[Federal Register Volume 81, Number 99 (Monday, May 23, 2016)]
[Notices]
[Pages 32322-32324]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-12062]
[[Page 32322]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP16-3-000 and CP16-3-001]
Texas Eastern Transmission, LP; Supplemental Notice of Intent To
Prepare an Environmental Assessment for the Proposed Access South,
Adair Southwest, and Lebanon Extension Projects and Request for
Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Access South, Adair Southwest,
and Lebanon Extension Projects (Projects) in Docket Nos. CP16-3-000 and
CP16-3-001. The Projects involve construction, abandonment, and
operation of facilities by Texas Eastern Transmission, LP (Texas
Eastern) that would enable an additional 622,000 dekatherms per day of
natural gas transportation on Texas Eastern's existing mainline
facilities to serve markets in the Midwest and Southeast. The
Commission will use this EA in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of a second scoping period that
the Commission will use to gather input from the public on the
Projects. The Commission is opening a second scoping period for
affected landowners who were not included in the mailing list for the
original Notice of Intent (NOI) issued for the Projects on August 1,
2015 during the pre-filing review process under Docket Number PF15-17-
000. This includes landowners near twelve existing compressor stations
where Texas Eastern proposes to replace pipeline or modify facilities
to allow for reverse flow capabilities, including one compressor
station where it proposes to install additional compression facilities.
Texas Eastern's proposal is more fully described on page 3 of this
notice.
You can make a difference by providing us with your specific
comments or concerns about the Projects. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. Your input will help
the Commission staff determine what issues they need to evaluate in the
EA. To ensure that your comments are timely and properly recorded,
please send your comments so that the Commission receives them in
Washington, DC on or before June 16, 2016.
Landowners receiving this notice are primarily abutters to Texas
Eastern's existing compressor stations where modifications are proposed
or are within 0.5 mile of the Tompkinsville Compressor Station in
Monroe County, Kentucky, where additional compression is proposed. One
landowner receiving this notice is directly affected by the proposed
replacement pipeline at Kosciusko Compressor Station in Attala County,
Mississippi, and Texas Eastern has stated it has contacted this
landowner. The company will seek to negotiate a mutually acceptable
agreement regarding acquisition of any easements needed to construct,
operate, and maintain the replacement pipeline. However, if the
Commission approves the Projects, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has expert staff available to assist you at
(202) 502-8258 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' If you are filing a comment on a particular project,
please select ``Comment on a Filing'' as the filing type; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket numbers
(CP16-3-000 and CP16-3-001) with your submission: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Room 1A, Washington, DC 20426.
Summary of the Proposed Project
The proposed pipeline facilities for the Projects include 15.8
miles of 36-inch-diameter pipeline loop \1\ in three segments, most of
which would be either within or adjacent to Texas Eastern's existing
rights-of-way in Athens, Meigs, Noble, and Monroe Counties, Ohio; and
0.5 mile of 16-inch-diameter replacement pipeline within an existing
right-of-way in Attala County, Mississippi. In addition two pig \2\
launcher/receivers would be relocated and two new pig launcher/
receivers would be installed in Monroe County, Ohio. Proposed
modifications to aboveground facilities would include modifications
necessary to allow for bi-directional flow and meter reversals at
twelve existing compressor stations which are proposed to be located
primarily within Texas Eastern's current footprint. In addition, a new
16,875 horsepower electric compressor would be added at the
Tompkinsville Compressor Station in Monroe County, Kentucky.
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
\2\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
The proposed modifications at twelve existing compressor station
sites would include piping modifications to accommodate bi-directional
flow capability along Texas Eastern's existing mainline. These
modifications are proposed at the following compressor stations:
Holbrook Compressor Station in Greene County,
Pennsylvania;
Lebanon Compressor Station in Warren County, Ohio;
Somerset Compressor Station in Perry County, Ohio;
Berne Compressor Station in Monroe County, Ohio;
Athens Compressor Station in Athens County, Ohio;
Owingsville Compressor Station in Bath County, Kentucky;
Danville Compressor Station in Lincoln County, Kentucky;
Tompkinsville Compressor Station in Monroe County,
Kentucky;
Gladeville Compressor Station in Wilson County, Tennessee;
[[Page 32323]]
Barton Compressor Station in Colbert County, Alabama;
Egypt Compressor Station in Monroe County, Mississippi;
and
Kosciusko Compressor Station in Attala County,
Mississippi.
The general location of the Projects facilities is shown in
appendix 1.\3\
---------------------------------------------------------------------------
\3\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 283.7
acres of land for the pipeline loops and replacement, including extra
workspace and access roads, and 341.0 acres of previously disturbed
land at compressor station facilities. Following construction, Texas
Eastern would maintain an additional 96.8 acres for permanent operation
of the Projects' facilities; the remaining acreage would be restored
and revert to former uses. The proposed loops would be located mostly
adjacent to Texas Eastern's existing pipeline rights-of-way and
construction at the compressor stations would occur at existing
facilities where no permanent expansion of the facilities would occur.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\4\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\4\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed Projects under these
general headings:
Geology and soils;
Land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species;
public safety; and
cumulative impacts.
We will also evaluate possible alternatives to the proposed
Projects or portions of the Projects, and make recommendations on how
to lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before we make our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section, beginning on page 2.
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we have initiated consultation with the applicable
State Historic Preservation Offices, and to solicit their views and
those of other government agencies, interested Indian tribes, and the
public on the Projects' potential effects on historic properties.\5\ We
will define the project-specific Area of Potential Effects (APE) in
consultation with the SHPOs as the Projects develop. On natural gas
facility projects, the APE at a minimum encompasses all areas subject
to ground disturbance (examples include construction right-of-way,
contractor/pipe storage yards, compressor stations, and access roads).
Our EA for the Projects will document our findings on the impacts on
historic properties and summarize the status of consultations under
section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list for the Projects includes federal,
state, and local government representatives and agencies; elected
officials; environmental and public interest groups; Native American
Tribes; and local libraries and newspapers. This list also includes all
affected landowners (as defined in the Commission's regulations) who
are potential right-of-way grantors, whose property may be used
temporarily for project purposes, or who own homes within certain
distances of aboveground facilities, and anyone who submits comments on
the Projects. The mailing list for this supplemental NOI just includes
landowners who were not previously notified by the original NOI and are
abutters to Texas Eastern's compressor stations or within 0.5 mile of
the Tompkinsville Compressor Station in Monroe County, Kentucky where
additional compression is proposed. We will update the environmental
mailing list as the analysis proceeds to ensure that we send the
information related to this environmental review to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed Projects.
If we publish and distribute the EA, copies of the EA will be sent
to the environmental mailing list for public review and comment. If you
would prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Motions to intervene are more fully described at
http://www.ferc.gov/resources/guides/how-to/intervene.asp. Instructions
for becoming an intervenor are in the ``Document-less Intervention
Guide'' under the ``e-filing'' link on the Commission's Web site.
Because you were not notified by the original NOI, you may still
intervene.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP16-
[[Page 32324]]
3). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: May 17, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-12062 Filed 5-20-16; 8:45 am]