[Federal Register Volume 81, Number 43 (Friday, March 4, 2016)]
[Notices]
[Page 11554]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04697]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14755-000]
Ever Better Hydro Power, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 16, 2016, Ever Better Hydro Power, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Pittsfield Mill Dam Hydroelectric Project (Pittsfield Project or
project) to be located on Suncook River, in the town of Pittsfield, in
Merrimack County, New Hampshire. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) An
existing 21-foot-high, 470-foot-long concrete and stone dam with a 150-
foot-long ogee spillway, two 4.5-foot-wide, 7-foot-high stoplog bays,
and two 6.25-foot-wide, 7.66-foot-high outlet gates; (2) an existing
20-acre impoundment with a normal storage capacity of 112 acre-feet at
spillway crest elevation of about 474.5 feet national geodetic vertical
datum (NGVD '29); (3) an existing gated intake structure and forebay
leading to an existing 200-foot-long, 9-foot-diameter steel penstock;
(4) an existing brick building housing a 415 kilowatt (kW) turbine-
generator, along with a control panel and switchgear; (5) a new 75-
foot-long, 13.8-kilovolt (kV) transmission line connecting the
generator to Public Service Company of New Hampshire's existing
distribution system; and (6) appurtenant facilities. The estimated
annual generation of the proposed Pittsfield Project would be about
1,400 megawatt-hours. The existing dam is owned by New Hampshire
Department of Environmental Services.
Applicant Contact: Mr. Douglas Troy, 5 Main Street, Pittsfield, NH
03263; phone: (603) 435-3598.
FERC Contact: John Ramer; phone: (202) 502-8969 or email:
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14755-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14755) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: February 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04697 Filed 3-3-16; 8:45 am]
BILLING CODE 6717-01-P