SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a
final revision to Section 2.0, ``Site Characteristics and Site
Parameters'' of NUREG-0800, ``Standard Review Plan (SRP) for the Review
of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.''
DATES: The effective date of this SRP update is November 14, 2016.
ADDRESSES: Please refer to Docket ID NRC-2015-0131 when contacting the
NRC about the availability of information regarding this document. You
may access publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0131. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
ADAMS accession number for each document referenced in this notice (if
that document is available in ADAMS) is provided the first time that a
document is referenced. The final revision, previously issued draft
revision for public use and comment, and redline strikeouts comparing
the final revision with draft revision are available in ADAMS under the
following Accession No(s). ML15279A105, ML15043A732, and ML15279A091.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
The NRC posts its issued staff guidance on the NRC's external Web
page (http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/).
FOR FURTHER INFORMATION CONTACT: Mark Notich, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3053, email: [email protected].
SUPPLEMENTARY INFORMATION:
[[Page 71117]]
I. Background
On May 27, 2015 (80 FR 30285), the NRC published for public comment
a proposed revision of Section 2.0, ``Site Characteristics and Site
Parameters'' of NUREG-0800, ``Standard Review Plan (SRP) for the Review
of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.'' The
staff received comments on the draft section. After consideration of
comments received on the proposed revision, the NRC staff reformatted
guidance for the review of nonsafety-related structures, systems, and
components (SSCs) into a tabular format, and separated it from the core
review guidance used for review of safety-related SSCs. A summary of
comments received and the staff's disposition of the comments are
available in a separate document entitled, ``Response to Public
Comments on Draft Standard Review Plan, Section 2, `Site
Characteristics and Site Parameters''' (ADAMS Accession No.
ML15279A093).
II. Backfitting and Issue Finality
Section 2 provides guidance to the staff for reviewing applications
for a construction permit and an operating license under part 50 of
title 10 of the Code of Federal Regulations (10 CFR) with respect to
systems associated with site characteristics and site parameters. SRP
Section 2 also provides guidance for reviewing an application for a
standard design approval, a standard design certification, a combined
license, and a manufacturing license under 10 CFR part 52 with respect
to the same subject matters.
Issuance of this SRP section revision does not constitute
backfitting as defined in 10 CFR 50.109 (the Backfit Rule) nor is it
inconsistent with the issue finality provisions in 10 CFR part 52. The
NRC's position is based upon the following considerations.
1. The SRP positions would not constitute backfitting, inasmuch as
the SRP is internal guidance to NRC staff.
The SRP provides internal guidance to the NRC staff on how to
review an application for NRC regulatory approval in the form of
licensing. Changes in internal staff guidance are not matters for which
either nuclear power plant applicants or licensees are protected under
either the Backfit Rule or the issue finality provisions of 10 CFR part
52.
2. The NRC staff has no intention to impose the SRP positions on
existing licensees either now or in the future.
The NRC staff does not intend to impose or apply the positions
described in the SRP to existing licenses and regulatory approvals.
Hence, the issuance of this SRP--even if considered guidance within the
purview of the issue finality provisions in 10 CFR part 52--does not
need to be evaluated as if it were a backfit or as being inconsistent
with issue finality provisions. If, in the future, the NRC staff seeks
to impose a position in the SRP on holders of already issued licenses
in a manner that does not provide issue finality as described in the
applicable issue finality provision, then the staff must make the
showing as set forth in the Backfit Rule or address the criteria for
avoiding issue finality as described in the applicable issue finality
provision.
3. Backfitting and issue finality do not--with limited exceptions
not applicable here--protect current or future applicants.
Applicants and potential applicants are not, with certain
exceptions, protected by either the Backfit Rule or any issue finality
provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue
finality provisions under 10 CFR part 52--with certain exclusions--were
intended to apply to every NRC action that substantially changes the
expectations of current and future applicants.
The exceptions to the general principle are applicable whenever an
applicant references a 10 CFR part 52 license (e.g., an early site
permit) or NRC regulatory approval (e.g., a design certification rule)
with specified issue finality provisions. The NRC staff does not, at
this time, intend to impose the positions represented in the SRP in a
manner that is inconsistent with any issue finality provisions. If, in
the future, the staff seeks to impose a position in the SRP section in
a manner that does not provide issue finality as described in the
applicable issue finality provision, then the staff must address the
criteria for avoiding issue finality as described in the applicable
issue finality provision.
III. Congressional Review Act
This action is a rule as defined in the Congressional Review Act (5
U.S.C. 801-808). However, the Office of Management and Budget has not
found it to be a major rule as defined in the Congressional Review Act.
Dated at Rockville, Maryland, this 11th day of October 2016.
For the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, New Reactor Rulemaking and Guidance Branch, Division of
Engineering, Infrastruture and Advanced Reactors, Office of New
Reactors.
[FR Doc. 2016-24859 Filed 10-13-16; 8:45 am]
BILLING CODE 7590-01-P