by the proposed changes to the existing
Security Plan because the proposed changes have no effect on plant
systems, structures, and components (SSCs) and no effect on the
capability of any plant SSC to perform its design function. The
proposed changes would not increase the likelihood of the
malfunction of any plant SSC.
Therefore, the proposed amendments do not involve a significant
increase in the probability or consequences of a previously
evaluated accident.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed amendments constitute a revision of the emergency
planning function commensurate with the ongoing and anticipated
reduction in radiological source term at SONGS.
The proposed amendments do not involve significant physical
alteration of the plant. The proposed license amendments would not
[[Page 16426]]
physically change any SSCs involved in the safe storage of spent
fuel or the mitigation of any postulated accident. Thus, no new
initiators or precursors of a new or different kind of accident are
created. Furthermore, the proposed amendments do not create the
possibility of a new failure mode associated with any equipment or
personnel failures. The credible events for the ISFSI remain
unchanged.
Therefore, the proposed amendments do not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Because the 10 CFR part 50 licenses for SONGS no longer
authorize operation of the reactors or emplacement or retention of
fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2),
the occurrence of postulated accidents associated with reactor
operation is no longer credible. With all nuclear spent fuel
transferred out of wet storage from the spent fuel pools and placed
in dry storage within the ISFSI, a fuel handling accident is no
longer credible. The proposed amendments do not involve a change in
the plant's design, configuration, or operation. There are no
modifications associated with this proposed amendment that would
affect either the way in which the plant SSCs perform their safety
functions or their design margins.
Therefore, the proposed amendments do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Walker A. Matthews, Esquire, Southern
California Edison Company, 2244 Walnut Grove Avenue, Rosemead,
California 91770.
NRC Branch Chief: Bruce Watson, CHP.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information and Safeguards Information for Contention
Preparation
Southern California Edison Company, et al., Docket Nos. 50-206, 50-361,
and 50-362, San Onofre Nuclear Generating Stations, Units 1, 2, and 3,
San Diego County, California
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing sensitive
unclassified information (including Sensitive Unclassified Non-
Safeguards Information (SUNSI) and Safeguards Information (SGI)).
Requirements for access to SGI are primarily set forth in 10 CFR parts
2 and 73. Nothing in this Order is intended to conflict with the SGI
regulations.
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI or SGI is necessary to respond to this notice
may request access to SUNSI or SGI. A ``potential party'' is any person
who intends to participate as a party by demonstrating standing and
filing an admissible contention under 10 CFR 2.309. Requests for access
to SUNSI or SGI submitted later than 10 days after publication will not
be considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI, SGI, or both to the Office of the Secretary, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, and provide a copy to the
Associate General Counsel for Hearings, Enforcement and Administration,
Office of the General Counsel, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001. The expedited delivery or courier mail
address for both offices is: U.S. Nuclear Regulatory Commission, 11555
Rockville Pike, Rockville, Maryland 20852. The email address for the
Office of the Secretary and the Office of the General Counsel are
[email protected] and [email protected], respectively.\1\ The
request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI and/or SGI
under these procedures should be submitted as described in this
paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) If the request is for SUNSI, the identity of the individual or
entity requesting access to SUNSI and the requestor's basis for the
need for the information in order to meaningfully participate in this
adjudicatory proceeding. In particular, the request must explain why
publicly available versions of the information requested would not be
sufficient to provide the basis and specificity for a proffered
contention; and
(4) If the request is for SGI, the identity of each individual who
would have access to SGI if the request is granted, including the
identity of any expert, consultant, or assistant who will aid the
requestor in evaluating the SGI. In addition, the request must contain
the following information:
(a) A statement that explains each individual's ``need to know''
the SGI, as required by 10 CFR 73.2 and 10 CFR 73.22(b)(1). Consistent
with the definition of ``need to know'' as stated in 10 CFR 73.2, the
statement must explain:
(i) Specifically why the requestor believes that the information is
necessary to enable the requestor to proffer and/or adjudicate a
specific contention in this proceeding; \2\ and
---------------------------------------------------------------------------
\2\ Broad SGI requests under these procedures are unlikely to
meet the standard for need to know; furthermore, NRC staff redaction
of information from requested documents before their release may be
appropriate to comport with this requirement. These procedures do
not authorize unrestricted disclosure or less scrutiny of a
requestor's need to know than ordinarily would be applied in
connection with an already-admitted contention or non-adjudicatory
access to SGI.
