[Federal Register Volume 81, Number 27 (Wednesday, February 10, 2016)]
[Notices]
[Pages 7090-7091]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-02635]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13642-003]
GB Energy Park, LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Unconstructed Major Project.
b. Project Nos.: 13642-003.
c. Date Filed: October 1, 2015.
d. Applicant: GB Energy Park, LLC.
e. Name of Project: Gordon Butte Pumped Storage Project.
f. Location: Approximately 3 miles west of the City of Martinsdale,
Meagher County, Montana. The proposed project would not occupy any
federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Carl. E. Borgquist, President, GB Energy
Park, LLC, 209 Wilson Avenue, P.O. Box 309, Bozeman, MT 59771; (406)
585-3006; [email protected].
i. FERC Contact: Mike Tust; (202) 502-6522 or
[email protected].
j. Deadline for filing comments, terms and conditions,
recommendations, and prescriptions: 60 days from the issuance date of
this notice; reply comments are due 105 days from the issuance date of
this notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include the
docket number P-13642-003.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis. If no substantive comments are received in
response to this notice, the Commission proposes to issue a single EA
by August 2016. If the Commission decides to issue a draft EA and no
substantive comments are received on the draft, a final EA will not be
necessary, in which case the draft EA will become the final EA.
Revisions to the schedule may be made as appropriate.
l. The Gordon Butte Hydroelectric Project would consist of the
following new facilities: (1) A manually operated head gate on an
existing irrigation canal that provides initial fill and annual make-up
water to the lower reservoir from the existing irrigation canal; (2) a
3,000-foot-long, 1,000-foot-wide upper reservoir created by a 60-foot-
high, 7,500-foot-long concrete-faced rockfill dam; (3) a reinforced
concrete intake/outlet structure at the upper reservoir with six gated
intake bays converging into a central 18-foot-diameter, 750-foot-long
vertical shaft; (4) an 18-foot-diameter, 3,000-foot-long concrete and
steel-lined penstock tunnel leading from the upper reservoir to the
lower reservoir; (5) a 2,300-foot-long, 1,900-foot-wide lower reservoir
created by a combination of excavation and two 60-foot-high, 500- and
750-foot-long concrete-faced rockfill dams; (6) a partially buried 338-
foot-long, 109-foot-wide, 74-foot-high reinforced concrete and steel
powerhouse with four 100-megawatt (MW) ternary Pelton turbine/pump/
generators; (7) a 600-foot-long, 200-foot-wide substation at the
powerhouse site with 13.8-kilovolt (kV) to 230-kV step-up transformers;
(8) a 5.7-mile-long, 230-kV transmission line; (9) a 1,200-foot-long,
1,450-foot wide substation with a 230-kV to 500-kV step-up transformer,
connecting to an existing non-project 500-kV transmission line; and
(11) appurtenant facilities. The project is estimated to provide 1,300
gigawatt-hours annually. No federal lands are included in the project.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
[[Page 7091]]
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
Dated: February 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.