[Federal Register Volume 81, Number 56 (Wednesday, March 23, 2016)]
[Proposed Rules]
[Pages 15481-15485]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-06509]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 35
[Docket No. RM16-8-000]
Requirements for Frequency and Voltage Ride Through Capability of
Small Generating Facilities
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Federal Energy Regulatory Commission (Commission) proposes
to revise the pro forma Small Generator Interconnection Agreement
(SGIA). The pro forma SGIA establishes the terms and conditions under
which public utilities must provide interconnection service to small
generating facilities of no larger than 20 megawatts. In this Notice of
Proposed Rulemaking, the Commission proposes to modify the pro forma
SGIA to require newly interconnecting small generating facilities to
ride through abnormal frequency and voltage events and not disconnect
during such events. The Commission already requires generators
interconnecting under the Large Generator Interconnection Agreement to
have this capability, and it would be unduly discriminatory not to also
impose these requirements on small generating facilities. The
Commission believes that small generating facilities should now have
ride through requirements comparable to large generating facilities.
DATES: Comments are due May 23, 2016.
ADDRESSES: Comments, identified by docket number, may be filed in the
following ways:
Electronic Filing through http://www.ferc.gov. Documents
created electronically using word processing software should be filed
in native applications or print-to-PDF format and not in a scanned
format.
Mail/Hand Delivery: Those unable to file electronically
may mail or hand-deliver comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
Instructions: For detailed instructions on submitting comments and
additional information on the rulemaking process, see the Comment
Procedures Section of this document.
FOR FURTHER INFORMATION CONTACT: Monica Taba (Technical Information),
Office of Electric Reliability, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426, (202) 502-6789,
[email protected].
Alan Rukin (Legal Information), Office of the General Counsel,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, (202) 502-8502, [email protected].
SUPPLEMENTARY INFORMATION:
1. The Commission proposes to revise the pro forma Small Generator
Interconnection Agreement (SGIA) originally set forth in Order No. 2006
\1\ and revised in Order No. 792.\2\ In this Notice of Proposed
Rulemaking (NOPR), the Commission proposes to modify the pro forma SGIA
pursuant to its authority under section 206 of the Federal Power Act
(FPA) to ensure that rates, terms and conditions of jurisdictional
service remain just and reasonable and not unduly discriminatory or
preferential.\3\ The proposed modifications would require small
generating facilities interconnecting through the SGIA to ride through
abnormal frequency and voltage events and not disconnect during such
events.\4\ The Commission intends that the proposed revisions address
the Commission's concerns that it would be unduly discriminatory to
impose these requirements on large generating facilities and not small
generating facilities. The Commission believes that small generating
facilities should now have ride through requirements comparable to
large generating facilities.\5\
---------------------------------------------------------------------------
\1\ Standardization of Small Generator Interconnection
Agreements and Procedures, Order No. 2006, FERC Stats. & Regs. ]
31,180, order on reh'g, Order No. 2006-A, FERC Stats. & Regs. ]
31,196 (2005), order granting clarification, Order No. 2006-B, FERC
Stats. & Regs. ] 31,221 (2006) (Order No. 2006).
\2\ Small Generator Interconnection Agreements and Procedures,
Order No. 792, 145 FERC ] 61,159 (2013), clarified, Order No. 792-A,
146 FERC ] 61,214 (2014) (Order No. 792).
\3\ 16 U.S.C. 824e.
\4\ In Order No. 2003, the Commission defined ``ride through''
to mean ``a Generating Facility staying connected to and
synchronized with the Transmission System during system disturbances
within a range of over- and under-frequency conditions, in
accordance with Good Utility Practice.'' Standardization of
Generator Interconnection Agreements and Procedures, Order No. 2003,
FERC Stats. & Regs. ] 31,146, at P 562 n.88 (2003), order on reh'g,
Order No. 2003-A, FERC Stats. & Regs. ] 31,160, order on reh'g,
Order No. 2003-B, FERC Stats. & Regs. ] 31,171 (2004), order on
reh'g, Order No. 2003-C, FERC Stats. & Regs. ] 31,190 (2005), aff'd
sub nom. Nat'l Ass'n of Regulatory Util. Comm'rs v. FERC, 475 F.3d
1277 (D.C. Cir. 2007), cert. denied, 552 U.S. 1230 (2008) (Order No.