---------------------------------------------------------------------------
(ii) The technical competence (demonstrable knowledge, skill,
training or education) of the requestor to effectively utilize the
requested SGI to provide the basis and specificity for a proffered
contention. The technical competence of a potential party or its
counsel may be shown by reliance on a qualified expert, consultant, or
assistant who satisfies these criteria.
(b) A completed Form SF-85, ``Questionnaire for Non-Sensitive
Positions,'' for each individual who would have access to SGI. The
completed Form SF-85 will be used by the Office of Administration to
conduct the background check required for access to SGI, as required by
10 CFR part 2, subpart C, and 10 CFR 73.22(b)(2), to determine the
requestor's trustworthiness and reliability. For security reasons, Form
SF-85 can only be submitted electronically through the electronic
questionnaire for investigations processing (e-QIP) Web site, a secure
Web site that is owned and operated by the Office of Personnel
Management. To obtain online access to the form, the requestor should
contact the NRC's Office of Administration at 301-415-3710.\3\
---------------------------------------------------------------------------
\3\ The requestor will be asked to provide his or her full name,
social security number, date and place of birth, telephone number,
and email address. After providing this information, the requestor
usually should be able to obtain access to the online form within
one business day.
---------------------------------------------------------------------------
(c) A completed Form FD-258 (fingerprint card), signed in original
ink, and submitted in accordance with 10 CFR 73.57(d). Copies of Form
FD-258 may be obtained by writing the Office of Administrative
Services, Mail Services Center, Mail Stop P1-37, U.S. Nuclear
[[Page 16427]]
Regulatory Commission, Washington, DC 20555-0001, or by email to
[email protected]. The fingerprint card will be used to satisfy
the requirements of 10 CFR part 2, subpart C, 10 CFR 73.22(b)(1), and
Section 149 of the Atomic Energy Act of 1954, as amended, which
mandates that all persons with access to SGI must be fingerprinted for
an FBI identification and criminal history records check.
(d) A check or money order payable in the amount of $324.00 \4\ to
the U.S. Nuclear Regulatory Commission for each individual for whom the
request for access has been submitted.
---------------------------------------------------------------------------
\4\ This fee is subject to change pursuant to the Office of
Personnel Management's adjustable billing rates.
---------------------------------------------------------------------------
(e) If the requestor or any individual(s) who will have access to
SGI believes they belong to one or more of the categories of
individuals that are exempt from the criminal history records check and
background check requirements in 10 CFR 73.59, the requestor should
also provide a statement identifying which exemption the requestor is
invoking and explaining the requestor's basis for believing that the
exemption applies. While processing the request, the Office of
Administration, Personnel Security Branch, will make a final
determination whether the claimed exemption applies. Alternatively, the
requestor may contact the Office of Administration for an evaluation of
their exemption status prior to submitting their request. Persons who
are exempt from the background check are not required to complete the
SF-85 or Form FD-258; however, all other requirements for access to
SGI, including the need to know, are still applicable.
Note: Copies of documents and materials required by paragraphs
C.(4)(b), (c), and (d) of this Order must be sent to the following
address: U.S. Nuclear Regulatory Commission, ATTN: Personnel
Security Branch, Mail Stop TWFN-03-B46M, 11555 Rockville Pike,
Rockville, MD 20852.
These documents and materials should not be included with the
request letter to the Office of the Secretary, but the request letter
should state that the forms and fees have been submitted as required.
D. To avoid delays in processing requests for access to SGI, the
requestor should review all submitted materials for completeness and
accuracy (including legibility) before submitting them to the NRC. The
NRC will return incomplete packages to the sender without processing.
E. Based on an evaluation of the information submitted under
paragraphs C.(3) or C.(4) above, as applicable, the NRC staff will
determine within 10 days of receipt of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI or need to know the SGI requested.
