[Federal Register Volume 81, Number 2 (Tuesday, January 5, 2016)]
[Notices]
[Pages 231-233]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-33123]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-490-000, CP15-490-001]
Delfin LNG, LLC; Notice of Scoping for the Proposed Delfin LNG
Project and Request for Comments on Environmental Issues
The Federal Energy Regulatory Commission (FERC or Commission) is
cooperating with the U.S. Coast Guard (Coast Guard), the lead federal
agency for environmental review of the Delfin LNG Project. This
proposal involves the construction and operation of an offshore
liquefied natural gas (LNG) deepwater port (under the jurisdiction of
the Coast Guard and the Maritime Administration) and associated
pipeline facilities, including about 1.1 mile of onshore pipeline and
aboveground facilities under the Commission's jurisdiction. FERC staff
is assisting the Coast Guard in its preparation of an environmental
impact statement (EIS) that will discuss the environmental impacts of
the Delfin LNG Project. This cooperative effort is to comply with the
National Environmental Policy Act of 1969 (NEPA), which requires the
Commission to take into account the
[[Page 232]]
environmental impact that could result from an action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity under section 7 of the Natural Gas Act.
NEPA requires the FERC to discover and address concerns the public
may have about proposals under its review. This process is referred to
as ``scoping.'' On November 19, 2015, Delfin LNG, LLC (Delfin LNG)
amended its application with the FERC regarding the proposed
aboveground facilities. Thus, the FERC is opening a scoping period to
solicit input from the public and interested agencies limited to the
proposed onshore pipeline and related facilities (i.e., those under
FERC jurisdiction) in Cameron Parish, Louisiana. You can make a
difference by providing us \1\ with your specific comments or concerns
about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help determine which
issues need to be evaluated in the EIS.\2\ Please note that the scoping
period will close on January 28, 2016, and comments should be limited
to the onshore facilities described in this amended docket. Details on
how to submit comments are provided in the Public Participation section
of this notice.
---------------------------------------------------------------------------
\1\ ``We,'' ``us,'' and ``our'' refers to environmental staff of
the Office of Energy Projects.
\2\ For more information on the original and amended Delfin LNG
Project or the Coast Guard's EIS process, see the July 29, 2015
edition of the Federal Register, page 45,270, and the December 24,
2015 edition of the Federal Register, page 80,455 ``Deepwater Port
License Application: Delfin LNG LLC, Delfin LNG Deepwater Port''
under Department of Transportation/Maritime Administration.
---------------------------------------------------------------------------
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the planned facilities. Delfin LNG
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, Delfin LNG could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
This notice is being sent to affected landowners; federal, state,
and local government representatives and agencies; elected officials;
Native American tribes; other interested parties; and local libraries
and newspapers. State and local government representatives are asked to
notify their constituents of this proposed project and to encourage
them to comment on their areas of concern.\3\ If you received this
notice, you are on the environmental mailing list for this project and
will continue to receive project updates including the draft and final
EISs.
---------------------------------------------------------------------------
\3\ Comments submitted during the Coast Guard's scoping period
(July 29-September 28, 2015) for the project as originally proposed
do not need to be resubmitted.
---------------------------------------------------------------------------
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
Summary of the Proposed Project (FERC Jurisdictional Facilities)
Delfin LNG proposes to activate the formerly abandoned U-T offshore
system (UTOS) pipeline and construct new connecting pipelines, a
compressor station, and appurtenant facilities the majority of which
would be within the PSI Midstream Partners, L.P. (PSI) Cameron Meadows
Gas Plant and adjacent Transcontinental Gas Pipe Line, LLC (Transco)
Station 44 in Cameron Parish. The proposed facilities consist of:
1.1 miles of the existing onshore portion of the 42-inch-
diameter UTOS pipeline from the landward side of the mean high water
mark along the coast of Cameron Parish to just inside the boundary of
Transco Station 44;
a mainline block valve and blowdown site located south of
Louisiana Highway 82;
a new meter station and connecting piping within the
Transco Station 44 site;
a new 0.25-mile-long 42-inch-diameter pipeline to connect
the UTOS line to the new meter station;
new twin 0.6-mile-long 30-inch diameter header pipelines;
a new compressor station consisting of:
[ssquf] four 30,000 horsepower (hp) Solar Tital 250 gas turbine-
driven compressors;
[ssquf] four gas coolers;
[ssquf] three 600 kilowatt generators;
[ssquf] two control buildings, office and warehouse buildings; and
[ssquf] pig launcher and check meter.
The general location of the proposed onshore pipeline is shown in
appendix 1.\4\
---------------------------------------------------------------------------
\4\ The appendix referenced in this notice will not appear in
the Federal Register. Copies of the appendix were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
page 5 of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Approximately 19.4 acres of land would be affected by construction,
with about 13.0 acres permanently impacted for operation. The
construction right-of-way width for the three adjacent pipelines--the
twin 0.6-mile, 30-inch-diameter header pipelines and the 0.25-mile 42-
inch-diameter pipeline would be 120 feet wide, of which 70 feet would
be retained as permanent right-of-way. The majority of aboveground
facilities would be constructed within the existing fence lines of the
Cameron Meadows Gas Plant and Transco Station 44.
Of the land effected by construction, approximately 36.4 percent is
classified as industrial land use and approximately 35.9 percent is
currently maintained in an herbaceous state. The remaining land
comprises intermediate marsh, coastal dune shrub thicket, scrub/shrub
swamp, and roads.
The EIS Process
NEPA requires the Commission to take into account the environmental
impacts that could result from an action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. NEPA
also requires us to discover and address concerns the public may have
about proposals. This process is referred to as ``scoping.'' The main
goal of the scoping process is to focus the analysis in the EIS on the
important environmental issues.
As mentioned previously, the Coast Guard is the lead federal agency
preparing the EIS for the overall Delfin LNG Deepwater Port Project.
According to the Maritime Administration's December 24, 2015 Notice of
Receipt of Amended Application and Request for Comments, when a draft
EIS is complete and ready for public review, the Maritime
Administration will publish a Notice of Availability in the Federal
Register to provide for a public comment period that include public
meetings in Louisiana and Texas. FERC, as a cooperating agency will
play an important role in developing the environmental analysis for the
FERC-jurisdictional (onshore) facilities in the EIS. Thus, FERC staff
will work with Coast Guard staff and contractors to ensure that the
onshore facilities are thoroughly evaluated and that all scoping
comments received as a result of this notice are addressed, as
[[Page 233]]
appropriate, in the EIS. Staff will also evaluate reasonable
alternatives to the proposed project or portions of the project, and
make recommendations on how to lessen or avoid impacts on various
resource areas.
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has expert staff available to assist you at
(202) 502-8258 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' If you are filing a comment on a particular project,
please select ``Comment on a Filing'' as the filing type; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP15-490) with your submission: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Room 1A,
Washington, DC 20426.
Becoming an Intervenor
In addition to involvement in the EIS scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the ``Document-less Intervention Guide'' under the ``e-filing'' link on
the Commission's Web site. Motions to intervene are more fully
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP15-
490). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: December 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-33123 Filed 1-4-16; 8:45 am]