2003).
\5\ Article 9 of the Large Generator Interconnection Agreement,
together with Reliability Standard PRC-024-2 (Generator Frequency
and Voltage Protective Relay Settings) (effective July 1, 2016),
generally require generating facilities larger than 20 MW to ride
through frequency and voltage disturbances.
---------------------------------------------------------------------------
I. Background
2. The pro forma SGIA establishes the terms and conditions under
which public utilities must provide interconnection service to small
generating facilities of no larger than 20 megawatts (MW). Currently,
the pro forma SGIA does not mandate that small generating facilities
must ride through voltage or frequency disturbances.
3. The Commission has previously evaluated whether small generating
facilities should be subject to these requirements. In Order No. 2006,
the Commission explored whether voltage ride through requirements
proposed for large wind generating facilities should apply to small
generating facilities.\6\ While a commenter asked the Commission to
implement standards for small generating facilities that are similar to
those proposed for large generating facilities, other commenters
responded that special capabilities, such as low voltage ride through,
were not needed for any small generating facility. The Commission
concluded that generating facilities interconnecting under Order No.
2006 would be small and would have minimal impact on the transmission
provider's electric system and, therefore, need not be subject to ride
through requirements.\7\
---------------------------------------------------------------------------
\6\ Order No. 2006, FERC Stats. & Regs. ] 31,180 at P 24.
\7\ Id. The penetration of small generating facilities has
increased since the Commission analyzed the impact of small
generating facilities in Order No. 2006. See infra P 7.
---------------------------------------------------------------------------
4. The Commission again addressed these requirements with regard to
small generating facilities in Order No. 792. In that proceeding, the
Commission proposed to revise section 1.5.4 of the pro forma SGIA to
address the reliability concern related to automatic disconnection of
small generating facilities during over- and under-frequency events
that could become a matter of concern at high penetrations of
[[Page 15482]]
distributed energy resources.\8\ The proposed revisions to section
1.5.4 would have required the interconnection customer to design,
install, maintain, and operate its small generating facility, in
accordance with the latest version of the applicable standards to
prevent automatic disconnection during over- and under-frequency
events.\9\
---------------------------------------------------------------------------
\8\ Small Generator Interconnection Agreements and Procedures,
Notice of Proposed Rulemaking, 142 FERC ] 61,049, at P 46 (2013)
(Order No. 792 NOPR).
\9\ Id.
---------------------------------------------------------------------------
5. The Commission declined to adopt this proposed revision in Order
No. 792.\10\ Instead, the Commission recognized that Institute of
Electrical and Electronics Engineers (IEEE) was, at the time, in the
process of amending IEEE Standard 1547, which is an interconnection
standard that is referenced in the Small Generator Interconnection
Procedures.\11\ The Commission also noted that IEEE was about to begin
a full IEEE Standard 1547 revision process in 2014, where frequency and
voltage ride through requirements in the standard were to be evaluated.
The Commission concluded that it would continue to monitor the IEEE
Standard 1547 revision process and could revise the pro forma SGIA as
it relates to IEEE Standard 1547 in the future, if necessary.\12\
---------------------------------------------------------------------------
\10\ Order No. 792, 145 FERC ] 61,159 at P 220.
\11\ Id.
\12\ Id.
---------------------------------------------------------------------------
6. Since the Commission issued Order No. 792, IEEE has completed a
partial revision of IEEE Standard 1547, which is IEEE Standard 1547a.
