[Federal Register Volume 81, Number 38 (Friday, February 26, 2016)]
[Notices]
[Pages 9844-9845]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04158]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 309-087]
Brookfield Power Piney and Deep Creek, LLC; Notice of Application
Accepted for Filing, Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application to amend temporary variance of
reservoir elevation requirements of license article 402.
b. Project No.: 309-087.
c. Date Filed: January 27, 2016.
d. Applicant: Brookfield Power Piney and Deep Creek, LLC.
e. Name of Project: Piney Hydroelectric Project.
f. Location: The project is located on the Clarion River in Clarion
County, Pennsylvania.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Randy Garletts, Brookfield Power Piney
and Deep Creek, LLC, 14 River View Terrace, Oakland, MD 21550, (301)
387-6616.
i. FERC Contact: Mr. Mark Pawlowski, (202) 502-6052, or
[email protected].
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 15 days from the date of issuance of this notice
by the Commission. The Commission strongly encourages electronic
filing. Please file motions to intervene, protests, comments, or
recommendations using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. Please include the project number (P-309-087) on
any comments, motions to intervene, protests, or recommendations filed.
k. Description of Request: The applicant proposes to modify the
timing and duration of the temporary variance of article 402 and Water
Quality Certificate conditions 1.1 and 1.2 of the project license
issued on March 30, 2015. The licensee requests authorization to
operate the Project with a maximum reservoir elevation of 1087.5 0.5 ft msl during the months of April through December, from
2016 through 2018 in order to replace the existing 14 radial spillway
gates.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
[[Page 9845]]
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading,
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: February 17, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04158 Filed 2-25-16; 8:45 am]
BILLING CODE 6717-01-P