SUMMARY: The FHWA is issuing this notice to advise the public that FHWA
and Wisconsin Department of Transportation (WisDOT) will no longer
prepare a Tier 1 EIS for the US 51 corridor in Dane County, Wisconsin
generally between Interstate 39/90 east of the City of Stoughton and US
12/18 (Madison South Beltline Highway) because funding to complete
improvements to be considered would not be available in the foreseeable
future.
FOR FURTHER INFORMATION CONTACT: Anna Varney, Major Projects Engineer,
Federal Highway Administration, 525 Junction Road, Suite 8000, Madison,
Wisconsin, 53717-2157, Telephone: (608) 829-7514. You may also contact
Steve Krebs, Director, Bureau of Technical Services, Wisconsin
Department of Transportation, P.O. Box 7965, Madison, Wisconsin 53707-
7965, Telephone: (608) 246- 7930.
SUPPLEMENTARY INFORMATION: A Notice of Intent (NOI) to prepare an
Environmental Impact Statement (EIS) was published in 77 FR 5087, Feb.
1, 2012 for proposed transportation improvements in the United States
Highway (US) 51 corridor in Dane County, Wisconsin generally between
Interstate 39/90 east of the City of Stoughton and US 12/18 (Madison
South Beltline Highway). A revised NOI was published in 80 FR 19111,
Apr. 9, 2015 to advise that the environmental review process was being
changed to a tiered process in which a Tier 1 EIS would be prepared to
evaluate potential corridors for a future project-specific alignment.
A needs assessment was conducted for the project corridor in 2004
followed by initiation of the environmental review process for an EIS.
The EIS review process examined factors contributing to the need for
improvements within the U.S. 51 study corridor (long-term planning and
corridor preservation, safety, roadway deficiencies, bike and
pedestrian accommodations, and travel demand and capacity). Based on
statewide transportation priorities, it was determined a commitment to
improvements that address all of the need factors could not be made and
the environmental review process was converted from a standard EIS to a
Tier 1 EIS. FHWA, in cooperation with WisDOT, planned to prepare a Tier
1 EIS for proposed improvements to address safety, operational and
capacity concerns on approximately 18 miles of U.S. 51 between
Interstate 39/90, east of the City of Stoughton, to U.S. 12/18 (Madison
South Beltline Highway).
The federal fiscal constraint requirement applied to WisDOT
environmental studies requires that funding be identified for the next
major project action to advance the project within a reasonable
timeframe. Based on statewide priorities, it was determined that the
U.S. 51 corridor alternatives proposed in the DEIS would not receive
funding for the next major action to advance the project. It is
anticipated 30+ years might elapse before improvements recommended in a
Tier 1 EIS might align with funding. As such, the preparation of the
EIS for the U.S. 51 corridor in Dane County, Wisconsin generally
between Interstate 39/90 east of the City of Stoughton and U.S. 12/18
(Madison South Beltline Highway) will not be completed. Any future
transportation improvements along the U.S. 51 corridor will progress
under a separate environmental review process in accordance with all
applicable laws and regulations.
Issued on: December 8, 2016.
Anna Varney,
Major Projects Engineer, Federal Highway Administration, Madison,
Wisconsin.
[FR Doc. 2016-30379 Filed 12-16-16; 8:45 am]
BILLING CODE 4910-22-P