IEEE is also in the process of fully revising IEEE Standard 1547. IEEE
Standard 1547a permits generating facilities to have wider trip setting
compared with IEEE Standard 1547. However, IEEE Standard 1547a includes
permissive--and not mandatory--ride through requirements.\13\
---------------------------------------------------------------------------
\13\ IEEE Standard 1547a contains ``must trip'' requirements; it
does not have ``must ride through'' requirements. By widening the
trip settings, IEEE Standard 1547a permits generating facilities to
trip at a later time. This change effectively allows generating
facilities to ride through disturbances, but they are not required
to do so.
---------------------------------------------------------------------------
7. Following the Commission's evaluations of the need for ride
through requirements for small generating facilities, the impact of
small generating facilities on the grid has changed, and the amount has
increased. For example, NERC has noted in multiple reports, the mix of
generation resources is changing and the high penetration of
distributed energy resources will impact the reliability of the
electric grid if sufficient care is not taken to mitigate potential
adverse impacts.\14\ NERC also has found that a lack of coordination
between small generating facilities and NERC Reliability Standards can
lead to events where system load imbalance may increase during
frequency excursions or voltage deviations due to the disconnection of
distributed energy resources, which may exacerbate a disturbance on the
Bulk-Power System.\15\ In addition, the Commission has observed the
growth in grid-connected solar photovoltaic generation since the
issuance of Order No. 2006 and the growth in small generator
interconnection requests driven by state renewable portfolio
standards.\16\ Moreover, technology now available to newly
interconnecting small generating facilities, such as smart inverters,
permits the capability to ride through frequency and voltage
disturbances.\17\
---------------------------------------------------------------------------
\14\ See NERC Special Report, Potential Bulk System Reliability
Impacts of Distributed Resources (Aug. 2011), http://www.nerc.com/docs/pc/ivgtf/IVGTF_TF-1-8_Reliability-Impact-Distributed-Resources_Final-Draft_2011.pdf; see also NERC Integration of
Variable Generation Task Force Draft Report, Performance of
Distributed Energy Resources During and After System Disturbance
(Dec. 2013), http://www.nerc.com/comm/PC/Integration%20of%20Variable%20Generation%20Task%20Force%20I1/IVGTF17_PC_FinalDraft_December_clean.pdf.
\15\ NERC, Essential Reliability Services Task Force Measures
Report, 21 (Dec. 2015), http://www.nerc.com/comm/Other/essntlrlbltysrvcstskfrcDL/ERSTF%20Framework%20Report%20-%20Final.pdf. NERC defines distributed energy resources to mean
resources that are distributed geographically and not centralized
like traditional generation resources.
\16\ See, e.g., Order No. 792, 145 FERC ] 61,159 at P 15; Solar
Industry Data, Solar Energy Indus. Ass'n, http://www.seia.org/research-resources/solar-industry-data (last visited Mar. 2, 2016).
\17\ See Electric Power Research Institute, Recommended Settings
for Voltage and Frequency Ride Through of Distributed Energy
Resources, 28-29 (May 2015), http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=000000003002006203.
---------------------------------------------------------------------------
II. Discussion
A. Disturbance Ride Through Capability Requirements
1. Need for Reform
8. Conditions have changed since the Commission last evaluated
whether to impose ride through requirements on small generating
facilities.\18\ IEEE has revised its standards, and IEEE Standard 1547a
now provides wider trip settings that give small generating facilities
greater ability to ride through disturbances.\19\ In addition,
distributed energy resources have had an increasing presence and impact
on the electric system. The absence of ride through requirements for
small generating facilities increases the risk that an initial voltage
or frequency disturbance may cause a significant number of small
generating facilities to trip across a particular area or
Interconnection. Moreover, the Commission is concerned that small
generating facilities, in the aggregate or in significant combination,
could exacerbate an initial disturbance by tripping off-line instead of
riding through a disturbance. Large generating facilities are already
subject to ride through requirements to avoid these types of
occurrences. Given the changes in conditions described above, we now
conclude there is reason to subject small generating facilities to ride
through requirements. For these reasons, the Commission preliminarily
concludes that the lack of ride through requirements is unduly
discriminatory or preferential for small generating facilities.
