[Federal Register Volume 81, Number 40 (Tuesday, March 1, 2016)]
[Notices]
[Pages 10611-10612]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04392]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14677-001]
Clark Canyon Hydro, LLC ; Notice of Application Accepted for
Filing, Soliciting Motions To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting Comments, Terms and Conditions,
Recommendations, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original License for a Major Water Power
Project at an Existing Dam, 5 Megawatts or Less.
b. Project No.: 14677-001.
c. Date filed: November 23, 2015.
d. Applicant: Clark Canyon Hydro, LLC.
e. Name of Project: Clark Canyon Dam Hydroelectric Project.
f. Location: On the River, in the Town of Dillon, Beaverhead
County, Montana. The project would occupy 62.1 acres of land owned by
the U.S. Bureau of Reclamation and 0.2 acres of land owned by the U.S.
Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: John Gangemi, (406) 249-3972, email at
[email protected].
i. FERC Contact: Kelly Wolcott, (202) 502-6480, email at
[email protected].
j. Deadline for filing motions to intervene and protests, comments,
terms and conditions, recommendations, and prescriptions: 30 days from
the issuance date of this notice; reply comments are due 45 days from
the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests, comments, terms and conditions,
recommendations, and prescriptions using the Commission's eFiling
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
[[Page 10612]]
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-14677-001.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The Clark Canyon Dam Hydroelectric Project would utilize the
U.S. Bureau of Reclamation's Clark Canyon Dam and outlet works
including an intake structure and concrete conduit in the reservoir.
The project would consist of the following new facilities: (1) A 360-
foot-long, 8-foot-diameter steel penstock within the existing concrete
conduit, ending in a trifurcation; (2) two 35-foot-long, 8-foot-
diameter penstocks extending from the trifurcation to the powerhouse,
transitioning to 6-foot-diameter before entering the powerhouse; (3) a
10-foot-long, 8-foot-diameter steel penstock leaving the trifurcation
and ending in a 7-foot-diameter cone valve and reducer to control
discharge into the existing outlet stilling basin; (4) a 65-foot-long,
46-foot-wide reinforced concrete powerhouse containing two vertical
Francis-type turbine/generator units with a total capacity of 4.7
megawatts; (5) two 25-foot-long steel draft tubes transitioning to
concrete draft tube/tailrace section; (6) a 17-foot-long, 15-foot-
diameter tailrace channel connecting with the existing spillway
stilling basin; (7) a 45-foot-long, 10-foot-wide aeration basin
downstream of the powerhouse with three frames containing 330
diffusers; (8) a 1,100-foot-long, 4.16-kilovolt (kV) buried
transmission line from the powerhouse to a substation; (9) a substation
containing step-up transformers and switchgear; (10) a 7.9-mile-long,
69-kV transmission line extending from the project substation to the
Peterson Flat substation (the point of interconnection); and (11)
appurtenant facilities. The estimated annual generation of the Clark
Canyon Dam Project would be 15.4 gigawatt-hours. All project facilities
would be located on federal lands owned by the U.S. Bureau of
Reclamation and the U.S. Bureau of Land Management. The applicant
proposes to operate the project as run-of-release.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit comments, a protest, or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, and .214. In determining the appropriate action to
take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,''
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. A copy of any protest or motion to intervene must
be served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: February 23, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04392 Filed 2-29-16; 8:45 am]
BILLING CODE 6717-01-P