F. For requests for access to SUNSI, if the NRC staff determines
that the requestor satisfies both E.(1) and E.(2) above, the NRC staff
will notify the requestor in writing that access to SUNSI has been
granted. The written notification will contain instructions on how the
requestor may obtain copies of the requested documents, and any other
conditions that may apply to access to those documents. These
conditions may include, but are not limited to, the signing of a Non-
Disclosure Agreement or Affidavit, or Protective Order setting forth
terms and conditions to prevent the unauthorized or inadvertent
disclosure of SUNSI by each individual who will be granted access to
SUNSI.\5\
---------------------------------------------------------------------------
\5\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
G. For requests for access to SGI, if the NRC staff determines that
the requestor has satisfied both E.(1) and E.(2) above, the Office of
Administration will then determine, based upon completion of the
background check, whether the proposed recipient is trustworthy and
reliable, as required for access to SGI by 10 CFR 73.22(b). If the
Office of Administration determines that the individual or individuals
are trustworthy and reliable, the NRC will promptly notify the
requestor in writing. The notification will provide the names of
approved individuals as well as the conditions under which the SGI will
be provided. Those conditions may include, but are not limited to, the
signing of a Non-Disclosure Agreement or Affidavit, or Protective Order
\6\ by each individual who will be granted access to SGI.
---------------------------------------------------------------------------
\6\ Any motion for Protective Order or draft Non- Disclosure
Agreement or Affidavit for SGI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 180 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
H. Release and Storage of SGI. Prior to providing SGI to the
requestor, the NRC staff will conduct (as necessary) an inspection to
confirm that the recipient's information protection system is
sufficient to satisfy the requirements of 10 CFR 73.22. Alternatively,
recipients may opt to view SGI at an approved SGI storage location
rather than establish their own SGI protection program to meet SGI
protection requirements.
I. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI or SGI must be filed by the requestor no later than 25 days
after receipt of (or access to) that information. However, if more than
25 days remain between the petitioner's receipt of (or access to) the
information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the
petitioner may file its SUNSI or SGI contentions by that later
deadline.
J. Review of Denials of Access.
(1) If the request for access to SUNSI or SGI is denied by the NRC
staff either after a determination on standing and requisite need, or
after a determination on trustworthiness and reliability, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) Before the Office of Administration makes a final adverse
determination regarding the trustworthiness and reliability of the
proposed recipient(s) for access to SGI, the Office of Administration,
in accordance with 10 CFR 2.336(f)(1)(iii), must provide the proposed
recipient(s) any records that were considered in the trustworthiness
and reliability determination, including those required to be provided
under 10 CFR 73.57(e)(1), so that the proposed recipient(s) have an
opportunity to correct or explain the record.
(3) The requestor may challenge the NRC staff's adverse
determination with respect to access to SUNSI or with respect to
standing or need to know for SGI by filing a challenge within 5 days of
receipt of that determination with: (a) The presiding officer
designated in this proceeding; (b) if no presiding officer has been
appointed, the Chief Administrative Judge, or if he or she is
unavailable, another administrative judge, or an Administrative Law
Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another
officer has been designated to rule on information access issues, with
that officer.
(4) The requestor may challenge the Office of Administration's
final adverse determination with respect to trustworthiness and
reliability for access to SGI by filing a request for review in
accordance with 10 CFR 2.336(f)(1)(iv).
(5) Further appeals of decisions under this paragraph must be made
pursuant to 10 CFR 2.311.
[[Page 16428]]
K. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed within 5 days of the notification by the
NRC staff of its grant of access and must be filed with: (a) The
presiding officer designated in this proceeding; (b) if no presiding
officer has been appointed, the Chief Administrative Judge, or if he or
she is unavailable, another administrative judge, or an Administrative
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if
another officer has been designated to rule on information access
issues, with that officer.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\7\
---------------------------------------------------------------------------
\7\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562; August 3, 2012) apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI/SGI
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
L. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI or SGI, and motions for protective orders, in a
timely fashion in order to minimize any unnecessary delays in
identifying those petitioners who have standing and who have propounded
contentions meeting the specificity and basis requirements in 10 CFR
part 2. The attachment to this Order summarizes the general target
schedule for processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 28th of March 2017.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information and Safeguards Information in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0............................. Publication of Federal Register notice
of hearing and opportunity to petition
for leave to intervene, including order
with instructions for access requests.