---------------------------------------------------------------------------
\18\ The Commission routinely evaluates the effectiveness of its
regulations and policies in light of changing industry conditions to
determine if changes in these conditions and policies are necessary.
See, e.g., Integration of Variable Energy Resources, Order No. 764,
FERC Stats. & Regs. ] 31,331 (2012).
\19\ The reforms proposed in this proceeding are not intended to
impede ongoing work of the IEEE Standard 1547 Working Group.
---------------------------------------------------------------------------
9. The Commission acknowledges that some areas have a greater
penetration of distributed resources than others at this time.
Nevertheless, the Commission believes that the proposed reforms to the
pro forma SGIA are appropriate on an industry-wide basis now. The issue
regarding small generating facilities the Commission seeks to address
in this NOPR is expected to increase over time, and it is appropriate
for the Commission to act on an industry-wide basis now to ensure
effective protections and to avoid possible increased costs that may
result from applying the rule on a different basis.\20\
---------------------------------------------------------------------------
\20\ See Order No. 792 NOPR, 142 FERC ] 61,049 at P 46.
---------------------------------------------------------------------------
10. The Commission affirms that this NOPR is not intended to
interfere with state interconnection procedures or agreements in any
way. The pro forma SGIA applies only to interconnections made subject
to a jurisdictional open access transmission tariff (OATT) for the
purposes of jurisdictional wholesale sales. Similar to the approach in
Order Nos. 2006 and 792, the Commission hopes that any changes to the
pro forma SGIA resulting from this NOPR will be helpful to states when
updating their own interconnection rules, but the states are under no
obligation to adopt the provisions of the Commission's proposal.\21\
---------------------------------------------------------------------------
\21\ Order No. 792, 145 FERC ] 61,159 at P 27; Order No. 2006,
FERC Stats. & Regs. ] 31,180 at P 8.
---------------------------------------------------------------------------
[[Page 15483]]
2. Commission Proposal
11. The Commission proposes to revise the pro forma SGIA to include
proposed section 1.5.7, which would require interconnection customers
to ensure the frequency ride through capability and the voltage ride
through capability of small generating facilities that execute
interconnection agreements following the effective date of the proposed
section 1.5.7. Proposed section 1.5.7 would also require a small
generating facility not to disconnect automatically or instantaneously
from the system or equipment of the transmission provider and any
affected systems for an under-frequency or over-frequency condition, or
an under-voltage or over-voltage condition. In addition, the
transmission provider must coordinate the small generating facility's
protective equipment settings with any automatic load shedding program
(e.g., under frequency load shedding, under voltage load shedding).
12. The Commission proposes to add new section 1.5.7 of the pro
forma SGIA:
1.5.7 The Interconnection Customer shall ensure ``frequency ride
through'' capability and ``voltage ride through'' capability of its
Small Generating Facility. The Interconnection Customer shall enable
these capabilities such that its Small Generating Facility shall not
disconnect automatically or instantaneously from the system or
equipment of the Transmission Provider and any Affected Systems for
a defined under-frequency or over-frequency condition, or an under-
voltage or over-voltage condition. The defined conditions shall be
in accordance with Good Utility Practice and consistent with any
standards and guidelines that are applied to other generating
facilities in the Balancing Authority Area on a comparable basis.
The Small Generating Facility's protective equipment settings shall
comply with the Transmission Provider's automatic load-shed program.
The Transmission Provider shall review the protective equipment
settings to confirm compliance with the automatic load-shed program.
