NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-027 and 52-028; NRC-2008-0441]
Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina
Electric & Gas Company
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemption and combined license amendment; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an
exemption to allow a departure from the certification information of
Tier 1 of the generic design control document (DCD) and issuing License
Amendment No. 35 to Combined Licenses (COL), NPF-93 and NPF-94. The
COLs were issued to South Carolina Electric & Gas Company (SCE&G), and
South Carolina Public Service Authority (the licensee), for
construction and operation of the Virgil C. Summer Nuclear Station
(VCSNS), Units 2 and 3 located in Fairfield County, South Carolina.
The granting of the exemption allows the changes to Tier 1
information requested in the amendment. Because the acceptability of
the exemption was determined in part by the acceptability of the
amendment, the exemption and amendment are being issued concurrently.
DATES: December 8, 2015.
ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that a document is referenced. The
request for the amendment and exemption was submitted by the letter
dated December 4, 2014 (ADAMS Accession No. ML14339A637). The licensee
supplemented this request by letters dated July 23 and August 27, 2015
(ADAMS Accession Nos. ML15204A845 and ML15239A814, respectively).
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Ruth Reyes, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
[[Page 76331]]
Washington, DC 20555-0001; telephone: 301-415-3249; email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is granting an exemption from Tier 1 information in the
certified DCD incorporated by reference in part 52 of title 10 of the
Code of Federal Regulations (10 CFR), appendix D, ``Design
Certification Rule for the AP1000 Design,'' and issuing License
Amendment No. 35 to COLs, NPF-93 and NPF-94, to the licensee. The
exemption is required by Paragraph A.4 of Section VIII, ``Processes for
Changes and Departures,'' Appendix D to 10 CFR part 52 to allow the
licensee to depart from Tier 1 information. With the requested
amendment, the licensee sought proposed changes related to the
structure and layout of various areas of the annex building. The
proposed changes to Tier 2 information in the VCSNS Units 2 and 3
Updated Final Safety Analysis Report (UFSAR), plant-specific Tier 1
information, and corresponding COL appendix C information would allow:
(1) Installation of an additional non-safety-related battery;
(2) Revision to the annex building internal configuration by
converting a shift turnover room to a battery room, adding an
additional battery equipment room, and moving a fire area wall;
(3) Increase in the height of a room in the annex building; and
(4) Increase in thicknesses of certain annex building floor slabs.
Part of the justification for granting the exemption was provided
by the review of the amendment. Because the exemption is necessary in
order to issue the requested license amendment, the NRC granted the
exemption and issued the amendment concurrently, rather than in
sequence. This included issuing a combined safety evaluation containing
the NRC staff's review of both the exemption request and the license
amendment. The exemption met all applicable regulatory criteria set
forth in 10 CFR 50.12, 10 CFR 52.7, and 10 CFR 52.63(b)(1). The license
amendment was found to be acceptable as well. The combined safety
evaluation is available in ADAMS under Accession No. ML15254A216.
Identical exemption documents (except for referenced unit numbers
and license numbers) were issued to the licensee for VCSNS Units 2 and
3 (COLs NPF-93 and NPF-94). These documents can be found in ADAMS under
Accession Nos. ML15254A203 and ML15254A207, respectively. The exemption
is reproduced (with the exception of abbreviated titles and additional
citations) in Section II of this document. The amendment documents for
COLs NPF-93 and NPF-94 are available in ADAMS under Accession Nos.
ML15254A197 and ML15254A200, respectively. A summary of the amendment
documents is provided in Section III of this document.
II. Exemption
Reproduced below is the exemption document issued to VCSNS, Units 2
and 3. It makes reference to the combined safety evaluation that
provides the reasoning for the findings made by the NRC (and listed
under Item 1) in order to grant the exemption:
1. In a letter dated December 4, 2014, and supplemented by letters
dated July 23 and August 27, 2015, South Carolina Electric & Gas
Company (licensee) requested from the Nuclear Regulatory Commission
(Commission) an exemption to allow departures from Tier 1 information
in the certified Design Control Document (DCD) incorporated by
reference in 10 CFR part 52, Appendix D, ``Design Certification Rule
for the AP1000 Design,'' as part of license amendment request (LAR) 13-
22, ``Annex Building Structure and Layout Changes.''
For the reasons set forth in Section 3.1 of the NRC staff's Safety
Evaluation, which can be found in ADAMS under Accession No.
ML15254A216, the Commission finds that:
A. the exemption is authorized by law;
B. the exemption presents no undue risk to public health and
safety;
C. the exemption is consistent with the common defense and
security;
D. special circumstances are present in that the application of the
rule in this circumstance is not necessary to serve the underlying
purpose of the rule;
E. the special circumstances outweigh any decrease in safety that
may result from the reduction in standardization caused by the
exemption, and
F. the exemption will not result in a significant decrease in the
level of safety otherwise provided by the design.
2. Accordingly, the licensee is granted an exemption to the
provisions of 10 CFR part 52, appendix D, Section III.B, to allow
deviations from the certified DCD Tier 1 Table 3.3-1 and Figure 3.3-
11A, as described in the licensee's request dated December 4, 2014, and
supplemented by letters dated July 23 and August 27, 2015. This
exemption is related to, and necessary for the granting of License
Amendment No. 35, which is being issued concurrently with this
exemption.
3. As explained in Section 5.0 of the NRC staff's Safety Evaluation
(ADAMS Accession No. ML15254A216), this exemption meets the eligibility
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment needs to be prepared in
connection with the issuance of the exemption.
4. This exemption is effective as of the date of its issuance.
III. License Amendment Request
The request for the amendment and exemption was submitted by the
letter dated December 4, 2014. The licensee supplemented this request
by the letters dated July 23 and August 27, 2015. The proposed
amendment is described in Section I, above.
The Commission has determined for these amendments that the
application complies with the standards and requirements of the Atomic
Energy Act of 1954, as amended (the Act), and the Commission's rules
and regulations. The Commission has made appropriate findings as
required by the Act and the Commission's rules and regulations in 10
CFR chapter I, which are set forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed no
significant hazards consideration determination, and opportunity for a
hearing in connection with these actions, was published in the Federal
Register on March 31, 2015 (80 FR 17093). No comments were received
during the 30-day comment period.
The NRC staff has found that the amendment involves no significant
hazards consideration. The Commission has determined that these
amendments satisfy the criteria for categorical exclusion in accordance
with 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no
environmental impact statement or environmental assessment need be
prepared for these amendments.
IV. Conclusion
Using the reasons set forth in the combined safety evaluation, the
staff granted the exemption and issued the amendment that the licensee
requested on December 4, 2014, and supplemented by the letters dated
July 23 and August 27, 2015. The exemption and amendment were issued on
October 22, 2015, as part of a combined package to the licensee (ADAMS
Accession No. ML15254A194).
Dated at Rockville, Maryland, this 30th day of November 2015.
[[Page 76332]]
For the Nuclear Regulatory Commission.
Lawrence Burkhart,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of
New Reactors.
[FR Doc. 2015-30879 Filed 12-7-15; 8:45 am]