10............................ Deadline for submitting requests for
access to Sensitive Unclassified Non
Safeguards Information (SUNSI) and/or
Safeguards Information (SGI) with
information: Supporting the standing of
a potential party identified by name
and address; describing the need for
the information in order for the
potential party to participate
meaningfully in an adjudicatory
proceeding; demonstrating that access
should be granted (e.g., showing
technical competence for access to
SGI); and, for SGI, including
application fee for fingerprint/
background check.
60............................ Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does not
require access to SUNSI and/or SGI (+25
Answers to petition for intervention;
+7 requestor/petitioner reply).
20............................ U.S. Nuclear Regulatory Commission (NRC)
staff informs the requestor of the
staff's determination whether the
request for access provides a
reasonable basis to believe standing
can be established and shows (1) need
for SUNSI or (2) need to know for SGI.
(For SUNSI, NRC staff also informs any
party to the proceeding whose interest
independent of the proceeding would be
harmed by the release of the
information.) If NRC staff makes the
finding of need for SUNSI and
likelihood of standing, NRC staff
begins document processing (preparation
of redactions or review of redacted
documents). If NRC staff makes the
finding of need to know for SGI and
likelihood of standing, NRC staff
begins background check (including
fingerprinting for a criminal history
records check), information processing
(preparation of redactions or review of
redacted documents), and readiness
inspections.
25............................ If NRC staff finds no ``need,'' no
``need to know,'' or no likelihood of
standing, the deadline for requestor/
petitioner to file a motion seeking a
ruling to reverse the NRC staff's
denial of access; NRC staff files copy
of access determination with the
presiding officer (or Chief
Administrative Judge or other
designated officer, as appropriate). If
NRC staff finds ``need'' for SUNSI, the
deadline for any party to the
proceeding whose interest independent
of the proceeding would be harmed by
the release of the information to file
a motion seeking a ruling to reverse
the NRC staff's grant of access.
30............................ Deadline for NRC staff reply to motions
to reverse NRC staff determination(s).
40............................ (Receipt +30) If NRC staff finds
standing and need for SUNSI, deadline
for NRC staff to complete information
processing and file motion for
Protective Order and draft Non-
Disclosure Affidavit. Deadline for
applicant/licensee to file Non-
Disclosure Agreement for SUNSI.
190........................... (Receipt +180) If NRC staff finds
standing, need to know for SGI, and
trustworthiness and reliability,
deadline for NRC staff to file motion
for Protective Order and draft Non-
disclosure Affidavit (or to make a
determination that the proposed
recipient of SGI is not trustworthy or
reliable). Note: Before the Office of
Administration makes a final adverse
determination regarding access to SGI,
the proposed recipient must be provided
an opportunity to correct or explain
information.
205........................... Deadline for petitioner to seek reversal
of a final adverse NRC staff
trustworthiness or reliability
determination under 10 CFR
2.336(f)(1)(iv).
A............................. If access granted: Issuance of a
decision by a presiding officer or
other designated officer on motion for
protective order for access to
sensitive information (including
schedule for providing access and
submission of contentions) or decision
reversing a final adverse determination
by the NRC staff.
A + 3......................... Deadline for filing executed Non-
Disclosure Affidavits. Access provided
to SUNSI and/or SGI consistent with
decision issuing the protective order.
A + 28........................ Deadline for submission of contentions
whose development depends upon access
to SUNSI and/or SGI. However, if more
than 25 days remain between the
petitioner's receipt of (or access to)
the information and the deadline for
filing all other contentions (as
established in the notice of
opportunity to request a hearing and
petition for leave to intervene), the
petitioner may file its SUNSI or SGI
contentions by that later deadline.
A + 53........................ (Contention receipt +25) Answers to
contentions whose development depends
upon access to SUNSI and/or SGI.
A + 60........................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60....................... Decision on contention admission.
------------------------------------------------------------------------
[[Page 16429]]