The term ``ride through'' as used herein shall mean the ability of a
Small Generating Facility to stay connected to and synchronized with
the system or equipment of the Transmission Provider and any
Affected Systems during system disturbances within a range of
conditions, in accordance with Good Utility Practice and consistent
with any standards and guidelines that are applied to other
generating facilities in the Balancing Authority on a comparable
basis. The term ``frequency ride through'' as used herein shall mean
the ability of a Small Generating Facility to stay connected to and
synchronized with the system or equipment of the Transmission
Provider and any Affected Systems during system disturbances within
a range of under-frequency and over-frequency conditions, in
accordance with Good Utility Practice and consistent with any
standards and guidelines that are applied to other generating
facilities in the Balancing Authority Area on a comparable basis.
The term ``voltage ride through'' as used herein shall mean the
ability of a Small Generating Facility to stay connected to and
synchronized with the system or equipment of the Transmission
Provider and any Affected Systems during system disturbances within
a range of under-voltage and over-voltage conditions, in accordance
with Good Utility Practice and consistent with any standards and
guidelines that are applied to other generating facilities in the
Balancing Authority Area on a comparable basis.
13. The Commission proposes to apply the frequency ride through and
the voltage ride through requirements to any new small generating
facility that executes an SGIA after the effective date of proposed
section 1.5.7. In addition, the Commission proposes to apply the
requirements to any small generating facility that has an executed SGIA
as of the effective date of proposed section 1.5.7 but that takes any
action that requires the submission of a new interconnection request
and the request is submitted on or after the effective date of proposed
section 1.5.7. The Commission intends that the proposed revisions to
the pro forma SGIA would not affect any other interconnected small
generating facilities.
14. At this time, the Commission does not propose to adopt specific
frequency and voltage ride through parameters. Instead, we propose to
allow for the development of appropriate system-specific standards,
which we expect will be based on work by recognized standards setting
bodies, such as IEEE.
15. The Commission seeks comment on the proposed requirement for
small generating facilities to ride through defined frequency and
voltage disturbances.
B. Proposed Compliance Procedures
16. The Commission proposes to require each public utility \22\
transmission provider that has an SGIA within its OATT to submit a
compliance filing within 90 days of the effective date of the final
rule in this proceeding revising the SGIA within its OATT subject to
the Commission's jurisdiction to demonstrate that it meets the
requirements set forth in this proposal.
---------------------------------------------------------------------------
\22\ For purposes of this NOPR, a public utility is a utility
that owns, controls, or operates facilities used for transmitting
electric energy in interstate commerce, as defined by the FPA. See
16 U.S.C. 824(e). A non-public utility that seeks voluntary
compliance with the reciprocity condition of an OATT may satisfy
that condition by filing an OATT, which includes an SGIA.
---------------------------------------------------------------------------
17. Some public utility transmission providers may have provisions
in their existing SGIAs that the Commission has deemed to be consistent
with or superior to the pro forma SGIA. Where these provisions would be
modified by the final rule, public utility transmission providers must
either comply with the final rule or demonstrate that these previously-
approved variations continue to be consistent with or superior to the
pro forma SGIA as modified by the final rule. The Commission also
proposes to permit appropriate entities to seek ``independent entity
variations'' from the proposed revisions to the pro forma SGIA.\23\
---------------------------------------------------------------------------
\23\ See, e.g., Order No. 2003, FERC Stats. & Regs. ] 31,146 at
P 827.
---------------------------------------------------------------------------
18. The Commission would assess whether each compliance filing
satisfies the proposed requirements stated above and issue additional
orders as necessary to ensure that each public utility transmission
provider meets the requirements of the subsequent final rule.
19. The Commission proposes that transmission providers that are
not public utilities would have to adopt the requirements of this
proposal and subsequent final rule as a condition of maintaining the
status of their safe harbor tariff or otherwise satisfying the
reciprocity requirement of Order No. 888.\24\
---------------------------------------------------------------------------
\24\ Promoting Wholesale Competition Through Open Access Non-
Discriminatory Transmission Services by Public Utilities; Recovery
of Stranded Costs by Public Utilities and Transmitting Utilities,
Order No. 888, FERC Stats. & Regs. ] 31,036, at 31,760-63 (1996),
order on reh'g, Order No. 888-A, FERC Stats. & Regs. ] 31,048, order
on reh'g, Order No. 888-B, 81 FERC ] 61,248 (1997), order on reh'g,
Order No. 888-C, 82 FERC ] 61,046 (1998), aff'd in relevant part sub
nom. Transmission Access Policy Study Group v. FERC, 225 F.3d 667
(D.C. Cir. 2000), aff'd sub nom. New York v. FERC, 535 U.S. 1
(2002).
---------------------------------------------------------------------------
III. Information Collection Statement
20. The following collection of information contained in this NOPR
is subject to review by the Office of Management and Budget (OMB) under
section 3507(d) of the Paperwork Reduction Act of 1995.\25\ OMB's
regulations require approval of certain information collection
requirements imposed by agency rules.\26\ Upon approval of a collection
of information, OMB will assign an OMB control number and expiration
date. Respondents subject to the filing requirements of this rule will
not be penalized for failing to respond to this collection of
information unless the collection of information displays a valid OMB
control number.
---------------------------------------------------------------------------
\25\ 44 U.S.C. 3507(d).
\26\ 5 CFR 1320.11.
---------------------------------------------------------------------------
21. The reforms proposed in this NOPR would amend the Commission's
[[Page 15484]]
pro forma SGIA in accordance with section 35.28(f)(1) of the
Commission's regulations.\27\ The NOPR proposes to require each public
utility transmission provider to amend its SGIA to require that all
newly interconnecting small generating facilities, as well as all
existing small generating facilities that submit new interconnection
requests, to ensure frequency ride through capability and voltage ride
through capability in accordance with good utility practice and
consistent with any standards and guidelines that are applied to other
generating facilities in the balancing authority area on a comparable
basis, as of the effective date of the final rule in this proceeding.
The reforms proposed in this NOPR would require filings of SGIAs with
the Commission. The Commission anticipates the reforms proposed in this
NOPR, once implemented, would not significantly change currently
existing burdens on an ongoing basis. With regard to those public
utility transmission providers that believe that they already comply
with the reforms proposed in this NOPR, they could demonstrate their
compliance in the filing required 90 days after the effective date of
the final rule in this proceeding. The Commission will submit the
proposed reporting requirements to OMB for its review and approval
under section 3507(d) of the Paperwork Reduction Act.\28\
---------------------------------------------------------------------------
\27\ 18 CFR 35.28(f)(1).
\28\ 44 U.S.C. 3507(d).
---------------------------------------------------------------------------
22. While the Commission expects the adoption of the proposed
reforms to provide significant benefits, the Commission understands
that implementation can be a complex and costly endeavor. The
Commission solicits comments on the accuracy of provided burden and
cost estimates and any suggested methods for minimizing the
respondents' burdens.
Burden Estimate: The Commission believes that the burden estimates
below are representative of the average burden on respondents. The
estimated burden and cost for the requirements contained in this NOPR
follow.\29\
---------------------------------------------------------------------------
\29\ Commission staff estimates that industry is similarly
situated in terms of hourly cost (wages plus benefits). Based on the
Commission average cost (wages plus benefits) for 2015, $72/hour is
used.
FERC 516A, Proposed Changes in NOPR in RM16-8
--------------------------------------------------------------------------------------------------------------------------------------------------------
Number of Annual number
respondents of responses Total number Average burden (Hrs.) and Total annual burden hours
\30\ per respondent of responses cost ($) per response and total annual cost ($)
(1) (2) (1)*(2)=(3) (4)........................... (3)*(4)=(5)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Conforming SGIA changes to incorporate 118 1 118 7.5 hrs.; $540................ 885 hrs.; $63,720
proposed revisions.
Total.............................. .............. ............... 118 7.5 hrs.; $540................ 885 hrs.; $63,720
--------------------------------------------------------------------------------------------------------------------------------------------------------
Cost to Comply: The Commission has projected the additional cost of
compliance as follows: \31\
---------------------------------------------------------------------------
\30\ Number of Applicable Registered Entities.
\31\ The costs for Year 1 would consist of filing proposed
changes to the pro forma SGIA with the Commission within 90 days of
the effective date of the final revision plus initial
implementation. The Commission does not expect any ongoing costs
beyond the initial compliance in Year 1.
---------------------------------------------------------------------------
Year 1: $63,720 for all affected entities ($540/utility).
Year 2 and subsequent years: $0.
After implementation in Year 1, the reforms proposed in this NOPR
would be complete.
Title: FERC-516A, Standardization of Small Generator
Interconnection Agreements and Procedures.
Action: Revision of currently approved collection of information.
OMB Control No.: 1902-0203.
Respondents for This Rulemaking: Businesses or other for profit
and/or not-for-profit institutions.
Frequency of Information: One-time during Year 1.
Necessity of Information: The Commission is proposing changes to
the pro forma SGIA in order to more efficiently and cost-effectively
interconnect generating facilities no larger than 20 MW (small
generating facilities) to Commission-jurisdictional transmission
systems. The purpose of this NOPR is to revise the pro forma SGIA so
small generating facilities can be reliably and efficiently integrated
into the electric grid and to ensure that Commission-jurisdictional
services are provided at rates, terms and conditions that are just and
reasonable and not unduly discriminatory or preferential. This Proposed
Rule seeks to achieve this goal by amending the pro forma SGIA to
include proposed section 1.5.7.
Internal Review: The Commission has reviewed the proposed changes
and has determined that the changes are necessary. These requirements
conform to the Commission's need for efficient information collection,
communication, and management within the energy industry. The
Commission has assured itself, by means of internal review, that there
is specific, objective support for the burden estimates associated with
the information collection requirements.
23. Interested persons may obtain information on the reporting
requirements by contacting the following: Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426 [Attention:
Ellen Brown, Office of the Executive Director], email:
[email protected], Phone: (202) 502-8663, fax: (202) 273-0873.
24. Comments on the collection of information and the associated
burden estimate in the proposed rule should be sent to the Commission
in this docket and may also be sent to the Office of Information and
Regulatory Affairs, Office of Management and Budget, 725 17th Street
NW., Washington, DC 20503 [Attention: Desk Officer for the Federal
Energy Regulatory Commission], at the following email address:
[email protected]. Please reference OMB Control No. 1902-0203
and the docket number of this proposed rulemaking in your submission.
IV. Environmental Analysis
25. The Commission is required to prepare an Environmental
Assessment or an Environmental Impact Statement for any action that may
have a significant adverse effect on the human environment.\32\ The
Commission concludes that neither an Environmental Assessment nor an
Environmental Impact Statement is required for the revisions proposed
in
[[Page 15485]]
this NOPR under section 380.4(a)(15) of the Commission's regulations,
which provides a categorical exemption for approval of actions under
sections 205 and 206 of the FPA relating to the filing of schedules
containing all rates and charges for the transmission or sale of
electric energy subject to the Commission's jurisdiction, plus the
classification, practices, contracts and regulations that affect rates,
charges, classifications, and services.\33\ The revisions proposed in
this NOPR would update and clarify the application of the Commission's
standard interconnection requirements to small generating facilities.
Therefore, this NOPR falls within the categorical exemptions provided
in the Commission's regulations, and as a result neither an
environmental impact statement nor an environmental assessment is
required.
---------------------------------------------------------------------------
\32\ Regulations Implementing the National Environmental Policy
Act, Order No. 486, FERC Stats. & Regs. ] 30,783 (1987).
\33\ 18 CFR 380.4(a)(15).
---------------------------------------------------------------------------
V. Regulatory Flexibility Act
26. The Regulatory Flexibility Act of 1980 (RFA) \34\ generally
requires a description and analysis of proposed rules that will have
significant economic impact on a substantial number of small entities.
The RFA does not mandate any particular outcome in a rulemaking. It
only requires consideration of alternatives that are less burdensome to
small entities and an agency explanation of why alternatives were
rejected.
---------------------------------------------------------------------------
\34\ 5 U.S.C. 601-612.
---------------------------------------------------------------------------
27. The Small Business Administration (SBA) revised its size
standards (effective January 22, 2014) for electric utilities from a
standard based on megawatt hours to a standard based on the number of
employees, including affiliates. Under SBA's standards, some
transmission owners will fall under the following category and
associated size threshold: Electric bulk power transmission and
control, at 500 employees.\35\
---------------------------------------------------------------------------
\35\ 13 CFR 121.201, Sector 22 (Utilities), NAICS code 221121
(Electric Bulk Power Transmission and Control).
---------------------------------------------------------------------------
28. The Commission estimates that the total number of public
utility transmission providers that would have to modify the SGIAs
within their currently effective OATTs is 118. Of these, the Commission
estimates that approximately 43 percent are small entities. The
Commission estimates the average total cost to each of these entities
will be minimal, requiring on average 7.5 hours or $540. According to
SBA guidance, the determination of significance of impact ``should be
seen as relative to the size of the business, the size of the
competitor's business, and the impact the regulation has on larger
competitors.'' \36\ The Commission does not consider the estimated
burden to be a significant economic impact. As a result, the Commission
certifies that the reforms proposed in this NOPR would not have a
significant economic impact on a substantial number of small entities.
---------------------------------------------------------------------------
\36\ U.S. Small Business Administration, A Guide for Government
Agencies How to Comply with the Regulatory Flexibility Act, at 18
(May 2012), https://www.sba.gov/sites/default/files/advocacy/rfaguide_0512_0.pdf.
---------------------------------------------------------------------------
VI. Comment Procedures
29. The Commission invites interested persons to submit comments on
the matters and issues proposed in this notice to be adopted, including
any related matters or alternative proposals that commenters may wish
to discuss. Comments are due May 23, 2016. Comments must refer to
Docket No. RM16-8-000, and must include the commenter's name, the
organization they represent, if applicable, and their address in their
comments.
30. The Commission encourages comments to be filed electronically
via the eFiling link on the Commission's Web site at http://www.ferc.gov. The Commission accepts most standard word processing
formats. Documents created electronically using word processing
software should be filed in native applications or print-to-PDF format
and not in a scanned format. Commenters filing electronically do not
need to make a paper filing.
31. Commenters that are not able to file comments electronically
must send an original of their comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
32. All comments will be placed in the Commission's public files
and may be viewed, printed, or downloaded remotely as described in the
Document Availability section below. Commenters on this proposal are
not required to serve copies of their comments on other commenters.
VII. Document Availability
33. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
Internet through the Commission's Home Page (http://www.ferc.gov) and
in the Commission's Public Reference Room during normal business hours
(8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE., Room 2A,
Washington, DC 20426.
34. From the Commission's Home Page on the Internet, this
information is available on eLibrary. The full text of this document is
available on eLibrary in PDF and Microsoft Word format for viewing,
printing, and/or downloading. To access this document in eLibrary, type
the docket number excluding the last three digits of this document in
the docket number field.
35. User assistance is available for eLibrary and the Commission's
Web site during normal business hours from the Commission's Online
Support at (202) 502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at
[email protected].
By direction of the Commission.
Issued: March 17, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-06509 Filed 3-22-16; 8:45 am]
BILLING CODE 6717-01-P